6
Technology Project Discipline Product Line FPSO FLOATING PRODUCTION STORAGE AND OFFLOADING
Transcript
Page 1: Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO …€¦ · Turret FPSO 2013 2015 2016 Product Life Extension/ De-commissioning Leader in FPSO relocation World class after

Technology

COST & SCHEDULE

The sole intention of this Factsheet is to share general information.

Contact Details [email protected]

© SBM Offshore 2016. All rights reserved. www.sbmoffshore.com

April 2016

*Note 1 Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO SAXI BATUQUE, FPSO ESPIRITO SANTO, FPSO CAPIXABA,

FPSO ASENG, FPSO CIDADE DE ANCHIETA, FPSO CIDADE DE PARATY, FPSO N’GOMA, FPSO CIDADE DE ILHABELA, FPSO CIDADE

DE MARICA, FPSO CIDADE DE SAQUAREMA, FPSO TURRITELLA – Operated Units: FPSO SERPENTINA, – Former fleet: FPSO FRADE,

P-57, FPSO VI, FSO DOMY, NKOSSA I, TANTAWAN EXPLORER, FPSO II, FPSO FALCON, FPSO FIRENZE, FPSO RANG DONG I, OKHA,

JAMESTON, FPSO MYSTRAS, FSO OGUZHAN, FSO UNITY, NKOSSA II, KUITO, FPSO BRASIL, SANHA LPG FPSO, FPSO MARLIM SUL

Project DisciplineProduct Line

FPSO

FLOATING PRODUCTION STORAGE AND OFFLOADING

Meeting scheduled delivery dates is a key success factor. The graph below (A) demonstrates SBM Offshore’s performance record for on-target and on-performance deliveries within budget, versus Industry performance (graph B).

SBM Offshore’s performance measures well on all axes:

• Less cost growth

• Less schedule slip

• Fewer prolonged shutdowns in 1st year

• Better production attainment (months 7-12)

Source: Independent Project Analysis, Inc (IPA)

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

“INDUSTRY FPSO PERFORMANCE IS POOR ACROSS ALL EXECUTION STRATEGIES”

CONVERSION FPSOS NEW BUILD FPSOS

90%

80%

70%

60%

50%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

100%

80%

60%

40%

20%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

(1) Data for the SBM Offshore study – illustrated in Graph A - was based on all SBM FPSO projects during the time period 2008-2014.

The above information and graphic is taken from ‘Great Expectations, a story about FPSO project performance’, Independent Project Analysis, Inc. Used by permission.

SBM FPSOS DELIVERED AND PRODUCING FROM 2008 – 2014

SBM OFFSHORE

Source: SBM Offshore

• Standardized multi-purpose new build hull - Decreased risk and cost

• Generic Hull reduces build time - Faster delivery

• Modular standard topsides - Less complex topsides, with a catalogue of solutions

• Reduced module integration time - Faster delivery

• Suitable for spread-moored, internal or external turret mooring systems - Flexibility

• Increased deck space to host more topsides - Greater range of solutions

• Reduced Engineering and Project Management costs - Experience Gap

• Maximum use of SBM’s Group Technical Standards - Expertise and track record

• More ground works & less confined space works - Better safety

SOLUTION and ADVANTAGE

Graph A Graph B

LOOKING FORWARD WITH FAST4WARD - offering a generic design compatible with different types of mooring systems and topsides, to revolutionize the FPSO industry

Page 2: Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO …€¦ · Turret FPSO 2013 2015 2016 Product Life Extension/ De-commissioning Leader in FPSO relocation World class after

Water Injection (bwpb)

0 20 40 60 80 100 120 140 160 180 200 220 240 260

50,000

100,000

150,000

200,000

250,000

0

300,000

EspiritoSanto

Cidade de Paraty

N’Goma

Kikeh

Cidade de Marica

Marlin SulMarlin Sul

Saxi -Batuque AsengCapixaba

Cidade de Saquarema

Cidade deIlhabela

Mondo Cidade deAnchieta

Gas compression (MMscfd)

Operating FPSOs

Oil Production

= 100,000 bopd>60MW

Power Generation

0>20MW 20>60MW

Serpentina

FPSO AT A GLANCE CONTINUOUS IMPROVEMENT ACROSS THE FULL LIFECYCLE STRATEGIC PARTNERSHIPS AND RECENT ACHIEVEMENTS

KEY ACHIEVEMENTS

12 FPSOs in current operating fleet

3 x First Oil in 2016 – including:

