33
LBWDs Desalinated Seawater LBWDs Desalinated Seawater LBWD s Desalinated Seawater LBWD s Desalinated Seawater Costs Estimates Costs Estimates Robert C. Cheng, Tai J. Tseng, Kevin L. Wattier Robert C. Cheng, Tai J. Tseng, Kevin L. Wattier March 30, 2011 March 30, 2011 2011 M b T h l C f 1 2011 Membrane T echnology Conference Long Beach, CA
Transcript
Page 1: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

LBWD’s Desalinated SeawaterLBWD’s Desalinated SeawaterLBWD s Desalinated Seawater LBWD s Desalinated Seawater Costs EstimatesCosts Estimates

Robert C. Cheng, Tai J. Tseng, Kevin L. WattierRobert C. Cheng, Tai J. Tseng, Kevin L. WattierMarch 30, 2011March 30, 2011

2011 M b T h l C f

11

2011 Membrane Technology ConferenceLong Beach, CA

Page 2: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Long Beach Water DepartmentLong Beach Water Department

• California’s 6th most populous city p p y(~500,000 residents)

• 70,000 AF/yr of drinking water, y g• 8,000 AF/yr of reclaimed water• Operate largest GW treatment plant in p g p

US• 900+ miles of drinking water linesg• 750+ miles of sewer lines

22

Page 3: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Presentation OutlinePresentation Outline

LBWD Desalination Research OverviewLBWD Desalination Research OverviewSummary of Prototype Research FindingsSummary of Prototype Research FindingsCost AnalysisCost AnalysisCost AnalysisCost AnalysisConclusionConclusion

33

Page 4: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

How to integrate seawater into How to integrate seawater into system?system?system?system?

A $20 M, 10A $20 M, 10--year investment year investment Leverage various partnerships for technical input and other supportLeverage various partnerships for technical input and other supportLeverage various partnerships for technical input and other supportLeverage various partnerships for technical input and other supportFederal/State/Local Funds, 50% funding by ReclamationFederal/State/Local Funds, 50% funding by Reclamation

Post treatment / DistributionPretreatment NF2 or RO

•Under Ocean Floor Intake and Discharge

•PrototypeUV/ClO

•Mitigation of WQ impacts due to i t ti f

44

Discharge •UV/ClO2 integration of new source

Page 5: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Prototype Plant Flow DiagramPrototype Plant Flow Diagram

South Train North Train

MF Unit

55

Page 6: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Prototype PlantPrototype Plant300,000 gpd facility, 8300,000 gpd facility, 8--in vesselsin vessels

66

Page 7: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Prototype Research ObjectivesPrototype Research ObjectivesOperate efficient pretreatment systemOperate efficient pretreatment system

MF tMF tMF systemMF systemCompare NFCompare NF22 against ROagainst RO

Water quality (TDS, boron, bromide), energy, Water quality (TDS, boron, bromide), energy, reliabilityreliability

Optimize NFOptimize NF22 processprocessConfiguration variation Configuration variation Biofouling control method: UV vs. ClOBiofouling control method: UV vs. ClO22

Energy recovery deviceEnergy recovery devicegy ygy yProvide cost analysis for fullProvide cost analysis for full--scale plantscale plant

77

Page 8: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Presentation OutlinePresentation Outline

LBWD Desalination Research OverviewLBWD Desalination Research OverviewSummary of Prototype Research FindingsSummary of Prototype Research FindingsCost AnalysisCost AnalysisCost AnalysisCost AnalysisConclusionConclusion

88

Page 9: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

MF process reliabilityMF process reliabilityStable water quality

Turbidity < 0.2 NTUTurbidity < 0.2 NTUSilt density index (SDI) < 1

No deviations from expectationspOperational time depends on water produced, chlorine addedFlux rate = 27 gfd

Page 10: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

NFNF22 vs. ROvs. RO

Two-pass RO required to meet all water quality objectivesquality objectives

Boron < 1 mg/LNF2 required less specific energy than RO/NFNF2 required less specific energy than RO/NF

NF2 required 20% less energy (50th percentile)

Page 11: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

NFNF22 OperationsOperations

ReliabilityMaximize run timeNF2 as reliable as SWROProduces reliable water quality-TDS <200 mg/L, Bromide <0.5 mg/L

EfficiencyEfficiencyMinimize specific energy consumption

Page 12: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Process optimizationProcess optimizationEnergy recovery deviceEnergy recovery device

PX device tested >90% efficientPX device tested >90% efficientMust incorporate into production plant

Biofouling controlBiofouling controlggClO2 may be beneficialUV results inconclusive

Varying membranes/configurationVarying membranes/configuration5 vs. 7 element test results inconclusiveUsing ultralow pressure (ULP) membranes on lead end with NF membrane on lag end increased efficiencyefficiency

Page 13: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Presentation OutlinePresentation Outline

LBWD Desalination Research OverviewLBWD Desalination Research OverviewSummary of Prototype Research FindingsSummary of Prototype Research FindingsCost AnalysisCost AnalysisCost AnalysisCost AnalysisConclusionConclusion

