Land Systems Division 1
Land Systems DivisionCapability Acquisition and Sustainment Group
The Road to Reform and Opportunities for Industry
Major General David CoghlanHead Land Systems
Land Systems Division 2
Scope
• New Government Policy and Defence Reform
• CASG’s Reform Journey
• Land Systems Division – What we do– Our current priorities– Industry opportunities– Reform and innovation initiatives
• Open forum
Land Systems Division 3
• The First Principles Review provided a clear strategy for reintegration of the acquisition and sustainment functions into the Department of Defence.
• A key recommendation was the abolition of the independent Defence Materiel Organisation and the creation of the Capability Acquisition and Sustainment Group within the Defence Department .
First Principles Review
Land Systems Division 4
• Released 25 February 2016
• White paper – explains how the Australian Government is investing in Australia’s defence capabilities.
– Increase in the Defence budget from $32.4 billion in FY2016-17 to $58.7 billion in FY2025-26
– Approximately $195 billion will be invested in our capabilities over the decade to 2025-26 in all aspects of Defence capability, a significant proportion of which will be spent in Australia
2016 Defence White Paper
Land Systems Division 5
Four key components:
•Delivering Defence capability through a more focussed and
coordinated relationship between Defence and industry
•A new approach to innovation by streamlining engagement
with industry and academia
•Driving competitiveness and export potential. Maximise
opportunities for competitive Australian businesses, build export
potential, depth of skills and diversification for Australian
defence industry
•Cutting red tape. Streamline tendering and contracting
procedures, rationalise industry programs and make it simpler
and less costly for industry to support Defence
Defence Industry Policy Statement
Land Systems Division 6
• For the first time, includes all Defence‐related investments.– 20‐year outlook, with greater
detail on first 10 years.
• Annual updates released with the Defence budget from 2017‐18.
• Builds consistency and predictability for Defence and industry.– Defence will work closely with
industry to inform industry planning.
Integrated Investment Program
Land Systems Division 7
The Capability Acquisition and Sustainment Group (CASG) seeks to partner with industry
to deliver Defence capability
Capability Acquisition and Sustainment Group
Land Systems Division 8
The CASG business plan 2015-17 provides guidance on how CASG partners with industry to deliver Defence capability.
Five Key goals to get us there
• Reform, implement and embed the First Principles Review recommendations
• Improve our relationship with our owners (Government) and customers (Capability Managers)
• Improve our strategic level partnerships with industry
• Achieve full cost and performance transparency of our projects and operations
• Develop, support and professionalise our people
CASG – Key goals
Land Systems Division 9
Improving the way we work with industry
• An increased role for industry in the delivery of Defence capability outcomes will require CASG to enhance its supplier management capability.
• Industry Intelligence and portfolio management of major industry suppliers– New capability to manage across the CASG and remove
sub-optimisation from management within ‘silos’:– Tiered ‘account management’ equivalent for Primes – Better leveraging of Primes across domains– Industry intelligence and– Market and supply chain awareness
Land Systems Division 10
• What is a Smart Buyer approach?
– Seeks to provide the best possible outcome for CASG’s customers, appropriate financial returns for our suppliers, and value for money outcomes for the taxpayer. In practice this means -
• Engaging with industry earlier
• Consolidating our approach to procurements
– Possibly more prime contracts that are responsible for acquisition and sustainment by handing over some functions to industry whereappropriate
– CASG will ensure our business structure and processes streamline the way we do business
• We are keen to reduce the cost burden to you and therefore ourselves
• We are keen to hear your opinions on how we can help and what wecan do to make thing better
Principles for CASG operation
Land Systems Division 11
Land Systems Division - Structure
Land Systems Division (LSD)acquires and sustains land materiel for the Australian
Defence Force.
Land Systems Division
Land Systems Division - Structure
Land Systems Division (LSD) acquires and sustains land materiel for the Australian Defence Force.
