+ All Categories
Home > Documents > Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an...

Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an...

Date post: 13-Mar-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
8
web: ww Last Planner® System Training Program
Transcript
Page 1: Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative

web: ww

Last Planner® System

Training Program

Page 2: Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative
Page 3: Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative

Delivering Projects on Time, On Budget, On

Quality, Safely through Collaboration

What is Last Planner® System (LPS)?

The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative based approach, where each contractor is involved in developing the plan and is accountable to the commitments agreed within the plan.

It involves identifying, in advance, what can prevent work flowing and then mitigating the

constraints before they occur, results in improved time on delivery

Benefits of Last Planner® System

Benefits include:

Reducing Accident Rates by up to 70%

Reducing Cost below Budget by up to 30%

Increasing Schedule Adherence to greater than 85%

Real Time Measure of Project Performance where the project is progressing

Encouraging True Collaboration to deliver customer Value and Profitability

“The Last Planner® System is “a production planning system designed to

produce predictable work flow and rapid learning in programming, design,

construction and commissioning of projects” Lean Construction US

Page 4: Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative

Introducing Last Planner® System

Program Aim

The aim of this program is to provide the Trainee with a foundation in the Last Planner® System. These skills can then be applied to the next Construction Project, thereby achieving client satisfaction and contractor profitability, through improved schedule adherence.

Program Objectives

At the end of this course, you will be able to:

Describe the 5 key Lean Principles and their applications to the Integrated Project Delivery process

Define the benefits of the Last Planner® System

Understand the alignment between the Last Planner® System and Lean

Define the 6 phases of the Last Planner® System

Apply the Last Planner® System to a Project

Duration

1 Day Training

Target Audience

This program is designed as an introduction to the Last Planner System and is suitable to all levels

involved in Project Management. This can include Senior and Middle Managers, Project

Managers, Contract Managers, Facilities Managers, Site Managers, All Sub-Contractors and Client

organisations.

"Planning is bringing the future into the present so that you can do

something about it now” Alan Lakein

Page 5: Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative

Contributing to Real Results

Program Syllabus

Key topics covered in this training course include:

Introduction to the 5 Lean Principles

Last Planner® System and its Benefits

Practical application of Last Planner® System during training

Develop a Master Schedule, Phase Schedule, Look Ahead Plan, Weekly Work Plan

Measure process performance with Percent Promises Complete (PPC)

Feedback and Learning

Certification

Certificate of attendance will be provided by CLS to

each candidate that attends the full day’s training

Certification Body Crystal Lean Solutions

Page 6: Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative

About Crystal Lean Solutions

Crystal Lean Solutions are Leading providers of Lean Transformation delivering sustained

competitive advantage for clients. We are commended by LCI and approved Lean Consultants and

Trainers with both the IDA and Enterprise Ireland.

Founded in 2008, we specialise in providing

energised action based learning to ensure that

everyone moves at the same pace. This ensures that

you can apply the concepts in your working

environment, with confidence. Each of our Trainers

have a minimum of 20 years’ experience of both

practical and training experience in Lean

Deployment.

Our Results:

Trained over 2,000 professionals in Lean and Six Sigma Mentored over 300 projects 100% Satisfaction with quality and delivery of training

Page 7: Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative

Financial Support Available

Funding

Crystal Lean Solutions are an approved Lean Consultant and Training Provider for the following

organisations:

Enterprise Ireland

IDA

Innovation and Lean Six Sigma Skills

net (ILSS)

Limerick Skills net

This provides clients with the opportunity of potential sources of funding given your specific

training requirements. In the event that you are considering a Lean Business offer such as Leanstart,

LeanPlus or LeanTransform, it can be delivered and funded as part of these programs.

For more information

Website: www.crystalleansolutions.ie

Tel: +353 (0) 87 622 6899

Email: [email protected]

Page 8: Last Planner System Training Program - Crystal lean Solutions · The Last Planner® System is an alternative method to Critical Path Method (CPM) for Project Planning. It is a collaborative

Benefits:

Futureproof your business through collaborative based project planning

Eliminate reoccurrence of schedule variation

Develop Lean Change Agents

Enhance your professional marketability

85% schedule adherence


Recommended