This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its ClientIntertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any
party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of thireport. Only the Client is authorized to copy or distribute this report and then only in its entirety. Any use of the Intertek name oone of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing byIntertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not implythat the material, product, or service is or has ever been under an Intertek certification program.
REPORT NUMBER: 101028759COQ-001
ORIGINAL ISSUE DATE: March 28, 2013
EVALUATION CENTERINTERTEK TESTING SERVICES NA LTD.
1500 BRIGANTINE DRIVECOQUITLAM, BC V3K 7C1
CANADA
RENDERED TO
LENMAK EXTERIOR INNOVATIONS INC.10404-176 STREET
EDMONTON,ALBERTAT5S 1L3
PRODUCT EVALUATED: StrataClad Wall System
EVALUATION PROPERTY: Air Leakage, Pressure Equalization, Static WaterPenetration, Dynamic Water Penetration,
TE
STREPORT
Report of Testing StrataClad Wall System for compliance with the applicablerequirements of the following criteria:
AAMA 508-07, Voluntary Test Method and Specification for PressureEqualized Rain Screen Wall Cladding Systems
8/10/2019 Lenmak 508
2/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001 Page 2 of 7
1 Table of Contents1 Table Of Contents.............................................................................................................2
2 Introduction .......................................................................................................................3
3 Test Samples ....................................................................................................................3
3.1. Sample Selection ..........................................................................................................3
3.2. Sample And Assembly Description ...............................................................................3
4 Testing And Evaluation Methods ......................................................................................4
4.1. Air Leakage...................................................................................................................4
4.2. Pressure Equalization ...................................................................................................4
4.3. Water Penetration Static ............................................................................................4
4.4. Water Penetration Dynamic .......................................................................................4
5 Test Apparatus..................................................................................................................56 Testing And Evaluation Results ........................................................................................6
6.1. Air Leakage...................................................................................................................6
6.2. Pressure Equalization ...................................................................................................6
6.3. Static Water Penetration ...............................................................................................6
6.4. Dynamic Water Penetration ..........................................................................................6
7 Conclusion ........................................................................................................................7
Appendix A Drawings.....................................................................................................7 Pages
8/10/2019 Lenmak 508
3/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001 Page 3 of 7
2 Introduction
Intertek Testing Services NA Ltd. (Intertek) has conducted testing for Lenmak ExteriorInnovations Inc. on the StrataClad product in accordance with AAMA 508-07, Voluntary
Method and Specification for Pressure Equalized Rain Screen Wall Cladding Systems . Thefollowing test methods were followed in this testing:
ASTM E283-04 (2012), Standard Test Method for Determining Rate of Air LeakageThrough Exterior Windows, Curtain Walls, and Doors Under Specified PressureDifferences Across the Specimen
ASTM E1233-06, Standard Test Method of Structural Performance of ExteriorWindows, Doors, Skylights, and Curtain Walls by Cyclic Air Pressure Differential
ASTM E331-00 (2009), Standard Test Method for Water Penetration of ExteriorWindows, Skylights, Doors, and Curtain Walls by Uniform Static Air PressureDifference
AAMA 501.1-05, Standard Test Method for Water Penetration of Windows, Curtain
Walls and Doors Using Dynamic Pressure.
This evaluation was completed during the month of February 2013.
3 Test Samples
3.1. SAMPLE SELECTION
The client submitted the exterior metal composite wall panel to the Evaluation Center onJanuary 25, 2013 and was identified as Coquitlam ID# VAN1301251608-001. Samples were notindependently selected for testing.
3.2. SAMPLE AND ASSEMBLY DESCRIPTION
The product was identified as the StrataClad Wall Panel, an exterior paneling systemconstructed from custom-manufactured 0.050 in. (1.25 mm) painted aluminum with 70% Kynarfinish. The aluminum panels are filled with 0.8 lb. Icynene foam with a foil paper layer on top.The wall samples were assembled and installed by the client and their installer on February 5,2013 at the Evaluation Center.
The overall framing dimensions measured 120 in. wide x 120 in. high. The wall was composedof 3 main wall sections, each measuring 120 in. x 40 in. Framing was constructed with 20ga C-channel steel studs (6 in. deep x 2 in. wide) placed 16 in. o/c. Framing was then sheathed with15/32 in. OSB and attached using #8 Tek3 screws. The wall sections were attached together
using #12 x 1 in. Tek3 screws. The wall was then covered with Tyvek membrane and sealedwith Tuck tape. A lower drip flashing, made from 0.050 in. aluminum, was mounted to the walland fastened every 16 in. o/c with #8 wafer head screws. The starter strip, made from 0.050 in.aluminum, was mounted to the wall and fastened every 16 in. o/c with #8 wafer head screws.The reveal strip, made from 0.050 in. aluminum, was mounted vertically to the wall andcentered, and then fastened every 16 in. o/c with #8 wafer head screws. The corner trim pieces,made from 0.050 in. aluminum, were mounted to the wall vertically and fastened every 16 in. o/cwith #8 wafer head screws. GaskaTape v700 was then applied to the reveal and corner trims toaid in water sealing. The panels are then installed to the wall using 100 plastic horsehoe
8/10/2019 Lenmak 508
4/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001 Page 4 of 7
spacers and #12 x 1.5 in. Tek3 screws spaced every 12 in. o/c. The top cap flashing, made from0.050 in. aluminum, was then mounted to the wall and fastened every 16 in. o/c with #8 waferhead screws. Refer to Appendix A for drawings of the tested wall sample.
