+ All Categories
Home > Documents > Lectro Dryer

Lectro Dryer

Date post: 17-Oct-2015
Category:
Upload: junsana
View: 1,616 times
Download: 101 times
Share this document with a friend
Description:
Turbo Generator Hydrogen Cooled
45
 INSTRUCTION MANUAL FOR LECTRODRYER BAC-50 HYDROGEN DRYING SYSTEM Manufactured for: General Electric End User: Plant Name: Unit Number: Lectrodryer Serial Number:  P.O. Box 2500 Richmond, Kentucky 40476-2602 Phone: (859) 624-2091 Fax: (859) 623-2436 www.lectrodryer.com CE2003.02 
Transcript
  • INSTRUCTION MANUAL

    FOR

    LECTRODRYER BAC-50

    HYDROGEN DRYING SYSTEM

    Manufactured for: General Electric End User: Plant Name: Unit Number:

    Lectrodryer Serial Number:

    P.O. Box 2500 Richmond, Kentucky 40476-2602

    Phone: (859) 624-2091 Fax: (859) 623-2436 www.lectrodryer.com

    CE2003.02

  • Page 2 of 45

    TABLE OF CONTENTS LECTRODRYER PAST & PRESENT................................................................................................ 4 CUSTOMER ASSISTANCE AND FIELD SERVICE ...................................................................... 5

    Dryer Specification Sheet ............................................................................................................... 6 Normal Readings and Instrument Setpoints ................................................................................ 7 General Description of Desiccant Dryers ..................................................................................... 8 Installation ....................................................................................................................................... 9

    Recommendations for Installation ................................................................................................ 9 Mechanical Connections ............................................................................................................... 9 Electrical Connections ................................................................................................................ 12 Optional Electrical Connections ................................................................................................. 13

    Startup & Shutdown Procedures ................................................................................................ 15 Prestartup Procedures .................................................................................................................. 15 Start-Up Procedures .................................................................................................................... 17 Performance History Chart ......................................................................................................... 19 Control Box Purging Instructions ............................................................................................... 20 Process Purging ........................................................................................................................... 22

    Operation ....................................................................................................................................... 23 Explanation of Adsorption and Reactivation Flowpaths ............................................................ 23 Sequence of Operation ................................................................................................................ 24 Push-to-Step Feature ................................................................................................................... 25 Operator Interface Display Panelview 300 Micro ................................................................... 26 Setting Reactivation Flow ........................................................................................................... 31

    Maintenance .................................................................................................................................. 32 Blower Removal ......................................................................................................................... 32 Blower Installation ...................................................................................................................... 33 Heater Removal .......................................................................................................................... 34 Heater Installation ....................................................................................................................... 34 Changing the Desiccant .............................................................................................................. 35 Cleaning the Trap ........................................................................................................................ 36 Proper Maintenance of Non-Lubricated Sleeved Plug Valves ................................................... 37 Instructions for Servicing Matryx Vane Actuators ..................................................................... 38 Preventive Maintenance Schedule .............................................................................................. 39

    Optional Electrical Features ........................................................................................................ 40 Optional Voltages ....................................................................................................................... 40 Diagnostics Package (Alarms) .................................................................................................... 41 Switch Failure ............................................................................................................................. 41 Heater Failure .............................................................................................................................. 41 Motor Failure .............................................................................................................................. 41 Inlet and Outlet Hygrometers ...................................................................................................... 42

    Parts Description and Functions ................................................................................................. 43

  • Page 3 of 45

    Parts List ........................................................................................................................................ 44 Appendix Material Vendor Literature Appendix A PLC Ladder Logic Appendix B Operator Interface Display Appendix C Reference Drawings Appendix D P & ID T-3501 Dimension Drawing T-3502 Wiring Diagram T-4008 Control Panel Layout T-4086

  • Page 4 of 45

    LECTRODRYER PAST & PRESENT

    Lectrodryer, L.L.C., originally was founded in May of 1932 by the W. E. Moore Company located in Pittsburgh, Pennsylvania, and was named the "Pittsburgh Lectrodryer Corporation." The W. E. Moore Company was a major manufacturer of electric arc furnaces for the steel industry. Pittsburgh Lectrodryer was formed for the purpose of drying gases used in these metal-treating furnaces. At that time, there were no companies manufacturing adsorption dryers. Most steel companies or furnace manufacturers built their own dryers on an as needed basis with very little adsorption technology. Pittsburgh Lectrodryer Corporation with cooperation from Aluminum Company of America, the leader in adsorbents, then developed desiccant dryers. Based on this research and data, Pittsburgh Lectrodryer Corporation introduced to industry the first fully engineered line of adsorption dryers. Its first order was for drying high-pressure natural gas for the Thomas Steel Company (now U.S. Steel) in Youngstown, Ohio. In 1955, the W.E. Moore Company was purchased by McGraw Electric Company, which merged with Thomas A. Edison Industries in 1956 (now known as McGraw Edison Company). Then, in 1972 McGraw Edison sold the Lectrodryer Division to Ajax Magnethermic of Warren, Ohio. At that time the name was changed to Lectrodryer, Division of Ajax Magnethermic. The plant and office personnel were moved from Pittsburgh to a facility in Richmond, Kentucky. In 2001 the Lectrodryer Division was purchased by the current owners who maintain a 12,000 square foot facility at 135 Quality Drive in Richmond, Kentucky. Today, Lectrodryer plays a vitally important role in solving the drying and purification problems of industry with heavy emphasis on the power industry. It has designed and manufactured units for every major generator manufacturer and is a leader in providing new control technology.

  • Page 5 of 45

    CUSTOMER ASSISTANCE AND FIELD SERVICE Lectrodryer has a complete staff of engineers and technicians to help assist you in your dryer problems or needs. If problems arise from any aspect of your dryer that cant be solved with the aid of this manual request our Customer Service or Engineering Department at:

    Lectrodryer, LLC P.O. Box 2500

    Richmond, KY 40476-2602 (859)-624-2091 (phone)

    (859)-623-2436 (fax) For prompt and accurate answers to written or verbal inquires please provide the following information:

    1. Dryer Type and Size 2. Dryer Serial Number 3. Dryer Operating Conditions (temperatures, pressures, flowrates etc.). 4. Approximate time in service. 5. Nature of the problem

    For spare parts needs, request our Spare Parts Department. For your Local Area Representative, request our Marketing Department. For information on other dryer applications request our Marketing Department. Shipping Damage If visible external or suspected internal damage has occurred during shipping, immediately enter a claim with the shipping carrier and contact our Customer Services Department. Note:

    Equipment shipped F.O.B. our Richmond, KY plant has the ownership transferred to the purchaser upon departure from our plant. All shipping claims of this nature must be processed by the owner with the shipping carrier and are not handled through Lectrodryer. Lectrodryer as a manufacturer will assist in any way possible, however, the responsibility for the claim rests with the owner.

    Any mishandling or carelessness by the carrier should be noted on the delivery receipt. Obtaining a signed agreement with the delivery person will facilitate any insurance claims. Any damage should be reported to Lectrodryer prior to installing the equipment.

  • Page 6 of 45

    Dryer Specification Sheet

    Gas Being Dried Hydrogen Operating Pressure 10-75 psig (7.04-5.28 kg/cm2) Inlet Dry Bulb Temperature 120F (49C) Inlet Dewpoint +50F (+10C) Outlet Dewpoint -40F (-40C) Heaters 1064 watts (each) Blower Motors 1/2 HP (each) Desiccant Activated Alumina 50 lbs (23 kg) per tower Enclosure Type NEMA 4 with Type Z Purge Class 1, Group B, Division 2 UTILITIES Power Supply (2.0 KVA) volts, 3 phase, 50/60 hertz Cooling Water Requirements 1.0 gpm at 85F (3.81 lpm at 29C) OPTIONS Inlet Hygrometer X Yes No Outlet Hygrometer Yes X No Diagnostics Package X Yes No Dryer Serial Number: 0824

  • Page 7 of 45

    Normal Readings and Instrument Setpoints BED TEMPERATURE SWITCHES TIS-1 and TIS-2 Setpoint 400F (204C) Normal Reading 325F 50F (163C 28C) (At end of heating cycle) BED OUTLET TEMPERATURE TI-1 180F 20F (82C 11C) (2-3 hrs into heating cycle) COOLER OUTLET TEMPERATURE TI-2 less than 100F (38C) CONTROL PANEL PURGE Regulator 6 inches (15.2 mm) of water column Differential Pressure Switch 0.75 inches (19 mm) of water column Purge Outlet Pressure Gage 1-6 inches (25 152 mm) of water column

  • Page 8 of 45

    General Description of Desiccant Dryers Adsorption Adsorption is the process by which a dryer removes water from a fluid (gas or liquid). The fluid is passed through a column of desiccant, which is a material that has an attraction for polar molecules, such as water molecules. The material is manufactured to have a porous structure. The size of these pores is controlled to optimize the collection capacity and minimize the retention of larger molecules. The porous structure of the desiccant greatly increases its effective surface area. As a wet fluid is passed over desiccant particles, the adsorbed molecule is attracted to, and captured by the desiccant. The fluid comes out dry. Reactivation As the desiccant eventually will become saturated, it must either be replaced, or else reactivated. To replace the desiccant every 8 hours is not practical from a labor, or material cost perspective. Hence, the process of reactivation. Reactivation is the process of driving the trapped water molecules from the desiccant and restoring the desiccants ability to adsorb.

