+ All Categories
Home > Documents > Legal Project Management Presentation for ACC Canada Vancouver, December 2 nd , 2010

Legal Project Management Presentation for ACC Canada Vancouver, December 2 nd , 2010

Date post: 05-Feb-2016
Category:
Upload: sloan
View: 17 times
Download: 0 times
Share this document with a friend
Description:
Legal Project Management Presentation for ACC Canada Vancouver, December 2 nd , 2010. Andrew Terrett, Director of Knowledge Management, BLG Carla Swansburg, Senior Counsel, Law Group, RBC. Is this your perception of Project Management?. Agenda. Part 1: Some definitions - PowerPoint PPT Presentation
Popular Tags:
51
Legal Project Management Presentation for ACC Canada Vancouver, December 2 nd , 2010 Andrew Terrett, Director of Knowledge Management, BLG Carla Swansburg, Senior Counsel, Law Group, RBC
Transcript
Page 1: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

Legal Project Management

Presentation for ACC Canada

Vancouver, December 2nd, 2010

Andrew Terrett, Director of Knowledge Management, BLG

Carla Swansburg, Senior Counsel, Law Group, RBC

Page 2: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

2

Is this your perception of Project Management?

Page 3: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

3

Agenda

Part 1: Some definitions

Part 2: Why do lawyers need Project Management?

Part 3: Key concepts

Part 4: Application to legal services

Page 4: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

4

Part 1 – Legal Project Management – key definitions

Page 5: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

5

• A mature discipline with:• A number of organisational “institutes” / associations

- Project Management Institute (PMI)

- Association for Project Management

• Standards e.g. Project Management Body of Knowledge (PMBOK), PRINCE2 (PRojects IN Controlled Environments)

• Certifications e.g. PMP, CAPM, PgMP, Risk, Scheduling

• Large growing global memberships – e.g. PMI is active in over 180 countries

What is it really? Project Management is…

Page 6: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

6

A few definitions…

• A project is “a temporary endeavor undertaken to create a unique product or service.” (PMI)

• Project Management is “the application of knowledge, skills, tools and techniques to project activities to meet project objectives” (PMI)

• In reality…part art, part science• Art – people management, negotiation

• Science – scope, time, cost, risk, communications, quality

Page 7: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

7

Artistry?

• PM is: • A set of tools, techniques and guidelines (a toolbox)

• To be used as required

• As appropriate – neither too much or too little (think “Goldilocks” – not too hot, not too cold…)

• Not just for the “mega-projects”

Page 8: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

8

Why has project management not captured the imagination of lawyers?

• They don’t teach it at law school• It seems like lawyers don’t need project management

•Lawyers have a framework – it’s called the Law!

•It seems like there are just too many variables in legal practice so “let’s just get drafting and billing!”

• Lawyers are not adept at applying best practices from the business world

• Lawyers enjoy the autonomy that comes with subject-matter expertise

Page 9: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

9

Part 2 – Why do lawyers need Project Management?

Page 10: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

10

Seven reasons…

• Maintain sanity!• Budgetary certainty• Project Management is proven – it works! • Project Plans are great communication tools (90% of

Project Management is COMMUNICATION).• Project Planning makes for better RFP responses for

law firms and evaluations of RFP’s by in-house counsel

• Project Plans make for better Knowledge Management• Project Plans are great learning tools for junior

lawyers

Page 11: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

11

Reason #1 - Maintain sanity!

