LAND RECLAMATION&.
AFFORESTATION PROGRAMME PLAN
AREA 10.0 HECTS.
FOREST RA~JGE JATARA
FOREST DIVISION TIKAMGARH
FOREST BLOCK GHURA - "A"
'--" COtv1PARTi"1ENT NO. P-316
APPLICANT :-MIs Khajuraho Minerals Pvt. Ltd.
6th km 5292: Road: ViI!age - ~h~d~r:P.O. & Distt-Chhatarpur (M.P.)Ph-(07682) 222751 ?d 1 r::;RQ. ,-- ..••.. , - ''''-'-'-
Prepared by :-Betrem Singh Associates Pvt. Ltd.---
Regd. No. : RQPIJBP/J 05/2003/BChopra Colony, P.O.- lvict;har
Distt. : Sarna (M.P.) Pin: 485771Phone: (07674)232473
.'.':~' ...' _ ..
"-"
'-.../
RECLAMATION PLAN
OF.
GHURA - "A" PYROPHYLLITE & DIASPORE DEPOSIT
AREA - 10.0 HECTS.
DETAILS OF FOREST LAND :-
FOREST RANGE JATARA
FOFFST DIVISION \1 K I\MCh~Rl:I
FOREST BLOCKI
GHURA - "A"
STATE MADHY A PRADESH
FOREST COMPARTMENT NO. P-316ar!
AREA 10.0 HECTS.
Mis. Khajuraho Minerals Pvt. Ltd., Chhatarpur has applied for grant of
mining lease over 10 ha area in Compartment no. P-316, Forest Block-Ghura - "A",
of Forest Range- Jatara, Forest Division -Tj\(aM(;\ARH ;: M.P.)
The St3te Gcvernrnent of ~.P. ~3S given in-p;:;.~:p~e CG!!5c!:t f·:·;- g:-c::t of :T::f:ing
lease to the lessee. The area being forest land, approval under Section-2 of FCA
1980 is mandatory. A letter of intent communicating precise area has been issued by
the State Government vide letter No.- 2-157jiiji2ii Bhopal Dated- 20.09.2011 for
taking forest approval under Section-2 of FCA 1980 and hence is appiying for
diversion of the forest land under Section -2 of FCA 1980 for non forest use. The
applicant requires the said M.L. for consumption of minerals in modern refractory,
pesticides, rubber, paint, cosmetics, soap, detergents and handicraft industries.
Diaspore is used for manufacture of high alumina bricks to curtail the imports,
Ceramic being the basic ancillary to the steel industry. India needs increasing
amounts of these minerals. Besides the applicant also intends to use the mineral in
own captive industry proposed to be setup.
LAND RECLAMATION :-
Since land resources are limited and scarce, the degraded land is
proposed to be reclaimed and made fit for reuse. The reclaimed land is proposed to
be revegetated. The fertility of the soil would be improved by application of suitable
fertilizer/me nu res.
The major part of the lease area i.e. mineable area will be backfilled
which will be started after mining the total depth of mineralization. After back filling,
the reclamation progress would commerce. During mining a reversal in the sequence
of beds may take place which can be systematized by proper reclamation planning.
This could be done during actual operation by closely monitoring the situation.
TECHNICAL RECLAMATION :-
The OBI waste generated during the course of mining will be
backfilled and leveled. The courser material vvil! be filled first and then finer materia!------
will be put on it. The soil will be filled in the holes dug for. plantatlcn. The leveled
area will be divided in to plots of one hects. separated by 3 m\ wide roads. A series of
bunds will hold water and facilitate removal of suspended solid. The side slopes of
the internal dump, would also be flattened.
BIOLOGICAL RECLAMATION :-
On the top of the ieveiied area once the plots are reaov. area would be
afforested. Pits 30-50 cm dia and about 50 cm deep would be dug. Depending on the
type of the soil and type of plant species the interval between the pits would be filled
with' a mixture of soil and manure. sapp!ings would then be planted at the
commencement of monsoon. As far as practical watering arrangement during dry
season would be provided.
EXCAVATION OF 08 I WASTE:-
Total applied area
Mineable area
1,00,000 sqm
90,000 sqm
Totai excavation 7,50,000 cum
OB/Soil
Pyrophyllite & Diaspore
6,0-0,000 cum
1,50,000 cum
'-'"
The topography of the appl ied area is hilly. The backfilling will be done in
such a way that a levelled surface is maintained at the end.
