LEAN in BIMBenjamin Crosby
BIM success! – Sort of ?
Software
Jump In.
Or Think it through first.
Installation
Sched. L5
Author -Shop. /
Fab. Design
Author –
Detailed Eng. /
Const Docs
Schematic
Design
Marketing
Prefabrication
Modularization
Detailed
Estimating
Sched
6D Owner Information
Phase (COBie)
3D Coordination Phase
(Clash Detection)
5D and 4D
(Quantities and
Sched)
Schematic
Estimating/
Sched.
Installation
Sched. L5
Author -Shop. /
Fab. Design
Author –
Detailed Eng. /
Const Docs
Schematic
Design
Marketing
Prefabrication
Modularization
Detailed
Estimating
Sched
6D Owner Information
Phase (COBie)
3D Coordination Phase
(Clash Detection)
5D and 4D
(Quantities and
Sched)
Schematic
Estimating/
Sched.
Destini
GT
STRUDL
SketchUp
3DsMax
DProfiler SketchUp
ArchiCAD
Revit
Primavera 6 Timberline
MC2
Vico
SynchroTekla CM
Assemble
Navisworks
or 360 Glue
BIMSight Viewpoint for Projects
Navigator
Projectwise
AECOSim
Solibri
Tekla
ArchiCAD
Revit
Other
SDS2
CADMech
SDS2
Tekla
File Exchange
/CollaborationBIM 360
Field
CNC
Mach.
Plasma
Cutter
VicoAssemble
BIM 360
Field
Civil
3DCivil
3D
BlueBeam
Project
Synchro
WebEx
Autodesk
Point
Layout
DES
CADPipe
CADDuct
East Coast
CAD
Designer 3D
DProfiler
Consensus
Docs
Cost
OS
3D
DWG
CAD
Works
STAAD
Solibri
DOE-2
Energy
Plus
CAD
Works
NewFormaProcore
VFC
Lumion
3D
HCSS
Business
Center
PlanGrid
iConstruct
VP
Command
VP
Command
SysQue
Revit
Revizto
YouBIMBusiness
Center
Oculus /
Vive
360 Docs
BIM to
Field
Unity /
Unreal
Cost
OS
General Items
Let Me Explain!
Or Stuff We need to Address.
Where do models come from?
Background – what is LOD?
http://bimforum.org/lod/
Installation
Sched. L5
Author -Shop. /
Fab. Design
Author –
Detailed Eng. /
Const Docs
Schematic
Design
Marketing
Prefabrication
Modularization
Detailed
Estimating
Sched
6D Owner Information
Phase (COBie)
3D Coordination Phase
(Clash Detection)
5D and 4D
(Quantities and
Sched)
Schematic
Estimating/
Sched.
Design-Bid-BuildPre-Design Phase
Schematic Phase
Design Development
ConstructionDocuments
Bid Phase
Construction Phase
Ops Phase
Shop Drawing and Fabrication
Models
Steel Fab Model
Ductwork Model
Mechanical Pipe Model
Plumbing Model
Electrical Model
Fire Protection Model
Other Models
SD ARC Design Model
SD STR Design Model
SD MEP-FP Design Model
DD ARC Design Model
DD STR Design Model
DD MEP-FP Design Model
CD ARC Design Model
CD STR Design Model
CD MEP-FP Design Model
Design Models
Preliminary Design Model
Conceptual Estimating
Model
Energy Analysis Model
Preliminary Design Models
Facility Managemen
t Model
Design AssistPre-Design Phase
Schematic Phase Design Development
ConstructionDocuments
Bid Phase
Construction Phase
Ops Phase
Shop Drawing and Fabrication Models
Steel Fab Model
Ductwork Model
Mechanical Pipe Model
Plumbing Model
Electrical Model
Fire Protection Model
Other Models
SD ARC Design Model
SD STR Design Model
SD MEP-FP Design Model
DD ARC Design Model
DD STR Design Model
DD MEP-FP Design Model
CD ARC Design Model
CD STR Design Model
CD MEP-FP Design Model
Design Models
Preliminary Design Model
Conceptual Estimating
Model
Energy Analysis Model
Preliminary Design Models
Pre-Construction Planning Model
Facility Management
Model
Design-BuildPre-Design Phase
Schematic Phase
Design Development
ConstructionDocuments
Bid Phase
Construction Phase
Ops Phase
Pre-Construction Planning Model
Shop Drawing and Fabrication Models
Steel Fab Model
Ductwork Model
Mechanical Pipe Model
Plumbing Model
Electrical Model
Fire Protection Model
Other Models
ARC Design Model
STR Design Model
Design Models
Facility Management
Model
Conceptual Estimating
Model
Energy Analysis Model
Preliminary Design Models(Critical Design
Models)
BIM Makers!
Models for nothing and the clicks for free?
Or Determine how BIM, when done right, doesn't cost anything.
Model Used to create
Drawings??
Model Used to design –
with Drawings as a
reporting function!!
Process Paradigm
Schematic
Drawings No
Model
Model
Model Coord.
Drawings
Construction
LOD 100
LOD 200-300
This work flow costs more, takes longer, and fails.
Process Paradigm
Schematic
Drawings Via
Model
Model
Model Coord.
Drawings
Construction
LOD 100
LOD 200-300
This work flow is hard and takes longer, but can work.
Process Paradigm
Schematic
Drawings
Design Model
s
Model Coord.
Construction
LOD 200-300LOD 100
This work flow costs less, is faster, and reduces risk.
Process Paradigm
Design Docs
Shop Drawings
Model Creation
Model Coord.
Fabrication
Construction
LOD 200-300
LOD 300-400
Process Paradigm
This work flow costs more, takes longer, and fails.
Design Docs
Shop Drawing
s
Shop Model
Model Coord.
Fabrication
Construction
LOD 350-400*LOD 200-300
This work flow costs less, is faster, and reduces risk.
*LOD 400 - Enables Automated Fabrication and Prefabrication(CNC, 3D Printing, Robotic Total Station Layout, Warehouse Fab, etc..)
Process Paradigm
BIM Makers!
Show Me the Money!!
Or Explore the financial benefits of BIM
and how to tap into them.
BIM costs less when it is Virtual Design & Construction.
Savings FromVDC/BIM
Document CreationReduced Field Changes
Scope Creation
Reduced Time and Risk
Models UsedReduced Duration
Reduced Time and Risk
Reduced Labor and Rework
Reduced Labor
Reduced Labor
Document Creation
Practice!
Third Time’s the Charm.
Or It takes Planning and Practice.
Let’s Get VDC Started
1.Decide what you want to do.
Let’s Get VDC Started
1.Decide what you want to do.2.Have a written plan to get started.
a. Update the plan regularly.
Let’s Get VDC Started
1.Decide what you want to do.2.Have a written plan to get started.
a. Update the plan regularly.3.Communicate with partners.
Let’s Get VDC Started1.Decide what you want to do.2.Have a written plan to get started.
a. Update the plan regularly.3.Communicate with partners.4.Use the right processes.
Let’s Get VDC Started
1.Decide what you want to do.2.Have a written plan to get started.
a. Update the plan regularly.3.Communicate with partners.4.Use the right processes.5.Use the models.
Examples!
Off to the Races.
Or What it might look like.
BIM costs less when it is Virtual Design & Construction.
Results FromVDC/BIM
VDC Results
Let’s Get VDC Started
Let’s Get VDC Started
VDC Results
BIM success! – YES!!