    LECTRODRYER BAC-50 The Lectrodryer BAC-50 is designed for the specific purpose of removing moisture from hydrogen-cooled generators. The BAC-50 is a dual tower dryer, having one tower in service, continuously drying the hydrogen gas in the generator (Adsorbing), while the other tower is being renewed by reactivation. After 8 hours of Adsorbing, the online tower is ready to be taken offline and reactivated. The freshly reactivated tower is ready to go back into Adsorption service. Reactivation on a Lectrodryer BAC-50 is a closed loop process with hydrogen gas at line pressure, with no purge loss. Each reactivation consists of 4 hours of heating and 4 hours of cooling. A blower, internal to each vessel, produces the reactivation flow. Heating - The desiccant is heated using internal, low watt density heaters, specifically designed for this application. The moisture is liberated from the warm desiccant and is carried out of the vessel by the reactivation flow, and on to the cooler, where the gas is cooled and the moisture begins to condense. The water is removed from the system by a centrifugal-type separator and a float-type trap. The reactivation flow continues back to the vessel where it begins this heating process all over again. The heating step is 4 hours. Cooling - The same reactivation flow continues with the heater turned off, cooling the desiccant down in preparation for its next adsorption cycle. The cooling step is 4 hours.

  • Page 9 of 45

    Installation

    Recommendations for Installation 1. 1" piping from the generator to the dryer and back is recommended, although a number of

    dryers operate adequately using 1/2" piping. 2. Isolation valves in these lines should be adequately sized so as to not cause excessive pressure

    drop in the system. Pay special attention to the Cv of the isolation valves. 3. This dryer should remove between a few ounces and several quarts of water every day,

    depending on specific conditions. It may be desirable to run this condensate to a drain. It can be a helpful troubleshooting or diagnostic tool to collect, measure, and record this

    condensate. This is an easy, effective, low cost way of verifying that the dryer is still functioning correctly, as well as a way to track the amount of water leakage into the generator.

    Reference Drawing: Dimension (See Appendix) When the Lectrodryer BAC-50 is first received, it should be closely inspected for any damage that may have occurred during shipment. If any signs of damage are present the unit should not be installed and Lectrodryer should be contacted immediately. When the unit is determined to be in good condition, the following installation procedures should be followed:

    Mechanical Connections 1. Place unit on a flat, level concrete platform and bolt firmly in place. The unit is provided with

    four 11/16 inch (17mm) holes at the corners of the skid for this purpose. NOTE: Insure there is enough clearance around the dryer to access all valves. Also, there must be a 30"

    (762 mm) clearance directly above vessel heads for heater removal. 2. Ground the unit using the grounding lug located on the front right of the skid. 3. Connect the 1" 150 lbs. process inlet flange of the dryer to the high pressure tap on the

    generator. This line should be 1" (25 mm) minimum and should have full line size isolation valves.

    4. Connect the 1" 150 lbs. process outlet flange of the dryer to the low pressure tap on the

    generator. This line should be 1" (25 mm) minimum and should be provided with full line size isolation valves.

  • Page 10 of 45

    5. Pipe the cooling water to the reactivation cooler. Water flow should be from right to left if you

    face the dryer from in front of the control panel. The water connections are 1/2", 150 lb., raised face flanges. Required water flow rate is 1 GPM at 85F inlet temperature (3.81 lpm at 29C). If cooling water temperatures are higher, flow rates may have to be increased to compensate.

    6. Place relief valves on top of each tower, if desired. A 1/2" fnpt connection is provided directly

    behind the pressure gages on the top of each tower. Once the relief valves are in place the discharge should be piped away to a safe location.

    7. A 1/4" fnpt connection is located on the left side of the dryer for control air and control panel

    purging. This connection should be hooked to an instrument air quality air line, with a minimum of 60 psig (4.23 kg/cm2) and a maximum of 120 psig (8.45 kg/cm2) of air pressure.

    8. The dryer CO2 purge inlet connection is located on the bottom right side of the dryer, (V-5). It

    should be piped to a location where carbon dioxide and hydrogen gas can both be supplied. Another option is to use portable tanks for purging when necessary.

    9. The dryer CO2 purge outlet connection is located on the front of the dryer directly below the

    control box, (V-6). This connection should be piped to a safe vent or header. Another option is to use a temporary line run to a vent when purging is necessary.

    10. The condensate drain connection is located on the trap. This 1/2" fnpt connection has been

    connected to a street elbow that is pointing vertically upward. If this connection is to be piped away, the street elbow should be removed and piping hooked up that does not rise above the elevation of the trap outlet.

    This piping system should be designed such that the water discharged from the trap can be

    measured. It is recommended that a container of some sort (beaker, bucket, coffee cup, etc.) be placed below this drain to collect the condensate. It should be checked and recorded at regular intervals, preferably daily. The container should collect very nearly the same amount of water every day. Depending on conditions and parameters of a given system, any where from a few ounces to several quarts of water should be removed from the system every day. If the dryer is located outdoors or where the temperature could drop below 32F (0C), the trap and discharge piping must be heat traced.

  • Page 11 of 45

    11. Hygrometer Probes / Moisture Sensors Inlet and / or Outlet Dewpoint Monitors are optional equipment on the Lectrodryer BAC-50.

    (see the Unit Specification Sheet, page iii, to determine if a particular dryer has these options.) If either of these is included, the hygrometer probes will need to be installed. These probes are

    shipped pre-packed in a small black box inside the control panel. Note that the probes are unit specific and must be matched up with the correct hygrometer.(inlet probe with inlet hygrometer and outlet probe with outlet hygrometer.)

    A blue cable will be hanging loose near the probe installation point. Connect this blue cable to

    the correct probe after installation.

  • Page 12 of 45

    Electrical Connections The only required electrical connection for the BAC-50 is the main power supply. This 3-phase power should be connected to the terminal blocks located in the top left corner of the control box. A 1" NPT hub is provided on the left hand side, near the top of the control box. The actual voltage to be applied depends on the particular dryer. The voltage should be specified at the time of ordering and can be determined by looking at the specification sheet in the front of this manual or on the dryer nameplate on the front of the control panel. There are six (6) options available for the main power supply. One of three different transformers is used to step down the supplied voltage to the 110 volts needed for the controls and the heater.

    TRANSFORMER FUSE SIZES 1. 208 volts, 3 phase, 50/60 hertz FNQ-10 2. 230 volts, 3 phase, 50/60 hertz FNQ-9 3. 460 volts, 3 phase, 50/60 hertz FNQ-5 4. 575 volts, 3 phase, 50/60 hertz FNQ-4 5. 380 volts, 3 phase, 50/60 hertz FNQ-6 6. 415 volts, 3 phase, 50/60 hertz FNQ-5

    Electrical power should not be applied until after the "Prestartup checks" have been completed (see Page 8). NOTE: To prolong the life of dryer electrical

    components, the dryer should be operated as closely as possible to the rated voltage. The dryer should never be operated at voltage in excess of 10% above the rated voltage.

    NOTE: The configuration of the internal

    blowers is such that the direction of rotation is not critical to the performance of the unit. Therefore, the three (3) legs of the power supply can be connected in any orientation and the dryer will function properly.

  • Page 13 of 45

    Optional Electrical Connections

    1. Common Alarm Relay Normally Open (N.O.) auxiliary contact is provided for remote indication of alarms. See wiring

    diagram for actual terminal numbers. Relay is energized during normal operation. (N.O. contact is closed) de-energized for alarm or loss of power. (N.O. contact is open) Note: Normally Closed (N.C.) contacts can be used by switching the wire at the relay, from the

    N.O. contact to the N.C. contact. 2. Inlet Dewpoint Monitor Normally Open (N.O.) auxiliary contact is provided for remote indication of High Inlet

    Dewpoint Alarm. See wiring diagram for actual terminal numbers. Relay is energized during normal operation. (N.O. contact is closed) de-energized for alarm or loss of power. (N.O. contact is open) Note: Normally Closed (N.C.) contacts can be used by switching the wire at the back of the

    hygrometer from the N.O. contact to the N.C. contact. A 4-20 milli-amp signal is provided for remote monitoring of the dewpoint. This connection is

    located on the back of the hygrometer. 3. Outlet Dewpoint Monitor Normally Open (N.O.) auxiliary contact is provided for remote indication of High Outlet

    Dewpoint Alarm. See wiring diagram for actual terminal numbers. Relay is energized during normal operation. (N.O. contact is closed) de-energized for alarm or loss of power. (N.O. contact is open)

  • Page 14 of 45

    Note: Normally Closed (N.C.) contacts can be used by switching the wire at the back of the hygrometer from the N.O. contact to the N.C. contact.

    A 4-20 milli-amp signal is provided for remote monitoring of the dewpoint. This connection is

    located on the back of the Hygrometer. See Wiring Diagram for contact configuration and wire/terminal block numbers for the auxiliary alarm contacts. Once all of these connections have been completed, the unit is ready to be tested and started up. See the "Prestartup Procedures" section of this manual, page 7, for proper testing requirements.

  • Page 15 of 45

    Startup & Shutdown Procedures

    Prestartup Procedures After the dryer has been properly installed, but before pressurizing with hydrogen, the following checks should be made: (The results should be recorded in the Dryer Performance History Chart of this manual, for future reference and trouble shooting.) A. Power Off

    1. Verify that all conduits entering the control box are sealed using a conduit seal fitting, or by using putty. Verify that all conduit seals have been poured.

    2. Measure the resistance values for both motors and both heaters. Record in the Dryer

    Performance History Chart. Motor resistance phase to phase Motor resistance phase to ground Heater resistance phase to phase Heater resistance phase to ground

    B. Power On 1. Apply power. 2. Verify that the Allen Bradley Panelview 300 Micro operator interface begins reading. 3. Turn "Off / Run" switch to the "Run" position. 4. Using the Push-to-Step feature, cycle the dryer thru the 4 steps of its sequence of operation. Step 1, Adsorbing 1, Heating 2 Step 2, Adsorbing 1, Cooling 2 Step 3, Adsorbing 2, Heating 1 Step 4, Adsorbing 2, Cooling 1 5. Verify that the 4 way valves, V-7 & V-8, switch properly. 6. Measure and record the amps draw for both motors and both heaters.

