Your Partner in Competitive Solutions Your Partner in Competitive Solutions
TABLE OF CONTENTTABLE OF CONTENT
INTRODUCTIONINTRODUCTION
OVERHAUL PROCESSOVERHAUL PROCESS
DOCUMENT REQUIREDDOCUMENT REQUIRED
TIME LINETIME LINE
TOOLSTOOLS
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
I N T R O D U C T I O NI N T R O D U C T I O N
OVERHAUL PROCESS
DOCUMENTS REQUIRED
TOOL AND EQUIPMENT
TIME LINE
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
INTRODUCTION INTRODUCTION
The landing gear system on a conventional aircraft tricycle configuration consisting of a nose landing gear and left and right main landing gear.
Each landing gear includes a shock strut with two wheel and tire assemblies.
Each main landing gear wheel is equipped with a brake assembly with anti-skid protection and it is located in the lower left and right wing area adjacent to midfuselage.
The nose landing gear is steerable and it is located in the lower forward fuselage.
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
INTRODUCTION INTRODUCTION landing gear structurelanding gear structure
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
OVERHAUL PROCESSOVERHAUL PROCESS
DOCUMENT REQUIRED
TOOL AND EQUIPMENT
TIME LINE
INTRODUCTION
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
OVERHAUL PROCESSOVERHAUL PROCESS
ENTRY CLEANINGDISASSEMBLY INSPECTION
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
OVERHAUL PROCESSOVERHAUL PROCESS
REPAIR/REBUILT ASSEMBLY PACKINGTESTING
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
STEP 1 Use digital pictures taken from all aspects to provide a permanent record of what is actually received.
OVERHAUL PROCESS
STEP 4 Paint is removed utilizing a blast cabinet and the media used is plastic chips which only remove the paint. The cadmium will be removed later by chemical strip.
STEP 5 Parts are inspected and a detailed ICR (incoming condition report) is made and compared to the design allowances. The engineering department after review of the ICR selects those operations necessary to repair the part and prints a routing for that
specific part and serial number.
STEP 2 Disassemble into individual components and the part numbers and serial numbers are recorded. The actual part numbers and serial numbers are compared to the Trace paperwork furnished by the customer.
STEP 3 Parts are cleaned and bushings removed from those parts that have bushings. All bushings are removed and discarded.
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
STEP 5 Parts are non-destructive tested for cracks by magnetic
particle inspection or by penetrant inspection.
OVERHAUL PROCESS
STEP 8 All the landing gear hydraulic system components are tested after final assembly. The landing gear is put in a special hydraulic press to compress the shock for testing proposes. After the testing procedure, the shock absorber is deflated to a reduced pressure for shipping.
STEP 9 The landing gear are being packed using bubble wrap to avoid from vibration and as surface protection.
STEP 6 Parts are sent based on their specific routing to the machine shop or plating as required. Chrome-plated surfaces are inspected and replated with the correct specification process if needed.Then, the parts are shotpeened and stripped and thus being inspected by magnetic particle again.
STEP 7 New bushings are installed. The new bushings are made to the exact size for the part after all of it’s rework. If the landing gear components are found Part is prime painted and top coat painted and thus being sent for assembly.
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
DOCUMENTS REQUIREDDOCUMENTS REQUIRED
TIME LINE
INTRODUCTION
OVERHAUL PROCESS
TOOL AND EQUIPMENT
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
DOCUMENTS REQUIREDDOCUMENTS REQUIRED
ENTRY
CONTRACT
PURCHASE ORDER (PO)
AGREEMENT
CONTRACT
PURCHASE ORDER (PO)
AGREEMENT
DISASSEMBLY
COMPONENT OVERHAUL MANUAL COMPONENT OVERHAUL MANUAL
CLEANING
MATERIAL SAFETY DATA SHEET (MSDS)
COMPONENT OVERHAUL MANUAL
MATERIAL SAFETY DATA SHEET (MSDS)
COMPONENT OVERHAUL MANUAL
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
DOCUMENTS REQUIREDDOCUMENTS REQUIRED
INSPECTION
COMPONENT OVERHAUL MANUAL COMPONENT OVERHAUL MANUAL
REPAIR/REBUILT
COMPONENT OVERHAUL MANUAL COMPONENT OVERHAUL MANUAL
ASSEMBLY
COMPONENT OVERHAUL MANUAL COMPONENT OVERHAUL MANUAL
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
TOOL AND EQUIPMENTTOOL AND EQUIPMENT
INTRODUCTION
OVERHAUL PROCESS
DOCUMENTS REQUIRED
TIME LINE
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
TOOL AND EQUIPMENTTOOL AND EQUIPMENT
FORKLIFTFORKLIFT5 TONNE OVERHEAD CRANE5 TONNE OVERHEAD CRANE ARDROX 6085ARDROX 6085
MAGNETIC PARTICLE INSPECTION MACHINEMAGNETIC PARTICLE INSPECTION MACHINE
CLOSED CIRCUIT BLASTING MACHINE
CLOSED CIRCUIT BLASTING MACHINE
BORE MACHINEBORE MACHINE
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
TOOL AND EQUIPMENTTOOL AND EQUIPMENT
CHROME PLATING MACHINECHROME PLATING MACHINE SUPERSONIC PARTICLE DEPOSITION (SPD)
SUPERSONIC PARTICLE DEPOSITION (SPD)
BUBBLE WRAPBUBBLE WRAP
SAMPLING BOTTLE FOR OLEO FLUID
SAMPLING BOTTLE FOR OLEO FLUID
METAL TAGGINGMETAL TAGGING
WATER DEMINERALIZATION
WATER DEMINERALIZATION
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
TIME LINE
INTRODUCTION
OVERHAUL PROCESS
DOCUMENTS REQUIRED
TOOL AND EQUIPMENT
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
TIME LINETIME LINE
NO. DESCRIPTION OPERATOR HOURS
MAN POWER REQUIRED
1. ENTRY: DOCUMENT
UNPACKING VISUAL INSPECTION PHOTO CAPTURE
1 day 2
2. DIASSEMBLY: SAMPLE COLLECTED DIASSEMBLE PARTS PAINT STRIPPING
1 ½ days 2
3. CLEANING: ALKALINE/ACIDIC LEVEL CHECK DEIONIZED PROCESS METAL TAGGING
2 ½ days 2
4. INSPECTION: MPI/DPI INSPECTOR LEVEL 2 CHECK
1 day 2
5. REPAIR/REBUILT: DOCUMENT
UNPACKING VISUAL INSPECTION PHOTO CAPTURE
1 day 3
Your Partner in Competitive Solutions Your Partner in Competitive Solutions
TIME LINETIME LINE
NO. DESCRIPTION OPERATOR HOURS
MAN POWER REQUIRED
6. ASSEMBLY: ASSEMBLE PARTS 1 day 1
2. TESTING: FUNCTIONAL & OPERATIONAL TEST
1 day 2
3. PACKING: PACKING USING BUBBLE WRAP 1 day 2