1
50 20 10 0 SCALE 1:1000 (A1) TWO-STOREY CRICKET PAVILION WITH IRRIGATION CONTROL, KIOSK AND PUBLIC AMENITIES UNDERGROUND RAINWATER HARVESTING TANKS BUS PARKING (2 X 12.5M SPACES) TOP OF BANK LINE SITE BOUNDARY VISITOR PARKING (128 STANDARD SPACES) RELOCATED POTABLE WATER MAIN SUPPLY (REFER TO ARCADIS DOCUMENTATION) ACCESSIBLE MOBILITY PARKING (12 SPACES) TOP OF BANK LOWER RIPARIAN ZONE LOWER RIPARIAN ZONE LOWER RIPARIAN ZONE 75M OVAL 6 X PITCH NATURAL TURF 60M OVAL 6 X PITCH NATURAL TURF 50M OVAL SINGLE PITCH SYNTHETIC TURF 20M SETBACK 40M SETBACK 1 5 2 3 4 CRICKET TRAINING NETS 4 x synthetic turf surface pitches, 10 x natural turf surface pitches. 6 x overhead cantilevered lighting columns. SPECTATOR SEATING STEPS AND SHADE STRUCTURES In-situ concrete seating steps set in turf embankment with powdercoat galvanised steel and timber shade structures. 9 x seating steps approx. 10m2 each. 9 x shade structures approx 15m2 each. PICNIC SHELTERS IN OPEN RECREATION AREA Timber shade structure and picnic table on in-situ concrete slab. Approx 5 x 5m footprint. Seating for approx. 12 people. ELECTRICAL SUBSTATION Proposed pole-mounted 200kVA substation with architecturally designed enclosure elevated above 100 yr flood level. Heavy vehicle access via carpark. Legend Legend EXISTING PEDESTRIAN BRIDGE TO BE RETAINED, AND PEDESTRIAN PATH REINSTATED INDICATIVE NEW LOCATION FOR COBBITTY PONY CLUB BUILDING EXISTING FENCE EXTENDED TO CREEK WITH NEW VEHICLE ACCESS GATES TO B.E.P. PROPOSED NEW HV SUPPLY FROM MITCHELL STREET NEW PROPOSED TWO-WAY VEHICLE BRIDGE WITH 2.5M WIDE RAISED FOOTPATH NEW PROPOSED TWO-WAY VEHICLE ACCESS CONTROL GATES NEW SCREENING VEGETATION TO BOUNDARY WITH B.E.P. NEW PROPOSED PEDESTRIAN FOOTBRIDGE TO CONNECT NEW RIPARIAN WALKWAY EXETER STREET ROADWAY WITH RAISED LEVELS AND NEW FOOTPATH TO EXCEED 5YR FLOOD EVENT WORKS TO CULVERT CROSSING TO BE CONFIRMED INCLUDING FINAL LEVELS EXETER STREET EXETER STREET ONSLOW OVAL BICENTENNIAL EQUESTRIAN PARK COBBITTY PONY CLUB ADJACENT PRIVATE PROPERTY NEPEAN RIVER MATAHIL CREEK CREEK MATAHIL 1 2 3 3 4 5 4 4 A A B B ADJUSTED CAT. B SPB 20M SETBACK ADJUSTED TOP OF BANK LINE ADJUSTED DPI RIPARIAN 40M SETBACK CAT B. NEPEAN RIVER STATE PROTECTION BOUNDARY 20M SETBACK LINE DPI RIPARIAN ZONE 40M SETBACK LINE C C D D EXISTING TIMBER POST AND RAIL FENCE TO BE RETAINED PROPOSED 1M HIGH ALUM. PICKET FENCE SURROUNDING OVAL 3M HIGH CYCLONE FENCE TO PROTECT PARKED VEHICLES PROPOSED SECONDARY EMERGENCY EGRESS AND VEHICLE CONTROL GATES PROPOSED 1.5M WIDE GRASS SWALE ALONG BOUNDARY G.P.T. AND DISCHARGE INTO MATAHIL CREEK Gross Pollutant Trap receiving stormwater from carpark areas. Proposed sump and pump location for Irrigation Option 2 (refer to Arcadis Catchment and Stormwater Concept Plan) 11 NO. 30M HIGH FLOOD- LIGHTING TOWERS. PROPOSED 1M HIGH ALUM. PICKET FENCE SURROUNDING OVAL PROPOSED 1.5M HIGH POST AND WIRE RIPARIAN FENCE PROPOSED RIPARIAN WALKWAY INDICATIVE ROUTE S PROPOSED SEWER LINE (REFER TO ARCADIS DOCUMENTATION) PROPOSED POST AND WIRE RIPARIAN AND BOUNDARY FENCE STORMWATER DRAINAGE PIPES (REFER TO ARCADIS DOCUMENTATION) W MAINTENANCE AND EMERGENCY FIELD ACCESS POINTS 6 6 6 6 EXISTING POST AND WIRE RIPARIAN FENCE RETAINED SIGHT SCREEN TWO-COAT SEALED ROAD 30X10M MAINTENANCE SHED / COMPOUND INCORPORATING PUBLIC AMENITIES 20M 2 SHED FOR PITCH COVERS PROPOSED CONNECTION TO RIM TRAIL EXISTING BOUNDARY FENCE 3M HIGH CYCLONE FENCING TO PROTECT VEHICLES IN CARPARK +62.20 +61.85 +62.75 +62.80 +62.50 +62.60 +58.50 +62.00 +62.00 +62.80 +62.50 +62.75 +62.05 +62.05 +62.05 +62.25 +62.05 +63.00 +62.50 +61.70 +61.85 +61.70 +(62.00) +(62.50) +(63.00) +(63.50) +(62.50) +(62.50) +(62.50) +(62.50) +(56.20) (62.00)+ +(62.50) +(62.00) +(62.00) +(62.50) +(62.50) (63.00)+ +(62.00) +(62.00) +(61.50) +(62.00) +(61.50) +62.30 +62.75 +62.30 +62.30 +62.50 +63.00 +62.30 +61.70 +61.85 61.70+ 61.70+ 62.50+ 62.30+ 62.45+ 63.50+ 63.50+ 62.50+ 63.00+ 61.70+ 62.30+ 62.30+ 62.75+ 62.05+ 62.05+ 62.05+ 62.05+ 62.75+ 62.50+ 63.00+ DATE CHKD APPROV DRWN REV PROJECT_DRG NO Landscape Concept Master Plan - Ultimate Layout Fergusons Land Premier Cricket Facility 18.06.2018 JR AL AL 05 0218-0119-00_DA-102
Transcript
Page 1: Landscape Concept Master Plan - Ultimate Layout · CRICKET TRAINING NETS 4 x synthetic turf surface pitches, 10 x natural turf surface pitches. 6 x overhead cantilevered lighting