RECLAIMING MATERIAL :-
Mine waste
20,000 cum
5,80,000 cum
6,00,000 cum
OB/soil
Total
Taking swell factor as 40 % and compaction factor as 20%, total reclaiming
I material = 1.40 x 0.80 x 6,00,000 rn ' = say 6,60,000 m'
'--"PROGRAMME OF RECLAMATION 8. PHASING OUT OF WORKS :-
Reclamation will start simultaneously along with thernining operations.
Reclamation will start after complete exhaustion of the mineral, as per programme given
below:-
SEQUENCE OF BACK FILLING :-
Mine waste with coarser material will be back filled first and finer
material above it.
I Year I Working I Plantation Reclamation I I I(Sqm.) (Sqm.) (Sqm.) (Soil m') (Mine waste m')
1-5 YR. I 15,000 I 3,OGG I - I 400 I 1,00,000 I(:)-1 U Y K. 1),000 3 11011 I
4:~0~ .-1 400' 1,00,000
11-15 YR. 15,000 400 1,00,000I
16-20 YR. . 15,000 30,000 30,000 400 1,00,000 I21-25 YR~ 15,000 30,000 30,000 400 1,00,900 1
I.I
26-30 YR 15,000 30,000 30,000 80,000 I- ITOTAL . 90,000 1,00,000 90,000 I 20,000 580000 !
I I I
PLANTATION TYPE OF TREES
Year No. of TArea mL Survival rate Local Name ! Botanicali I nameII II
1-5 YR. 600 I 3,000 80% Type of species wili be
6-10 YR. 600 3,000 80%decided by the forestdepartment.
II-IS YR. 800 4,000 80%
I 16-20 YR. 6,000 I 30,000 80%II I
171_7';YR 6,000 I 30,000 180% !I .- A --' ..•....•..••.• , :!i 26-30 YR. 16,000 30,000 i 80%
PROGRAMME OF AFFORESTATION :-
FINANCIAL OUTLAYS:-
The roral investment of land reclamation will be' divided into two
components
(a) Technical reclamation :-
This includes simultaneous backfilling of waste and soii by labour, levelling
and grading of the ground, making side slopes, contour paths etc.
(b) . Biologica! rec!amation :-
Biological reclamation cost includes preparation of the ground, cost of sapplings
its plantation and maintenance for five year and fencing around the plantation
The total applied area of 10.O hects. will be afforested out of this mineable area is
9.00 hects. and balance 1.0 Heets. is barrier zone. Reclamation will only be
required in 9.00 Hects. applied area.
--'
"-"
"--
COST OF RECLAMATION AND PLANTATION :-
(a) Technical Reclamation :-
(i) Simultaneous backfilling of soil/waste :-
This will be done by labour force in support of excavator cum loader!
scrapper simultaneously in 9.00 hects. About 6,00,000 m' of soil/waste
will be backfilled.
Expected cost = say 1,00,00,000/- [i]
(1'1') Th-l's u;i 11 hi> rlrmp h" tr<>rtrw fittprl lll1th thp scrapper and leveler R., dozer.•................. _...., •....__ '-"J •...•.•...•.~ •."' .&...1.•.•..••••..••..•. ",. A •..•••. .1........ .......lU _a_", __ _ -- .
(iii)
This will be engaged for about 300 days.
Towards cost of tractor and dozer per day Rs. 2000 /-
so cost for days = 2000 x 300 = 6.00.000 t.• - - I
1,000 man days will required for the execution of above
mentioned works. Hence the cost of 1000 man days x ISO/man days
[ii]
1,50,000/-
[iii]
So total cost of Technical
reclamation per hects. lil + [ii] + [iii]
1,00,00,000/- + 6,00,000/- + 1,50,000!-
1,07,50,000/- Rs. [A]
BIOLOGICAL RECLAMATION :-
(i) Preparation of ground :-
This includes marking of pits of size 30cm x 50 em and during diggjng 20,000
pits (Avg.) in 10.0 hects. 100 man days will be required for marking the position
of the proposed pits hence cost.
