Date post: | 24-Jan-2016 |
Category: |
Documents |
Upload: | fitria-handamar |
View: | 228 times |
Download: | 1 times |
KPC COAL AGREEMENT AREAS
INDEX LOCATION MAP
KALIMANTAN
TANJUNG BARA
BENGALON
SANGATTA
BONTANG
KUTAI NATIONALPARK
SAMARINDA BLOCK
SANGKULIRANG
SAMARINDA
LEMBAK BLOCK
0 10 20 30 40 km
FIGURE 2
LAMPIRAN A
AGREEMENT AREAS
PT KALTIM PRIMA COAL
MINING AREAS, COAL PREPARATION AND HANDLING ANDCOAL TERMINAL FACILITIES
FIGURE 3
COAL TERMINALSTOCKPILESPOWERSTATION
SHIPLOADERS
GENERAL SERVICEWHARF
ACCESS ROAD
13 Km CONVEYORPREPARATION PLANTWORKSHOPMINE OFFICEWAREHOUSE
PIT JE WEST
CURRENT OPEN PITLOCATIONS
PINANG DOME
UNAFFECTEDCOAL DEPOSITS
PIT A
PIT B
C NORTH
H NORTH
PIT K
C SOUTH
SangattaBaru
H - SOUTH
E EAST
PIT D
SANGATT
APPROXIMATEZONE OF INFLUENCEOF AFFECTED COAL DEPOSITS
TANJUNG BARA
LAMPIRAN B
MINING AREA, COAL PREPARATION AND HANDLING COAL TERMINAL
PT KALTIM PRIMA COAL
EXTRA.DWG
PRIMA BLENDING
STOCKPILE
60000 TONNES
35000 TONNES
PINANG STOCKPILE
DIRTY COAL
7000 TONNES
WASHING PLANT
PRIMA CONVEYOR
ROM HAUL ROAD
AB
C
D
STOCKPILES IN THE CPP AREA
ROMDUMP
HOPPERS
OVERLAND
CONVEYOR
N
ROM STOCKPILEROM STOCKPILE
ROM STOCKPILE
ROM STOCKPILE
ROM-AREA
LAMPIRAN C
STOCKPILE IN CPP AREA
PT KALTIM PRIMA COAL
LAMPIRAN D
ROM ALLOCATION 2014
COAL MINING DEPARTMENT PT KALTIM PRIMA COAL
Inul Kwest Inul Middle Inul East Bendili Prima Pit J Pinang South
PR SN PL A1
Low Ash Low TS
BNMD, KD, MN, NU,
M2PANEL 8B, LAYANG
B2 P4, M1, NLGAYUS, PANEL 8A,
LAYANG EXT, MITHA
B2, BE, TM, NM L4, ML, JR INPIT PS70
B2, B2UR, PL P3, NU, NL, B2, KLTATA 1,
CHANIAGOHigh Ash Low TS
P7, P6, P5, MA, P2, P1, PNUR, SNUR
M3
BN, PU, U5, U1, PM
BN, PR1, BE, E2, E1, J4, TM
J2, J4
PU, PRLR, PRUR, DU, SN, SL
P4, FL, BRUR, KU, KDUR, KA, K1, DULR
INPIT AB
BE, U3MUSTAHIL (TM,
U3)
PERI (U3, U4) KHAYAL 2PERI (T2, U5,
TM, PM, NM), MELAWAN (T1,
PM)
KHAYAL 1 M1
PAMA PAMA PAMA PAMA PAMA PAMA PAMA B1
ALL DIRTY ALL DIRTY ALL DIRTY ALL DIRTY ALL DIRTY ALL DIRTY ALL DIRTY
A3, M5
D1
MELAWAN 1, MELAWAN 3
C4
ROMBENDILI In Pit ROMPIT JHATARI
COAL QUALITY
MELAWAN THIESS THIESS THIESS
THIESS
THIESS
PRIMA
PINANG
THIESS THIESS
DIRTY COAL
Low Ash High TS
High Ash High TS
K19, K17LR, K14UR, K14, K13
DU, P7, P6TATA 2, WAHAU,
TATA 3
THIESS
LAMPIRAN E
STOCKPILE CAPACITY 2014
COAL MINING DEPARTMENT PT KALTIM PRIMA COAL
LAMPIRAN F
ROM Stock Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Prima 32 32 32 32 32 32 132 132 132 132 132 132
Pinang 733 683 583 583 683 733 933 633 633 483 483 483
Melawan 194 144 144 344 344 344 244 144 244 314 164 164
Dirty 95 95 95 95 95 95 95 95 95 95 95 95
TOTAL 1,054 954 854 1,054 1,154 1,204 1,404 1,004 1,104 1,024 874 874
Stockpile Capacity
Prima 160 160 160 160 160 160 160 160 160 160 160 160
Pinang 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340
Melawan 1,380 1,380 1,380 1,380 1,380 1,380 1,380 1,380 1,380 1,380 1,380 1,380
Dirty 165 165 165 165 165 165 165 165 165 165 165 165
TOTAL 4,045 4,045 4,045 4,045 4,045 4,045 4,045 4,045 4,045 4,045 4,045 4,045
Remain Capacity
Prima 128 128 128 128 128 128 28 28 28 28 28 28
Pinang 1,607 1,657 1,757 1,757 1,657 1,607 1,407 1,707 1,707 1,857 1,857 1,857
Melawan 1,186 1,236 1,236 1,036 1,036 1,036 1,136 1,236 1,136 1,066 1,216 1,216
Dirty 70 70 70 70 70 70 70 70 70 70 70 70
TOTAL 2,991 3,091 3,191 2,991 2,891 2,841 2,641 3,041 2,941 3,021 3,171 3,171
COAL CHAIN FROM PITS TO SHIP
PT KALTIM PRIMA COAL
LAMPIRAN G
COAL CHAIN FROM PITS TO SHIP
PT KALTIM PRIMA COAL
LAMPIRAN H
PREPARATION PLANT
PT KALTIM PRIMA COAL
LAMPIRAN I
FLOW DIAGRAM COAL PRAEPARAATION
PT KALTIM PRIMA COAL
LAMPIRAN J
TANJUNG BARA COAL TERMINAL
PT KALTIM PRIMA COAL
LAMPIRAN K
LUBUK TUTUNG COAL STOCKPILE
PT KALTIM PRIMA COAL