• 2 high-capacity, pre-salt FPSOs offshore Brazil

• The world’s deepest production facility, on Shell’s Gulf of Mexico Stones project

>99% delivery production uptime

4.6 billion barrels of cumulative production

SBM Offshore has continuously pushed industry boundaries in term of water depth and conversion-based floating production topside complexity

Feedback from SBM Offshore’s extensive Projects and Operations ensures continuous improvement across the full lifecycle

INSTALLATION

CONSTRUCTION

OPERATIONS

ENGINEERING PROCUREMENT

LIFE EXTENSION

DECOMMISSIONING

WORLD RECORDS

FPSO Turritella in the Gulf of Mexico claims the world record for the deepest floating production unit at 2,900 meters and the largest disconnectable system, reinforcing SBM Offshore’s reputation as a technology pioneer

FPSO Turritella for Shell’s Stones development is SBM Offshore’s ground-breaking move into the region.

Turritella makes the record books as the world’s deepest production facility as well as the first to use steel lazy wave risers connected to a disconnectable turret mooring system. The FPSO also boasts one of the most complex mooring systems ever built.

• World’s deepest production unit and deepest FPSO at 2,900 meters

• First and largest disconnectable system, with Steel Risers

G3 FPSO DESIGN

SBM’s third generation FPSO design (G3) has proven to be a game-changer for pre-salt fields, with an impressive quartet of pre-salt FPSOs for Petrobras

Improved production efficiency and time savings on the schedules for FPSO Cidade de Ilhabela, FPSO Cidade de Paraty, and more recently sister FPSOs, Cidade de Maricá and Cidade de Saquarema.

G3 standardization has given SBM a winning advantage and brought clear results for Petrobras:

• 150,000 bpd processing capacity

• Complex gas processing with CO2 renewal and re-injection

• 1.6 million barrels storage capacity

• Moored in approximately 2,300 meters water depth

PAENAL YARD – Porto Amboim, Angola

• Annual capacity: >10,000 tons

• 85% Angolan nationals - trained to international standards

• 490-meter integration quay

• Only yard in West Africa suitable for VLCCs

• Jamba - 2,500 tons heavy lift crane, the largest in West Africa

YARDS

BRASA yard – Niteroi, Brazil

• 65,000 m² work space for module fabrication and FPSO integration

• Integration quayside takes VLCC size FPSOs

• Pelicano 1 - 2000 tons floating crane barge, one of largest in South America

Success for SBM Offshore is when our clients meet their goals. Our competitive technical and commercial solutions, our delivery track record, operational excellence and production uptime for all our FPSOs demonstrated it.

Since our first FPSO operations for Shell in 1976, SBM Offshore has executed over 30 FPSO projects worldwide. (*see Note 1) SBM Offshore maintains this clear leadership position by continuously investing in new technology, and offering unique solutions for clients, irrespective of challenging field dynamics or location.

FPSO Cidade de Ilhabela

Delivery of the first Generic FPSO

2002

Delivery of the largest SeastarTM TLP

2003

New Build LPG FPSO

2005

CALM Buoy

1959

Drilling Jack-up

1960

DP Drillship

1972

SBS Mooring System

1973

SALS Mooring System

1977

Leased FPSO

1981

External Turret

1985

Jacket Soft Yoke

1985

Disconnectable Turret

1986

Turnkey North Sea FPSO

1996

Internal Turret

1993

Deepwater CALM Buoy

1999

Deepest Semi-Submerisible in the GoM

2006

Offshore Offloading Line : Trelline™ Installed

2006 2009 2012

GAP™ mid water Fluid Transfer System

2007

Largest Internal Turret with 75 risers

2007

First turret-moored FPSO using steel risers

COOL™ LNG Transfer System

2011

HV-AC Electric Swivel rated at 65KV and 150 MW

VHP Fluid Swivel rated at over 800 bar

1st Generation 3 FPSO (Paraty)

Twin HullTM FLNG ARCATM Mooring System GoM Disconnectable Turret FPSO

2013 2013 2015 2015 2016

Product Life Extension/

De-commissioning

Leader in FPSO relocation

World class after sales Green ship-recycling

Construction

Strategic partnerships Unrivalled project experience

Operations

260+ years of operational experience

99.1%+ production uptime

Engineering

55 years of industry firsts Leading edge technology

Installation

Dedicated fleet Unparalleled experience Extensive project capability

Procurement

Integrated supply chain Global efficiencies Local sourcing Frame agreements with vendors

