5020100
SCALE 1:1000 (A1)
TWO-STOREY CRICKET PAVILION WITH IRRIGATION CONTROL, KIOSK AND PUBLIC AMENITIES
UNDERGROUND RAINWATER HARVESTING TANKS
BUS PARKING (2 X 12.5M SPACES)TOP OF BANK LINE
SITE BOUNDARY
VISITOR PARKING (128 STANDARD SPACES)
RELOCATED POTABLE WATER MAIN SUPPLY (REFER TO ARCADIS DOCUMENTATION)
ACCESSIBLE MOBILITY PARKING (12 SPACES)
TOP O
F BAN
K
LOWER RIPARIAN ZONE
LOWER RIPARIAN ZONE
LOW
ER RIPARIAN ZO
NE
75M OVAL 6 X PITCH NATURAL TURF
60M OVAL 6 X PITCH NATURAL TURF
50M OVAL SINGLE PITCH SYNTHETIC TURF
20M SETBACK
40M SETBACK
1 5
2
3
4
CRICKET TRAINING NETS4 x synthetic turf surface pitches, 10 x natural turf surface pitches.
6 x overhead cantilevered lighting columns.
SPECTATOR SEATING STEPS AND SHADE STRUCTURESIn-situ concrete seating steps set in turf embankment with
powdercoat galvanised steel and timber shade structures.
9 x seating steps approx. 10m2 each.
9 x shade structures approx 15m2 each.
PICNIC SHELTERS IN OPEN RECREATION AREATimber shade structure and picnic table on in-situ concrete slab.
Approx 5 x 5m footprint. Seating for approx. 12 people.
ELECTRICAL SUBSTATIONProposed pole-mounted 200kVA substation with architecturally designed enclosure
elevated above 100 yr fl ood level. Heavy vehicle access via carpark.
Legend
Legend
EXISTING PEDESTRIAN BRIDGE TO BE RETAINED,
AND PEDESTRIAN PATH REINSTATED
INDICATIVE NEW LOCATION FOR
COBBITTY PONY CLUB BUILDING
EXISTING FENCE EXTENDED TO CREEK WITH
NEW VEHICLE ACCESS GATES TO B.E.P.
PROPOSED NEW HV SUPPLY
FROM MITCHELL STREET
NEW PROPOSED TWO-WAY VEHICLE BRIDGE
WITH 2.5M WIDE RAISED FOOTPATH
NEW PROPOSED TWO-WAY VEHICLE ACCESS
CONTROL GATES
NEW SCREENING VEGETATION TO BOUNDARY WITH B.E.P.
NEW PROPOSED PEDESTRIAN FOOTBRIDGE
TO CONNECT NEW RIPARIAN WALKWAY
EXETER STREET ROADWAY WITH RAISED LEVELS AND
NEW FOOTPATH TO EXCEED 5YR FLOOD EVENT
WORKS TO CULVERT CROSSING TO BE CONFIRMED
INCLUDING FINAL LEVELS
E X E T E R S T R E E T
EX
ET
ER
ST
RE
ET
O N S L O WO V A L
B I C E N T E N N I A L E Q U E S T R I A N P A R K
C O B B I T T Y P O N Y C L U B
AD
JAC
EN
T P
RIV
AT
E P
RO
PE
RT
Y
N E P E A N R I V E R
MA TA H I L C R E E K
CR
E E K
MA
TA
HI L
1
2
3
3
4
5
4 4
A
A
B
B
ADJUSTED CAT. B SPB 20M SETBACK
ADJUSTED TOP OF BANK LINE
ADJUSTED DPI RIPARIAN 40M SETBACK
CAT B. NEPEAN RIVER STATE PROTECTION BOUNDARY 20M SETBACK LINE
DPI RIPARIAN ZONE 40M SETBACK LINE
C
C
D
D
EXISTING TIMBER POST AND RAIL FENCE TO BE RETAINED
PROPOSED 1M HIGH ALUM. PICKET FENCE
SURROUNDING OVAL
3M HIGH CYCLONE FENCE TO PROTECT PARKED VEHICLES
PROPOSED SECONDARY EMERGENCY
EGRESS AND VEHICLE CONTROL GATES
PROPOSED 1.5M WIDE GRASS SWALE ALONG BOUNDARY
G.P.T. AND DISCHARGE INTO MATAHIL CREEKGross Pollutant Trap receiving stormwater from carpark areas.
Proposed sump and pump location for Irrigation Option 2
(refer to Arcadis Catchment and Stormwater Concept Plan)
11 NO. 30M HIGH FLOOD-
LIGHTING TOWERS.
PROPOSED 1M HIGH ALUM. PICKET
FENCE SURROUNDING OVAL
PROPOSED 1.5M HIGH POST AND WIRE
RIPARIAN FENCE
PROPOSED RIPARIAN WALKWAY INDICATIVE ROUTE
S PROPOSED SEWER LINE (REFER TO ARCADIS DOCUMENTATION)
PROPOSED POST AND WIRE RIPARIAN AND BOUNDARY FENCESTORMWATER DRAINAGE PIPES (REFER TO
ARCADIS DOCUMENTATION)
W
MAINTENANCE AND EMERGENCY FIELD ACCESS POINTS6
6
6
6
EXISTING POST AND WIRE RIPARIAN FENCE
RETAINED
SIGHT SCREENTWO-COAT SEALED ROAD
30X10M MAINTENANCE SHED /
COMPOUND INCORPORATING
PUBLIC AMENITIES
20M 2 SHED FOR
PITCH COVERS
PROPOSED CONNECTION
TO RIM TRAIL
EXISTING BOUNDARY FENCE
3M HIGH CYCLONE FENCING TO PROTECT VEHICLES IN CARPARK
+62.20
+61.85
+62.75
+62.80
+62.50
+62.60
+58.50+62.00
+62.00
+62.80+62.50
+62.75
+62.05
+62.05
+62.05
+62.25
+62.05
+63.00
+62.50
+61.70+61.85
+61.70
+(62.00)
+(62.50)
+(63.00)
+(63.50)
+(62.50)
+(62.50)
+(62.50)
+(62.50)
+(56.20)(62.00)+
+(62.50)+(62.00)
+(62.00)
+(62.50)
+(62.50)
(63.00)+
+(62.00)
+(62.00)
+(61.50)
+(62.00)
+(61.50)
+62.30
+62.75
+62.30
+62.30
+62.50
+63.00
+62.30
+61.70+61.85
61.70+
61.70+
62.50+
62.30+
62.45+
63.50+
63.50+
62.50+
63.00+
61.70+
62.30+
62.30+
62.75+
62.05+
62.05+
62.05+
62.05+
62.75+
62.50+
63.00+
DATECHKD APPROVDRWNREVPROJECT_DRG NO
Landscape Concept Master Plan - Ultimate LayoutFergusons Land Premier Cricket Facility
18.06.2018JR AL AL050218-0119-00_DA-102