  • Page 16 of 45

    Optional

    7. Test the Alarms a. Switch Failure Alarm - Shut off the instrument air supply to the solenoid valve. Then, using

    the "Push-to-Step" feature, advance the dryer until it tries to switch towers. The valves should not switch. After a 10 second time delay, a Switch Failure Alarm will be indicated. The Common Alarm Relay (CR1) will de-energize for alarm conditions.

    b. Heater Failure Alarm - Trip the heater circuit breaker, CB-1, 15 amps. Advance the dryer to

    step 1 or 3, a heating step. After 10 seconds a Heater Failure Alarm will be indicated. The Common Alarm Relay (CR1) will de-energize for alarm conditions.

    c. Motor Failure Alarm - Trip the Motor Starter Protector, MSP. After 10 second a Motor

    Failure Alarm will be indicated. The Common Alarm Relay (CR1) will de-energize for alarm conditions.

    d. Control Box Purge Failure Alarm - Shut off the purge gas supply to the control panel, or just

    open the door. A Control Box Purge Failure Alarm will be indicated. The Common Alarm Relay (CR1) will de-energize for alarm conditions.

    8. Once all of the electrical checks have been completed, be sure to put the dryer in step 1, then

    back to automatic mode. C. Power Off

    1. Prime the Trap Insure proper trap drainage by removing the vent tubing on the top of the trap and pouring

    water into the trap until it discharges. This will also provide a water seal on the trap discharge to insure no hydrogen leakage. a. Record in Dryer Performance History Chart.

    2. Purge the Control Panel Verify control panels have been purged properly and maintain an internal purge pressure of

    at least 0.1" W.C. See Control Box Purging section of this manual. a. Record the purge pressure in the Dryer Performance History Chart.

    3. Purge the dryer with CO2 to remove all air from the system. See Process Purging section

    of this manual. 4. Purge/Pressurize With Hydrogen Once all of the above checks and measurements have been verified and recorded, the dryer is

    ready to be purged and pressurized with hydrogen. a. Follow the same steps found in Process Purging, except using hydrogen instead of

    CO2.

  • Page 17 of 45

    b. Once brought to line pressure with hydrogen, the dryer should be thoroughly checked for hydrogen leaks.

    c. Special attention should be paid to all process connections that are connected via

    electrical conduit to the control panels. Especially: Two (2) heater terminal studs in the top of each vessel. One (1) motor electrical feed-thru in the bottom of each vessel.

    5. Position all manual valves in their normal operating position. V-1, Flow Control Valve - partially open; see setting reactivation flow section of this manual. V-2, Trap isolation valve - Open. V-3, Trap vent valve - Open.

    V-5, Purge Inlet - Closed. V-6, Purge Outlet - Closed

    Start-Up Procedures Before attempting to start-up the BAC-50, the installation procedures, pre-start-up procedures, CO2 purging, control box purging, and hydrogen leak check must be properly completed. The unit should be under pressure and electrically ready to go on-line. When all of this is complete the following procedures should be followed to place the unit on-line. POWER OFF 1. Insure that both vessels are at line pressure. 2. Valves V-2 & V-3, should be fully open. 3. Valves V-5 & V-6, should be fully closed. 4. Valve V-1 (Flow Control Valve) should be open about 1-1/2 turns. 6. Insure that all owner supplied in-line block valves are open. 7. Verify the circuit breaker on each of the motor starter protectors (MSP-1, 2) are in the ON

    position. 8. Verify the control boxes have been properly purged and maintain an internal pressure of at least

    0.1" W.C. (25 Pa).

  • Page 18 of 45

    POWER ON 9. Close the disconnect switch on the side of the control box to apply power to the dryer. 10. Place the OFF/RUN switch in the RUN position. The unit should begin its continuous cycle as soon as the switch is placed in the RUN position. During the first several cycles the unit requires adjustments to achieve maximum performance. It also requires monitoring to assure that all aspects of operation are working properly. As soon as operation begins, the following should be completed: 11. Check the dryer operation against the "Sequence of Operation" section of this manual to assure

    proper operation. 12. Once the reactivating tower has reached temperature (about 2 hours into heating), V-1 should be

    closed in 1/8-turn intervals until the optimum temperatures are reached. The bed outlet temperature (TI-1) should show 180F 20F (82C 11C) and the beds should be at 325F 50F (163C 28C) (See Setting Reactivation Flow" section of this manual.)

    NOTE: Once adjustments have been made, 15-20 minutes are required for the unit to reach steady state

    conditions. 13. Monitor the water removal per cycle for the first several cycles. Water should begin to

    discharge from the trap just after the bed temperature reaches 180F 20F (82C 11C). Total water removal is dependent upon moisture load in the generator as well as several other factors. The water taken out during the first several cycles should be between 1 pint and 1 quart. The very first reactivation cycle will have significantly less water removal if the desiccant is dry when installed.

    14. Monitor the outlet dewpoint of the dryer.

  • Page 19 of 45

    Performance H

    istory Chart

  • Page 20 of 45

    Control Box Purging Instructions General Description

    Lectrodryer Type Z purge system is designed to meet or exceed the requirements of the National Fire Protection Association (NFPA), particularly NFPA 496 Purged and Pressurized Enclosures and NFPA 70 National Electric Code (NEC). Lectrodryers provided with a Type Z purged electrical enclosure are permitted by the NEC to be used in a Class I, Division 2 location. The purging/pressurizing of a general-purpose enclosure protects it by reducing the concentration of hazardous gases and vapors initially present to a safe level, and keeps the safe level by maintaining a positive pressure in the enclosure. Instrument quality air or suitable inert gases are normally considered acceptable purge supplies. The purge system includes a regulator, pressure gage, outlet valve, warning nameplate, differential pressure switch, relief valve, and loss of purge alarm light with SPDT dry contacts. Purge Requirements

    Before applying power, the control panel must be purged with four (4) enclosure volumes of protective purge gas while maintaining a minimum pressure of 0.1 inches of water (25 Pa). In order to accomplish this, the purge flow regulator must be set to maintain a minimum pressure of 0.7 inches of water (175 Pa) with the purge outlet valve wide open. This will produce a purge flow of approximately 1.8 scfm. The initial purge time (number of minutes) is stamped on the purge warning nameplate on the front of the enclosure. After this initial purge time the purge outlet valve must be left open for continuous purge, unless one of the following exceptions apply. EXCEPTION #1 - The protective purge gas supply is an inert gas such as nitrogen or carbon dioxide

    (CO2). EXCEPTION #2 - There are no conduit connections to any flammable / hazardous gas or fluid that,

    by way of a single failure such as a diaphragm on a pressure switch, could allow the flammable/hazardous gas or fluid into the conduit system, and ultimately into the control panel. This includes any means of introducing a flammable / hazardous gas or fluid into the control panel by way of a single failure.

    If one of the above exceptions does apply, then after the initial purge time, the purge outlet valve may be closed in order to minimize purge gas usage. Note: On the Lectrodryer BAC-50, the purge gas connection is tubed up to the Instrument Air Connection for the dryer switching valves. In this configuration, instrument air is necessary at the one connection point to serve both functions.

  • Page 21 of 45

    Operation It is very important to note that Power must not be applied to the enclosure until it has been purged and pressurized per these instructions. If the enclosure has not been fully purged or if the purge has failed, do not operate any disconnects, buttons, or switches at the enclosure. Only turn the power off from a safe (remote) location to prevent arcing in an unprotected enclosure. 1. Apply pressure to the purge supply regulator inlet. Maximum supply pressure 100 psig. 2. Open the purge outlet valve located by the enclosure pressure indicator. Ensure a minimum of

    0.7 inches of water (175 Pa) is maintained in the enclosure during the purge period. 3. Purge the enclosure for the time period stamped on the warning nameplate. The enclosure must

    be purged for 4 volume changes. 4. At the end of the initial purge period the purge outlet valve may be closed if one of the

    exceptions, previously listed, does apply. A minimum of 0.1 inches of water column pressure must be maintained.

    5. Turn power on to the enclosure. IMPORTANT: ALWAYS REMOVE POWER FROM THE ENCLOSURE BEFORE THE PURGE SYSTEM IS SHUT OFF. Purge Failure Alarm A differential pressure switch monitors the purge pressure. Under normal conditions the purge pressure is above the setpoint and the purge alarm relay is energized signaling a normal condition. If the purge pressure drops below the setpoint the relay will be de-energized. A Purge Failure alarm will be signaled locally with a light and remotely with the customers dry contacts. Power to the enclosure must be shut off immediately from a "safe" (remote) location. Push buttons and switches on the enclosure should not be operated. The enclosure must be purged again before power can be re-applied to the enclosure.

  • Page 22 of 45

    Process Purging Specific instructions for purging the dryer with CO2 or other inert gas should be established by the appropriate operating and/or safety personnel for each plant. However, as a minimum, it is recommended the unit be purged prior to initial start-up or any time the dryer is being brought on-line after having been depressurized. Also, the dryer should be purged immediately following depressurization in order to remove all hydrogen from the system. One method of purging the dryer is as follows: A. Close all isolation valves between the

    dryer and the generator. B. Connect CO2 supply to purge inlet valve

    V-5, minimum 30 psig (2.1 kg/cm2), maximum 100 psig (7.0 kg/cm2).