Land Systems Division 13
Land Systems Division 14
Integrated Soldier Systems Branch (ISSB) comprises five SPOs responsible for:• Armaments – Small Arms and Direct Fire Support Weapons• ADF clothing – Combat and Non-Combat • Soldier Modernisation – Body Armour, Load Carriage, Field Equipment, Chemical Biological
Radiological and Nuclear Defence, Aerial Delivery Equipment• Health Systems – Pharmaceuticals, Medical and Dental Equipment, Combat Rations• Diggerworks – Future Soldier Systems Development, Configuration and Integration
Key Projects• Land 40 Phase 2 Direct Fire Support Weapons
• Land 53 Phase 1BR NINOX Night Fighting Equipment - Technology Refresh
• Land 125 Phase 3C Soldier Systems Integration – Lethality
• Land 125 Phase 3B Soldier Enhancement – Survivability
• Land 125 Phase 4 Soldier Systems Integration – version 3
• Land 2110 Phase 1B Chemical, Biological, Radiological and Nuclear Defence
• Land 3025 Phase 1 Deployable Incident Response Regiment Capability
• Land 3025 Phase 2 Deployable Incident Response Regiment Capability
• JP 2060 Phase 3 Deployable Health
• Land 125 Phase 4 Integrated Soldier Systems
Integrated Soldier Systems
Land Systems Division 15
Initiatives• Defence Industry Forums• Prime Vendors
• Non Combat Clothing• Health Pharmaceuticals• Health Medical / Dental Consumables• Ration Packs• Armaments • Future – Soldier Combat Ensemble /
CBRN / Deployable Health• Adaptive Acquisition
Challenges• Large Number of Small to Medium Enterprises • Industry Capacity and Capability• Number of Industry Supply Agents
representing Overseas OEM
Key Messages• Early Engagement of Industry• Transparency in the way we work• Educate and then work with Industry• Performance Based Contracting
• Guarantee Cash flow • Enduring contracts extension
• Significant Media / Ministerial Scrutiny
ISSB Industry Engagement
Land Systems Division 16
• Small Arms Target RFT (Tranche 2) – to be released Q3 2018.• Polymer Weapon for Land 125 Phase 3C RFT – to be released Q3 2016.• Field Equipment
• Multi-tool – Army reviewing requirement – Open tender Dec 2016• Duffle Bags – Army reviewing requirement – Open tender Oct 2016
Face Paint, Camouflage – Mar / Apr 2016 • Procurement of Medical & Dental Equipment – seeking a Prime Vendor
– Open tender Sep 16• Combat Ration Packs – seeking Prime Vendor – Open tender Q3 2016
ISSB Future Outlook and Opportunities
Land Systems Division 1717
Land Systems Division 1818
Land Vehicle Systems Branch is responsible for sustaining Defence’s general service vehicles (green fleet) and commercial vehicles (white fleet) and acquiring and delivering the next generation of field vehicles, modules and trailers to the ADF under the multi-phased program LAND 121 (Overlander).
Key Projects
• LAND 121 Phase 3A Lightweight and Light Vehicles and Trailers
• LAND 121 Phase 3B Medium and Heavy Vehicles and Trailers
• LAND 121 Phase 4 Protected Mobility Vehicles – Light
• LAND 121 Phase 5B Medium and Heavy Vehicles and Trailers
• JP157 Phase 1 National Support Base Aviation Refuelling Vehicles
Land Vehicle Systems
Land Systems Division 1919
Initiatives• Use of Whole of Australian
Government (WoAG) agreements for ‘Smart Buying’ of commercial vehicles.
• Consolidation of many small standing-offer contracts for similar products (e.g. tyres)
• Increased use of OEMs for key equipment support through strategic agreements
Challenges• Ageing fleets need to be sustained
until new capability arrives• Various integrated logistics support
models need to be standardised• Smart Sustainment initiatives continue
to be implemented
LVSB Industry Engagement
Key Messages• WoAG procurement saves time
and money• Industry best-practice
innovations are to be thoroughly explored – performance-based contracting
• Industry should be involved early in project and contract management
Land Systems Division 2020
• LVSB encourages small/medium enterprises to engage directly with the prime contractors that support our acquisition projects and legacy vehicle and trailer fleets.
• For example:– Rheinmetall MAN Military Vehicles Australia (LAND 121 Phase 3B) is establishing a
Global Supply Chain agreement to enhance Australian subcontractor engagement– Thales Australia (LAND 121 Phase 4) is still finalising its supplier arrangements.
