+ All Categories
Home > Documents > LANDRECLAMATION AFFORESTATION PROGRAMME...

LANDRECLAMATION AFFORESTATION PROGRAMME...

Date post: 30-Apr-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
9
~ .-.-' .....- LAND RECLAMATION &. AFFORESTATION PROGRAMME PLAN AREA 10.0 HECTS. FOREST RA~JGE JATARA FOREST DIVISION TIKAMGARH FOREST BLOCK GHURA - "A" '--" COtv1PARTi"1ENT NO. P-316 APPLICANT :- MIs Khajuraho Minerals Pvt. Ltd. 6th km 5292: Road: ViI!age - ~h~d~r: P.O. & Distt-Chhatarpur (M.P.) Ph -(07682) 222751 ?d 1 r::;RQ . ,-- ..••.. , - ''''-'-'- Prepared by :- Betrem Singh Associates Pvt. Ltd. --- Regd. No. : RQPIJBP/J 05/2003/B Chopra Colony, P.O.- lvict;har Distt. : Sarna (M.P.) Pin: 485771 Phone: (07674)232473 .'.':~' . .. ' _ ..
Transcript
Page 1: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

~.-.-'

.....-

LAND RECLAMATION&.

AFFORESTATION PROGRAMME PLAN

AREA 10.0 HECTS.

FOREST RA~JGE JATARA

FOREST DIVISION TIKAMGARH

FOREST BLOCK GHURA - "A"

'--" COtv1PARTi"1ENT NO. P-316

APPLICANT :-MIs Khajuraho Minerals Pvt. Ltd.

6th km 5292: Road: ViI!age - ~h~d~r:P.O. & Distt-Chhatarpur (M.P.)Ph-(07682) 222751 ?d 1 r::;RQ. ,-- ..••.. , - ''''-'-'-

Prepared by :-Betrem Singh Associates Pvt. Ltd.---

Regd. No. : RQPIJBP/J 05/2003/BChopra Colony, P.O.- lvict;har

Distt. : Sarna (M.P.) Pin: 485771Phone: (07674)232473

.'.':~' ...' _ ..

Page 2: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

"-"

'-.../

RECLAMATION PLAN

OF.

GHURA - "A" PYROPHYLLITE & DIASPORE DEPOSIT

AREA - 10.0 HECTS.

DETAILS OF FOREST LAND :-

FOREST RANGE JATARA

FOFFST DIVISION \1 K I\MCh~Rl:I

FOREST BLOCKI

GHURA - "A"

STATE MADHY A PRADESH

FOREST COMPARTMENT NO. P-316ar!

AREA 10.0 HECTS.

Mis. Khajuraho Minerals Pvt. Ltd., Chhatarpur has applied for grant of

mining lease over 10 ha area in Compartment no. P-316, Forest Block-Ghura - "A",

of Forest Range- Jatara, Forest Division -Tj\(aM(;\ARH ;: M.P.)

The St3te Gcvernrnent of ~.P. ~3S given in-p;:;.~:p~e CG!!5c!:t f·:·;- g:-c::t of :T::f:ing

lease to the lessee. The area being forest land, approval under Section-2 of FCA

1980 is mandatory. A letter of intent communicating precise area has been issued by

the State Government vide letter No.- 2-157jiiji2ii Bhopal Dated- 20.09.2011 for

taking forest approval under Section-2 of FCA 1980 and hence is appiying for

diversion of the forest land under Section -2 of FCA 1980 for non forest use. The

applicant requires the said M.L. for consumption of minerals in modern refractory,

pesticides, rubber, paint, cosmetics, soap, detergents and handicraft industries.

Diaspore is used for manufacture of high alumina bricks to curtail the imports,

Ceramic being the basic ancillary to the steel industry. India needs increasing

amounts of these minerals. Besides the applicant also intends to use the mineral in

own captive industry proposed to be setup.

Page 3: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

LAND RECLAMATION :-

Since land resources are limited and scarce, the degraded land is

proposed to be reclaimed and made fit for reuse. The reclaimed land is proposed to

be revegetated. The fertility of the soil would be improved by application of suitable

fertilizer/me nu res.

The major part of the lease area i.e. mineable area will be backfilled

which will be started after mining the total depth of mineralization. After back filling,

the reclamation progress would commerce. During mining a reversal in the sequence

of beds may take place which can be systematized by proper reclamation planning.

This could be done during actual operation by closely monitoring the situation.

TECHNICAL RECLAMATION :-

The OBI waste generated during the course of mining will be

backfilled and leveled. The courser material vvil! be filled first and then finer materia!------

will be put on it. The soil will be filled in the holes dug for. plantatlcn. The leveled

area will be divided in to plots of one hects. separated by 3 m\ wide roads. A series of

bunds will hold water and facilitate removal of suspended solid. The side slopes of

the internal dump, would also be flattened.

