LEED Versão 4
Novidades para o Setor
Matt Chmielewski, LEED AP Líder de Aplicação e Apoio a Projetistas
Trane Brasil
Agenda
Certificação LEED -
What is it?
How does it work?
Why do it?
LEED no Brasil
LEED Versão 4
Novidades por Categoria
LEED na Prática
O que é LEED?
Developed by the U.S. Green Building Council (USGBC),
LEED is a framework for identifying, implementing, and
measuring green building and neighborhood design,
construction, operations, and maintenance.
LEED seeks to optimize the use of natural
resources, promote regenerative and restorative
strategies, maximize the positive and minimize
the negative environmental and human health
consequences of the construction industry, and
provide high-quality indoor environments for
building occupants.
Leadership in Energy and
Environmental Design (LEED):
• Verifica que um prédio (ou bairro) e projetado,
construído, e operado conforme princípios de
sustentabilidade estabelecidos pelo GBC;
• Projeto tem de atender 8 pré-requisitos;
• Projeto ganha pontuação conforme atende os
objetivos de 9 categorias;
• Certificação a partir de 40 pontos.
Por que LEED?
Sustentabilidade
Atender as necessidades da
geração atual sem sacrificar as
necessidades de gerações
futuras.
FONTE: http://www.gbcbrasil.org.br/?p=empreendimentos-leed (21/08/14)
Versão 4 Alterações
Foco Global
Unidades SI
Caminhos alternativos
de Compliance
Pré-requisitos e créditos
novos e mais rigorosos
Linguagem específica
para os setores
envolvidos
1 2
3
4
LEED versão 3 X versão 4
MR Materiais e Recursos
IEQ Qualidade do Ambiente Interna
IN Inovação e Processo do Projeto
RP Créditos Regionais
I Processo Integrativa
LT Local e Transporte
SS Espaços Sustentáveis
WE Uso Racional de Água
EA Energia e Atmosfera
LEED® v4 BD+C Rating System 8 prerequisites to qualify
PLUS …
• Integrative Process 1 1
• Location and Transportation 8 16
• Sustainable sites 6 10
• Water efficiency 4 11
• Energy and atmosphere 7 33
• Materials and resources 5 13
• Indoor environmental quality 9 16
• Innovation and design process 2 6
• Regional 1 4
Sub- categorias
Pontos Disponíveis
110
100
pts
Bônus
novo
LEED v4
• Integrative Process 1 1
• Location and Transportation 16 –
• Sustainable sites 10 –
• Water efficiency 11 5
• Energy and atmosphere 33 33
• Materials and resources 13 1
• Indoor environmental quality 16 7
• Innovation and design process 6 3
• Regional 4 1
Participação de Climatização no
Certificação LEED Pontos
Disponíveis
110
Pontos de Climatização
51
Integrative Project
Planning and Design
• Criar “Owner’s project requirements
document”
• Estabelecer objetivo de nível de
Certificação LEED (Gold, Silver, etc.)
• Estabelecer e reunir os profissionais
de cada disciplina do projeto
• Design charrette (reunião de 4+
horas com todas as disciplinas).
Otimizar integração de estratégias
verdes.
novo
LEED v4
Local e Transporte Não há pré-requisitos nesta categoria
Pontos
• LEED for Neighborhood Development location 16
• Sensitive land protection 1
• High-priority site 1–2
• Surrounding density and diverse uses 1–5
• Access to quality transit 1–5
• Bicycle facilities 1
• Reduced parking footprint 1
• Green vehicles 1
Total 16
OR
novo
LEED v4
Espaços Sustentáveis
Redução de Poluição oriundo Construção Pré-requisito
Pontos
• Assessoria do Site 1
• Desenvolvimento do Site – Proteger ou
Restaurar Habitato 1–2
• Espaço Aberto 1
• Gerenciamento de Água de Chuva 1–3
• Efeito Ilha de calor 2
• Redução de Poluição de Iluminação 1
Total 10
• Recuperar condensado de sistema HVAC
• Rastrear consumo de água atraves de sistema de automação
• Otimizar torre de esfriamento
Uso Racional de Água
• Redução de uso externo de água Pré-requisito • Redução de uso interno de água Pré-requisito • Medição de consumo predial de água Pré-requisito
Points
• Redução de uso externo de água 1–2
• Redução de uso interno de água 1–6
• Consumo de Torre de Resfriamento 1–2
• Medição de consumo predial de água 1
Total 11
Papel de Climatização
Redução de uso interno de água Pré-requisito
• Reduzir consumo 20% relativo ao modelo baseline
• Requisitos para Torres de Resfriamento
– Não “once-through cooling” com água potável
– Medição de água de reposição obrigatório
– Obrigatório monitorar condutividade e transbordagem
– Eliminador de partícula (‘drift’) obrigatório
Relógio de água para o Prédio Pré-requisito
• Medidores permanentes de
água para prédios e o terreno
• Compartilhar dados de uso
por 5 anos com o GBC
• Medidores para pelo menos
dois subsistemas (ex. Água
doméstica, irrigação, etc.)