    C. Connect tubing to purge outlet valve V-6 and pipe away to safe location. D. Open valves V-2 & V-3. C. Depressurize dryer by opening purge

    outlet valve V-6, if not already

    depressurized. Close purge outlet valve V-6.

    D. Open purge inlet valve V-5. Pressurize

    the dryer with CO2 to a minimum of 30 psig (2.1 kg/cm2).

    E. Close purge inlet valve V-5. F. Open purge outlet valve V-6.

    Depressurize the dryer to 5 psig (0.35 kg/cm2).

    CAUTION: Do not allow pressure to reach

    atmospheric pressure, because this could allow oxygen to re-enter the dryer.

    G. Close purge outlet valve V-6. Repeat Steps D, E, F, and G four (4) times to reduce the percent of oxygen to less than 0.65%. Always use a sniffer analyzer to confirm purging complete.

    Alternate Purge Method: Open purge inlet valve V-5 and purge outlet valve V-6. Purge the reactivating tower by sweep method until sniffer analyzer indicates that purging is complete. It is recommended to swap the dryer towers several times during purging if using a sweep method. An easy way to swap towers is to reverse the pushloc tubing coming out of the solenoid valve, going to the actuator. Make certain to re-install the tubing to the proper ports when complete. Solenoid Valve port 2 Actuator port facing the back of the control box. Solenoid Valve port 4 Actuator port facing tower #1.

  • Page 23 of 45

    Operation

    Explanation of Adsorption and Reactivation Flowpaths

    Assume that tower #1 is on Adsorption and tower #2 is on Reactivation. ADSORPTION The adsorption consists of hydrogen exiting the high-pressure tap on the generator, passing through the bottom 4-way valve, V-8. At this point, the adsorption flow is diverted into the bottom of tower #1 where the internal blower assists in forcing the hydrogen up through the desiccant bed where the water is removed. The dry hydrogen exits the dryer through the top 4-way valve, V-7, and then returns to the low-pressure tap on the generator. While Tower 1 is in adsorption service providing dry hydrogen to the generator, Tower 2 is being reactivated, the process of drying out the desiccant, restoring its ability to adsorb moisture. Once Tower 2 is fully reactivated, it is ready to go back into adsorption service. The 2 towers alternate back and forth in this manner.

    REACTIVATION Starting at the blower motor, the hydrogen is forced up through the bed that is being warmed by the heater, driving off the water collected by the desiccant. The wet flow then travels through the flow control valve (V-1) and on to the cooler. Flow of warm moist hydrogen continues through the cooler where the temperature is lowered to less than 100F (38C), and water begins to condense. A centrifugal type separator separates the water from the hydrogen. The water is taken out of the system via the float-type trap. The cooled hydrogen flow continues through the bottom 4-way valve, V-8, then back into the bottom of the vessel where this heating process starts all over again. During normal operation, valves V-2 & V-3 should be open. Valves V-5 & V-6 should be closed, and V-1 should be partially closed. Valves V-7 & V-8 are 4-way switching valves and are controlled automatically by the dryer.

  • Page 24 of 45

    Sequence of Operation The Lectrodryer BAC-50 is a fully automatic, dual tower, continuous operation hydrogen drying system. The BAC-50 adsorption flow uses blowers that are internal to the adsorption vessels, to assist the generator fan differential in producing adsorption flow. The BAC-50 timing cycle consists of 8 hours adsorbing and 8 hours of reactivation for each tower. The reactivation consists of 4 hours heating and 4 hours cooling. The BAC-50 is designed to operate according to the following 4 steps:

    Step 1 Adsorbing 1, Heating 2 4 hours Step 2 Adsorbing 1, Cooling 2 4 hours Step 3 Adsorbing 2, Heating 1 4 hours Step 4 Adsorbing 2, Cooling 1 4 hours

    Assume the dryer is in Step 1, adsorbing tower #1 and heating tower #2. Outputs 0 and 3 are energized. Output 0 energizes solenoid coil S-1 to position the 4-way valves for adsorbing tower #1. Output 3 energizes heater contactor CON-2. The motors run continuously unless power is removed from the dryer, or if the ON/OFF circuit breaker on the motor starter protector is OFF. The heating process liberates the moisture trapped by the desiccant during the adsorption period. The movement of the gas through the bed, the cooler, and the separator removes the liberated and condensed water vapor from the reactivation system via the drain trap. After 4 hours the dryer will advance to Step 2, Adsorbing tower #1, Cooling tower #2. In this step the heater de-energizes. Flow continues through tower #2 to cool the desiccant. After 4 hours of cooling the towers reverse and the dryer will adsorb on tower #2 and reactivate tower #1. This cycle will continue until power is removed from the dryer. A pressure make-up line is provided across the lower 4-way valve. The make-up line insures that both vessels are at line pressure before switching.

  • Page 25 of 45

    Push-to-Step Feature The Lectrodryer BAC-50 is controlled by a Programmable Logic Controller (PLC) and is equipped with a Push to Step feature. Push to Step is a troubleshooting tool that is used to manually sequence the dryer, and to verify the Sequence of Operation. Under normal operating conditions the PLC is programmed to control the dryer according to a predetermined set of conditions. When in the normal automatic operating mode, the only thing that can advance the dryer to the next step is these conditions becoming satisfied. For the BAC-50, the conditions are the heating and cooling timer that last 4 hours each. In order to save an operator or trouble shooting personnel from waiting on these timers, the Push to Step feature was added. It will allow the predetermined set of conditions to be overridden and advance the dryer to the next step in the sequence. This is a very important feature and can be very helpful when troubleshooting. WARNING: It is also a very powerful tool and should be used with extreme caution. Always make sure that you understand the dryer and sequence, and that you know exactly what is going to happen when the dryer enters the next step. All safety interlocks are overridden by the Push to Step feature. Make sure that it is safe to advance to the next step before doing so. Always know what is going to happen, before it happens.

    A time delay of 5 seconds must expire between each step when using the Push to Step feature. This delay is sometimes the only interlock preventing a cycle advance. It is left up to the operators judgment as to whether it is safe to advance. When in "Test" mode, the dryer cannot cycle automatically. Always change the controller back to Auto when trouble- shooting is complete. SUMMARY: 1. Be sure to understand the dryer and the

    dryer sequence. 2. Place the dryer in Test mode Refer

    to the Operator Interface Panelview 300 Micro.

    3. Verify conditions are safe to advance

    to next step. 4. Wait for the 5-second time delay. 5. Advance step Function key F4 on the

    Dryer Status screen. 6. Repeat steps 3-5 until troubleshooting

    is complete. 7. Change the controller back to Auto

    mode.

  • Page 26 of 45

    Operator Interface Display Panelview 300 Micro The Allen Bradley Panelview 300 Micro operator interface is designed to provide status, timing, and alarm indication to operators and maintenance personnel. Six normal operating pages are currently configured for the PanelView operator interface. Use the left and right arrow keys to scroll through these pages. Page 1 Dryer Status Page 2 List of Alarms Page 3 PLC Input Status Page 4 PLC Output Status Page 5 Active Alarms Page 6 Alarm History There is also a Screen Selector Page. Password Protected Pages There are six other pages configured that are password protected. They do not show up as you scroll through the normal pages listed above. They do show up on the Screen Selector page. Select Automatic or Test Modes of Operation Page Counter Setup Page Reset Heating Page Reset Cooling Page Screen Configure Page Change Password Page When prompted to do so, enter the password from left to right. Use the up and down arrow keys to change the first digit, then press the right arrow to move to the next digit. When all digits are correct, press the enter button.

  • Page 27 of 45

    Page1 Dryer Status will display the following: Lectrodryer Run / Stop Status Dryer sequence step name, number and elapsed time Dryer mode of operation (Automatic / Test) Alarm Status Three function key push buttons are enabled on this page: F2 Go to Screen Selector Page F3 Go to Select Automatic or Test Modes of Operation Page F4 Push to Step - If dryer is in Test Mode this button will advance the dryer to the next

    sequence step. Page 2 Alarm Status will display the following: 4 Way Valve Failure Alarm / No Alarm Heater #1 Failure Alarm / No Alarm Heater #2 Failure Alarm / No Alarm Motor #1 Failure Alarm / No Alarm Motor #2 Failure Alarm / No Alarm C-box Purge Failure Alarm / No Alarm Two function key push buttons are active on this page: F1 Go to Dryer Status Page F2 Go to Screen Selector page

  • Page 28 of 45

    Page 3 PLC Input Status This page will display all of the PLC digital inputs that are used in the program, and their status (on / off). This is useful when troubleshooting. The control panel is purged and normally requires a permit to open. This page allows an operator to view all inputs without having to open the box. The only push buttons that are active on this page are: F1 Go to Dryer Status Page F2 Go to Screen Selector Page Page 4 PLC Out put Status This page will display all of the PLC digital outputs that are used in the program, and their status (on / off). This is useful when troubleshooting. The control panel is purged and normally requires a permit to open. This page allows an operator to view all outputs without having to open the box. The only push buttons that are active on this page are: F1 Go to Dryer Status Page F2 Go to Screen Selector Page Page 5 Active Alarms This will display any alarms that have not yet been acknowledged. To acknowledge an alarm from this page, use the up and down arrow keys to scroll to the alarm to be acknowledged. Press the enter button. The only push buttons that are active on this page are: F1 Go to Dryer Status Page F2 Go to Screen Selector Page

