Large Disturbances During 2014 in Power System of Serbia (32 nd Conference of CIGRE Serbia, Zlatibor, 17.-21. May 2015) by Gojko Dotlić 3 rd Management Board of SEERC meeting, Kiev (UKR) , 23 rd June 2015
Transcript
Page 1: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

Large Disturbances During 2014

in Power System of Serbia

(32nd Conference of CIGRE Serbia, Zlatibor, 17.-21. May 2015)

by Gojko Dotlić

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Page 2: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

Presented large disturbances: 1. Floodings in May 2014 2. Thunderstorm in June 2014 3. Ice-rain in December 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

PZ2

G

L

KOA

PR4

KO B

LE2

NI2

KS1

KR3

CA3

PO1

BB

SKOPLJE

FIERZA

RIBAREVINA

KG2

SOFIJA

BO2

DJE1

DRM

PA2

BG8

BG3

BG17

BG5

OB

OB B

ML

SA

3

SM2

SR

NS3

ZR2

SU3

SANDORFALVA

VA3

VISEGRAD

PLJEV

BG20

SO3

JA 4

SM3

RAZVOJ PRENOSNE MREZE

U PERIODU

2005-2010. GODINE

PE 3

KOL B

A

B

VR

BIS

Power Transmission

System of Serbia

Page 3: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 – Surface coal-mine “Kolubara”

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

• Two mines were flodded: „Tamnava West Field“ and „Tamnava East Field“.

• Assesment of water quantity were: about 187 milions of cubiles (m3) in „Tamnava West Field“ and 25 milions of cubiles (m3) in „Tamnava East Field“.

• Five rotation excavators were complitely flooded, as well as other mine equipment.

PZ2

G

L

KOA

PR4

KO B

LE2

NI2

KS1

KR3

CA3

PO1

BB

SKOPLJE

FIERZA

RIBAREVINA

KG2

SOFIJA

BO2

DJE1

DRM

PA2

BG8

BG3

BG17

BG5

OB

OB B

ML

SA

3

SM2

SR

NS3

ZR2

SU3

SANDORFALVA

VA3

VISEGRAD

PLJEV

BG20

SO3

JA 4

SM3

RAZVOJ PRENOSNE MREZE

U PERIODU

2005-2010. GODINE

PE 3

KOL B

A

B

VR

BIS

Attacked region

Page 4: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 – Surface coal-mine “Kolubara”

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Page 5: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 – Surface coal-mine “Kolubara”

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Page 6: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 - Transmission

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

PZ2

G

L

KOA

PR4

KO B

LE2

NI2

KS1

KR3

CA3

PO1

BB

SKOPLJE

FIERZA

RIBAREVINA

KG2

SOFIJA

BO2

DJE1

DRM

PA2

BG8

BG3

BG17

BG5

OB

OB B

ML

SA

3

SM2

SR

NS3

ZR2

SU3

SANDORFALVA

VA3

VISEGRAD

PLJEV

BG20

SO3

JA 4

SM3

RAZVOJ PRENOSNE MREZE

U PERIODU

2005-2010. GODINE

PE 3

KOL B

A

B

VR

BIS

Attacked region

Substation 400/220 kV “Obrenovac”

Page 7: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 – Photos in Transmission

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Page 8: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 - Transmission

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

The main steps did in substation 400/220 kV “Obrenovac”: • All generators (except one for auxiliary supply

thermal power plant) were switched off. • All transformers 400/220 kV were switched off. • All bus couplers are switched off. • The control voltage 220Vdc were switched off in

220 and 400 kV switchyard (SCADA out of operation, no control, no protection, no interlocking, etc.).

• All MCBs of VTs were switched off (located in the box on middle supports).

NOTE: Actually, all busbars were transferred in nodes (”solid connections”) with all OHLs switched on. OHLs are protected on remote sides only.

Page 9: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 - Tranmission

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

What is the lesson?

Relay house

Relay house

Page 10: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 - Distribution

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Distribution Central Office in City Obrenovac

Distribution Central Storage after Flooding

Page 11: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

1. Floodings in May 2014 - Distribution

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Distribution network before flooding: • 5 substations 35/10 kV • 372 substations 10/0,4 kV • 344 km cables 10 kV

Distribution network after flooding: • One substation 35/10 kV

„Obrenovac“ completely flooded

• 150 substations 10/0,4 kV without supply and 95 of them completely flooded.

Page 12: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

2. Thunderstorm in June 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

PZ2

G

L

KOA

PR4

KO B

LE2

NI2

KS1

KR3

CA3

PO1

BB

SKOPLJE

FIERZA

RIBAREVINA

KG2

SOFIJA

BO2

DJE1

DRM

PA2

BG8

BG3

BG17

BG5

OB

OB B

ML

SA

3

SM2

SR

NS3

ZR2

SU3

SANDORFALVA

VA3

VISEGRAD

PLJEV

BG20

SO3

JA 4

SM3

RAZVOJ PRENOSNE MREZE

U PERIODU

2005-2010. GODINE

PE 3

KOL B

A

B

VR

BIS

Attacked region

Page 13: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

2. Thunderstorm in June 2014 – 25.06.2014.

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

18:10

18:10

18:23 18:27

16:52

30 km

Page 14: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

2. Thunderstorm in June 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

110kV

OHL No.

Number of destroyed

towers

Fall down Useless

120/1 3

120/2 2

123/1 1

157 4 3

1223 3 1

Totally 13 4

Totally

destroyed 17

Page 15: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

2. Thunderstorm in June 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

The main characteristic: • All towers were

broken at the middle!?