Process intensification

World record Industry first

Page 3: Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO …€¦ · Turret FPSO 2013 2015 2016 Product Life Extension/ De-commissioning Leader in FPSO relocation World class after

Water Injection (bwpb)

0 20 40 60 80 100 120 140 160 180 200 220 240 260

50,000

100,000

150,000

200,000

250,000

0

300,000

EspiritoSanto

Cidade de Paraty

N’Goma

Kikeh

Cidade de Marica

Marlin SulMarlin Sul

Saxi -Batuque AsengCapixaba

Cidade de Saquarema

Cidade deIlhabela

Mondo Cidade deAnchieta

Gas compression (MMscfd)

Operating FPSOs

Oil Production

= 100,000 bopd>60MW

Power Generation

0>20MW 20>60MW

Serpentina

FPSO AT A GLANCE CONTINUOUS IMPROVEMENT ACROSS THE FULL LIFECYCLE STRATEGIC PARTNERSHIPS AND RECENT ACHIEVEMENTS

KEY ACHIEVEMENTS

12 FPSOs in current operating fleet

3 x First Oil in 2016 – including:

• 2 high-capacity, pre-salt FPSOs offshore Brazil

• The world’s deepest production facility, on Shell’s Gulf of Mexico Stones project

>99% delivery production uptime

4.6 billion barrels of cumulative production

SBM Offshore has continuously pushed industry boundaries in term of water depth and conversion-based floating production topside complexity

Feedback from SBM Offshore’s extensive Projects and Operations ensures continuous improvement across the full lifecycle

INSTALLATION

CONSTRUCTION

OPERATIONS

ENGINEERING PROCUREMENT

LIFE EXTENSION

DECOMMISSIONING

WORLD RECORDS

FPSO Turritella in the Gulf of Mexico claims the world record for the deepest floating production unit at 2,900 meters and the largest disconnectable system, reinforcing SBM Offshore’s reputation as a technology pioneer

FPSO Turritella for Shell’s Stones development is SBM Offshore’s ground-breaking move into the region.

Turritella makes the record books as the world’s deepest production facility as well as the first to use steel lazy wave risers connected to a disconnectable turret mooring system. The FPSO also boasts one of the most complex mooring systems ever built.

• World’s deepest production unit and deepest FPSO at 2,900 meters

• First and largest disconnectable system, with Steel Risers

G3 FPSO DESIGN

SBM’s third generation FPSO design (G3) has proven to be a game-changer for pre-salt fields, with an impressive quartet of pre-salt FPSOs for Petrobras

Improved production efficiency and time savings on the schedules for FPSO Cidade de Ilhabela, FPSO Cidade de Paraty, and more recently sister FPSOs, Cidade de Maricá and Cidade de Saquarema.

G3 standardization has given SBM a winning advantage and brought clear results for Petrobras:

• 150,000 bpd processing capacity

• Complex gas processing with CO2 renewal and re-injection

• 1.6 million barrels storage capacity

• Moored in approximately 2,300 meters water depth

PAENAL YARD – Porto Amboim, Angola

• Annual capacity: >10,000 tons

• 85% Angolan nationals - trained to international standards

• 490-meter integration quay

• Only yard in West Africa suitable for VLCCs

• Jamba - 2,500 tons heavy lift crane, the largest in West Africa

YARDS

BRASA yard – Niteroi, Brazil

• 65,000 m² work space for module fabrication and FPSO integration

• Integration quayside takes VLCC size FPSOs

• Pelicano 1 - 2000 tons floating crane barge, one of largest in South America

Success for SBM Offshore is when our clients meet their goals. Our competitive technical and commercial solutions, our delivery track record, operational excellence and production uptime for all our FPSOs demonstrated it.

Since our first FPSO operations for Shell in 1976, SBM Offshore has executed over 30 FPSO projects worldwide. (*see Note 1) SBM Offshore maintains this clear leadership position by continuously investing in new technology, and offering unique solutions for clients, irrespective of challenging field dynamics or location.

