LCSC - Relaying the Astro; week 4
By Heinz
Carpet-laying progressing well in the good weather
2 –part adhesive is thoroughly mixed before being used to joint the carpet
White tape prevents glued joint adhering to shock pad
Power-brushing sand into the carpet
Terrace construction on-going
Another layer of sand being brushed in at the half-way line
80% of the carpet laid at the end of week 4