• The attacked route wasn’t wide (only 0.5-1 km)

Page 16: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

2. Thunderstorm in June 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Very good experience with mobile aluminium towers.

Page 17: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

2. Thunderstorm in June 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

What is the lesson? Parameters for designing OHLs are under reviewing. For example, wind pressure from P=60 daN/m2 (which is equivalent to wind speed of 108 km/h) should be replaced with wind pressure from P=75 daN/m2 (which is equivalent to wind speed of 126 km/h).

Page 18: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

What is ice-rain?

Hot air

Rain Ice-rain Sleet Snow

Page 19: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Combination: □ ice-rain □ snow □ storm □ „siberian“ coldness

Page 20: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

The results of combined meteorological factors : horizontal icicles !!!

Page 21: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014 - Transmission

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

110kV

OHL No.

Number of destroyed towers

Fall down Useless

Temporary

in service

(for repairing)

128/3 1

177 4 4

193/1 9 14 2

148/2 4

1212 1

150 19 5 2

122B 4 4 1

Totally 38 23 14 Totally

destroyed 75 PZ2

G

L

KOA

PR4

KO B

LE2

NI2

KS1

KR3

CA3

PO1

BB

SKOPLJE

FIERZA

RIBAREVINA

KG2

SOFIJA

BO2

DJE1

DRM

PA2

BG8

BG3

BG17

BG5

OB

OB B

ML

SA

3

SM2

SR

NS3

ZR2

SU3

SANDORFALVA

VA3

VISEGRAD

PLJEV

BG20

SO3

JA 4

SM3

RAZVOJ PRENOSNE MREZE

U PERIODU

2005-2010. GODINE

PE 3

KOL B

A

B

VR

BIS

Attacked region

Page 22: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014 – Photos in Transmission

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Page 23: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014 – Photos in Transmission

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Page 24: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014 – Photos in Transmission

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Page 25: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014 - Distribution

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

PZ2

G

L

KOA

PR4

KO B

LE2

NI2

KS1

KR3

CA3

PO1

BB

SKOPLJE

FIERZA

RIBAREVINA

KG2

SOFIJA

BO2

DJE1

DRM

PA2

BG8

BG3

BG17

BG5

OB

OB B

ML

SA

3

SM2

SR

NS3

ZR2

SU3

SANDORFALVA

VA3

VISEGRAD

PLJEV

BG20

SO3

JA 4

SM3

RAZVOJ PRENOSNE MREZE

U PERIODU

2005-2010. GODINE

PE 3

KOL B

A

B

VR

BIS

Attacked region

Replaced equipment Quantity

Steel lattice towers (pieces) 47 for 35kV

Reinforced concrete towers (pieces) 16 for 35kV

30 for 10kV

Wooden towers (pieces) 700 for 10kV

1400 for 0.4kV

ACSR conductor (tons) 15.2

ABC cables (km) 9

Insulators (pieces) 3000

Page 26: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014 – Photos in Distribution

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Page 27: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

The result of ice-rain was that from 16:55 hours on 01.12.2014. all substations 110/X kV in this region: Majdanpek 1, Majdanpek 2 and Majdanpek 3, were out of service. The consume 110kV without supply was cca. 20MW.

Page 28: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

What we did for the first moment? We decided to use 400kV OHL No. 401/2 as temporary connection for substation 110/35kV Majdanpek 1 via “solid” connections: 110kV OHL No. 1159 and 400kV OHL No. 401/2, as well as 110kV OHL No. 150 and 400kV OHL No. 401/2. Temporary connection was finished on 03.12.2014. in 21:07 hours and supplied at first substation 110/35kV Majdanpek 1 and later all other substations 110/XkV.

Page 29: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

What was the risk of temporary usage the section of 400kV OHL No. 401/2 as 110kV OHL? The complete generation of HP Đerdap 1 was on only one direction through 400kV OHLs: No. 402 Đerdap 1 – Bor 2 and No. 403 Bor 2 – Niš 2. Unfortunately, in the night 09/10. 12.2014. happened the outage of 400kV OHL No. 403 Bor 2 – Niš 2 and they didn’t succeed to synchronize this 400kV direction (phase discrepancy was >35°). Therefore, urgently we decided to remove temporary connections of 400kV OHL No. 401/2. The reinstallation was finished on 11.12.2014. in 11:39. During this 7 days we succeed to provide some 110kV connections to the region. The repairing of transmission network is still in work.

PZ2

G

L

KOA

PR4

KO B

LE2

NI2

KS1

KR3

CA3

PO1

BB

SKOPLJE

FIERZA

RIBAREVINA

KG2

SOFIJA

BO2

DJE1

DRM

PA2

BG8

BG3

BG17

BG5

OB

OB B

ML

SA

3

SM2

SR

NS3

ZR2

SU3

SANDORFALVA

VA3

VISEGRAD

PLJEV

BG20

SO3

JA 4

SM3

RAZVOJ PRENOSNE MREZE

U PERIODU

2005-2010. GODINE

PE 3

KOL B

A

B

VR

BIS

Page 30: Large Disturbances During 2014 in Power System of … · 1. Floodings in May 2014 - Transmission 3rd Management rdBoard of SEERC meeting, Kiev (UKR) , 23 June 2015 The main steps

3. Ice-rain in December 2014

3rd Management Board of SEERC meeting, Kiev (UKR) , 23rd June 2015

Thank you for your attention.