5020100

SCALE 1:1000 (A1)

TWO-STOREY CRICKET PAVILION WITH IRRIGATION CONTROL, KIOSK AND PUBLIC AMENITIES

UNDERGROUND RAINWATER HARVESTING TANKS

BUS PARKING (2 X 12.5M SPACES)TOP OF BANK LINE

SITE BOUNDARY

VISITOR PARKING (128 STANDARD SPACES)

RELOCATED POTABLE WATER MAIN SUPPLY (REFER TO ARCADIS DOCUMENTATION)

ACCESSIBLE MOBILITY PARKING (12 SPACES)

TOP O

F BAN

K

LOWER RIPARIAN ZONE

LOWER RIPARIAN ZONE

LOW

ER RIPARIAN ZO

NE

75M OVAL 6 X PITCH NATURAL TURF

60M OVAL 6 X PITCH NATURAL TURF

50M OVAL SINGLE PITCH SYNTHETIC TURF

20M SETBACK

40M SETBACK

1 5

2

3

4

CRICKET TRAINING NETS4 x synthetic turf surface pitches, 10 x natural turf surface pitches.

6 x overhead cantilevered lighting columns.

SPECTATOR SEATING STEPS AND SHADE STRUCTURESIn-situ concrete seating steps set in turf embankment with

powdercoat galvanised steel and timber shade structures.

9 x seating steps approx. 10m2 each.

9 x shade structures approx 15m2 each.

PICNIC SHELTERS IN OPEN RECREATION AREATimber shade structure and picnic table on in-situ concrete slab.

Approx 5 x 5m footprint. Seating for approx. 12 people.

ELECTRICAL SUBSTATIONProposed pole-mounted 200kVA substation with architecturally designed enclosure

elevated above 100 yr fl ood level. Heavy vehicle access via carpark.

Legend

Legend

EXISTING PEDESTRIAN BRIDGE TO BE RETAINED,

AND PEDESTRIAN PATH REINSTATED

INDICATIVE NEW LOCATION FOR

COBBITTY PONY CLUB BUILDING

EXISTING FENCE EXTENDED TO CREEK WITH

NEW VEHICLE ACCESS GATES TO B.E.P.

