+ All Categories
Home > Documents > Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems...

Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems...

Date post: 20-Jan-2016
Category:
Upload: lisa-stewart
View: 217 times
Download: 0 times
Share this document with a friend
Popular Tags:
24
Lecture Objectives: •Finish with thermal storage systems •Plumbing •Hydronic distribution systems –Chiller/Boiler – Storage – Building
Transcript
Page 1: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Lecture Objectives:

• Finish with thermal storage systems

• Plumbing • Hydronic distribution systems

–Chiller/Boiler – Storage – Building

Page 2: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Installation of Thermal Storage System

DownstreamUpstream

• Increases chiller efficiency • Increases chiller capacity • Overall system efficiency ??? • Decreases storage capacity• Simplifies system layout• …..

• Decreases chiller efficiency• Decreases chiller capacityOverall system efficiency ???• Increases storage capacity•……• Does not allow chiller shut down!

Page 3: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Modeling

Write energy and mass balancer equation for each section

Page 4: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Plumbing Arrangement for Chillers

(and Boilers)• Primarily water circulation loop only

• Primarily & Secondary circulation loops

• Primarily & Secondary & Tertiary loops

• ….

Reading assignment:

Chilled Water Plant Design Guide (Section 4)http://energydesignresources.com/media/2305/EDR_DesignGuidelines_CoolToolsChilledWater.pdf

Page 5: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Hydronic systems for district cooling/heating and buildings

Constant-Flow System, Single Chiller, Single Coil Constant-Flow System, Single Chiller, Multiple Coils

Mixing valve that control by-pass flow Major pumping force is the chiller pump

Page 6: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Control of coil temperature Mixing valve that control the flow through the coil Flow Variation as a Function of Valve Position

Major pumping force is the chiller pump

Same pressure drop like a cooling coil

Page 7: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Multiple chiller (or boilers) Parallel Serial

Page 8: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Primary-Loop Only VariableSpeed Flow

Single chiller Multiple chillers

Page 9: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Primary and Secondary Loop Variable Flow Design

Parallel chillers

Serial chillers

Page 10: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Large Plant or Building Distribution Systems

Primary/Secondary Loops with Variable Flow and Distributed Pumping

Page 11: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Primary/Secondary and Tertiary Pumping

Page 12: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Primary Pump ArrangementsDedicate a pump for each chiller

Provide a common header for the pumps

Page 13: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Coil Pumping Strategies

Variable speed pumps vs. Single pas Valve vs. Mixing valves vs. Diverting Valves

Page 14: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Impact of Piping Coil

Page 15: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Plumbing Arrangement in Building’s hydronic systems

Fan coil systems Baseboard heaters

Radiators

Page 16: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Hydronic Terms

• Head loss

• Open-loop vs. closed loop

Page 17: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Head Loss

Page 18: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Fittings

g

Vkh

2

2

Page 19: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Pumps• Raise pressure and produce flow

• Main type• Centrifugal

Inline Base mounted

Example of Turbine pump

Page 20: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Pump curves

• NPSHR = Net Positive Suction Head Required

Page 21: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.
Page 22: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Changing Pump Speed

Page 23: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Curve for Multiple Pumps

Page 24: Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.

Net Positive Suction Head(cavitation)


Recommended