  • Page 29 of 45

    Page 6 Alarm History This page will display the 100 most recent alarms. After 100, the oldest alarms get pushed out as new ones come in. The only push buttons that are active on this page are: F1 Go to Dryer Status Page F2 Go to Screen Selector Page Screen Selector Page This page displays a list of all pages in the Panelview 300 Micro program. Use the up and down arrow keys to scroll to the desired page, then press the enter button, and the display will go directly to that page. Select Automatic or Test Modes of Operation Page This page allows the operator to switch the dryer between Automatic and Test Modes of operation. F1 Go to Dryer Status Page F2 Go to Screen Selector Page F3 Automatic Mode F4 Test Mode Counter Setup Page This page displays and allows for changes, to the preset and accumulated values, for Minutes and Hours, for both the heating and cooling steps. Use the left and right arrow keys to scroll to the value to change. Use the up and down arrows to change the value, then press the enter button. F1 Go to Dryer Status Page F2 Go to Screen Selector Page

  • Page 30 of 45

    Reset Heating Page This page allows the operator to reset the sequence to the beginning of the Heating Step. If the sequence is currently in the Heating Step, then the counter will just reset to zero. If the sequence has already advanced to the Cooling Step, then the sequence will back up and restart the previous Heating Step. F1 Go to Dryer Status Page F2 Go to Screen Selector Page F3 Reset sequence to the beginning of the Heating Step Reset Cooling Page This page allows the operator to reset the sequence to the beginning of the Cooling Step. If the sequence is currently in the Cooling Step, then the counter will just reset to zero. If the sequence is still in the Heating Step, then the sequence will skip the Heating Step and jump into the Cooling Step. F1 Go to Dryer Status Page F2 Go to Screen Selector Page F3 Reset sequence to the beginning of the Cooling Step. Screen Configure Page This page allows the operator to adjust screen parameters such as contrast, time and date, etc. F1 Go to Dryer Status Page F2 Go to Screen Selector Page F3 Enters the Screen Configuration Menu Change Password Page This panel is programmed to accept up to 3 different passwords. They are all 3 factory set at 2450. A supervisor may wish to assign different passwords to different operators or departments. F1 Go to Dryer Status Page F2 Select password to change F3 New Password F4 Verify Password

  • Page 31 of 45

    Setting Reactivation Flow The reactivation flow control valve, V-1, is factory set at approximately 1-1/2 turns open. During start-up, it may be necessary to adjust V-1 to achieve the proper reactivation temperatures. Normal Operating Temperatures: A. 325F 50F (163C 28C) at TIS-1 or TIS-2,bed temperature

    B. 180F 20F (82C 11C) at TI-1, bed outlet gas temperature C. 100F (38C) or less at TI-2, cooler outlet gas temperature NOTE: If V-1 is set properly, the bed outlet gas temperature of 180F 20F (82C 11C) will be reached approximately two hours into the heating step. 1. If the reactivation flow is too low:

    A. The bed temperature will be too high. B. The bed outlet gas temperature will be too low. C. The cooler outlet gas temperature will be normal.

    V-1 should be opened in 1/8 turn increments to increase the reactivation flow. Once adjustments have been made, allow 15 - 20 minutes for the temperature to stabilize before re-adjusting. Refer to Normal Operating Temperatures.

    2. If the reactivation flow is too high: A. The bed temperature will be too low.

    B. The bed outlet gas temperature could be too low, too high, or normal, depending on how much too high the reactivation flow is. C. The cooler outlet gas temperature will be too high.

    V-1 should be closed in 1/8 turn decrements to decrease the reactivation flow. Once adjustments have been made, allow 15 - 20 minutes for the temperature to stabilize before re-adjusting. Refer to Normal Operating Temperatures.

    In order to maximize the efficiency of the dryer, all three of these temperatures must be balanced as best as possible.

  • Page 32 of 45

    Maintenance

    Blower Removal 1. Verify the tower to be serviced is off-line

    and has been purged. 2. Remove the three (3) motor leads and

    conduit from the terminal blocks in the junction box "3" on the outside of the bottom head.

    3. Remove the interconnecting piping "4"

    between the vessel and bottom 4-way valve, V-8.

    4. Carefully remove vessel bottom head

    bolts "1". When all of these bolts have been removed, the bottom head "2" can be lowered. The entire blower assembly is attached to the bottom head and will be lowered along with the head.

    NOTE: Use caution when lowering the head as

    the weight of the assembly is 125 lbs. (56 kg)

    5. To remove the blower wheel "6", loosen

    set screw "7" and lift upward. 6. To remove the blower housing end plate,

    remove four (4) screws "9" and lift upward.

    7. To remove the blower housing "5",

    remove the four (4) bolts "8" and lift upward.

    8. Remove motor leads from electrical feed

    through wires on the inside of the bottom head. The wires should be clipped near the splice connectors.

    CAUTION: Use caution when working with split

    bolts and electrical "feed through". High heat tape and heat shink must be used (500 F/260 C) Damage to these can be a source of hydrogen leakage and electrical short. Do not over tighten. Always check this area after servicing.

    9. To remove the motor, remove the four (4)

    remaining bolts from the inside of the housing.

    Be sure to transfer the auxiliary stop collar (not shown) on the old motor shaft to the new motor shaft.

  • Page 33 of 45

    Blower Installation 1. Verify the motor is mounted securely

    inside blower housing "5" and the stop collar has been transferred from the old motor shaft to the new shaft.

    2. Connect motor leads to the feed through

    wires located on the inside of the bottom head "2".

    3. Mount the blower housing "5" inside the

    ring on the inside of the bottom head. Secure with the four (4) bolts "8".

    4. Place the blower housing end plate in

    place and secure with four (4) screws "9". 5. Place the blower wheel "6" on the motor

    shaft and tighten set screw "7". There should be a 1/64" to 1/16" (0.5 - 1.5 mm) clearance between the blower wheel and the top of the blower motor housing.

    6. Replace the 10" 150 lb flange gasket

    (must be good for hydrogen at 150 psig {10.56 kg/cm2} and 500F {260C}).

    7. Bolt vessel bottom head back into place

    (bolt torque 80-100 ft.-lbs {10.88 - 13.61 M-kg}).

    8. Bolt the interconnecting piping "4" back

    into place (replace 1", 150 lb gasket). 9. Connect the three (3) motor leads to the

    terminal block in the junction box on the outside of the bottom head.

    CAUTION: Use caution when working with split

    bolts and electrical "feed through". High heat tape and heat shink must be used (500 F/260 C) Damage to these can be a source of hydrogen leakage and

    electrical short. Do not over tighten. Always check this area after servicing.

    10. Leak test. 11. Purge the dryer of air to ready it to be

    placed back on-line. See "Process Purging Instructions."

  • Page 34 of 45

    Heater Removal

    1. Verify the tower to be serviced is off-line

    and has been purged. 2. Remove the temperature switch element

    "8" from the top head. Remove leads and

    conduit from the terminal studs "3" on the outside of the top head.

    3. Remove vessel top head bolts "1". 4. Lift top head "2" and disconnect heater

    from terminal studs "3" on inside of head. CAUTION: Use caution when working with split

    bolts and electrical "feed through". High heat tape and heat shink must be used (500 F/260 C) Damage to these can be a source of hydrogen leakage and electrical short. Do not over tighten. Always check this area after servicing.

    5. Remove head "2". 6. The desiccant "4" must then be removed

    per the "Changing the Desiccant Procedure" section of this manual.

    7. Once the desiccant has been removed

    from the vessel "6", the heater "5" can easily be removed.

    Heater Installation 1. Place the heater "5" back inside the vessel

    "6". 2. Refill vessel with desiccant "4". 3. Replace the 10" 150 lb flange gasket

    (must be good for hydrogen at 150 psig {10.56 kg/cm2} and 500F {260C}).

    4. Connect heater to terminal studs "3". CAUTION: Use caution when working with these

    terminal stud "feed-throughs". Damage to these can be a source of hydrogen

    leakage. Do not over tighten. Always check these for leaks after servicing.

    5. Check heater resistance at terminal studs

    to verify no short-to-ground exists. 6. Bolt vessel head back into place (bolt

    torque 80-100 ft.-lbs {10.88 - 13.61 M-kg}).

    7. Reinstall temperature switch element and

    heater wires on the outside of the top head.

    8. Dryer should be leak checked and purged prior to being placed back into service.

  • Page 35 of 45

    Changing the Desiccant The BAC-50 holds 50 lbs. (23 kg) of activated alumina desiccant per tower. Under normal operation the desiccant will be good for approximately 3 to 5 years. If the hydrogen has oil present or is dirty, desiccant life may be shorter. When the desiccant performance has fallen off to an unacceptable level, the following procedure should be followed to replace it with new desiccant. 1. Take the unit off-line and purge the dryer

    using the process purging instructions.

    2. Remove the temperature switch element

    "8" from the top head. Remove heater leads and conduit from the terminal studs "3" on the outside of the top head.

    3. Remove bolts "1", lift the top head "2"

    slightly and disconnect the heater wires from the terminal studs "3".

    4. Remove old desiccant "4" with a vacuum.

    5. Remove the heater "5". Vacuum remaining desiccant and clean the bottom screen.

    6. Replace the heater assembly. 7. Refill vessel with new desiccant. Take

    care not to pour desiccant dust into the vessel.

    8. Replace the 10" 150 lb flange gasket

    (must be good for hydrogen at 150 psig {10.56 kg/cm2} and 500F {260C}).

    9. Reconnect heater wires to terminals "3"

    and replace the top head "2". Replace bolts "1".

    CAUTION: Use caution when working with split bolts

    and electrical "feed through". High heat tape and heat shink must be used (500 F/260 C) Damage to these can be a source of hydrogen leakage and electrical short. Do not over tighten. Always check this area after servicing.

    10. Check heater resistance at terminals to

    verify no short-to-ground exists. 11. Bolt vessel head back into place (bolt

    torque 80-100 ft.-lbs) {10.88 - 13.61 M-kg}).

    12. Leak test. 13. Purge the dryer of air to ready it to be

    placed back on-line.