• Are you familiar with this scenario? A new project is announced. You experience the following:

• Excitement• Disenchantment• Confusion• Panic!• Disaster• (Search for the guilty, punishment of the innocent)• (Rewards for the non-participants…)

• Good Project Management can reduce the likelihood of this scenario…

Page 12: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

12

Reason #2 – Budgetary certainty

• The economic imperative - “more for less” • Law departments are keen to negotiate alternative fee

arrangements and firms are under pressure to oblige:•Association of Corporate Counsel (ACC) Value Challenge•AFA’s – Fixed fees, caps, blended rates (not discounts)

• In-house counsel are getting more and more pressure to control and accurately predict costs

• They want value; and• They want a reliable budget in advance; so• Planning is becoming essential • To deliver AFA and make a profit, law firms need PM• Law Departments can use PM to negotiate and structure AFAs and manage

internal projects

Page 13: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

13

Reason #3 – Planning Precedes Performance

• Project Management is proven

• Research on IT software development projects shows better outcomes when PM discipline is adopted.

• No organisation that adopts project management ever walks away from it. They simply evolve and mature in their usage

• (But it’s not a magic bullet!) • The majority of project still fail in terms of on-time and on-budget delivery• But if you don’t use PM, you would have no idea what on-time and on-

budget even means!

Page 14: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

14

Reason #4 – Project Plans are a great communication tool and an opportunity for reflection

• Project plans allow the planner to• Reflect

• Identify and validate assumptions

• Reduce risks

• Project Management requires that a plan is communicated to all project “stakeholders”

• The entire team

• Clients/Business partners/internal clients for in-house lawyers

• Entire external legal team

• Students, law clerks/paralegals

•For internal projects, other key people like corporate communications/PR, executives

• In other words, anyone who has a stake in the project

Page 15: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

15

Reason #5 – Project plans are great BD tools for law firms and evaluation tools for clients

• Project plans allow law firms to respond more quickly to RFP’s and can distinguish firms

• “Here’s how we would tackle your problem”• Demonstrates that the firm has thought this through

• Demonstrates that they have done this type of work before

• For in-house counsel, allows an easier comparison of responses and progress

Page 16: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

16

Reason #6 – Project Plans are great KM tools

• Knowledge Management is all about lawyers accessing the right information at the right time.

• We collect and re-use precedents, research memos, clauses

• Why not project plans?

• Avoids “wheel re-invention”• Embeds knowledge for others to access• Allows for evolution of process improvement

Page 17: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

17

Reason #7 – Project Plans are great learning tools

• It is in the organisation’s interests that new lawyers get up to speed as quickly as possible on any given legal matter.

• A project plan provides an overview of the entire process. It defines what is meant by “done” and describes the necessary steps.

Page 18: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

18

Part 3 – Key Project Management Concepts

Page 19: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

19

Some key PM concepts (as described in the PMI’s PMBOK)

• Scope, Time, Cost, Risk, Quality, Communication• Bear in mind PMBOK is a “toolkit’ – pick the pieces that suit the

circumstances

• In legal services, “one size does not fit all…”• there’s complexity

• there are unknowns associated with negotiation

• litigation (strategic aspect)

Page 20: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

20

The Four Project Stages (the PMBOK “Waterfall” approach)

Page 21: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

21

Initiation

• Ask / Listen in this stage• Should we do “this”?

• What are the alternatives and their merits?

• Typically, as lawyers, the approval to proceed has already been given e.g.

• Acquire this target

• Defend the client against this lawsuit

• Output• In-house Counsel – Response to a situation

• Private Practice – Engagement / Retainer Letter

Page 22: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

22

Planning

• Ask / Listen in this stage• What does “done” look like? • What is “success” here?• What do we need to do to get there?• Who is best to do it?• What will it cost?

• Typical response before PM…..• We don’t have time to plan, we need to start now…..• (Equivalent of saying “We would rather do this quickly than efficiently”)

• Output• Scope• Project Plan/Strategy• Fee/cost estimate

Page 23: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

23

1st key concept - Scope

• Scope” is the work that must be performed • to deliver a product or service and

• meet specified requirements.