FPSO Cidade de Ilhabela

Delivery of the first Generic FPSO

2002

Delivery of the largest SeastarTM TLP

2003

New Build LPG FPSO

2005

CALM Buoy

1959

Drilling Jack-up

1960

DP Drillship

1972

SBS Mooring System

1973

SALS Mooring System

1977

Leased FPSO

1981

External Turret

1985

Jacket Soft Yoke

1985

Disconnectable Turret

1986

Turnkey North Sea FPSO

1996

Internal Turret

1993

Deepwater CALM Buoy

1999

Deepest Semi-Submerisible in the GoM

2006

Offshore Offloading Line : Trelline™ Installed

2006 2009 2012

GAP™ mid water Fluid Transfer System

2007

Largest Internal Turret with 75 risers

2007

First turret-moored FPSO using steel risers

COOL™ LNG Transfer System

2011

HV-AC Electric Swivel rated at 65KV and 150 MW

VHP Fluid Swivel rated at over 800 bar

1st Generation 3 FPSO (Paraty)

Twin HullTM FLNG ARCATM Mooring System GoM Disconnectable Turret FPSO

2013 2013 2015 2015 2016

Product Life Extension/

De-commissioning

Leader in FPSO relocation

World class after sales Green ship-recycling

Construction

Strategic partnerships Unrivalled project experience

Operations

260+ years of operational experience

99.1%+ production uptime

Engineering

55 years of industry firsts Leading edge technology

Installation

Dedicated fleet Unparalleled experience Extensive project capability

Procurement

Integrated supply chain Global efficiencies Local sourcing Frame agreements with vendors

Process intensification

World record Industry first

Page 4: Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO …€¦ · Turret FPSO 2013 2015 2016 Product Life Extension/ De-commissioning Leader in FPSO relocation World class after

Water Injection (bwpb)

0 20 40 60 80 100 120 140 160 180 200 220 240 260

50,000

100,000

150,000

200,000

250,000

0

300,000

EspiritoSanto

Cidade de Paraty

N’Goma

Kikeh

Cidade de Marica

Marlin SulMarlin Sul

Saxi -Batuque AsengCapixaba

Cidade de Saquarema

Cidade deIlhabela

Mondo Cidade deAnchieta

Gas compression (MMscfd)

Operating FPSOs

Oil Production

= 100,000 bopd>60MW

Power Generation

0>20MW 20>60MW

Serpentina

FPSO AT A GLANCE CONTINUOUS IMPROVEMENT ACROSS THE FULL LIFECYCLE STRATEGIC PARTNERSHIPS AND RECENT ACHIEVEMENTS

KEY ACHIEVEMENTS

12 FPSOs in current operating fleet

3 x First Oil in 2016 – including:

• 2 high-capacity, pre-salt FPSOs offshore Brazil

• The world’s deepest production facility, on Shell’s Gulf of Mexico Stones project

>99% delivery production uptime

4.6 billion barrels of cumulative production

SBM Offshore has continuously pushed industry boundaries in term of water depth and conversion-based floating production topside complexity

Feedback from SBM Offshore’s extensive Projects and Operations ensures continuous improvement across the full lifecycle

INSTALLATION

CONSTRUCTION

OPERATIONS

ENGINEERING PROCUREMENT

LIFE EXTENSION

DECOMMISSIONING

WORLD RECORDS

FPSO Turritella in the Gulf of Mexico claims the world record for the deepest floating production unit at 2,900 meters and the largest disconnectable system, reinforcing SBM Offshore’s reputation as a technology pioneer

FPSO Turritella for Shell’s Stones development is SBM Offshore’s ground-breaking move into the region.

Turritella makes the record books as the world’s deepest production facility as well as the first to use steel lazy wave risers connected to a disconnectable turret mooring system. The FPSO also boasts one of the most complex mooring systems ever built.

• World’s deepest production unit and deepest FPSO at 2,900 meters

• First and largest disconnectable system, with Steel Risers

G3 FPSO DESIGN

SBM’s third generation FPSO design (G3) has proven to be a game-changer for pre-salt fields, with an impressive quartet of pre-salt FPSOs for Petrobras

Improved production efficiency and time savings on the schedules for FPSO Cidade de Ilhabela, FPSO Cidade de Paraty, and more recently sister FPSOs, Cidade de Maricá and Cidade de Saquarema.

G3 standardization has given SBM a winning advantage and brought clear results for Petrobras:

• 150,000 bpd processing capacity

• Complex gas processing with CO2 renewal and re-injection

• 1.6 million barrels storage capacity

• Moored in approximately 2,300 meters water depth

PAENAL YARD – Porto Amboim, Angola

• Annual capacity: >10,000 tons

• 85% Angolan nationals - trained to international standards

• 490-meter integration quay

• Only yard in West Africa suitable for VLCCs

• Jamba - 2,500 tons heavy lift crane, the largest in West Africa

YARDS

BRASA yard – Niteroi, Brazil

• 65,000 m² work space for module fabrication and FPSO integration

• Integration quayside takes VLCC size FPSOs

• Pelicano 1 - 2000 tons floating crane barge, one of largest in South America

Success for SBM Offshore is when our clients meet their goals. Our competitive technical and commercial solutions, our delivery track record, operational excellence and production uptime for all our FPSOs demonstrated it.

