The ability to reduce risk and securitize energy savings are important aspects of a successful energy efficiency project. One aspect is the ability of the vendor to secure the energy savings at the meter and demonstrate this to the customer every month going forward. This will be more important as utilities and banks offer On Bill Finance and On Bill Repayment Programs.
Popular Tags:
22
Comfort International State of California Registered Small Business/Minority Asian Owned Supplier #1168060 ENERGY EFFICIENCY HIGH TECH MANUFACTURING WHOLE BUILDING ENERGY EFFICIENCY THE SUSTAINABLE SOLUTION PG&E AWARD WINNING TRADE PROFESSIONAL ACHIEVES LARGEST REBATE IN SILICON VALLEY - 2012
Transcript
Page 1: Largest Energy Efficiency Incentive_Savings at the Meter

Comfort International

State of Cal i fornia Registered Small Business/Minority Asian OwnedSuppl ier #1168060

ENERGY EFFICIENCY HIGH TECH MANUFACTURING

WHOLE BUILDING ENERGY EFFICIENCYTHE SUSTAINABLE SOLUTION

PG&E AWARD WINNING TRADE PROFESSIONAL ACHIEVES LARGEST REBATE IN SIL ICON VALLEY - 2012

Page 2: Largest Energy Efficiency Incentive_Savings at the Meter

Energy savings need show up at the utility meter – no masking of savings is allowed due to changes in the operation. What is said in the proposal should show up at the utility meter.

After project is completed the Customer checks utility meter daily, then weekly and then monthly to ensure savings are present at the meter.

KEY CRITERIA

Page 3: Largest Energy Efficiency Incentive_Savings at the Meter

TECHNICAL COMPLEXITY - A CORE SKILL OF OUR TRADE PROFESSIONALS

Page 4: Largest Energy Efficiency Incentive_Savings at the Meter

Complexity SuretyAccountability

Page 5: Largest Energy Efficiency Incentive_Savings at the Meter

Reduce operating costs year after year in order to stay more competitive versus moving operations out of California.

Competitiveness - Continue to stay globally competitive, keep manufacturing in the heart of Silicon Valley and save jobs

CUSTOMER NEEDS

Page 6: Largest Energy Efficiency Incentive_Savings at the Meter

1. 24/7/365 operation. Unyielding standards.

2. Each of their many clean rooms contains dozens of tools or production machines churning out the wafers through 1000 distinct fabrication steps and cycle times from 8 to 12 weeks per product.

3. These tools depend on the building's mechanical systems

4. The fabrication requires unyielding standards for temperature and humidity control. The environment must be maintained at 68° F +/- 1° and 45% relative humidity +/- 2.5%.

Any deviation from these standards can cause a shutdown and aff ect multiple layers of the wafer and mill ions of dollars in losses. Just 30 minutes of out-of-spec humidity can erase 4 to 5 hours of production (and it grows exponentially from there).

EXACTING CUSTOMER STANDARDS

Page 7: Largest Energy Efficiency Incentive_Savings at the Meter

Business Challenge

Energy one of their largest single costs for the operations.

How to reduce energy costs without affecting production

Technical ChallengeExceed energy

effi ciency performance but don’t impact production

Find additional methods to reduce energy consumption

Keep “Production” tolerances of +/- 1 degrees and 2 % humidity specifications 24/7

THE CHALLENGES

Page 8: Largest Energy Efficiency Incentive_Savings at the Meter

Headway Technologies implemented an extensive review process:

1. Identified the most qualified contractor familiar with

experience in re-engineering complex clean room facilities, data centers, high tech facilities.

2. Customer Criteria - Guarantee the savings at the utility meter

3. Comfort International Inc. selected to provide “performance grade audit” and perform the energy effi ciency improvements.

4. Energy savings need show up on PG&E meter – no masking of savings is allowed. Customer checks PG&E meter day weekly and then monthly to ensure savings are present at the meter!

