Lecture 1 INTRODUCTION TO MODULE 2. Module 2 Principles of evaluation Depreciation Income tax Breakeven analysis Choosing amongst alternative investments Brief introduction to me Introduction to Lecture 1. INTRODUCTION. Engineering Management Chartered Engineer - PowerPoint PPT Presentation
26
1 Lecture 1 Lecture 1 INTRODUCTION TO MODULE 2 INTRODUCTION TO MODULE 2 Module 2 Module 2 Principles of evaluation Principles of evaluation Depreciation Depreciation Income tax Income tax Breakeven analysis Breakeven analysis Choosing amongst alternative investments Choosing amongst alternative investments Brief introduction to me Brief introduction to me Introduction to Lecture 1 Introduction to Lecture 1
Transcript
Page 1: Lecture 1 INTRODUCTION TO MODULE 2

1

Lecture 1Lecture 1INTRODUCTION TO INTRODUCTION TO

MODULE 2MODULE 2

Module 2Module 2 Principles of evaluationPrinciples of evaluation DepreciationDepreciation Income taxIncome tax Breakeven analysisBreakeven analysis Choosing amongst alternative investmentsChoosing amongst alternative investments

Brief introduction to meBrief introduction to me Introduction to Lecture 1Introduction to Lecture 1

Page 2: Lecture 1 INTRODUCTION TO MODULE 2

2

INTRODUCTIONINTRODUCTION

Engineering ManagementEngineering Management Chartered EngineerChartered Engineer 18 years - Industrial Experience18 years - Industrial Experience

Systems Design, Programme and Technical ManagementSystems Design, Programme and Technical Management 13 years - Department of Electronics13 years - Department of Electronics

Deputy Head of DepartmentDeputy Head of Department Chair, Faculty Curriculum Development BoardChair, Faculty Curriculum Development Board Chair, Local Branch of Institution of Electrical Engineers Chair, Local Branch of Institution of Electrical Engineers

(IEE)(IEE) Vice President, European Association for Education in Vice President, European Association for Education in

Electrical and Information Engineering (EAEEIE)Electrical and Information Engineering (EAEEIE) Engineering Management Course DirectorEngineering Management Course Director

Page 3: Lecture 1 INTRODUCTION TO MODULE 2

3

LECTURE 1LECTURE 1

Principles of evaluation of alternativesPrinciples of evaluation of alternatives Basic concepts for comparing alternativesBasic concepts for comparing alternatives Introduction to methods for evaluating and comparingIntroduction to methods for evaluating and comparing Benefits - Cost ratio analysisBenefits - Cost ratio analysis

Rules:Rules: If you have a question - please ask - anytime!If you have a question - please ask - anytime! If you do not understand something - stop meIf you do not understand something - stop me When I ask for interaction please contributeWhen I ask for interaction please contribute If nobody speaks up I will pick on somebodyIf nobody speaks up I will pick on somebody

Page 4: Lecture 1 INTRODUCTION TO MODULE 2

4

BASIS FOR COMPARISONBASIS FOR COMPARISON

What does ‘the same’ mean?What does ‘the same’ mean?

Recall (Module 1) - ‘Equivalence’Recall (Module 1) - ‘Equivalence’

““A basis for comparison is an A basis for comparison is an indexindex containing particular containing particular information about a series of receipts and disbursements information about a series of receipts and disbursements representing an investment opportunity.”representing an investment opportunity.”

Page 5: Lecture 1 INTRODUCTION TO MODULE 2

5

COMPARISON IN REALITYCOMPARISON IN REALITY

Reduction to a single Reduction to a single ‘index’‘index’ or or ‘value’‘value’

120,000 m.u. > 115,000 m.u.120,000 m.u. > 115,000 m.u.

Time value of moneyTime value of money

120,000 m.u. now ? 125,000 m.u. in 1 years time120,000 m.u. now ? 125,000 m.u. in 1 years time

State and understand all assumptionsState and understand all assumptions

Page 6: Lecture 1 INTRODUCTION TO MODULE 2

6

BASES FOR COMPARISONBASES FOR COMPARISON

Present worthPresent worth

Annual equivalentAnnual equivalent

Future worthFuture worth

Internal rate of returnInternal rate of return

Payback periodPayback period

Page 7: Lecture 1 INTRODUCTION TO MODULE 2

7

PRESENT WORTHPRESENT WORTH

The The present worthpresent worth is the net equivalent amount at the is the net equivalent amount at the present that represents the difference between the present that represents the difference between the equivalent disbursements and the equivalent receipts of an equivalent disbursements and the equivalent receipts of an investment’s cash flow for a defined interest rate.investment’s cash flow for a defined interest rate.