Since our first FPSO operations for Shell in 1976, SBM Offshore has executed over 30 FPSO projects worldwide. (*see Note 1) SBM Offshore maintains this clear leadership position by continuously investing in new technology, and offering unique solutions for clients, irrespective of challenging field dynamics or location.

FPSO Cidade de Ilhabela

Delivery of the first Generic FPSO

2002

Delivery of the largest SeastarTM TLP

2003

New Build LPG FPSO

2005

CALM Buoy

1959

Drilling Jack-up

1960

DP Drillship

1972

SBS Mooring System

1973

SALS Mooring System

1977

Leased FPSO

1981

External Turret

1985

Jacket Soft Yoke

1985

Disconnectable Turret

1986

Turnkey North Sea FPSO

1996

Internal Turret

1993

Deepwater CALM Buoy

1999

Deepest Semi-Submerisible in the GoM

2006

Offshore Offloading Line : Trelline™ Installed

2006 2009 2012

GAP™ mid water Fluid Transfer System

2007

Largest Internal Turret with 75 risers

2007

First turret-moored FPSO using steel risers

COOL™ LNG Transfer System

2011

HV-AC Electric Swivel rated at 65KV and 150 MW

VHP Fluid Swivel rated at over 800 bar

1st Generation 3 FPSO (Paraty)

Twin HullTM FLNG ARCATM Mooring System GoM Disconnectable Turret FPSO

2013 2013 2015 2015 2016

Product Life Extension/

De-commissioning

Leader in FPSO relocation

World class after sales Green ship-recycling

Construction

Strategic partnerships Unrivalled project experience

Operations

260+ years of operational experience

99.1%+ production uptime

Engineering

55 years of industry firsts Leading edge technology

Installation

Dedicated fleet Unparalleled experience Extensive project capability

Procurement

Integrated supply chain Global efficiencies Local sourcing Frame agreements with vendors

Process intensification

World record Industry first

Page 5: Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO …€¦ · Turret FPSO 2013 2015 2016 Product Life Extension/ De-commissioning Leader in FPSO relocation World class after

Technology

COST & SCHEDULE

The sole intention of this Factsheet is to share general information.

Contact Details [email protected]

© SBM Offshore 2016. All rights reserved. www.sbmoffshore.com

April 2016

*Note 1 Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO SAXI BATUQUE, FPSO ESPIRITO SANTO, FPSO CAPIXABA,

FPSO ASENG, FPSO CIDADE DE ANCHIETA, FPSO CIDADE DE PARATY, FPSO N’GOMA, FPSO CIDADE DE ILHABELA, FPSO CIDADE

DE MARICA, FPSO CIDADE DE SAQUAREMA, FPSO TURRITELLA – Operated Units: FPSO SERPENTINA, – Former fleet: FPSO FRADE,

P-57, FPSO VI, FSO DOMY, NKOSSA I, TANTAWAN EXPLORER, FPSO II, FPSO FALCON, FPSO FIRENZE, FPSO RANG DONG I, OKHA,

JAMESTON, FPSO MYSTRAS, FSO OGUZHAN, FSO UNITY, NKOSSA II, KUITO, FPSO BRASIL, SANHA LPG FPSO, FPSO MARLIM SUL

Project DisciplineProduct Line

FPSO

FLOATING PRODUCTION STORAGE AND OFFLOADING

Meeting scheduled delivery dates is a key success factor. The graph below (A) demonstrates SBM Offshore’s performance record for on-target and on-performance deliveries within budget, versus Industry performance (graph B).

SBM Offshore’s performance measures well on all axes:

• Less cost growth

• Less schedule slip

• Fewer prolonged shutdowns in 1st year

• Better production attainment (months 7-12)

Source: Independent Project Analysis, Inc (IPA)

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

“INDUSTRY FPSO PERFORMANCE IS POOR ACROSS ALL EXECUTION STRATEGIES”

CONVERSION FPSOS NEW BUILD FPSOS

90%

80%

70%

60%

50%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

100%

80%

60%

40%

20%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

(1) Data for the SBM Offshore study – illustrated in Graph A - was based on all SBM FPSO projects during the time period 2008-2014.

