+ All Categories
Home > Documents > Leaflet - Mapeproof ESM

Leaflet - Mapeproof ESM

Date post: 22-Jan-2018
Category:
Upload: jay-cheung
View: 87 times
Download: 0 times
Share this document with a friend
2
Mapeproof ESM www.mapei.co.uk Solvent-free and very low odour; ideal for Schools, Hospitals, Offices etc. Fast curing properties allow a two coat system to be applied in 1 day! Low viscosity product ensuring high substrate penetration. One coat up to 92%RH Suitable for under floor heating Application Now stock Mapeproof ESM Introductory price of £61.99 per 6kg unit Two component solvent free surface dpm for cement-based substrates with residual or static moisture.
Transcript
Page 1: Leaflet - Mapeproof ESM

Mapeproof ESM

www.mapei.co.uk

Solvent-free and very low odour; ideal for Schools, Hospitals, O� ces etc.Fast curing properties allow a two coat system to be applied in 1 day!Low viscosity product ensuring high substrate penetration.One coat up to 92%RHSuitable for under fl oor heating

Application

Now stock Mapeproof ESM Introductory price of £61.99 per 6kg unit

Two component solvent free surface dpm for cement-based substrates with residual or static moisture.

••

Page 2: Leaflet - Mapeproof ESM

Technical DataColour: transparent

Consistency: liquid

Application temperature range: +10OC to +30OC

Application by: Roller or brush

Setting times (approx): 5-6 hours at +10OC; 3-4 hours at +23OC: 2-3 hours at +30OC

Storage: 24 months

Packaging: 6kg Part A: 4.5kg, Part B: 1.5kg1kg Part A: 0.75kg, Part B: 0.25kg

Coverage (approx): 6kg 30m2

1kg 5m2

A two-component solvent free, surface dpm for use as a moisture vapour barrier on cement-based substrates with residual or static moisture.This Surface Membrane has fast curing properties which allow a two-coat system to be applied in 1 day!

Ideal for inhabited environments such as schools, hospitals and o� ces due to very low odour and the absence of solvents. Latexplan levelling compounds can be installed between 5 and 18 hours from application of the surface membrane. Where this period is exceeded prime with Eco Prim T. Where water-based compounds are used, the membrane must be primed in all cases.

Mapeproof ESM

Apply Mapeproof ESM.

Ensure on the second application that the product is applied at right angles to the previous application.

Roll the surface.

MK32

5364

UK

www.mapei.co.uk


Recommended