BIOLOGICAL RECLAMATION :-

On the top of the ieveiied area once the plots are reaov. area would be

afforested. Pits 30-50 cm dia and about 50 cm deep would be dug. Depending on the

type of the soil and type of plant species the interval between the pits would be filled

with' a mixture of soil and manure. sapp!ings would then be planted at the

commencement of monsoon. As far as practical watering arrangement during dry

season would be provided.

EXCAVATION OF 08 I WASTE:-

Total applied area

Mineable area

1,00,000 sqm

90,000 sqm

Totai excavation 7,50,000 cum

OB/Soil

Pyrophyllite & Diaspore

6,0-0,000 cum

1,50,000 cum

Page 4: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

'-'"

The topography of the appl ied area is hilly. The backfilling will be done in

such a way that a levelled surface is maintained at the end.

RECLAIMING MATERIAL :-

Mine waste

20,000 cum

5,80,000 cum

6,00,000 cum

OB/soil

Total

Taking swell factor as 40 % and compaction factor as 20%, total reclaiming

I material = 1.40 x 0.80 x 6,00,000 rn ' = say 6,60,000 m'

'--"PROGRAMME OF RECLAMATION 8. PHASING OUT OF WORKS :-

Reclamation will start simultaneously along with thernining operations.

Reclamation will start after complete exhaustion of the mineral, as per programme given

below:-

SEQUENCE OF BACK FILLING :-

Mine waste with coarser material will be back filled first and finer

material above it.

I Year I Working I Plantation Reclamation I I I(Sqm.) (Sqm.) (Sqm.) (Soil m') (Mine waste m')

1-5 YR. I 15,000 I 3,OGG I - I 400 I 1,00,000 I(:)-1 U Y K. 1),000 3 11011 I

4:~0~ .-1 400' 1,00,000

11-15 YR. 15,000 400 1,00,000I

16-20 YR. . 15,000 30,000 30,000 400 1,00,000 I21-25 YR~ 15,000 30,000 30,000 400 1,00,900 1

I.I

26-30 YR 15,000 30,000 30,000 80,000 I- ITOTAL . 90,000 1,00,000 90,000 I 20,000 580000 !

I I I

Page 5: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

PLANTATION TYPE OF TREES

Year No. of TArea mL Survival rate Local Name ! Botanicali I nameII II

1-5 YR. 600 I 3,000 80% Type of species wili be

6-10 YR. 600 3,000 80%decided by the forestdepartment.

II-IS YR. 800 4,000 80%

I 16-20 YR. 6,000 I 30,000 80%II I

171_7';YR 6,000 I 30,000 180% !I .- A --' ..•....•..••.• , :!i 26-30 YR. 16,000 30,000 i 80%

PROGRAMME OF AFFORESTATION :-

FINANCIAL OUTLAYS:-

The roral investment of land reclamation will be' divided into two

components

(a) Technical reclamation :-

This includes simultaneous backfilling of waste and soii by labour, levelling

and grading of the ground, making side slopes, contour paths etc.

(b) . Biologica! rec!amation :-

Biological reclamation cost includes preparation of the ground, cost of sapplings

its plantation and maintenance for five year and fencing around the plantation

The total applied area of 10.O hects. will be afforested out of this mineable area is

9.00 hects. and balance 1.0 Heets. is barrier zone. Reclamation will only be

required in 9.00 Hects. applied area.

Page 6: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

--'

"-"

"--

COST OF RECLAMATION AND PLANTATION :-

(a) Technical Reclamation :-

(i) Simultaneous backfilling of soil/waste :-

This will be done by labour force in support of excavator cum loader!

scrapper simultaneously in 9.00 hects. About 6,00,000 m' of soil/waste

will be backfilled.

Expected cost = say 1,00,00,000/- [i]

(1'1') Th-l's u;i 11 hi> rlrmp h" tr<>rtrw fittprl lll1th thp scrapper and leveler R., dozer.•................. _...., •....__ '-"J •...•.•...•.~ •."' .&...1.•.•..••••..••..•. ",. A •..•••. .1........ .......lU _a_", __ _ -- .

(iii)

This will be engaged for about 300 days.

Towards cost of tractor and dozer per day Rs. 2000 /-

so cost for days = 2000 x 300 = 6.00.000 t.• - - I

1,000 man days will required for the execution of above

mentioned works. Hence the cost of 1000 man days x ISO/man days

[ii]

1,50,000/-

[iii]

So total cost of Technical

reclamation per hects. lil + [ii] + [iii]

1,00,00,000/- + 6,00,000/- + 1,50,000!-

1,07,50,000/- Rs. [A]

BIOLOGICAL RECLAMATION :-

(i) Preparation of ground :-

This includes marking of pits of size 30cm x 50 em and during diggjng 20,000

pits (Avg.) in 10.0 hects. 100 man days will be required for marking the position

of the proposed pits hence cost.