• Other opportunities may include:– Patrol Motor Cycle (PMC) - quantity 60
• Defence is currently reviewing its requirement. • Timing for the Approach To Market is yet to be confirmed (estimated for FY16/17)
– Deployable All Terrain Vehicles (ATV) – quantity 184• 6x6 variant –quantity 142; and 4x4 variant – quantity 42. • Defence is currently reviewing its requirement.• Timing for the Approach To Market is yet to be confirmed (estimated for FY19/20). • All Terrain Vehicles • Trailers
• Quantity 20 to transport the ATV• Quantity 50 to carry stores behind the ATV
LVSB Future Outlook and Opportunities
Land Systems Division 2121
Land Systems Division 2222
Land Manoeuvre Systems Branch (LMSB) comprises four SPOs responsible for:• Mounted Combat • Combat Support Vehicles• Combat Support• General Support
Key Projects• LAND 19 Phase 7A C-RAM
• LAND 116 Phase 3 Bushranger
• LAND 17 Phase 1C1 Additional Lightweight Towed Howitzers
• LAND 136 Phase 1 Land Force Mortar Replacement
• LAND 907 Phase 1 Main Battle Tank Replacement
• LAND 998 Phase 1 Replacement Aviation Fire Trucks
• LAND 155 Phase 1 Enhanced Gap Crossing Capability
• JP 2097 Phase 1B Enhancements to Special Operations
Land Manoeuvre Systems
Land Systems Division 2323
Initiatives• PMV Modernisation/Baseline:
• Vehicle kits• Armour• APU• RWS
• Commodity Reform Program• Managing Contractor – LAND 155• Performance Based Contract – PMV• Life of Type Management Planning for A Vehicles
Challenges• Breadth of materiel:
• Platforms/systems/commodities • Ageing Fleets• First Principles Review Transformation• Digitisation for Indirect Fires and Platform
integration
Key Messages• Close collaboration with key
industry partners• Listen to Industry and
incorporate their feedback. • Performance Based
Contracting:• Guarantee cash flow • Value enduring contracts
extension
LMSB Industry Engagement
Land Systems Division 2424
•On Pavement Forklifts lease - Engagement with SG Fleet (Whole of Government leasing contract).•CA05 - Ground Surveillance Radar. Possible contract for support and heavy grade repair (Q2/3 2016).•L19 Phase 7B Short Range Ground Based Air Defence - Acquisition strategy to be finalised. Potential for Prime Systems Integrator and materiel supplies. •Land 8120 Engineer Support Platforms (IIP) – Scope being developed in conjunction with Army – potential for fleet management services and individual equipment procurement.•Land 8140 Phase 1 Deployable Force Infrastructure (IIP) – Scope being developed in conjunction with Army – potential for single delivery manager or a range of field products to be sourced.
LMSB Future Outlook and Opportunities
Land Systems Division 2525
COMBINEDA R M S F I G H T I N G S Y S T E M
Land Systems Division 2626
Combined Arms Fighting System (CAFS) manages LAND 400
• LAND 400 will acquire the armoured fighting vehicles systems to deliver the mounted close combat capability to the Land Force.
LAND 400 – Land Combat Vehicle System
• Phase 1: Project Scoping Study (complete)
• Phase 2: Mounted Combat Reconnaissance Capability (ASLAV replacement)
• Phase 3: Mounted Close Combat Capability(M113 replacement)
• Phase 4: Integrated Training System
Combined Arms Fighting System
Land Systems Division 2727
CAFS Future Outlook and Opportunities
• Phase 2:
• BAES AMV and Rheinmetall Boxer have been selected for evaluation in the Phase 2 Risk Mitigation Activity.
• Risk Mitigation Activities (2016-2017) comprising:• Test and Evaluation Activities• Improvement of AIC opportunities• Cost/Capability tradeoff analysis
• Government Second Pass Consideration (2018)
Land Systems Division 2828
CAFS Future Outlook and Opportunities
• Phase 3:
• RFI evaluation complete (debrief opportunities during Land Forces 2016)
• Program Timeframe of 2019-2032
• Phase 4. The 2016 IIP identifies:
• Program Timeframe of 2023-2032
• Architecture / framework being established in 2016
Land Systems Division 2929
Initiatives
• LAND 400 Industry Portal, regular Industry briefings through a wide range of forums (ASPI, Land Environment Working Group etc).
• Dedicated website for direct communication.• Engagement with Industry bodies (AIDN, ICN) and
State Government Industry bodies.• Independent review of Phase 2 RMA AII activities.• Deloitte
– ‘Strong and clear alignment’– RMA enhancements
• AIC Roadmap has been delivered by BAES and Rheinmetall.
Challenges
• Optimising Australian Industry involvement.• Managing expectations in a fluid/changing
environment.• Balancing Industry and Government / Defence
expectations.
Key Messages
• L400-2 RFT progressing – Stage 2 Risk Mitigation Activities (RMA) commenced 18 Aug 16.
• Listening to Industry and incorporating their feedback.
• Fairness and openness with Industry.
• Early engagement - tell Industry what is going on in a timely manner.
• Deloitte Review of RMA AII activities publicly released by MDIND on 28 Jul 16.
• Australian Industry showcase opportunities planned for Q4 2016.
