10
1 A/V Sponsor With respect to our environment, the CCGA chooses not to print session notes. We know many people find session notes to be beneficial, therefore session notes for most sessions are available for download on the website at: www.canadiancga.com/page‐1720765 or on the app within the session description.
Transcript
Page 1: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

1

A/V Sponsor

With respect to our environment, the CCGA chooses 

not to print session notes. We know many people find 

session notes to be beneficial, therefore session notes 

for most sessions are available for download on the 

website at: www.canadiancga.com/page‐1720765 or 

on the app within the session description.

Page 2: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

2

Douglas MadsenVancouver Tunnels Group Leader, Hatch Infrastructure

(Previously Chief Civil Engineer, Metrolinx Capital Projects)Tel: 604-637-4493

Email: [email protected]

November 1, 2018Whistler, BC

Subsurface Utility Engineering (SUE) on Finch West LRT

Finch West LRT, Toronto• 11 km LRT line on Finch Ave West from Yonge St to Humber College

• 16 surface stops and 2 below‐grade terminal stations

• Mainly above‐ground in dedicated right of way

• Extensive road widening, utility relocation, maintenance facility

• Infrastructure Ontario Alternative Financing & Procurement (AFP) contract to design, build, finance, maintain

• $2.5B AFP contract awarded 2018 to ACS/Aecon/Dragados/CRH

• Utility early works commenced in 2016, construction 2018 ‐ 2023

Page 3: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

3

Utility Risk and SUE

• Utility conflicts are major risk with LRT projects

• Early coordination with utility firms essential

• Identify utility conflicts with SUE

• Mitigate utility conflicts in design

• Utility plan & profiles to bidders to define risk

ASCE 38‐02 Quality LevelsAmerican Society of Civil Engineers (ASCE) “Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data”.

• A : Information obtained by exposing and measuring the precise horizontal and vertical position of a utility at a specific point.

• B : Information obtained with surface geophysical techniques to determine the existence and approximate horizontal position.

• C : Information obtained by surveying and plotting visible above‐ground utility features and by using professional judgement.

• D : Information derived from existing records or oral recollections.

Page 4: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

4

Finch Avenue Toronto

Finch Avenue Existing Condition

Page 5: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

5

Finch Avenue with LRTNewHydro 

NewHydro 

Toronto Hydro Early Works• Metrolinx executed Utility Relocation Agreement

• Toronto Hydro provides staffing, advisory, design reviews, and Offer to Connect processing

• Relocation design by consultant DPM Energy

• Design to THESL standards and requirements

• Relocate 233 hydro poles, aerial lines, manholes, and undergrounding at buildings close to ROW

Page 6: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

6

Telecoms Early Works

• Bell, Allstream, Cogeco, Rogers, Telus own plant on Finch

• Telecoms engaged to inspect plant, condition assessment, inventory reporting, relocations design

• Telecoms relocations coordinated with hydro design

• Design info available to AFP Proponents

Enbridge Gas Early Works

• Metrolinx executed Preparatory Agreement

• Enbridge staff designed gas main relocations

• Early works construction defined by Enbridge design

• LRT alignment shifted 2m to retain 760mm diam gas main (relocation costs approx $22M per km)

• Approx 1 km gas main relocations were unavoidable

Page 7: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

7

Enbridge Gas Early Works

760mm Gas Main Reinstatement Across Finch Ave at Keele Street

SUE Test Holes in Finch Ave

Page 8: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

8

SUE Test Holes in Finch Ave

SUE Test Holes in Finch Ave

Page 9: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

9

SUE Test Holes in Finch Ave

Utilities Confirmed by SUE 

SUE Cost $3.1M for 1070 test holes in Finch Avenue

Page 10: Large Scale Linear Projects Doug Madsen...Toronto Hydro Early Works •Metrolinx executed Utility Relocation Agreement •Toronto Hydro provides staffing, advisory, design reviews,

10

Before You Leave…

Please complete your survey!

Your feedback matters.