novo
LEED v4
Parameter Maximum
Concentration
Ca (as CaCO3) 1000 ppm
Total Alkalinity 1000 ppm
SiO2 100 ppm
Cl- 250 ppm
Conductivity 2000 µS/cm
Água de Reposição da Torre novo
LEED v4
Energia & Atmosfera
• Comisionamento e Verificação Pré-requisito • Desempenho mínimo de Energia Pré-requisito • Medição de consumo predial de energia Pré-requisito • Gestão Fundamental de Gases Refrigerantes Pré-requisito
Pontos
• Melhoria no comissionamento 2–6
• Otimização da performance energética 1–18
• Medição de consumo predial Avançada 1
• Demand response 1 – 2
• Geração local de energia renovável 1 – 3
• Melhoria na gestão de gases refrigerantes 1
• Energia Verde e “Carbon Offsets” 1 - 2
Total 33
Climatização é Fundamental no Crédito EA
novo
LEED v4
Minimum energy performance
• Cumprir com mínimos da ASHRAE 90.1-2010
(fatores U, eficiência de equipamento, etc.)
• Option 1: whole building energy simulation – Baseline building complies with ASHRAE Appendix G
– 5% better than 90.1-2010 Baseline for new construction,
• Option 2: prescriptive compliance path – ASHRAE 50% Advanced Energy Design Guide for all mechanical
• Option 3: prescriptive compliance path
– Advanced Buildings Core Performance Guide
&
pré-requisito
RESULTADO => % de redução de custo anual de energia => Proposed vs. 90.1
Baseline => LEED POINTS (EA Crédito 1)
Energy Cost Savings by Construction
Type
EAC2 Points Earned by Building
Type
New
Construction
Major
Renovation
Core and
Shell
All
others
Healthcare Schools
5% 3% 2% Prerequisite
6% 4% 3% 1 3 1
8% 6% 5% 2 4 2
…
20% 18% 17% 8 10 8
…
42% 40% 39% 16 18 16
46% 44% 43% 17 19 16
50% 48% 47% 18 20 16
Otimizar Performance Energética
• Option 1: whole building energy simulation – Baseline building complies with Appendix G Building PRM
– 6% better than 90.1-2010 for new construction,
• Option 2: prescriptive compliance path – 50% Advanced Energy Design Guides
– 5 possible points by following recommendations (each worth one point)
• Building envelope (opaque)
• Building envelop (glazing)
• Interior lighting
• Exterior lighting
• Plug loads
Até 18 pts
Até 5 pts
90.1 - 2010 Alterações para
Envoltoria
• Fenestration orientation
• Continuous air barrier
• Cool roofs (Zones 1-3 – a maioria do Brasil)
• Envelope/lighting interactions
• daylighting control
• modify the area thresholds for top and side daylighting
90.1-2010 Alterações de Iluminação
• Lower Lighting Power Density (LPD)
• Lighting controls
• Manual on or first level of lighting 50%
• One control step between 30% and
70% of design LPD
• Parking garage lighting control
• Control of 50% of receptacles
• Envelope/lighting interaction
• Alteration threshold (10%) at which replacement
lighting and controls must comply
90.1-2010 Significant Mechanical Changes
• Eficiências mínimas de Equipamento
• Economizador de ar obrigatório na maioria
das zonas climáticas
• Recuperação de energia do lado do ar
exigido em mais climas em níveis
reduzidos de % de Ar externa
90.1-2010 Alterações aos requisitos
de Controles – Lado de ar
• Existing control requirements (since 1999) – Fan pressure optimization (como função de vazão
de projeto)
– Demand control ventilation (DCV) in high density zones
• Alterações aos controls requirements – DCV in lower density zones
– Ventilation reset
– Supply air temperature reset
– VAV minimum airflow/reheat minimums
– Pump pressure optimization
Building-level energy metering Pré-requisito
• Building-level meters or submeters que permite um visão clara do consumo de cada forma de energia – Ex: Electricity, natural gas, chilled water,
steam, fuel oil, propane, etc.