  • Page 36 of 45

    Cleaning the Trap

    The trap should be cleaned weekly for the first two weeks of operation, once ever three months thereafter. To clean the trap: 1. Close valves V-2 & V-3. Be sure these

    valves are closed before servicing the trap.

    2. Disconnect drain line from trap outlet. 3. Remove the four bolts around the

    circumference of the trap and remove float assembly.

    4. Clean trap thoroughly with detergent solution. Check to be sure drain orifice is clear.

    5. Reassemble trap. 6. Reconnect drain line. 7. Remove plug in top of trap and fill with

    water until drainage occurs. Place plug back in trap.

    8. Open valves V-2 & V-3. 9. Leak test.

    WARNING: Valves V-2 and V-3 must be CLOSED while servicing trap. Failure to close these valves will allow pressurized hydrogen to leak into the atmosphere, which could result in an explosion causing personal injury. CAUTION: During normal operation valve V-2 and V-3 must be OPEN. Failure to open these valves after servicing trap or closing them for extended periods of time will result in damage to the dryer.

  • Page 37 of 45

    Proper Maintenance of Non-Lubricated Sleeved Plug Valves The non-lubricated plug valves used on BAC-50 dryer are designed and built to give long, trouble-free service. Properly applied, adjusted and operated, these valves should require minimum attention. Field repair of valves may be performed carefully following the instructions in this book, but should be weighed against the advantage of returning the valves to Lectrodryer, because of the availability of specialized service equipment. Consult Lectrodryer for any questions or additional information. The following procedures have been prepared to assist you in the maintenance and repair of these valves: ADJUSTMENTS Loss of seal All valves are factory adjusted and normally further adjustment is not required. However, if seepage does occur at the plug shank or downstream, the following adjustments can be made: Tighten each of the three adjustment bolts (or screw) 1/4 turn. Operate valve and check for leakage. Repeat as necessary to stop the seepage. The need for frequent adjustment of the bolts, and/or many adjustment turns indicates the seals are worn to the point of needing replacement. Excessive tightening of the adjustment bolts will cause an increase in the valve stem torque. Valve torque Valves should be operated under service conditions for at least twelve hours before any torque adjustments are made, since the initial breakaway torque normally reduces with usage and temperature. If necessary to loosen the valves to obtain proper shifting each of the three adjustment bolts must be loosened uniformly 1/4 turn. Check the operation of the valves. Repeat this procedure as necessary but no more than three times, or leakage may occur. After the initial break-in period, the following adjustments can be made if the valve torque is higher than the recommended 15 foot - pounds (2.04 M-kg) at the stem.

  • Page 38 of 45

    Instructions for Servicing Matryx Vane Actuators

    1. Remove all screws. Lift off cover and

    remove paddle. 2. Clean inside surface with solvent. 3. Remove sealant on joint surface with

    lacquer thinner. 4. Lubricate internal surfaces with Parker O-

    Lube. 5. Replace O-rings and paddle seal rings.

    Lubricate with Parker O-Lube. 6. Place paddle in body half.

    7. Coat housing joint surface with General Electric or Dow Corning silicone sealant. This is available as silicone bathtub caulk.

    8. Replace top half of body. With paddle

    turned to right side, snug down screws on left side shoulder bolt first. Rotate paddle to left side of actuator and snug down screws on right side, shoulder bolt first.

    9. Tighten all screws securely. 10. Rotate shaft several times. 11. Actuator should not be placed in service

    for at least 4 hours so sealant will be completely set up.

  • Page 39 of 45

    Preventive Maintenance Schedule Daily 1. Check dryer control panel and remote alarms for any alarm conditions. 2. Collect, measure, and record the amount of water removed through the condensate trap. Weekly 1. Verify the heater outlet temperature near the end of the four (4) hour heating period is 180F

    20F (82C 11C), and bed temperature is reading approximately 325F 50F (163C 28C).

    2. Check dewpoint. 3. Verify trap drainage at the end of four (4) hour heating period. Disassemble and clean if

    necessary. Quarterly 1. Check entire dryer for hydrogen leakage including all electrical feed-through connections. 2. Measure differential pressure across the dryer to verify flow through dryer. Every Six Months 1. Take dryer readings and record on Performance Chart. 2. Verify proper operation of 4-way valves, V-7 & V-8. 3. Verify proper operation of Switch Failure, Heater Failure, Motor Failure, and Control Panel

    Purge Failure Alarms. Yearly 1. Clean and inspect Hygrometer probe as described in the Panametrics Manual, if applicable. 2. Verify and/or calibrate relief valves if applicable. 3. Clean solenoid valves. Rebuild as necessary. 4. Clean/flush cooler fin/tube bundle. Every Three Years 1. Replace desiccant if performance hasn't necessitated prior replacement. 2. Return Panametrics Series 5 Hygrometer to Panametrics for recalibration, if applicable. Every Outage 1. Perform Daily, Weekly, Quarterly, and Six Month preventive maintenance items above.

  • Page 40 of 45

    Optional Electrical Features

    Optional Voltages Several different voltages are offered as standard on the BAC-50. To accomplish this and still keep all components identical, special transformers are installed. These transformers can be wired differently for different primary voltages to achieve the same secondary voltages (110 volt). The different wirings for the transformer are shown below.

  • Page 41 of 45

    Diagnostics Package (Alarms) A diagnostics package consisting of Switch Failure, Motor Failure, Heater Failure Alarms is provided as optional equipment on the Commercial Model BAC-50. Each of these is explained below. Refer to Wiring Diagram and the PLC Ladder Logic for exact details.

    Switch Failure During normal operation limit switch contact ZS-3 will close when Tower 1 is adsorbing and ZS-4 will close when Tower 2 is adsorbing. If the main adsorbing valves fail to operate properly, timer T4:2 will begin counting. After 10 seconds the Switch Failure Alarm will be indicated and the Common Alarm Relay (CR1) will de-energize.

    Heater Failure During normal operation of a heating step, one of the heater contactor auxiliary contacts CON1-1B or CON2-1B will be closed indicating that the heater contactor is energized. If the contactor is in fact energized, then the heater should be drawing current (approximately 9.5 Amps). The current relay (IR-1) will be energized The normally open contact wired to input #5 will close and energize the input, indicating normal operation.

    If the heater burns out, shorts out, or a fuse or circuit breaker trips, the current relay will detect no current and de-energize, the normally open contact (IR-1) will open and turn off input #5 and the PLC timer T4:3 for heater 1, or T4:4 for heater 2 will begin counting. After 10 seconds the Heater Failure Alarm will be indicated and the Common Alarm Relay (CR1) will de-energize.

    Motor Failure During normal operation both blower motors run continuously. The motor starter auxiliary interlocks should both be closed and inputs #3 and #4 should be energized, indicating normal operation. If either motor burns up, overloads, shorts out, or a phase unbalance or phase loss is detected by the Motor Starter Protector (MSP), the MSP will trip and de-energize that motor starter contactor. Input #3 or #4 will be de-energized and the PLC timer T4:5 for motor 1, or T4:6 for motor 2 will begin counting. After 10 seconds the Motor Failure Alarm will be indicated and the Common Alarm Relay (CR1) will de-energize.

  • Page 42 of 45

    Inlet and Outlet Hygrometers Optional Inlet and outlet hygrometers are provided for monitoring the moisture content entering and exiting the dryer. Each hygrometer is provided with an aluminum oxide probe and is calibrated over a range of -166F to +68F (-110C to +20C). Each is provided with a normally open and normally closed alarm contact and a 4-20 milliamp output. The alarm contacts are prewired to a terminal strip. The alarm points are adjustable by opening the window kit on the front panel. The alarms are preset at the factory at: AI-1 (inlet) +20F (-7 F) AI-2 (outlet) -20F (-29C) NOTE: A complete hygrometer instruction manual is shipped with every dryer.

  • Page 43 of 45

    Parts Description and Functions ADSORBER VESSELS - The absorber vessels are of carbon steel construction with stainless steel

    desiccant support screens. The vessels contain a low watt density removable embedded heater for efficient heating of the desiccant.

    BLOWER ASSEMBLY - An internal blower is provided in each absorber vessel. The blower is

    used for reactivation flow, and to assist adsorption blow. TOWER PRESSURE GAGE - Tower mounted pressure gages have a scale of 0-200 psig are

    provided. PROGRAMMABLE CONTROLLER - An Allen Bradley MicroLogix 1000 Programmable

    Controller is provided to control the sequencing of the dryer. MAIN VALVES - Four-way non-lubricated plug valves are used to direct the normal flow of air

    through the adsorption and reactivation circuits. MAIN POWER DISCONNECT - A three (3) pole disconnect switch is provided for the dryer

    package. THERMOCOUPLES Two (2) thermocouples are included to monitor both tower temperatures. MOTOR STARTER PROTECTOR - Provides motor protection for current overload, phase

    unbalance, single phase or short circuit. Also used as ON/OFF circuit breaker on motors. TYPE Z PURGE STYSTEM - Includes purge pressure regulator, differential pressure switch, local

    pressure gage (0-15" W.C.) and local purge failure alarm light. OPERATOR INTERFACE DISPLAY Allen Bradley Panelview 300 Micro message display

    provides status, timing and alarm indication to operators and maintenance personnel.