• In-Scope / Out-of-Scope• Think of this as two lists – A and B…

• Scope Management• “Speak now or forever hold your peace”

• Define the impact of scope changes before scope is approved. (Scope Change not scope creep…)

• Distinguish must haves from nice to haves

Page 24: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

24

Work Breakdown Structure (WBS)

• Two approaches• Top down (Decomposition)

• Bottom-up

• Expert judgment• Find the people who have done it before…

• Templates• “Progressive elaboration”

• You don’t have a crystal ball so that you can look 5 years down the road…

• Particularly important, for example, for litigation

Page 25: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

25

W ha t typ e?

T o w h o?

In v ita t io ns

W ha t typ e?

C a ke

W h ere ? W he n?

V en ue

W ha t?

A c tiv it ies

B irth d ay P a rty

A simple WBS example

Page 26: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

26

Commercial Lending Agreement Example(High level)

Commercial Lending Agreement

Letter of Intent or Memorandum of Understanding

Due DiligenceNegotiation and

Settlement of Documents

Loan Agreement Guarantees

Closing

Review of title?

Page 27: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

27

Commercial Litigation

Commercial Litigation

PleadingsDiscovery/

DepositionsMotions

Pre-trial preparation

Trial AppealMediation/Settlement

Page 28: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

28

• Logic/network diagrams

• Bar charts, milestones, “gates”

• Critical Path

2nd key concept – time management

Page 29: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

29

3rd key concept – Cost Planning

• To create a budget (from nothing)• Step 1 - Work Breakdown Structure (Task list)• Step 2 - Assigning resources (each of which have a cost)• Step 3 - Consider contingencies

…gives us an estimate• The importance of historical data

• Don’t start with a blank sheet of paper unless you have to!• Time and billing systems – vast quantities of historical data but difficult to

mine without other tools…

• “Ball-parking” budgets is massively unreliable• Don’t do it!

Page 30: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

30

Execution/Monitor and control

• Deliver the work product• Ask / Listen in this stage

• Are we on time?• Are we on budget?• Have we met the deliverables?• Have the objectives changed?

• Typical response before PM• Focus on the tasks and get them done

• Output• Communication• Revised plan• Deliverables

Execution

Monitor and Control

Page 31: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

31

4th key concept – Cost management

• Step 1 – Determine at what level of detail you will manage the budget

• Step 2 - For law firms: ensure timekeepers regularly enter their time

• Step 3 – Compare estimate, cost to date and remaining work

• You don’t need sophisticated tools to do this….• Project plan allows in-house counsel to track firms’

progress

Page 32: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

32

Closing

• Ask / Listen in this stage• What did we do well?• What can be done better next time?• Did I receive value for the costs? (client)• Did we deliver value for the costs (law firm)

• Typical response before PM• Get the bill paid (Private Practice)• Determine if any deliverables will make good precedents (KM

opportunity)

• Output• Lessons Learned• Process Assets

Page 33: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

33

5th Key PM concept - Risk

• Two elements: • Probability (is it going to happen?) and

• Severity (how bad would that be?)

• Risk Management process:• Identify, Analyse, Respond

• Risk rating = probability * severity

• Allows counsel to focus on true risks and spend less time/effort on minimal risks

• Risk Response Planning:• Mitigate, Avoid, Transfer, Accept

• Risks can be hidden, missing or unclear because requirements are unclear…What are the risk triggers?

Page 34: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

34

6th Key PM concept – Communication

• Communication Planning – who needs to know what, when, how?

• Project Sponsor – Who is the overall decision maker? • Responsibility Planning:

• Who is responsible?

• Who is accountable?

• Who needs to be consulted?

• Who needs to be informed?

Page 35: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

35

7th Key PM concept - Quality

• Quality is defined as “The degree to which a set of inherent

characteristics fulfils requirements” • What is quality in the context of legal services?

Page 36: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

36

The Project Management “Iron Triangle” or “Triple Constraint”

Cost

Time

Scope

Risk&

Quality

Page 37: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

37

Part 4 – Application of PM principles to legal practice

Page 38: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

38

Objection #1 - “Yes, but issues come up…”

• Issues come up in every project that require changes to scope, schedule, etc.

