Land use transformation along the BRT corridor – Ahmedabad Prof. Nitika Bhakuni, Prof. H.M. Shivanand Swamy , Swapna Ann Wilson CEPT University Ahmedabad
Transcript
Page 1: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Land use transformation along the BRT corridor – Ahmedabad

Prof. Nitika Bhakuni, Prof. H.M. Shivanand Swamy , Swapna Ann Wilson

CEPT University

Ahmedabad

Page 2: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Hypothesis

• “Land market has a tendency to place a higher premium on parcels that are in close proximity to the transit corridors due to the travel time saving and hence the land use transformation along the transit corridors is evident.”

Page 3: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Objectives

• Study the land-use changes induced by the introduction of BRT in Ahmedabad.▫ Built Form▫ Land use▫ Property values

• Understand the implication of these changes-▫ Urban poor ▫ Transit supportive uses

Page 4: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

LEGEND

RESIDENTIAL

INDUSTRIAL

INSTITUTIONAL

AHMEDABAD -LANDUSE PLAN

Chandkheda

Naroda village

Odhav

Bopal

Narol

Kalupur Rly. Stn.

Maninagar Rly. stn.

RanipSola RoB

Shivranjani Nehrunagar

AECNaroda

Soni ni chaali

Ahmedabad Airport.

Naroda GIDC

Odhav Industrial estate

Vatva Industrial estate

Gandhigram Rly. stn

Sabarmati Rly. stn

Gujarat University

BRT Ahmedabad

RTORailway Stations

GSRTC terminals

Airport

University/ educational campus

Industrial estatesGeeta Mandir

Phase 1 corridors (58 kms.)

Phase 2 corridors (30.5 kms.)

Study Area (25.67Km)

RTO to Soni ni Challi

Total Number of bus stops- 52

Page 5: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Total Bus stops - 41

STUDY AREA

Section No

Corridor Total Area(Km

2)

Total Length (Km)

1 RTO to Akhbarnagar 1.6 1.9

2 Akhbarnagar to Helmet 1.5 3.3

3 Helmet to Shivranjini 2 2.7

4 Shivaranjini to Chandranagar

2.4 4.7

5 Danilimda to CTM 5.8 9.9

6 CTM to Sonini Chali 2.3 3.17

Total Study Area 15.6 25.67

Page 6: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Change in Built Up West stretch

East stretch

Total Plots Surveyed – 2430New built Up -10

Page 7: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Built Up

Open

Vacant

2006

BUILT UP, OPEN AND VACANT -2006

Page 8: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

BUILT UP, OPEN AND VACANT -2010

Built Up

Open

Vacant

2010

Page 9: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Helmet Cross Roads

Page 10: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Change in Built form West stretch

East stretch

Page 11: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

LegendFloor Height(ft) 2006

Above G+5

G+5

G+4

G+3

G+2

G+1

Ground Floor

Vacant

Building Height- 2006

Page 12: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

LegendFloor Height(ft) 2010

Above G+5

G+5

G+4

G+3

G+2

G+1

Ground Floor

Vacant

Building Height- 2010

Page 13: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

LegendFloor Height(ft) 2006

Above G+5

G+5

G+4

G+3

G+2

G+1

Ground Floor

Vacant

West Stretch - 2006

Shivranjani Cross Roads

Page 14: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

LegendFloor Height(ft) 2010

Above G+5

G+5

G+4

G+3

G+2

G+1

Ground Floor

Vacant

West Stretch - 2010

Shivranjani Cross Roads

Page 15: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

LegendFloor Height(ft) 2006

Above G+5

G+5

G+4

G+3

G+2

G+1

Ground Floor

Vacant

East Stretch - 2006

Page 16: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

LegendFloor Height(ft) 2010

Above G+5

G+5

G+4

G+3

G+2

G+1

Ground Floor

Vacant

East Stretch - 2010

Page 17: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Land Use Change West stretch

East stretch

Page 18: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Landuse (2006)

Residential

Commercial

Industry

Public

Open Space

Vacant

LANDUSE-2006

Page 19: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

LANDUSE-2010

Landuse (2010)

Residential

Commercial

Industry

Public

Open Space

Vacant

Page 20: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Land Use Change

Both Residential areas and Commercial areas being converted to industrial ( Service and Light, Automobile) on the eastern side of river.

Public areas increase as vacant lands and slums converted to Public.

Page 21: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Changes in Sub-category Land use West stretch

East stretch

Page 22: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

CHANGE IN SUB CATEGORY RESIDENTIAL-2006

Page 23: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

CHANGE IN SUB CATEGORY RESIDENTIAL-2010

No of Slums in 2006-231

Slums in 2010- 128

Slum To Number

Appartment 25

Commercial 4

Mixed 13

Public 5

Service and Light Industry

40

Tenament 16

Page 24: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

No of Polygons

45

154

96

15

Land use Change Vs Passenger Numbers – West Side

Page 25: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

No of Polygons

140

316

313

15

Land use Change Vs Passenger Numbers – East Side

Page 26: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Buffer150 250 350

1 3 0

0 3 5

4 8 6

14 11 9

Akbarnagar bus stop

Average Boarding/Day- 3065

Page 27: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Buffer150 250 350

2 0 0

2 1 0

2 1 0

3 0 5

Memnagar bus stop

Average Boarding/Day- 2681

Page 28: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Buffer150 250 350

0 0 1

0 12 2

15 18 10

2 16 4

Shivranjani, Nehru Nagar and Anjali bus stop

Page 29: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Buffer150 250 350

0 3 6

1 29 13

7 46 15

7 8 27

Danilimda, Narol bus stop

Page 30: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Buffer150 250 350

0 0 0

42 20 17

45 32 36

6 3 1

CTM, Jogeshwari Society, Soni ni Chali stop

Page 31: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Changes in Property Value

Page 32: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Implication• Urban Poor▫ Affordability of housing and accessibility issues may emerge in

future. Shortage of affordable housing in the eastern side of the city.

• Transit Supportive uses▫ Change in land use especially towards non transit supportive in

the eastern of the river needs to be checked. Unfavorable trend for Transit Oriented Development.

• Land values▫ Land prices in overall city have increase phenomenally. ▫ Although there is an increase in land values it is too soon to link it

to transit as the BRT has been operational for just over one year.

Page 33: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi

Thank You