SELECTION OF CONTRACTOR

Page 9: Largest Energy Efficiency Incentive_Savings at the Meter
Page 10: Largest Energy Efficiency Incentive_Savings at the Meter
Page 11: Largest Energy Efficiency Incentive_Savings at the Meter

Guarantee the energy savings at the meter

Savings need to show up on the bill and tracked at the end of each month

KEY SUCCESS FACTOR REQUIRED

Page 12: Largest Energy Efficiency Incentive_Savings at the Meter

112,000 square feet production building in Milpitas, Calif.

Made up of class 100 critical clean room manufacturing space with many, very intensive cleanroom tools that require approximately 1000 steps, over the span of 12 weeks, to produce one of their recording heads.

The main HVAC system consists of seven chillers totaling 2,700 tons of air conditioning ranging from 250 to 800 ton chillers, ten (10) boilers, five (5) cooling towers, and over 125 air handlers

CUSTOMER FACILITIES ARE COMPLEX

Page 13: Largest Energy Efficiency Incentive_Savings at the Meter

The Solution Comfort International, Inc. was able to achieve the energy savings

without replacing any of primary HVAC systems (chillers, boilers, air handlers, etc.) but instead they engineered new ways to make use of all of the HVAC systems interact in a more sustainable way - util izing new strategies and operations radically diff erent than the ineffi cient original design.

The HVAC systems design solution involved highly modifi ed advanced reengineering by installing over 1200 points of controls, approximately 57 variable frequency drives (VFD's), as well as new dampers and valves to enable new operations of the systems.

As a result the air handlers are now using 83% less energy in fan power, a 90% reduction in preheating/reheating and a 50% savings in cooling and dehumidifying.

In many ways, the approach is more sustainable because the customer didn’t need to retrofi t and replace, throw-a-way big equipment.

THE SUSTAINABLE SOLUTION

Page 14: Largest Energy Efficiency Incentive_Savings at the Meter

Energy system re-engineering and re-commissioningSuper-modify and re-engineering instead of changing

expensive equipment and throwing it away.Re-blueprint the building's energy systems.Why change a chiller that’s working when all it needs

is re-commissioning? Example – when you car needs a tune-up to you change

your engine or get a tune-up? The same for building energy systems.

Even if you install a engine what if that engine system is not tuned up? You waste energy.

THE SUSTAINABLE SOLUTIONNEW WAYS OF THINKING

Page 15: Largest Energy Efficiency Incentive_Savings at the Meter

Beyond equipment, real energy savings were realized with a change to the control logic. High resolution of A-to-D conversion on the inputs of the new controllers was needed to properly manage the highly accurate sensor data

The experience and expertise to change out the original factory control systems with extremely high resolution super modifi ed building control systems approach – reengineer the building.

Added numerous and precision sensors to the clean rooms and outfi tted each AHU/VFD pair with model A1616 BTL-listed BACnet building controllers

Example - Re-circulating AHUs were oversized and had crude dampers. Customer needed better control to achieve the energy savings

KEY DIFFERENTIATORS

Page 16: Largest Energy Efficiency Incentive_Savings at the Meter
Page 17: Largest Energy Efficiency Incentive_Savings at the Meter

$633,500 PG&E INCENTIVE CHECKTHE LARGEST IN THE S IL ICON VALLEY

PG&E presented Milpitas-based Headway Technologies with a $633,500 incentive check for energy savings from upgrading the air conditioning system at its large industrial clean room facil ity. The project allowed the company to reduce cooling and heating energy, with savings of 477 KW, over 4 mill ion kwh, and more than 324,000 therms of natural gas.

Representatives from PG&E joined officials from the city of Milpitas and Headway Technologies to celebrate a six-figure incentive check for energy savings.

At TDK headquarters, Dan Burris (center) holds the recognition reward check form PG&E. CEO Alan Pong (second from right) is assisting.