CAFS Industry Engagement
Land Systems Division
CAFS Australian Industry Involvement
• Deloitte Australia completed Review on 30 June 2017 and found clear alignment with Government policy direction.
• Recommendations from Review:– Costed options for differing levels of Australian industry participation.– Develop an Opportunity Roadmap for Australian Industry (Q4 2016).– Defence facilitated workshops in all states for Australian industry to
showcase their capabilities (Q4 2016).– Scope options for placement of Australian university technical
graduates.• RMA Contract changes for both shortlisted tenderers:
– Contractual obligations to deliver the four recommendations above.– AIC Plans to include MOUs between the tenderer and Australian
industry subcontractors.– Obligation to establish Design Authority Function in Australia.
Land Systems Division 31
Land Systems Division
Land Engineering Agency
LEA’s primary role is to provide engineering resources and capability to support project and sustainment activities within the System Program Offices (SPOs) of Land Systems Division.
LEA does this by providing systems, processes and physical capability to ensure compliance with the Army Technical Regulatory Framework to ensure that equipment is:• Fit for service• Safe to operate• Environmentally compliant
Land Systems Division
At a glance:
• ‘Outposted’ model – Direct support to Projects & Sustainment in LSD Branches
• 7 Directorates – (~153 core staff & ~340 outposted) - Includes 248 engineers and 245 technical staff
• Providing engineering capabilities– Design– Testing– Prototyping– Configuration Management– Drafting– Specialist Engineering
Land Engineering Agency
33
Land Systems Division
Directorate Systems Engineering and Integration (DSEI)• DSEI provides wide ranging engineering support to LSD System Program Offices in niche technologies and capabilities that are more efficiently delivered from a centralised model.
• DSEI provides services across LSD in Configuration Management, Drafting and Specialist Engineering including Safety, Integration, Reliability and Maintainability, Survivability, Electronic Warfare and Communications.
Directorate Systems Engineering and Integration (DSEI)
34
Land Systems Division
Weapons/Lethality
Mobility
RAMConfiguration Management
Electrical Power
Electronics/ Communications/ EW
3D Modelling
Engineering Analysis/Simulation
SurvivabilitySoftware
Human Factors
Optics
Directorate Systems Engineering and Integration (DSEI)
35
Land Systems Division
RADHAZ
EMI / EMC
ANTENNA CO‐SITE ANALYSIS ANTENNA PERFORMANCE
ANTENNA PLACEMENT OPTIMISATION
DSEI – Electromagnetic Modelling
36
Land Systems Division
DSEI – Survivability, Mine Blast & Ballistic Modelling & Testing
37
Land Systems Division
Land Engineering Agency Test Capability -LEA Proving Ground Monegeetta
• The test capability includes vehicle performance and endurance testing, Electromagnetic Interference and Compatibility, Electro-Optics and Thermal Imaging Testing, Climatic Testing, Mechanical testing, Weapons testing, Field Data Acquisition and High Speed Video in support of blast testing.
Directorate of Prototype and Test Services (DPTS)
38
Land Systems Division 39
Land Systems Division
Communications & Interoperability Testing
Electro Optics & Thermal Imaging
Electronics & Communications Laboratory
40
Land Systems Division
Climatic Testing
Heavy Vibration Facility
Mechanical & Environmental Laboratory
41
Land Systems Division
Enclosed Light Armaments Facility
Data Acquisition & Analysis
Data Acquisition & Analysis Laboratory
42
Land Systems Division
Automotive Performance Laboratory
43
Land Systems Division 44
LSD Initiatives
•Aerial Delivery Equipment & Adventure Training Equipment Prime Vendor•L125 Phase3B Soldier Combat Ensemble Prime Vendor•Contract Reform: Night Fighting Equipment Management•Pharmaceuticals and Medical & Dental Consumables Prime Vendor•Combat Rations Prime Vendor•Prototype Engineering Centre relocation•C and D Vehicle Fleet Rationalisation and Contracted Management•Commodity Reform Program•LAND 155 Enhanced GAP Crossing Managing Contractor•Extended PMV and ASLAV / Tank Contracted Management Activities•Deliver JP157 through a Managed Contractor model•Engagement of Integrated Support Contractor for ILS
Land Systems Division 45
Summary
• As part of Defence and CASG’s reform journey, LSD is changing.
• In partnership with Industry we seek to fully implement a Smart Buyer approach.
• We are already a Smart Buyer in many ways. However, we can get better and need your help in doing so – your feedback is essential.
Land Systems Division 46
Questions