The above information and graphic is taken from ‘Great Expectations, a story about FPSO project performance’, Independent Project Analysis, Inc. Used by permission.

SBM FPSOS DELIVERED AND PRODUCING FROM 2008 – 2014

SBM OFFSHORE

Source: SBM Offshore

• Standardized multi-purpose new build hull - Decreased risk and cost

• Generic Hull reduces build time - Faster delivery

• Modular standard topsides - Less complex topsides, with a catalogue of solutions

• Reduced module integration time - Faster delivery

• Suitable for spread-moored, internal or external turret mooring systems - Flexibility

• Increased deck space to host more topsides - Greater range of solutions

• Reduced Engineering and Project Management costs - Experience Gap

• Maximum use of SBM’s Group Technical Standards - Expertise and track record

• More ground works & less confined space works - Better safety

SOLUTION and ADVANTAGE

Graph A Graph B

LOOKING FORWARD WITH FAST4WARD - offering a generic design compatible with different types of mooring systems and topsides, to revolutionize the FPSO industry

Page 6: Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO …€¦ · Turret FPSO 2013 2015 2016 Product Life Extension/ De-commissioning Leader in FPSO relocation World class after

Technology

COST & SCHEDULE

The sole intention of this Factsheet is to share general information.

Contact Details [email protected]

© SBM Offshore 2016. All rights reserved. www.sbmoffshore.com

April 2016

*Note 1 Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO SAXI BATUQUE, FPSO ESPIRITO SANTO, FPSO CAPIXABA,

FPSO ASENG, FPSO CIDADE DE ANCHIETA, FPSO CIDADE DE PARATY, FPSO N’GOMA, FPSO CIDADE DE ILHABELA, FPSO CIDADE

DE MARICA, FPSO CIDADE DE SAQUAREMA, FPSO TURRITELLA – Operated Units: FPSO SERPENTINA, – Former fleet: FPSO FRADE,

P-57, FPSO VI, FSO DOMY, NKOSSA I, TANTAWAN EXPLORER, FPSO II, FPSO FALCON, FPSO FIRENZE, FPSO RANG DONG I, OKHA,

JAMESTON, FPSO MYSTRAS, FSO OGUZHAN, FSO UNITY, NKOSSA II, KUITO, FPSO BRASIL, SANHA LPG FPSO, FPSO MARLIM SUL

Project DisciplineProduct Line

FPSO

FLOATING PRODUCTION STORAGE AND OFFLOADING

Meeting scheduled delivery dates is a key success factor. The graph below (A) demonstrates SBM Offshore’s performance record for on-target and on-performance deliveries within budget, versus Industry performance (graph B).

SBM Offshore’s performance measures well on all axes:

• Less cost growth

• Less schedule slip

• Fewer prolonged shutdowns in 1st year

• Better production attainment (months 7-12)

Source: Independent Project Analysis, Inc (IPA)

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

“INDUSTRY FPSO PERFORMANCE IS POOR ACROSS ALL EXECUTION STRATEGIES”

CONVERSION FPSOS NEW BUILD FPSOS

90%

80%

70%

60%

50%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

100%

80%

60%

40%

20%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

(1) Data for the SBM Offshore study – illustrated in Graph A - was based on all SBM FPSO projects during the time period 2008-2014.

The above information and graphic is taken from ‘Great Expectations, a story about FPSO project performance’, Independent Project Analysis, Inc. Used by permission.

SBM FPSOS DELIVERED AND PRODUCING FROM 2008 – 2014

SBM OFFSHORE

Source: SBM Offshore

• Standardized multi-purpose new build hull - Decreased risk and cost

• Generic Hull reduces build time - Faster delivery

• Modular standard topsides - Less complex topsides, with a catalogue of solutions

• Reduced module integration time - Faster delivery

• Suitable for spread-moored, internal or external turret mooring systems - Flexibility

• Increased deck space to host more topsides - Greater range of solutions

• Reduced Engineering and Project Management costs - Experience Gap

• Maximum use of SBM’s Group Technical Standards - Expertise and track record

• More ground works & less confined space works - Better safety

SOLUTION and ADVANTAGE

Graph A Graph B

LOOKING FORWARD WITH FAST4WARD - offering a generic design compatible with different types of mooring systems and topsides, to revolutionize the FPSO industry