Page 18: Largest Energy Efficiency Incentive_Savings at the Meter

Alan Pong • President & Owner - Alan has been in the HVAC and Energy Management industry since 1989. Alan’s company brings the experience of professional engineers, energy management experts, and journeyman HVAC service technicians. He has helped his cl ients achieve the lowest metrics in energy consumption for many types of medium to large commercial faci l it ies

Alan holds the following licenses: - CA license C-38 - Refrigeration - CA license C-10 - Electrical - CA license C-4 - Boiler, Hot Water, Steam Systems - CA license C-20 - HVAC

Bil l Christian • Engineering Manager - Bi l l received a B.S. degree in engineering from Worcester Polytechnic Institute in Massachusetts and a M.S. in mechanical engineering from Rensselaer Polytechnic Institute in New York. His academic work in physics and energy systems has al lowed him to develop innovative modifi cations to the layout and operation of existing HVAC and l ighting systems.

Richard Lear • Regional Area Manager - Richard Lear is a Regional Area Manager with Comfort International and senior journeyman HVAC service technician who has over 15 years of experience in the industry. He has extensive experience maintaining, servicing, and repair ing al l types of HVAC units, consistently del ivering exceptional service.

CORE TEAM – COMFORT INTERNATIONAL

Page 19: Largest Energy Efficiency Incentive_Savings at the Meter

“ROI occurred in 10 months,” says Dan Burris enthusiastically. “On the electrical side, we went from a continuous demand of 5.4 megawatts to 4.7 megawatts. In fact, we've seen it as low as 4.4 megawatts. That's enough to power 128 homes per year and easily surpasses our 10% reduction goal. It also represents a direct costs savings of over $800,000.”

CUSTOMER TESTIMONIAL

Page 20: Largest Energy Efficiency Incentive_Savings at the Meter

Comfort International 2570 N. First Street, 2nd floor San Jose, CA 95131

Headway Technologies

KMC Controls

TECHNICAL REFERENCES

Page 21: Largest Energy Efficiency Incentive_Savings at the Meter

REGISTERED SMALL BUSINESS STATE OF CALIFORNIA

May 10, 2013 SB APP

Supplier #1168060 COMFORT INTERNATIONAL INC 2570 N. First Street, 2nd Floor PMB #104 SAN JOSE CA 95131

Dear Business Person:

Congratulations on your Small Business (SB) certification with the State of California. Your business is now entitled to compete in the State's goal to spend 25 percent of its annual contracting dollars with small businesses. Each certified SB receives a five percent bid preference on applicable solicitations. This certification also guarantees higher interest penalties for late payment of undisputed invoices. You may purchase a rubber stamp by completing the Prompt Payment Rubber Stamp Order form at www.documents.dgs.ca.gov/pd/smallbus/ppstampreq.pdf. For more information or to verify certification status, visit www.eprocure.dgs.ca.gov.

Certification Period From May 10, 2013 to May 31, 2015 Business Types Service

Conflict of Interest for Current and Former State Employees Prior to contract award, agencies will assure the vendor is in compliance with Public Contract Code, Section 10410 et seq. addressing conflict of interest for State employees or former employees.

Annual Submission Requirement Submit copies of the ENTIRE federal tax return to the Office of Small Business and DVBE Services (OSDS). If you have been granted a tax filing extension with the Internal Revenue Service, submit a copy of the extension form and annual financial statements; then, submit a copy of the tax return once filed. If you have employees, include the California Employment Development Department's "Quarterly Contribution Return and Report of Wages (Continuation)" (Form DE9C). If you have out-of-state employees, submit the employee documentation comparable to Form DE9C. These annual submissions also apply to all affiliated businesses.

Page 22: Largest Energy Efficiency Incentive_Savings at the Meter

Energy business for over 25 years – ten in the Sil icon Valley Co-Formed South Fremont High Tech Manufacturers Assoc. Commissioned Power Quality Monitoring Systems Assisted customers with re-commissioning projects the past 20

years - high performance systems. Speaker at IFMA Sil icon Valley, State of California Segments – Government, healthcare, manufacturing, commercial,

industrial, petroleum, chemical, agriculture, residential

Fel ix LopezStrategic Account ManagerCorporate AccountsPac ifi c Gas and E lectr ic Company245 Market Street , 843ASan Franc isco, CA 94105Offi ce 415-973-1387Cel l [email protected]

ABOUT THE AUTHOR