LEAN STARTUP JA LAST PLANNER – CASE SWECO Atte Leppänen Liiketoiminnan kehitysjohtaja Sweco Rakennetekniikka Oy Twitter @AtteLeppanen [email protected]
Transcript
Page 1: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

LEAN STARTUP JA LAST PLANNER – CASE SWECO Atte Leppänen Liiketoiminnan kehitysjohtajaSweco Rakennetekniikka OyTwitter @[email protected]

Page 2: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

VÄITTÄMÄ

VESIPUTOUS- JA LUMIPALLOEFEKTI VOIDAAN VÄLTTÄÄ KÄYTTÄMÄLLLÄ LEAN STARTUP- JA LAST PLANNER-TOIMINTAMALLEJA

Page 3: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

ONGELMA 1 – VESIPUTOUSEFEKTI

2018-05-16

3

Lähde: https://www.smithsonianmag.com/travel/guide-to-taiwans-waterfalls-180959779/ ja https://tc1019softwareengineering.wordpress.com/2016/10/03/waterfall-model/

Page 4: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

ONGELMAN AIHEUTTAJA – UNOHDAMME ASIAKKAAN

2018-05-16

4

Lähde: https://millo.co/details-to-know-about-your-design-client

Page 5: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

ONGELMA 2 - LUMIPALLOEFEKTI

2018-05-16

5

Lähde: https://iminco.nl/2016/03/09/mijn-werknemer-functioneert-niet-wat-nu/ ja https://thetaoofwealth.wordpress.com/2013/05/17/the-snowball-effect-of-credit-card-debt-and-how-to-break-it/

Page 6: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

ONGELMAN AIHEUTTAJA – HYVÄKSYMINEN ALUN MYÖHÄSTYMISELLE

2018-05-16

6

Lähde: http://phdcomics.com/comics.php?f=1815

Page 7: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

RATKAISU 1 -VESIPUTOUSONGELMA

LEAN STARTUP – TOIMINTAMALLI

Page 8: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

LEAN STARTUP-MALLI

”LOVE THE PROBLEM NOT THE SOLUTION”

2018-05-16

8

Lähde: http://www.abookaweek.org/review/the-lean-startup-by-eric-ries/

Page 9: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

LEAN STARTUP-MALLI

2018-05-16

9

Lähde: https://hbr.org/visual-library/2017/04/why-the-lean-start-up-changes-everything

Page 10: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

2018-05-16

10

Lähde: https://hbr.org/visual-library/2017/04/why-the-lean-start-up-changes-everything

Page 11: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

RATKAISU 2 - LUMIPALLOEFEKTIONGELMA

LAST PLANNER VILLEGON AVULLA

Page 12: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

LAST PLANNER® SYSTEM (LPS)• Lean rakennusalalla – Lean Construction Institute

• Lean Construction työkalu – Last Planner-menetelmä

• Edellytykset kunnossa – Työn aloitus ja työn aikana

• Varmistus viikoittain

2018-05-16

12

Page 13: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

VILLEGO - LAST PLANNER® SYSTEM (LPS)-PELILLISTÄMINEN

2018-05-16

13

Page 14: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

VILLEGO - LAST PLANNER® SYSTEM (LPS)-PELILLISTÄMINEN

2018-05-16

14

Page 15: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

YHTEENVETO

Page 16: LEAN STARTUP JA LAST PLANNER – CASE SWECOlci.fi/wp-content/uploads/2018/05/7_LCI_2018_Leppänen_Atte.pdf · • Lean rakennusalalla –Lean Construction Institute • Lean Construction

YHTEENVETO

• Vesiputous- ja lumipalloefektit ovat ratkaistavissa

• Vaatii

• Uutta ajattelua• Halua• Johdon tukea

2018-05-16

16