1313

Page 14: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost AnalysisCost AnalysisCost curvesCost curves

Based on historical information Based on historical information Cost modelsCost models

Use locationUse location--specific parameters specific parameters NFNF22 cost modelcost model

Based on ADC cost model (funded by Based on ADC cost model (funded by Reclamation)Reclamation)))Modified by LBWD, used Prototype dataModified by LBWD, used Prototype data

1414

Page 15: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Federal Roadmap EstimatePower + Debt = 81%Power + Debt = 81%

Non-energy O&M = 19%

Electrical Membrane

Replacement LaborMaintenance

& Parts

Non-energy O&M = 19%

Power44%

5%Labor

4% 7%

C blConsumables3%

DebtDebt37%

Page 16: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost Modeling ApproachCost Modeling ApproachParameters Retained Changed

E kWh $Power E

P FluxRecovery

Chemical Chemicals DoseO&M

Chemical Unit cost Dose

Cartridge filterMembranes MF replacement

OtherMembranes

CIPSolids disposalCO2 reduction

MF replacementMembrane life

Labor2

Capital

BuildingElectricalPermitting

MF costInterest ratep g

Scaling factorContingency

project life

Page 17: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

NFNF2 2 Cost Model ScenariosCost Model ScenariosSelected from testsSelected from tests

Highest overall system recoveryHighest overall system recoveryHighest overall system recoveryHighest overall system recoveryLowest specific energy (kWh/kgal)Lowest specific energy (kWh/kgal)Highest flux (gfd)Highest flux (gfd)Highest flux (gfd)Highest flux (gfd)

Different production rateDifferent production rate50 d50 d50 mgd50 mgd5 mgd5 mgd

1717

Page 18: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

BaselineBaseline

Variable ValueProject Life 30 yrs

Interest 5%Membrane life 6.5 yrs

Energy cost $0.12 kWh

Page 19: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost AnalysisCost Analysis

Two pass RO NF NF2

Scenario 1 Scenario 2 Scenario 1 Scenario 2 Scenario 3 Pass

1Pass

2Pass

1Pass

2Pass

1Pass

2Pass

1Pass

2Pass

1Pass

2Flux (gfd) 6.91 15.89 5.41 11.47 6.65 19.55 6.29 15.35 7.05 15.17Recovery (%) 42% 82% 35% 75% 46% 75% 45% 78% 44% 80%( )Overall recovery (%) 34% 27% 38% 41% 39%Energy (kWh/kgal) 9.3 1.7 9.8 1.3 6.6 1.6 7.0 2.2 7.4 2.3Optimization parameter Capital, energy Energy Capital Capital

1919

Page 20: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost AnalysisCost AnalysisBaseline

10

Baseline50 MGD - 30 Years, $0.12/kWh, 5% interest, 6.5 yrs membrane life

Energy O&M Component Non-Energy O&M Component Capital Cost

7

8

9 Double Pass RO NF Double Pass NF NF

4.465.02

4 07 4 24 4 245

6

7

ost (

$/kg

al)

.10

1.28

09 11 09

1.57 1.

84

1.54 1.57

1.54

4.07 4.24 4.24

2

3

4Co

1.78

1.90

1.44

1.55

1.61

1 1

1.0 1.1

1.

0

1

2

2020

RONF 1 - 6.91 gfd/31%

RONF 2 - 5.41 gfd/27%

NFNF 1-6.65 gfd/38%

NFNF 2-6.29 gfd/41%

NFNF 3-7.05 gfd/39%

Page 21: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost AnalysisCost Analysis

10

Baseline5 MGD - 30 Years, $0.12/kWh, 5% interest, 6.5 yrs membrane lifeEnergy O&M Component Non-Energy O&M Component Capital Cost

$7.10 $7.66

$6 69$7.53

$6.857

8

9 Double Pass NF NFDouble Pass RO NF2.

96 3.22

2.92 3.

64

2.92

$6.69 $6.85

5

6

7

($/k

gal)

2.35 2.53

2.33 2.34

2.32

2

3

4Cos

t

1.78

1.90

1.44

1.55

1.61

2

0

1

2

2121

RONF 1 - 6.91 gfd/31%

RONF 2 - 5.41 gfd/27%

NFNF 1-6.65 gfd/38%

NFNF 2-6.29 gfd/41%

NFNF 3-7.05 gfd/39%

Page 22: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost AnalysisCost AnalysisReclamationReclamation

Road MapRoad MapNFNF1 NFNF1

6 65 gfd/38%6 65 gfd/38% Road MapRoad Map6.65 gfd/38%6.65 gfd/38%

ECapitalEnergy Capital Energy

44%Capital 37%

gy37%37%

O&MO&M 

2222

O&M 19%26%

Page 23: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Sensitivity AnalysisSensitivity Analysis

Variable changed EffectProject Life Decrease (25 yrs) CapitalProject Life Decrease (25 yrs) Capital

Interest Increase (6%) CapitalInterest Decrease (4%) Capital

Membrane Life Increase (10 yrs) Non-energy

Energy Increase ($0.15/kWh) Energy

Page 24: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost Analysis Cost Analysis –– 50 mgd50 mgdyy gg