• Share energy consumption and electric demand with USGBC for five years
LEED v4: EA (1 ponto)
Advanced energy metering • Install energy meter in subsystem(s) (ou seja
consumidores que representa 10% or more of
total building annual consumption)
– Ex: Chilled water system, condenser water
system, hot water system, air-handling system
novo
LEED v4
LEED v4: EA (2-6 points)
Enhanced commissioning
• Documented commissioning experience
– At least two projects with similar scope of work
– Early design phase through at least 10 months
of occupancy
• Employee of owner, independent consultant
or “disinterested subcontractor of the design
team”
LEED v4: EA (2-6 points)
Enhanced commissioning
• Option 1, Path 1: Enhanced Systems Commissioning (3 points)
– ASHRAE 0-2005, 1.1-2007
• Option 1, Path 2: Enhanced Monitoring-Based commissioning (4 points)
– Path 1 AND
– Monitoring-based procedures, measurement, tracking, evaluation, correction, training, repairs, and frequency
• Option 2: Envelope commissioning (2 points)
– Commissioning of the thermal envelope
– Related to energy, water, IEQ, and durability
Demand Response (“Smart Grid”)
• Case 1:
Participate in utility DR
program (2 points)
– Real-time fully automated
response
– 10% demand reduction
– Minimum 1 year contract
with multiple year intent
– Comprehensive plan to
meet DR contract
– Include DR in
commissioning
• Case 2:
No DR program available
(1 point)
– Install recording meters with
communications and ability
to accept DR signal
– 10% demand reduction
– Include DR in
commissioning
– Contact local utility
representatives to discuss
future DR programs
novo
LEED v4
Renewable energy production
• Use on-site renewable energy systems to offset
building energy cost (solar, aeolica, biogas, etc.)
• Creditos reduzidos de v3 para v4 – LEED V3: Up to 7 points
– LEED V4: Up to 3 points
• Solar gardens or community renewable energy
systems allowed
% Renewable
Energy
Points
(NC, Retail,
Schools,
Healthcare)
Points (CS)
1% 1 1
3% 2
5% 2 3
10% 3
Enhanced refrigerant management
• Reduced from 2 points (v3) to 1 point (v4)
– Credit for no refrigerant or refrigerants with
ODP = 0 and GWP < 50
– Calculation for other refrigerants required
(ODP, GWP, initial refrigerant charge, leakage
rate, equipment life; no changes)
Green power and carbon offsets
• 50% from renewable resources (1 point)
• 100% from renewable resources (2 points)
• At least a 5-year contract
• Resources must have come online since Jan. 1st,
2005
• Storage & collection Pré-requisito
• Construction and demolition Pré-requisito
waste management planning
Points
• Building life-cycle impact 2–5
reduction
• Environmental product 1–2
declaration
• Sourcing of raw materials 1–2
• Material ingredients 1–2
• Construction and demolition 1–2
waste management
Total 13
Materiais & Recursos
Papel de Climatização
novo
LEED v4
novo
LEED v4
LEED v4: MR new credit (1-2 points)
Environmental product declarations
Source: http://urbanfabrick.com/understanding-life-cycle-assessment-lca/
novo
LEED v4
Environmental product declarations
• Option 1:
EPD (1 point)
– Use ≥ 20 permanently-
installed products (at least 5
manufacturers)
– Product-specific self
declaration (valued at ¼
product)
– Industry-wide third-party EPD
(valued at ½ product)
– Product-specific third-party
EPD (valued at 1 product)
– USGBC-approved program
• Option 2:
Multi-attribute optimization
(1 point)
– At least 50% (based on cost)
of the permanently-installed
products must demonstrate
environmental impact
reduction (third-party
certified)
– Products sourced within 100
miles of site are valued at 2x
the cost
– Structure and enclosure
materials can contribute no
more than 30%
novo
LEED v4
o EarthWise™ CenTraVac™, o primeiro resfriador
do mundo a obter a Declaração Ambiental do
Produto, de acordo com a norma ISO 14025.
Extremamente rigorosa, a certificação considera
todas as fases do ciclo de vida do produto e
garante que desde sua fabricação ele tenha sido
comprometido com os mais altos padrões de
sustentabilidade e eficiência energética.