PROPOSED NEW HV SUPPLY

FROM MITCHELL STREET

NEW PROPOSED TWO-WAY VEHICLE BRIDGE

WITH 2.5M WIDE RAISED FOOTPATH

NEW PROPOSED TWO-WAY VEHICLE ACCESS

CONTROL GATES

NEW SCREENING VEGETATION TO BOUNDARY WITH B.E.P.

NEW PROPOSED PEDESTRIAN FOOTBRIDGE

TO CONNECT NEW RIPARIAN WALKWAY

EXETER STREET ROADWAY WITH RAISED LEVELS AND

NEW FOOTPATH TO EXCEED 5YR FLOOD EVENT

WORKS TO CULVERT CROSSING TO BE CONFIRMED

INCLUDING FINAL LEVELS

E X E T E R S T R E E T

EX

ET

ER

ST

RE

ET

O N S L O WO V A L

B I C E N T E N N I A L E Q U E S T R I A N P A R K

C O B B I T T Y P O N Y C L U B

AD

JAC

EN

T P

RIV

AT

E P

RO

PE

RT

Y

N E P E A N R I V E R

MA TA H I L C R E E K

CR

E E K

MA

TA

HI L

1

2

3

3

4

5

4 4

A

A

B

B

ADJUSTED CAT. B SPB 20M SETBACK

ADJUSTED TOP OF BANK LINE

ADJUSTED DPI RIPARIAN 40M SETBACK

CAT B. NEPEAN RIVER STATE PROTECTION BOUNDARY 20M SETBACK LINE

DPI RIPARIAN ZONE 40M SETBACK LINE

C

C

D

D

EXISTING TIMBER POST AND RAIL FENCE TO BE RETAINED

PROPOSED 1M HIGH ALUM. PICKET FENCE

SURROUNDING OVAL

3M HIGH CYCLONE FENCE TO PROTECT PARKED VEHICLES

PROPOSED SECONDARY EMERGENCY

EGRESS AND VEHICLE CONTROL GATES

PROPOSED 1.5M WIDE GRASS SWALE ALONG BOUNDARY

G.P.T. AND DISCHARGE INTO MATAHIL CREEKGross Pollutant Trap receiving stormwater from carpark areas.

Proposed sump and pump location for Irrigation Option 2

(refer to Arcadis Catchment and Stormwater Concept Plan)

11 NO. 30M HIGH FLOOD-

LIGHTING TOWERS.

PROPOSED 1M HIGH ALUM. PICKET

FENCE SURROUNDING OVAL

PROPOSED 1.5M HIGH POST AND WIRE

RIPARIAN FENCE

PROPOSED RIPARIAN WALKWAY INDICATIVE ROUTE

S PROPOSED SEWER LINE (REFER TO ARCADIS DOCUMENTATION)

PROPOSED POST AND WIRE RIPARIAN AND BOUNDARY FENCESTORMWATER DRAINAGE PIPES (REFER TO

ARCADIS DOCUMENTATION)

W

MAINTENANCE AND EMERGENCY FIELD ACCESS POINTS6

6

6

6

EXISTING POST AND WIRE RIPARIAN FENCE

RETAINED

SIGHT SCREENTWO-COAT SEALED ROAD

30X10M MAINTENANCE SHED /

COMPOUND INCORPORATING

PUBLIC AMENITIES

20M 2 SHED FOR

PITCH COVERS

PROPOSED CONNECTION

TO RIM TRAIL

EXISTING BOUNDARY FENCE

3M HIGH CYCLONE FENCING TO PROTECT VEHICLES IN CARPARK

+62.20

+61.85

+62.75

+62.80

+62.50

+62.60

+58.50+62.00

+62.00

+62.80+62.50

+62.75

+62.05

+62.05

+62.05

+62.25

+62.05

+63.00

+62.50

+61.70+61.85

+61.70

+(62.00)

+(62.50)

+(63.00)

+(63.50)

+(62.50)

+(62.50)

+(62.50)

+(62.50)

+(56.20)(62.00)+

+(62.50)+(62.00)

+(62.00)

+(62.50)

+(62.50)

(63.00)+

+(62.00)

+(62.00)

+(61.50)

+(62.00)

+(61.50)

+62.30

+62.75

+62.30

+62.30

+62.50

+63.00

+62.30

+61.70+61.85

61.70+

61.70+

62.50+

62.30+

62.45+

63.50+

63.50+

62.50+

63.00+

61.70+

62.30+

62.30+

62.75+

62.05+

62.05+

62.05+

62.05+

62.75+

62.50+

63.00+

DATECHKD APPROVDRWNREVPROJECT_DRG NO

Landscape Concept Master Plan - Ultimate LayoutFergusons Land Premier Cricket Facility

18.06.2018JR AL AL050218-0119-00_DA-102

Recommended