100 man days x 150 = 15000/-

Page 7: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

Cost of digging of 100 pits =Rs. 50001-,Hence 20,000 pits in 10.0 heets will

cost 5000 x 200 = Rs. 10,00,000 t..hence cost in preparation of pits in 10.0 hects.

ofground = 15,000/- + 10,00,000/- = 10,15,000/- = Say 11.0 Lac [i)

o

(ii) Cost of sappling and its plantation :-

Sappl ing will be purchased from nursery. The cost of above factors includes cost

of tress, application of fertile soil and manures, plantation of trees, application of

water and safety etc.

Cost of tree 20,O()() in numbers 2,00,000/-

Transportation of trees = 25,000/-

Cost of application of fertile'--"

soil and manure including

transportation, labour and cost

of manure etc. 5,00,000/-

Total cost = 2,00,000 /- + 25,000 /- + 5,00,000/- = 7,25,000/- [ii]

(iii) Miscellaneous expenses 1,00,000/- [iii]

'-"'

(iv) . Safety and maintenance of trees will be done by the mine guard.

So the total cost of biological reclamation = (i) + (ii) + (iii)

- 11,00,000/- + 7,25,000 /- + 1,00,000/-

19,25,000/-

HENCE TOTAL COST OF TECHNICAL RECLAMATION s 810LOGICAL

RECLAMATION ETC. :-

( II I -l- (PI\' 'J . \'-'J

1,07,50,000/- + 19,25,000/-

1,26,75,000/- (1)

Page 8: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

(C) FENCING AROUND THE LEASE AREA IN 900 M PERIPHERY LENGTH :-

(a) Cost of barbed wire :-

Cost per meter = 125 !-

4 rows of barbed wire will be provided, hence total length of barbed WIre

required 900m x 4 = 3,600 m. Hence cost of barbed wire =

3,600 x 125 = 4,50,000 1-

{hi,-/ J:;'1<l(lctnnp n;l1<lrc _..•."'-b u'"'-'.•..•.••..y _..1. u

.:»:

This will provided at interval of 6m for supporting wire hence number of

pillars.

Required = 900 1 6m

Cost of one pillars

Hence cost of 150 pillars

150 Numbers.\

Rs. 45 /-

= 150 x 45 = 6,7001-

(c) Labour cost :-

Minimum wages of unskilled labour per day = 1501- per days.

Total number of m~n days required will be 50 for erection of pillars and

stretching of wire, hence cost oflabour 50 x 150 = 7,500 1-

Hence total cost of fencing (a) + (b) + (c)

4,50,0001- + 6,700 1-+ 7,500 1-

4,64,200/-

Say = 5,00,000 1- (2)

Hence Total cost of reclamation, plantation including fencing, safety

measures taken etc. in 10.0 heets. area (1) + (2)

1,26,75,0.001- + 5,00,000/-

1,31,75,0001-

Page 9: LANDRECLAMATION AFFORESTATION PROGRAMME PLANforestsclearance.nic.in/writereaddata/Addinfo/0_0_10112712291218… · This includes simultaneous backfilling of waste and soii by labour,

~:

ABSTRACT OF PHYSICAL AND FINANCIAL OUT-LAYS :-

Year Working Reclamation .Plantation

(Area m") (Area m-) Cost (Area m") Cost (in Rs.)

1-5 YR. 15,000 I 3,000 57,750I i - -

I 6-10 YR. 15,000 - - 3,000 57,750

11-15 YR. 15,000 - - 4,000 77,000

16-20 YR. 15,000 30,000 35,80.000 30,000 5,77,500

21-25 YR. 1 " ()()() 30,000 35,80,000 '1{\ {\{\{\ 5,77,500! I .l.J,vvv I I JV,VVV II I I

! 26-30 YR. I 15,000 ! 30,000 35,90,000 ! 30,000 I 5,77,500I

I I ii TOTAL I 90,000 i 90,000 1,07,50,UUO I 1,00,000 I 19,25,000I I I Ii i

'-...: Hence total cost of reclamation and plantation will be

Adding cost of fencing

10750000/- + 19,25,000/-

1,26,75,000/-

1,26,75,000/- + 5,00,000 /-

1,31,75,000/-

To maintain the ecological balance and nature, land reclamation and

afforestation is obligatory. A significant awareness has been generated

on environment and reclamation of land is being adopted and has gained momentum.

Since land is a basic resource, the reclamation of land has been considered as a part of

mining system and the applicant after grant of mining lease will take ali after cares to

protect the trees and monitor the implementation of the programme.

Applicant :-

- .: t., \ J

Sa/ram Singh AssociJtJs Pvt/Ltd.

Regd. N0. : RQPIJBPIl OS/2003/B

"../

~·'rueCopy.·kHAJURAhO M1NERALS~

Land Reclamation I Afforestation Programme Plall- . ,- p4 9fRE9'oR .EncJ :


Recommended