  • Page 44 of 45

    Parts List

    DESCRIPTION PART NUMBER Desiccant, 50 lbs/tower (23 kg/tower) D40107 Heater (1 KW at 115 volts) D53251 1/2 H. P. Blower Motors, (208, 230, 380, 460 volts) D35508 (575 volts) D35510 All other voltages contact factory 1/2" Diaphragm Valves D57013 1" Diaphragm Valves D57014 1" 4-Way Switching Valves D57418 (V-7 & V-8) Condensate Trap D52347 Tower Pressure Gages (PI-1 & PI-2) (psi-kg/cm2) D53714 (psi-Barg) D53714-001 (psi-kPa) D53714-002 Control Air Filter D52309 Solenoid Valve (S-1 and S-2) D37518 Operator Interface Display D36946 Programmable Controller (PLC) D36945 24 VDC Power Supply D39608 Heater Contactors (CON-1, CON-2) D36630 Motor Starter Contactors (MS-1, MS-2) D36630 Motor Starter Protectors, 460 volts (MSP-1, MSP-2) 208, 230 volts T-3504-22 380, 415, 460, 575 volts D36629 Current Relay (IR-1) D36621

  • Page 45 of 45

    DPDT Relay (CR1) D36617 Heater Circuit Breaker - 15 Amps (CB-1) D38234 Controls Circuit Breaker - 2.5 Amps (CB-2) D38233 Main Disconnect Switch (30 Amps) D38235 Transformer Primary Side Fuses - FNQ-5 D33368 PLC Output Fuses 2.0 Amps AGC-2 D33369 Hygrometers (AI-1 & AI-2) D36632 Probes (sensing elements) for Hygrometers D36634 (AE-1, AE-2) Limit Switches (ZS-3, ZS-4) D35157 OFF/RUN Selector Switch 32557A01 Purge System Regulator D58821 Purge System Pressure Gage D52764 Purge System Differential Pressure Switch D55808 Red Pilot Light D32515

    HomeLetterGEK 63362Distribution ListShortage SheetRevision HistoryOrder PartsRepair SolutionsOutage OptimizerGE Power.comMain Table Of ContentsTab 1GEK 111309

    Tab 2GEI 38809GEK 72284GEK 116577GEK 107460GEK 103802GEK 100478270T780-09-r0270T780-10-r0270T780-08-r0GEK 98966GEK 107046GEK 111301GEK 116552 GEK 25407GEK 111180GEK 100469GEK 110856244A5881GEK 72285GEK 85274GEK 98965GEK 107178GEK 89610GEK 92566GEK 72281GEK 110049GEK 41745GEK 94487GEK 14397GEK 107387GEK 94488GEK 94489GEK 94490GEK 14400GEK 72349

    Tab 3GEK 116578GEK 116541GEK 116531GEK 103794GEK 116366GEK 116367GEK 116365GEK 116364GEI 100189GEI 100506GEI 100516GEH 6126_Vol1GEH 6126_Vol2GFK1180GFK1260GFK1396GEH 6706GEI 100627GEH 6700GEH6721_Vol_IGEH6721_Vol_IIGEH6721_Vol_IIIGEK 110293GEK 107154GEK110122GEK 103557GEK 110121GEK 116414GEK 116532GEK 107151GEK 99008GEK 116368GEK 116415GEH 3055GEH 3057GEK 83756DET-034B-B-2000215D1183

    Tab 4141E4572139E5373365A3486365A3333141E3232139E4487365A5616

    Tab 5GEK 111680GEK 17933GEK 110367GEK 41693GEK 32969GEI 69688GEK 72348GEK 89558GEK 106958GEK 111512270T778_FEQ

    Tab 6126E8173G0003126E8173139E5375141E4780139E3982GEI 78706GEI 88723141E4766G0001141E4766U833141E4644144E5263144E5645141E4521G0001154B1731G0001154B1731135E7566G0001135E7566135E7561G0001135E7561141E4780GEK 72351816L2758G0001105L2884G0002816L2810G0001134E1475G0001134E1475127E8371G0001137C1618GEI 88576196C7235G0008196C7235135E5344141E2942134E1480G0001141E7572GEK 111253GEK 107098GEK 72351GEK 100478753D275GEI 29017GEI 40800GEI 79468GEI 88612GEI 88698GEK 111776GEK 11242GEK 11392GEK 25434GEK 37936GEK 111776GEK 37948GEK 37974GEK 11236GEK 72172GEK 72227GEK 25450GEK 72323GEK 25424GEK 46547GEK 107409GEI 58556GEI 30077GEI 88660

    Tab 7GEK 46354GEK 72270GEK 85246GEK 25567373A4011GEI 40834GEK 63354GEK 63458GEK 46362GEK 72271237A5536

    Tab 8GEK 98132143E1502386A9207386A9206386A9205227D6458PS10_270-90T778_SPLPS10_270-90T780_SPL386A9201386A9202Inlet FSAusvalvedwg30400-00mabzvalve396-397-ed397-handle1APM 611_10Datasheet F-20atmti_52Essex BrassBulletin_E-57GMercoid Series 201International BBV_141S_171N_171SUSValveCatalogabzvalve396-397-ed397-handle1Procoseries240-242CatalogAll-TempSens_B28All-TempSens_B28IM-140gustavoprestonco.inc227D6458PS10GEK 107384GEK 107163141A7186141A7188393A6625393A6578394A5185272B8605272B8606272B8518394A5186266B2920366B5497394A5187PV02_270-90T778-80_393A6579_SPLPV02_270-90T778-80_393A6626_SPLPV02_270-90T778-80_393A7965_SPL393A7976388A3900388A3901368B7558368B7569368B7554393A7978PV01_270-90T778-80_SPL141A7114141A7115388A3900388A3901365A9356366B1688393A7999394A5955394A5201394A5202366B1669366B1683368B7560366B1690394A5434PV03_270-90T778-80_SPL-394A5956PV03_270-90T778-80_SPL-386A9956PV03_270-90T778-80_SPL-394A5957PV03_270-90T778-80_SPL-393A7975GEY 119LMENIM1306-02

    Tab 9Rexroth_Hyd_CompntsGEK 110359GEK 110360GEK 14415GEK 33056GEK 99000134E5351134E5350235C3581G0001235C3581360A8240360A8243GEK 17802126E7209383A4874383A4875GEK 89924GEK 98091GEK 96755GEK 94599366B6212366B6733366B6730366B6203366B6200PJ70_270-90T788-80_SPL366B6211366B6729366B7625366B6204366B6202PJ69_270-90T788-80_SPL211D6144211D6160GEK 89628368B7729PV21_EPL372B8928PV21_270-90T778-80_SPLGEK 46361223A3273GEK 37937GEK 106759186C9881196B6793GEK 106806141A7192272B8527272B8532394A5204PV29_270-90T778-80_SPLleslie10_2_5_0229A2629PV32_270T778-80_SPL

    Tab 10GEK 72345GEK 107382GEK 63390138E8800TPK082345

    Tab 11GEK 110999GEK 111000GEK 111001M428

    Tab 12228D5307135E9298G0002135E9298144E5342G0001144E5342144E4138G0001144E4138141E4779G0001141E4779267B4538G0001267B4538267B4539G0001267B4539GEK 89626GEI 90368

    Tab 13143E1502GEK 107098FF5081D100310X012FF5483FF5772

    Tab 14386A9593229D2169229D2170229D2127394A5272386A9592Alfa Laval PHE-A160-hebAB_802-HebAscroft PGI-HebAscroft PGI-HebAscroft PGI-Hebbuffpumps-3380-hebRelianceDCManual-HebBuffPumps_D-CH-HebBuff Pumps FalkT20-HebBuff Pumps_3382-HebRelianceACManual-hebBuffPumps_D-CH-HebBuff Pumps FalkT20-HebRelianceDCManual-HebBuffPumps_D-CH-HebBuff Pumps FalkT20-HebFPP-Callahan 6 SM-HebConax_6027_FI-hebconax_thermocouple-hebBuffPumps_D-CH-HebBuffPumps_D-CH-HebDwyer Series 2000-HebDwyer Series 2000-HebEW Valve-Hebflow-tektraids-hebFFP_M-S-354A3298P1-P2-HebHeatrex IO and MIFI- Heater-HebHilco Oil Filter Housing-Hebphfiltercph739-11-cg1vge-hebhilcomisteliminator-om07-hebHilco_OCS_02CS25- 28010061-HebInferno S-RWA_TWA_RWB_TWB-Hebneodyn_ioms-100p,142p,160p-hebneo-dyns-142p-hebneo-dyn_132tc-pr01-hebneodyn-iom-2231t-132tc-hebneo-dyn_130p-132p-232p-hebNeo-dyn S-132P-Hebneo-dyn_130p-132p-232p-hebNeo-dyn S-132P-Hebneo-dyn_130p-132p-232p-hebNeo-dyn S-132P-Hebneodyn_ioms-100p,142p,160p-hebneo-dyns-100p-hebneo-dyn_130p-132p-232p-hebNeo-dyn S-132P-HebMagnetrol Kotron-S-HebMagnetrol B73_S75-HebAnderson-MM-300-Hebmidwest120series-fm-hebMidwest 120 E-HebA41 IOM-Hebparker_ini-208_01-99-hebParker H S3-5 VM-Hebparker_ini-208_01-99-hebparker_ini-208_01-99-hebRosemount 3051_R5-HebSwagelok 83-H83 S-HebSwagelok_BV_SS-H83PS8-HebSwagelok_BV63TS12-HebSwagelok BV60S-HebMax_SV_IC04S_IOM-HebABB_Low VMHA-HebMagnaloy FDC-Heboilgeart-pvwh-pvww-pvw_p-hebTraic S_88-PR01-HebWeksler 3BK04-HebXomox T-HPBV-HebPR01143E1520139E4487GEH 3967GEK 107395364A7196