Also called the Also called the Net Present Value’Net Present Value’ or NPV of a future net or NPV of a future net cash streamcash stream

The future net cash flows are discounted back to present The future net cash flows are discounted back to present worth, or preset value, using the discount factorworth, or preset value, using the discount factor

The present worth of all the future net cash flows are The present worth of all the future net cash flows are summed to give the net summed to give the net present worthpresent worth..

Interest Rate 12%Year 2000 2001 2002 2003 2004 2005Net Cash Flow -100,000 25,000 27,000 35,000 30,000 35,000Present Worth -100,000 22,321 21,524 24,912 19,066 19,860Net Present Worth7,683

Page 8: Lecture 1 INTRODUCTION TO MODULE 2

8

ANNUAL EQUIVALENTANNUAL EQUIVALENT

The annual equivalent amount is the amount of money that The annual equivalent amount is the amount of money that would be disbursed annually over the life of the project would be disbursed annually over the life of the project that is equivalent, in present worth terms, to the overall that is equivalent, in present worth terms, to the overall project cost.project cost.

Calculate the NPV as shown in the Calculate the NPV as shown in the present worthpresent worth method. method. Calculate the amount that, if paid each year over the life of Calculate the amount that, if paid each year over the life of

the project, results in the same present worth. This the project, results in the same present worth. This amount is the amount is the annual equivalentannual equivalent..

Interest Rate 12%Year 2000 2001 2002 2003 2004 2005Net Cash Flow -100,000 25,000 27,000 35,000 30,000 35,000Present Worth -100,000 22,321 21,524 24,912 19,066 19,860Net Present Worth7,683Annual Equivalent 2,131 2,131 2,131 2,131 2,131

Page 9: Lecture 1 INTRODUCTION TO MODULE 2

9

FUTURE WORTHFUTURE WORTH

Because we can move the value of money forwards or Because we can move the value of money forwards or backwards in time using the compound interest equation, backwards in time using the compound interest equation, we can, as we have seen, calculate the we can, as we have seen, calculate the present worth present worth of a of a future net cash flow.future net cash flow.

Equally we can project forwards the present worth of a Equally we can project forwards the present worth of a present net cash flow into the future. The result is the present net cash flow into the future. The result is the future worthfuture worth..

Interest Rate 12%Year 2000.06 28918.33 2000 2000 2000 2000Net Cash Flow 0 19,952 0 0 0 0Present Worth 0 13,560 0 0 0 0Net Present Worth13,560Future Worth 15,187 17,010 19,051 21,337 23,898

Page 10: Lecture 1 INTRODUCTION TO MODULE 2

10

INTERNAL RATE OF RETURNINTERNAL RATE OF RETURN

The The present worthpresent worth or or Net Present ValueNet Present Value of a future net of a future net cash stream is determined for a particular interest rate.cash stream is determined for a particular interest rate.

Generally the Generally the Present worthPresent worth decreases with increasing decreases with increasing interest rate.interest rate.

There exists, in There exists, in general, a value for general, a value for the interest rate at the interest rate at which the which the Present Present worthworth equals zero. equals zero.

This value of This value of interest rate is interest rate is called the called the Internal Internal rate of Returnrate of Return or or IRRIRR

IRR=15%

Page 11: Lecture 1 INTRODUCTION TO MODULE 2

11

PAYBACK PERIODPAYBACK PERIOD

The payback period without interest is commonly defined The payback period without interest is commonly defined as the length of time required to recover the first cost of as the length of time required to recover the first cost of an investment from the net cash flow produced by that an investment from the net cash flow produced by that investment.investment.Year 2000 2001 2002 2003 2004 2005

Net Cash Flow -100,000 25,000 27,000 35,000 30,000 35,000Cumulative NCF-100,000 -75,000 -48,000 -13,000 17,000 52,000

2003/4

• Interest Rate is ignored• Cumulative Net Cash Flow is zero between 2003 and 2004.

Page 12: Lecture 1 INTRODUCTION TO MODULE 2

12

CAPITALIZED EQUIVALENT CAPITALIZED EQUIVALENT AMOUNTAMOUNT

The Capitalized Equivalent Amount is the amount at The Capitalized Equivalent Amount is the amount at Present Worth which, at a given interest rate, is equivalent Present Worth which, at a given interest rate, is equivalent to an repetitive Net Cash Flow amount that continues in to an repetitive Net Cash Flow amount that continues in perpetuity. perpetuity.