• Issues simply highlight the importance of• Agreeing in advance what “done” looks like; and

• Agreeing to a process for approving changes

• “Scope Change Management”

• New tasks, new dollars, amended timeline

• “The Iron Triangle”…

Page 39: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

39

Objection #2 – “We cannot plan from beginning to end” (say the litigators in unison…)

• So don’t try! • Litigation is not so much a single project as a series

• Clearly you cannot schedule from pleadings to trial – litigation is too fluid. The planning horizon is much shorter

• “Progressive elaboration”!!!

• Plan to the next milestone or deliverable

• Be prepared to throw away the plan!

Page 40: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

40

Objection #3 – “We’re already doing a lot of this…”

• You may well be…

• But Legal Project Management: • Makes explicit what was previously implicit

• Adds structure to what you already do (provides a template for better organization and planning of legal matters)

• Introduces a common vocabulary

Page 41: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

41

Objection #4 – “Everything I do is unique…every deal is different”

• (aka “fear of Susskind”…)• Response - you actually need more PM!• Project Management is about structure

• not necessarily about process improvement, commoditisation, etc.

• (“Yeah but…”)

Page 42: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

42

Objection #5 – “PM cannot be done in the context of a law firm/client relationship”

• Roles and responsibilities• What PM skills are available – • Do they have dedicated PM’s or “dabblers”?• Do we have an agreed PM methodology?

• Who’s in charge? • Inhouse

•General Counsel •Assistant General Counsel•Senior Counsel

• External Counsel •Partner?•Senior associate?•Paralegal (project co-ordinator)

Page 43: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

43

Objection #6 – “There’s no suitable PM software for lawyers…”

• There are many software applications that can assist with project management planning and execution

• Some options for your consideration…• MS Project 2010 (Server), Primavera, Liquid Planner, Onit, Swiftlight

• Budgeting software – e.g. Budget Manager, Engage, Feesability

• eBilling Software e.g. Serengeti

• Matter Management – Needles, Prolaw, Amicus Attorney

• (Note: The Apollo moon landings didn’t have MS Project…)

• Use software as a tool. It should not replace critical thinking

Page 44: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

44

Transactions Litigation Compliance

Can you scope out this project from beginning to end?

Yes (generally) Yes - tasks to the next milestone in detail. You can also plan end-to-end at a high level with a lower degree of certainty

Yes, but more process than project. Deliverables are defined already

Can you estimate time and costs required based on the tasks?

Yes (generally) Yes – reliable estimates to the next milestone and less accurate high level time and cost estimates for future phases

Yes

Can you define communication and responsibility requirements?

Yes Yes Yes

Can you identify risk and associated mitigation strategies?

Yes Yes Yes

“One size does not fit all…”

Page 45: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

45

“OK, I get it. Where do I start”…

• Start small• Pick an area (start with the simpler areas – not IPO, not Class Actions…)

• Bring in a consultant for basic Legal PM training like this

• Create a Work Breakdown Structure and try to execute against it

• (It won’t be fun the first time…)

• Learn quickly and “fail forward”

• Apply Lessons Learned, “rinse and repeat”…

• Then start talking to external counsel• Start small, pick another area

• Create a Work Breakdown Structure, try to execute against it…

• Figure out what tools and techniques work best for you.

Page 46: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

46

Discussion

Page 47: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

47

Example Scope Statement template

Page 48: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

48

Project Communications Plan

Page 49: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

49

Example Responsibility Matrix

Page 50: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

50

Risk Assessment Matrix

Page 51: Legal Project Management  Presentation for ACC Canada  Vancouver, December 2 nd , 2010

51

Contact Details

Andrew Terrett, PMP

Director of Knowledge Management

Borden Ladner Gervais LLP

Toronto

(416) 367 6497

[email protected]

Carla Swansburg

Senior Counsel

Royal Bank of Canada

Toronto

(416) 974-6712

[email protected]


Recommended