P

RONF 16.91

fd/31%

NFNF 16.65

fd/38%Parameter gfd/31% gfd/38%Baseline $4.46 $4.07 Project life decrease (25 yrs) $4.61 $4.21 j ( y ) $ $Interest increase (6%) $4.65 $4.25 Interest decrease (4%) $4.29 $3.90 M b lif i (10 ) $4 41 $4 01Membrane life increase (10 yrs) $4.41 $4.01 Energy increase ($0.15/kWh) $4.91 $4.43

Page 25: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost Analysis Cost Analysis –– 5 mgd5 mgdyy gg

Parameter

RONF 16.91

gfd/31%

NFNF 16.65

gfd/38%Parameter gfd/31% gfd/38%Baseline $7.10 $6.69 Project life decrease (25 yrs) $7.37 $6.96 I t t i (6%) $7 44 $7 03Interest increase (6%) $7.44 $7.03 Interest decrease (4%) $6.77 $6.37 Membrane life increase (10 yrs) $7.04 $6.64Membrane life increase (10 yrs) $7.04 $6.64 Energy increase ($0.15/kWh) $7.54 $7.05

Page 26: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

InflationInflationProduced water cost can more than Produced water cost can more than double over project lifedouble over project lifedouble over project lifedouble over project life

Historical increase of 3% for goods Historical increase of 3% for goods ((www bls govwww bls gov))((www.bls.govwww.bls.gov))Energy increased by 4%Energy increased by 4%•• Inflation projection for energy from historical dataInflation projection for energy from historical data•• Inflation projection for energy from historical dataInflation projection for energy from historical data

2626

Page 27: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost AnalysisCost AnalysisInflation rateInflation rate

Power Cost vs. Time (source: www.bls.gov)

$0 25Sep-78 Sep-86 Sep-94 Oct-02 Oct-10

$0.20

$0.25

$0.15

Cos

t ($)

4% Increase

y = 0.004x + 0.057

$0.10

Pow

er C

$

$0.05

2727

$-0 4 8 12 16 20 24 28 32

Time (yrs)

Page 28: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost AnalysisCost Analysis50 MGD baseline with 4% energy inflation and 3% commodity (CPI) for

RONF 1 and NFNF 1

RO NF NF2

$160

$180

$200RO NF NF2

Total Cost$3.65 Billion

$100

$120

$140

$160

llions

($)

Total Cost $3.26 Billion

$60

$80

$100

Cos

t in

mi

$-

$20

$40

2828

0 5 10 15 20 25 30 35Time (yrs)

Page 29: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost AnalysisCost Analysis5 MGD baseline with 4% energy inflation and 3% commodity

(CPI) for RONF 1 and NFNF 1RONF Total NF Total

$25

$30 RONF Total NF Total

Total cost$ 549 Million

$15

$20

illion

s ($

)

Total cost$ 509 Million

$10

$15

Cost

in m

$-

$5

2929

0 5 10 15 20 25 30 35Time (yrs)

Page 30: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Cost SummaryCost Summary50 mgd50 mgd

NFNF22 $4 07 t $4 24/k l$4 07 t $4 24/k lNFNF22 = $4.07 to $4.24/kgal = $4.07 to $4.24/kgal RONF = $4.46 to $5.02/kgalRONF = $4.46 to $5.02/kgal

5 mgd5 mgdNFNF22 = $6.69 to $7.53/kgal = $6.69 to $7.53/kgal RONF = $7.10 to $7.66/kgal RONF = $7.10 to $7.66/kgal

Literature (WRF 4038 report) Literature (WRF 4038 report) ( p )( p )$2.12 to $6.96/kgal $2.12 to $6.96/kgal

3030

Page 31: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

Presentation OutlinePresentation Outline

LBWD Desalination Research OverviewLBWD Desalination Research OverviewSummary of Prototype Research FindingsSummary of Prototype Research FindingsCost AnalysisCost AnalysisCost AnalysisCost AnalysisConclusionConclusion

3131

Page 32: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

ConclusionsConclusionsADC model used for cost analysisADC model used for cost analysis

Prototype plant provided data to modify inputsPrototype plant provided data to modify inputsSize of facility has significant impactsSize of facility has significant impacts

Scaling down from 50 mgd to 5 mgd can increase Sca g do o 50 gd to 5 gd ca c easecost up to 100%

Cost of desalinated water (2010)Cost of desalinated water (2010)$1,380/AF for NF2, $1,640/AF for RO/NF (50 mgd)$2,450/AF for NF2, $2,500/AF for RO/NF (5 mgd)

Sensitivity analysisSensitivity analysisMembrane life, power, interest, project lifeM t iti t i t t dMost sensitive to interest and power

Page 33: LBWDLBWD s’s Desalinated Seawater Desalinated … MTC cost... · LBWDLBWD s’s Desalinated Seawater Desalinated Seawater Costs Estimates ... 5 vs. 7 element test results ... ScaSca

www lbwater orgwww lbwater orgwww.lbwater.orgwww.lbwater.org