4 Testing and Evaluation Methods
4.1. AIR LEAKAGE
The Air Leakage tests (Air Infiltration) were conducted in accordance with ASTM E283. The testswere performed using a test pressure of 75 Pa (1.57 psf). As per AAMA 508, air leakage wasinduced in the system to provide a leakage rate of 0.6 L/s*m2 (0.12 cfm/ft2). 196 holes, eachmeasuring 1/8 in. diameter, were drilled into the sheathing to achieve the required air leakage.
4.2. PRESSURE CYCLING
The Pressure Cycle test was tested in accordance with ASTM E1233 and evaluated to AAMA508-07. The test was preformed at a specified pressure differential of 240 Pa (5 psf) to 1200 Pa(25 psf) for a minimum of 100 three-second cycles.
4.3. WATER PENETRATION STATICThe Static Water Penetration test was tested in accordance with ASTM E331. This test wasperformed at the specified pressure differential of 720 Pa (15 psf) and a water spray rate of atleast 204 L/m2per hour (5.0 U.S. gal/ft2per hour). The test was run for fifteen minutes, duringwhich the pressure and water spray were continuously applied.
4.4. WATER PENETRATION DYNAMIC
The Dynamic Water Penetration test was tested in accordance with AAMA 501.1. The test wasperformed at the specified pressure differential of 720 Pa (15 psf), or 120 kph (75 mph) windspeed equivalent, generated using a Pratt and Whitney R-2800 Aircraft Engine, and a waterspray rate of at least 204 L/m2per hour (5.0 U.S. gal/ft2per hour). This test consisted of fifteenminutes, during which the pressure and water spray were continuously applied.
8/10/2019 Lenmak 508
5/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001 Page 5 of 7
5 Test Apparatus
Test Appl ication Equipment Intertek ID#
To develop the testpressures
Air blowerNA
To measure the volume ofair passing through the testsample
Meriam Instrument Co. laminarflow element, Model No.50MW20-2, and a MeriamInstrument Co. 8 in. H2Ocalibrated inclined manometer,Model No. 40HEX35WM
705960-W1,705960-w2
To measure the chamberpressure
Dwyer 0-0.5 in. H2O manometer 2101
Air Leakage
To measure the laminar
flow element inlet pressure
Dwyer 0-4 in. H2O manometer 2100
To develop the testpressures
Air blowerNA
Pressure Cycling
To measure the chamberpressure
Dwyer 0-36" H2O manometer 2171
To develop the testpressures
Air blower --
To measure the pressures Dwyer 0-4" H20 manometer 2100
Static WaterPenetration
To deliver the water on thetest sample
Water spray assembly ITS1
To develop the testpressures
Pratt and Whitney R-2800 DC-6propeller aircraft engine
PW2Dynamic WaterPenetration
To deliver the water on thetest sample
10 X9 spray rack assemblies,
with Site Test RacksITS10
8/10/2019 Lenmak 508
6/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001 Page 6 of 7
6 Testing and Evaluation Resul ts
6.1. AIR LEAKAGE
Air leakage test data is indicated in the following table:
Test Pressure for all samples: 75 Pa
Overall Area of each sample: 9.42 m2(101.42 ft2)
Air Leakage: 0.635 L/s*m2 (0.125 cfm/ft2)
6.2. PRESSURE CYCLING
During the Pressure Cycling at a pressure differential from 240 Pa (5 psf) to 1200 Pa (25 psf) for100 cycles the systems lag times was below the required 0.08 seconds and the differentialbetween the cavities and cyclic wind pressure did not exceed 50% of the maximum testpressure. All samples tested met the requirements as specified by the client for Pressure
Equalization and as per AAMA 508-07.
6.3. STATIC WATER PENETRATION
During the 15-minute test period, using a pressure differential of 720 Pa (15 psf), there was nowater leakage observed through the tested sample. The sample met the requirements asspecified by the client for Static Water Penetration and as per ASTM E331.
6.4. DYNAMIC WATER PENETRATION
During the 15-minute test period, using a Pratt and Whitney R-2800 Aircraft Engine to generate apressure differential of 720 Pa (15 psf), no water leakage was observed through the testedsample. The sample met the requirements as specified by the client for Dynamic Water
Penetration.
8/10/2019 Lenmak 508
7/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001 Page 7 of 7
7 Conclusion
The StrataClad Wall System tested and described in this report has met the Air Leakage,Pressure Equalization, Static Water Penetration, and Dynamic Water Penetration test
requirements specified by the client.
The conclusions of this test report may not be used as part of the requirements for Intertek productcertification. Authority to Mark must be issued by Intertek for a product to become certified byIntertek.
INTERTEK TESTING SERVICES NA LTD.
Tested by:Frank Gadea-LopezTechnician Fenestration Products
Reported by:Chris Chang, EITTechnician Building Products
Reviewed by:Riccardo DeSantisManager Building Products
8/10/2019 Lenmak 508
8/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001
APPENDIX A: Drawings (7 pages)
8/10/2019 Lenmak 508
9/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001
8/10/2019 Lenmak 508
10/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001
8/10/2019 Lenmak 508
11/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001
8/10/2019 Lenmak 508
12/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001
8/10/2019 Lenmak 508
13/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001
8/10/2019 Lenmak 508
14/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001
8/10/2019 Lenmak 508
15/15
Lenmak Exterior Innovations Inc. March 28, 2013Report No. 101028759COQ-001