100 man days x 150 = 15000/-
Cost of digging of 100 pits =Rs. 50001-,Hence 20,000 pits in 10.0 heets will
cost 5000 x 200 = Rs. 10,00,000 t..hence cost in preparation of pits in 10.0 hects.
ofground = 15,000/- + 10,00,000/- = 10,15,000/- = Say 11.0 Lac [i)
o
(ii) Cost of sappling and its plantation :-
Sappl ing will be purchased from nursery. The cost of above factors includes cost
of tress, application of fertile soil and manures, plantation of trees, application of
water and safety etc.
Cost of tree 20,O()() in numbers 2,00,000/-
Transportation of trees = 25,000/-
Cost of application of fertile'--"
soil and manure including
transportation, labour and cost
of manure etc. 5,00,000/-
Total cost = 2,00,000 /- + 25,000 /- + 5,00,000/- = 7,25,000/- [ii]
(iii) Miscellaneous expenses 1,00,000/- [iii]
'-"'
(iv) . Safety and maintenance of trees will be done by the mine guard.
So the total cost of biological reclamation = (i) + (ii) + (iii)
- 11,00,000/- + 7,25,000 /- + 1,00,000/-
19,25,000/-
HENCE TOTAL COST OF TECHNICAL RECLAMATION s 810LOGICAL
RECLAMATION ETC. :-
( II I -l- (PI\' 'J . \'-'J
1,07,50,000/- + 19,25,000/-
1,26,75,000/- (1)
(C) FENCING AROUND THE LEASE AREA IN 900 M PERIPHERY LENGTH :-
(a) Cost of barbed wire :-
Cost per meter = 125 !-
4 rows of barbed wire will be provided, hence total length of barbed WIre
required 900m x 4 = 3,600 m. Hence cost of barbed wire =
3,600 x 125 = 4,50,000 1-
{hi,-/ J:;'1<l(lctnnp n;l1<lrc _..•."'-b u'"'-'.•..•.••..y _..1. u
.:»:
This will provided at interval of 6m for supporting wire hence number of
pillars.
Required = 900 1 6m
Cost of one pillars
Hence cost of 150 pillars
150 Numbers.\
Rs. 45 /-
= 150 x 45 = 6,7001-
(c) Labour cost :-
Minimum wages of unskilled labour per day = 1501- per days.
Total number of m~n days required will be 50 for erection of pillars and
stretching of wire, hence cost oflabour 50 x 150 = 7,500 1-
Hence total cost of fencing (a) + (b) + (c)
4,50,0001- + 6,700 1-+ 7,500 1-
4,64,200/-
Say = 5,00,000 1- (2)
Hence Total cost of reclamation, plantation including fencing, safety
measures taken etc. in 10.0 heets. area (1) + (2)
1,26,75,0.001- + 5,00,000/-
1,31,75,0001-
~:
ABSTRACT OF PHYSICAL AND FINANCIAL OUT-LAYS :-
Year Working Reclamation .Plantation
(Area m") (Area m-) Cost (Area m") Cost (in Rs.)
1-5 YR. 15,000 I 3,000 57,750I i - -
I 6-10 YR. 15,000 - - 3,000 57,750
11-15 YR. 15,000 - - 4,000 77,000
16-20 YR. 15,000 30,000 35,80.000 30,000 5,77,500
21-25 YR. 1 " ()()() 30,000 35,80,000 '1{\ {\{\{\ 5,77,500! I .l.J,vvv I I JV,VVV II I I
! 26-30 YR. I 15,000 ! 30,000 35,90,000 ! 30,000 I 5,77,500I
I I ii TOTAL I 90,000 i 90,000 1,07,50,UUO I 1,00,000 I 19,25,000I I I Ii i
'-...: Hence total cost of reclamation and plantation will be
Adding cost of fencing
10750000/- + 19,25,000/-
1,26,75,000/-
1,26,75,000/- + 5,00,000 /-
1,31,75,000/-
To maintain the ecological balance and nature, land reclamation and
afforestation is obligatory. A significant awareness has been generated
on environment and reclamation of land is being adopted and has gained momentum.
Since land is a basic resource, the reclamation of land has been considered as a part of
mining system and the applicant after grant of mining lease will take ali after cares to
protect the trees and monitor the implementation of the programme.
Applicant :-
- .: t., \ J
Sa/ram Singh AssociJtJs Pvt/Ltd.
Regd. N0. : RQPIJBPIl OS/2003/B
"../
~·'rueCopy.·kHAJURAhO M1NERALS~
Land Reclamation I Afforestation Programme Plall- . ,- p4 9fRE9'oR .EncJ :