• Minimum IAQ pré-requisito performance
• Environmental tobacco pré-requisito smoke control
Points
• Enhanced IAQ strategies 1–2
• Low-emitting materials 1–3
• Construction IAQ 1 management plan
• IAQ assessment 1–2
• Thermal Comfort 1
• Interior lighting 1–2
• Daylight 1–3
• Quality views 1
• Acoustic performance 1
Total 16
Indoor Environmental Quality
Papel de Climatização
novo
LEED v4
Minimum IAQ performance pré-requisito
• ASHRAE 62.1-2010, Sections 4–7 (ASHRAE 170-2008 for healthcare)
• Mechanically ventilated spaces:
– Use Ventilation Rate Procedure
– Monitor OA intake flow (sistema VAV)
• Naturally ventilated spaces:
– Use Natural Vent. Procedure
– Monitor NV openings, exhaust airflow, or CO2 concentrations
• IAQ Procedure not allowed
novo
LEED v4
ASHRAE Standard 62.1-2010 section change
6.2.1 Added MERV 11 requirement for PM2.5 non-attainment areas,
more stringent requirements for ozone air cleaning
6.2.7.1 Prescriptive requirements for DCV and other reset strategies
6.4 Prescriptive requirements for natural ventilation (location and
size of openings, controls), requires “mixed-mode” systems in
most applications
6.1, 6.5 Clarified that exhaust airflow requirements are required
regardless of which procedure is being used
5.5.1 Simplified intake/exhaust separation requirements (by air class)
6.2 Clarified Ventilation Rate Procedure calculations
LEED v4: IEQ (1-2 points)
Enhanced IAQ strategies
• Option 1 (1 point), implement all:
– Entryway systems, and
– Local exhausts, and
– MERV 13 filtration of outdoor air
• Option 2 (1 point), choose:
– Prevent pollutants from outside, or
– Increased ventilation (↑30%), or
– CO2 monitoring (≥ 25p/1000ft2), or
– Monitor other contaminants
LEED v4: IEQ (1 point)
Construction IAQ management plan
• SMACNA control measures
• Protect materials from moisture
• MERV 8 filters if HVAC equipment is used during construction
LEED v4: IEQ (1-2 points)
IAQ assessment
• Option 1: Flush-out (1 point), or
• Option 2: Air testing (2 points)
(more contaminants to test for)
LEED v4: IEQ (1 point)
Thermal comfort • Design per ASHRAE 55-2010
• Requirements for permanent monitoring
and occupant survey have been removed
• Individual controls for at least 50% of
individual occupant spaces, controls for
all shared multi-occupant spaces
LEED v4: IEQ (1 point)
Acoustic performance NC, Hospitality, Warehouses (1 point)
• Maximum background sound levels per
ASHRAE Handbook
• Sound Transmission Class (STC)
requirements
• Reverberation time requirements (table)
• Reinforcement or masking systems
novo
LEED v4
LEED v4: IEQ
Acoustic performance
Schools (prerequisite)
• Background sound level ≤ 40 dBA
• ANSI S12.60-2010 reverberation time requirements
• Limit noise from exterior sources
Schools (1 point)
• Background sound level ≤ 35 dBA
• ANSI S12.60-2010 STC reqs
• Window STC rating ≥ 35
Healthcare (1-2 points)
• Meet 2010 FGI Guidelines for speech privacy, background sound, acoustical finishes, and site noise
novo
LEED v4
Points
• Innovation in design 1–5
• LEED® Accredited 1
Professional
Total 6
Innovation & Design Process
Exemplo Resultado de Produtividade
de Investimento em Conforto
• Custo de Produtividade do Funcionário
– R$100.000 salário (custo p empresa)
– 10 m²/funcionário
– R$10.000/m² por funcionário por ano
– 2% a 20% produtividade perda/ganho:
R$200 á R$2.000/m², por ano
Compare com…
• Melhoria no sistema HVAC (aumento de conforto térmico + qualidade acústica + qualidade do ar)
– Custo Base de Instalação + equipamento para sistema básico = R$300/m2
50% comfort system upgrade para sistema bom : R$150/m², uma vez
Cost of Electricity 94.53%
First Cost of Chiller 5.18%
Cost of Initial Refrigerant 0.25%
Cost of Lifetime Refrigerant Supply
Custo do Ciclo de Vida de um Chiller Centrífugo
0.04%
Custo Total Id
eali
zação
Co
ncep
. e
Pro
jeto
< 0,2% 0,8%
50 anos (vida útil de
projeto)
14 %
80 %
5 %
Co
nstr
ução
Us
o e
op
era
çã
o
Ad
ap
tação
para
reu
so
Edifício comercial em 50 anos de uso
$
• 4500 visitantes
• 1042 congressistas
• 48 jornalistas
• 141 palestrantes
• 63 expositores
• 32 países.
• Abertura por Fernando Henrique
Cardoso
Obrigado!!