Capitalized Equivalent 83,333Interest Rate 12%Year 0 1 2 3 4 5 …Annual Amount 10,000 10,000 10,000 10,000 10,000 10,000

Page 13: Lecture 1 INTRODUCTION TO MODULE 2

13

PRIVATE VERSUS PUBLICPRIVATE VERSUS PUBLIC

Private organisationsPrivate organisations ProfitProfit

Public organisations / activitiesPublic organisations / activities General welfareGeneral welfare Value to beneficiariesValue to beneficiaries Beneficiaries are unique individualsBeneficiaries are unique individuals

Value = Value = ff(personal values, beliefs, etc.)(personal values, beliefs, etc.)

Page 14: Lecture 1 INTRODUCTION TO MODULE 2

14

BENEFIT - COST ANALYSISBENEFIT - COST ANALYSIS

General rule:General rule: Maximise the value gained from the use of available resourcesMaximise the value gained from the use of available resources The benefits may accrue to anyoneThe benefits may accrue to anyone Those who pay may or may not be the beneficiaries (generally Those who pay may or may not be the beneficiaries (generally

not)not)

BenefitsBenefits Those things that provide a gain to the userThose things that provide a gain to the user

DisbenefitsDisbenefits Those things that provide unfavorable benefits to the userThose things that provide unfavorable benefits to the user

Net benefitsNet benefits Benefits - DisbenefitsBenefits - Disbenefits

Net “good” that will be engendered by the projectNet “good” that will be engendered by the project

Page 15: Lecture 1 INTRODUCTION TO MODULE 2

15

BENEFIT - COST ANALYSISBENEFIT - COST ANALYSIS

Costs:Costs: Project cost less any savings gained from its Project cost less any savings gained from its

implementationimplementation

All benefits and costs are expressed in All benefits and costs are expressed in Present Worth Present Worth termsterms

summed over the different benefitssummed over the different benefits

Project us deemed desirable if:Project us deemed desirable if: The benefits exceed the costsThe benefits exceed the costs

Benefits

Costs1

Page 16: Lecture 1 INTRODUCTION TO MODULE 2

16

TYPES OF BENEFITSTYPES OF BENEFITS

How far should one go to identify all the consequences of a How far should one go to identify all the consequences of a project?project? This question is importantThis question is important All considered consequences should be fully understood All considered consequences should be fully understood

and quantifiedand quantified Poor choice can have a substantial impact on the cost of Poor choice can have a substantial impact on the cost of

undertaking the Benefit - Cost analysisundertaking the Benefit - Cost analysis Too many consequences - too expensiveToo many consequences - too expensive Too few - loss of key component and possible Too few - loss of key component and possible

political impactpolitical impact

Page 17: Lecture 1 INTRODUCTION TO MODULE 2

17

CLASSIFYING BENEFITSCLASSIFYING BENEFITS

Primary benefitsPrimary benefits Primary benefits are those that represent the value of Primary benefits are those that represent the value of

the direct products or services realized from the project the direct products or services realized from the project activities.activities.

Example: A new irrigation system increases crop yieldExample: A new irrigation system increases crop yield

Secondary benefitsSecondary benefits Secondary benefits are those that represent the value Secondary benefits are those that represent the value

of additional products or services stimulated by the of additional products or services stimulated by the project activities. project activities.

Beneficial by products of the projectBeneficial by products of the project Example: The new irrigation system increases the Example: The new irrigation system increases the

economic strength of the farming community.economic strength of the farming community.

Page 18: Lecture 1 INTRODUCTION TO MODULE 2

18

VALUING BENEFITSVALUING BENEFITS

Not always an easy taskNot always an easy task Should be measured in terms meaningful to the stakeholdersShould be measured in terms meaningful to the stakeholders

A good Benefits - Cost analysis should not only compare the A good Benefits - Cost analysis should not only compare the quantifiable consequences of a project but should also describe quantifiable consequences of a project but should also describe the non-quantifiable characteristics in whatever terms are the non-quantifiable characteristics in whatever terms are feasible.feasible.

Consideration of taxes:Consideration of taxes: Economic gains or losses in respect of taxes should be taken Economic gains or losses in respect of taxes should be taken

into account in the analysisinto account in the analysis Example: loss of company tax where a project displaces Example: loss of company tax where a project displaces

businesses to a different geographic location.businesses to a different geographic location. Example: increase in sales tax where a project leads to more Example: increase in sales tax where a project leads to more

salessales

Page 19: Lecture 1 INTRODUCTION TO MODULE 2

19

IDENTIFYING BENEFITSIDENTIFYING BENEFITS

Benefits to PublicBenefits to Public Reduced vehicle operating Reduced vehicle operating

costs (excluding Fuel tax)costs (excluding Fuel tax) Reduced commercial and Reduced commercial and

noncommercial travel timenoncommercial travel time Increased safetyIncreased safety Increased accessibility Increased accessibility

between communitiesbetween communities Ease of drivingEase of driving Appreciation of land valuesAppreciation of land values