    Tab 15143E1516GEK 46357GEK 46391GEK 100407143E1579143E1517363A7427237A7859PR90_Appendix A237A7872141E4435141E4436141E4437141E4439141E4438352B4084PR90_Appendix BPR90_Appendix CPR90_API-CTCPR90_ASCROFT-TGCPR90_ASCROFT-TGSSPR90_FLOWEZY-MPSCSPR90_FLOWEZY-HCPSCSPR90_GE-MCPR90_HALDEX_B-GC-PCPR90_HALDEX_B-GC-PSIPR90_HILCO-CSDECPR90_HILCO-CSSECPR90_HILCO-CSFHDPR90_IMO-CPCPR90_IMO-CPOSMPR90_IMO-CPSIPLPR90_IMO-CPDPR90_ITT-PSCSPR90_ITT-PSSPR90_LHA-TMCPR90_LubeDevice-SGCPR90_LubeDevice-SGIIPR90_MAGNETROL-LTBPR90_MAGNETROL-LTIMPR90_MAGNETROL-LTPBPR90_MAIN-FCPR90_MARATHON-MMIPR90_MARATHON-MDPR90_MARATHON-MWDPR90_MINCO-TDPR90_NACOL-ACPR90_NACOL-ASPPR90_NACOL-CHKPR90_OG-MPBPR90_OG-MPCSPR90_OG-MPIIPR90_OG-MPSIPR90_OG-MPVMPPR90_OG-GPPMTPR90_PALL-MFACSPR90_PALL-MFECSPR90_PALL-SPFCSPR90_PALL-MFSIPR90_PALL-DBEPR90_PALL-DPSCSPR90_ROSEMOUNT-PTCPR90_ROSEMOUNT-TMCPR90_STAUFF-TFCPR90_SUNH-SVCPR90_SUNH-SVSMPR90_SUNH-SCFCPR90_SVF-BVCPR90_SVF-BVDSPR90_SVF-BVSIPR90_TT-CCSPR90_TT-WMVCSPR90_UEC-TSCSPR90_UEC-TSSIPR90_UEC-TSDPR90_WEA-BVCPR90_WEA-BVSI

    Tab 16GEK 98076GEK 111134GEK 98078GEK 98081GEK 98079GEK 111136219D6690365A3614131029-01GEK 103575211D716586130-01105826-01173959-01

    Tab 17GEK 116371GEK 95149GEK 107237GEK 103763GEI 53947GEI 74478GEK 7658GEK 103616GEK 29281GEK 75512GEI 85803GEK 95168GEA 14749GEA 13240GEK 95154GEI 53942GEK 107443GEI 85802GEK 103566GEK 46071GEK 46074GEI 35019GEK 111176GEI 69534GEK 7613GEI 53995GEK 116351GEI 87016GEK 116372GEK 46091GEK 46097GEK 95211GEK 116376GEK 116362355A1631365A5005365A5000138E8015387A1676393A4353215D1246361B3505134E1446135E5924252C1263RA001126E7645383A6763126E7739127E9077110E7147110E7485127E8935141E3253127E9078211D1050383A8416127E7748127E8885127E8893143E1399127E8900

    Tab 18GEH 6414GEH 6694GEH 6632GEH 6695GEH 6676GEI 100256GEI 100267GEI 100584GEI 100453GEI 100454GEI 100456GEI 100457GEI 100459GEI 100460GEI 100462GEI 100463GEI 100464GEI 100465GEI 100466GEI 100467GEI 100475GEI 100488GEI 100509GEI 100511GEI 100532GEI 100601GEI 100548386A5970151X1207AA01SA01389B1310AE359B9488AO

    Tab 19E107-7-06-120E107-7-07-117312-701-00cGEK 106290GEH 1793GEK 106438GEI 68719GEH 202441-751NLOR-1GEK 106448GEK 10644324-124-1NP731071_BOM731071_WireTable731071_AnalogWireTable269B9791

    Tab 20274B1876274B1879118C2050C150_A4-018598272B7275C150-WD08206247B1875247B187814-16928_3114-16932_3414-16935_4014-0552-283C150C193_Front MatterC193_Section 1C193_Section 2C193_Section 3Pgs. 15_27-4139000-243-01A3594H-MDOC-7400-R11640CT080180043-712-03Pg. 1-QOB120Pg. 1-QOB115GFIPB1.1-2007S3355-7062100-034E2100-002Q2100-385C2110-450C7960-249K4095-6232110-605H4097-322BF-7960-420MIS-2428AMIS-2407A69-193569-1940ES-0269-1941ES-02GPM65gefK655-V1235-7222-041235-7223-091201-7206-021670CT070180043-741-0140060-218-01CA51CHPNLC, PNLJ6541511053987567803Pg. 9-19-9-20Section 12Pgs. 124-125SCPA8I3Instructions-WiegmannSPMC193_Section 4A-500-07267B9938365A9540267B9939365A9541C193_270-90T778-80_SPLFront Matter_AEL1AEL1_Part 1AEL1_Part 2AEL1_Part 3AEL1_Part 4AEL1_AnnexesAEL1_AAEL1_BAEL1_270-90T778-80_SPLAEL1_DAEL1_E229D1479AEL1_F229D1480Front Matter_AEN1AEN1_Part 1AEN1_Part 2AEN1_Part 3AEN1_Part 4AEN1_AnnexesAEN1_AAEN1_270-90T778-80_SPLAEN1_CAEN1_D227D6648AEN1_E227D6649

    Tab 21GEK 95162G2E0_DHCPG2E0_EPLG2E0_HD0356PXX211D6910G2E0_HD027P01G2M0_OMMG2M0_Appendix AG2M0_AthenaG2M0_SingleG2M0_Appendix BG2M0_Appendix CG2M0_Appendix D342A2762342A2751342A2761342A2752G2M0_PLGEK 103763GEK 27190GEI 40723GEI 32986GEK 459412130754GEK 103611IMP_120_11363A1444143E1399110E7485127E8885127E8893127E8848115E3406

    Tab 22GEI 74430GEK 95180GEK 46130GEI 3005046-118_13IM_67-GE-1G4A2_Title_290T778G4A2_Title_290T780G4A2_TocG4A2_Section 1G4A2_Section 2G4A2_Section 2.1361B9759G4A2_Section 2.2361B9760G4A2_Section 2.3393A6864393A7566G4A2_Section 2.4393A6865393A7567G4A2_Section 2.5G4A2_290T778_SPLG4A2_290T780_SPLG4A2_Section 3G4A2_Section 3.1G4A2_Section 3.2G4A2_Section 3.3G4A2_Section 3.4G4A2_Section 3.5G4A2_Section 3.6G4A2_Section 3.7G4A2_Section 3.8G4A2_Section 3.9G4A2_Section 3.10G4A2_Section 3.11G4A2_Section 3.12G4A2_Section 3.13G2H0_Title_290T778G2H0_Title_290T780G2H0_TocG2H0_Section 1G2H0_Section 1.1361B9714366B3003G2H0_Section 1.2393A6912393A7571G2H0_Section 1.3393A6913393A7572G2H0_Section 1.4G2H0_290T778_SPLG2H0_290T780_SPLG2H0_Section 2G2H0_Section 2.1G2H0_Section 2.2G2H0_Section 2.3G2H0_Ashcroft-1279G2H0_Ashcroft-DresserG2H0_BTLG2H0_002010-1.2.39-NecG2H0_Form 5469G2H0_Form 1570G2H0_UE-120-B-04G2H0_IMP-120-10G2H0_MS-01-49G2H0_FlexproG2H0_00813-0100-4001G2H0_Check ValveG2P0_Title_290T778G2P0_Title_290T780G2P0_TocG2P0_Section 1G2P0_Section 1.1361B9711G2P0_Section 1.2393A6918393A7752G2P0_Section 2G2P0_Section 2.1G2P0_Section 2.2G2P0_Section 2.3G2P0_BTLG2P0_MagnetrolG2P0_46-605-14G2P0_TLLSG2N0_Title_290T778G2N0_Title_290T780G2N0_Toc_290T778G2N0_Toc_290T780G2N0_Section 1G2N0_Section 1.1393A6909393A7569G2N0_Section 1.2393A6910G2N0_Section 1.3G2N0_290T778_SPLG2N0_290T780_SPLG2N0_Section 1.4361B9756G2N0_Section 2G2N0_VictorG2N0_Ashcroft-1279G2N0_Ashcroft-DresserG2N0_BL-258DG2N0_ApolloG2N0_I845300G2N0_GBG2N0_SOPG2K0_Title_290T778G2K0_Title_290T780G2K0_Toc-290T778G2K0_Toc-290T780G2K0_Section 1G2K0_Section 1.1393A6915393A7750G2K0_Section 1.2393A6916G2K0_Section 1.3G2K0_290T778_SPLG2K0_290T780_SPLG2K0_Section 1.4361B9755G2K0_Section 2G2K0_VictorG2K0_Ashcroft-1279G2K0_Ashcroft-DresserG2K0_BL-258DG2K0_ApolloG2K0_I845300G2K0_GVG2K0_SOPG4D1_Front MatterG4D1_Section 1G4D1_267B9649G4D1_Section 2393A6920G4D1_Section 3G4D1_QuestG4D1_0308-F88MG4D1_080101-AG4D1_Flo-TiteG4D1_VelanG3E0_Title_270T778G3E0_Title_270T780G3E0_FCI-GF92G3E0_FCI-06EN003229G2R0_Title_290T778G2R0_Title_290T780G2R0_TocG2R0_Section 1G2R0_Section 2G2R0_DrawingsG2Z0_Front MatterG2Z0_Section 1G2Z0_Section 1.1202D2818G2Z0_Section 1.2393A6919G2Z0_Section 2G2Z0_MMS-35G2Z0_GE SesingG2Z0_Mseires143E139921271242126784110E7147127E8900

    Tab 23GEK 103591

    On-line HelpSearch HelpNavigate HelpZoom Help


Recommended