Savings to StateSavings to State Toll revenuesToll revenues Increased taxes due to Increased taxes due to

appreciated land and appreciated land and increased business activityincreased business activity

Disbenefits to the PublicDisbenefits to the Public Land removed from Land removed from

agricultural productionagricultural production Damages resulting from Damages resulting from

changes to water flowchanges to water flow Decreased movement of Decreased movement of

livestock across highwaylivestock across highway Increased air pollution and Increased air pollution and

litterlitter

Costs to StateCosts to State Construction costsConstruction costs Maintenance costsMaintenance costs Administrative costsAdministrative costs

Page 20: Lecture 1 INTRODUCTION TO MODULE 2

20

COSTSCOSTS

Total project cost = Total project cost = Capital (Investment cost) ‘I’Capital (Investment cost) ‘I’

+ Annual recurrent cost ‘C’+ Annual recurrent cost ‘C’

So:So:

Alternative expression: (Benefit - Annual cost) / InvestmentAlternative expression: (Benefit - Annual cost) / Investment

Cost I C

BC B

I C

BC B CI

Net gain to beneficiary Net gain to beneficiary per unit of invested per unit of invested capitalcapital

Page 21: Lecture 1 INTRODUCTION TO MODULE 2

21

THE SOMETOWN STONE THE SOMETOWN STONE COMPANYCOMPANY

A toll road has been opened between two cities. Your business is in one of these cities. You need to travel between the two cities regularly as you have a customer to whom you deliver goods has their factory in the other city. The distance between you and your customer is 102 miles via the shortest free road and 95 miles via the new toll road. Determine the economic advantage of using the toll road, if any, given the following conditions:

Toll cost 5.50 m.u. Driver cost 12.50 m.u./hour Average driving speed is 60 mph via the toll road and 50 mph via the

free road

The estimated average cost of operating the truck per mile is 0.18 m.u./mile via the toll road and 0.20 m.u./mile via the free road

Page 22: Lecture 1 INTRODUCTION TO MODULE 2

22

EVALUATING PUBLIC PROJECTSEVALUATING PUBLIC PROJECTS

Select the Select the proper point of viewproper point of view Sociological - classes of people, organisations, Sociological - classes of people, organisations,

demographicdemographic Environmental - geographic regionEnvironmental - geographic region

Who receives the benefits?Who receives the benefits? Who pays?Who pays?

Point of view Project

National National highway, Major water-resource project, Mass-transit system

Regional Regionally funded air-quality control project, Regional highway

City City park, Local community projects

Page 23: Lecture 1 INTRODUCTION TO MODULE 2

23

EVALUATING IN PRACTICEEVALUATING IN PRACTICE

Great care needs to be takenGreat care needs to be taken Some projects benefit some at the expense of othersSome projects benefit some at the expense of others Decisions are politicalDecisions are political The impact on the environment ?????The impact on the environment ?????

Private Sector Public Sector

Organizational viewpoint Variable viewpoint

Benefits = Profit, Growth, Shareholder wealth

Benefits are larger than local for local projects (visitors, people in transit, etc.)

Source of funds = Debt or Equity Government funds are ‘free’ to local community

Page 24: Lecture 1 INTRODUCTION TO MODULE 2

24

BENEFIT - COST ANALYSISBENEFIT - COST ANALYSIS

Project impactProject impact With the project outcomesWith the project outcomes Without the project outcomesWithout the project outcomes (Not the same as before and after the project!)(Not the same as before and after the project!)

General welfare benefitsGeneral welfare benefits Enhancement of personal economic situationEnhancement of personal economic situation Desire for clean airDesire for clean air Desire for clean waterDesire for clean water Pleasant surroundingsPleasant surroundings Personal securityPersonal security Improvement of quality of lifeImprovement of quality of life

Page 25: Lecture 1 INTRODUCTION TO MODULE 2

25

BENEFIT - COST ANALYSISBENEFIT - COST ANALYSIS

What interest rate should we choose?What interest rate should we choose? At least the government’s cost of borrowing moneyAt least the government’s cost of borrowing money ““To maintain public and private expenditures on a comparative basis, it

seems logical that the interest rate selected should represent the opportunity forgone when taxes are paid. That is, the interest rate should reflect the rate that should have been earned if the funds had not been removed from the private sector.”

Rate is a matter of judgment

10 20 30Interest Rate

Government costof borrowing

Individuals’ investment opportunity

Organization's return on investment

Page 26: Lecture 1 INTRODUCTION TO MODULE 2

26

CASE STUDY - 2

State Highways Dept


Recommended