  • 8/3/2019 Lesson I, Engineering Economy

    1/79

    Risk AnalysisCE 828

    Pooyan Aslani, Ph.D.

    Department of Civil Engineering

    Fall 2008

  • 8/3/2019 Lesson I, Engineering Economy

    2/79

    Syllabus

    Grading For purpose of grading, the

    performance of students enrolled in CE

    828 will be assessed using thefollowing scoring system:

    Class Participation 15%

    Homework* 45%

    Final Exam/ Project 40%

  • 8/3/2019 Lesson I, Engineering Economy

    3/79

    Homework Assignments

    Homework problems will be assigned weeklyand are due by the beginning of the classthrough drop box system in my poly. Allhomework must be done in Microsoft

    Excel.Late homework will be given no credit.

    Students are encouraged to discuss & workon homework problems with otherclassmates, but all problems must becompleted by the student her/himself; nocopying will be permitted.

  • 8/3/2019 Lesson I, Engineering Economy

    4/79

    Options for Extra Credit: Project

    You may complete a project of your own design.Your objective is to apply one or more of theconcepts in this course to a specific problem inyour area of interest. The application should be toa fresh problem and it should represent your work.

    Do not simply summarize an application that is

    described in the literature The report should be double-spaced, and it should

    not exceed 10 pages in length, including figuresand tables. The report should be concise and

    clear; the emphasis is on creativity and quality,not quantity. I have to confirm your project topic and the final

    report and presentation is due December 5, 2005

  • 8/3/2019 Lesson I, Engineering Economy

    5/79

    Examination

    final exam is formally scheduled for thefollowing date:

    Thursday 18/12/2008

  • 8/3/2019 Lesson I, Engineering Economy

    6/79

    Text and Reader/Notes

    Required Textbooks for this course are following: Making hard decisions Clemen, R. and Reilly, T.

    2004 update. ISBN: ISBN 0-495-01508-3 Against the Gods, The Remarkable Story of Risk''

    Peter L Bernstein ISBN: 9780471295631

    Recommended Reading: Data analysis using Microsoft Excel Middleton, M.Third Edition. Published by Thompson. ISBN:0534402933

    `Fooled By Randomness, The Hidden Role of Chancein Life and in the Markets,' Nassim Nicholas Taleb,

    2nd Ed., ISBN: 978-0812975215 ``The Black Swan: The Impact of the HighlyImprobable,''Nassim Nicholas Taleb, ISBN: 978-0812975215

    Wall Street Journal. You can get a student discount.

  • 8/3/2019 Lesson I, Engineering Economy

    7/79

    Topics to be covered

    See the Syllabus

  • 8/3/2019 Lesson I, Engineering Economy

    8/79

    What about you?

    Introduces yourself

    What area of Civil Engineering are youinterested in?

    What year are you in?

    Full time or Part time?

    Who do you work for?

    Beside the fact that CE 828 is one of themandatory courses what do you expectfrom the course to learn?

  • 8/3/2019 Lesson I, Engineering Economy

    9/79

    Thinking?!

    Thinking is important to all of us in ourdaily life.

    Good thinking is; therefore not

    something that is forced upon us inschool: It is something that we all want to do,

    Wants other to do,

    To achieve our goals and theirs

    This approach gives a special meaningto the term rationale.

  • 8/3/2019 Lesson I, Engineering Economy

    10/79

    Rational

    Rational does not mean, here, a kind ofthinking that denies motions anddesires.

    It means, the kind of thinking we wouldall want to do, if we were aware of ourown best interest, in order to achieve

    our goals.

  • 8/3/2019 Lesson I, Engineering Economy

    11/79

    Decision

    A decision is a choice of action- of whatto do or not to do.

    Decisions may attempt to satisfy the

    goals of others as well as the selfishgoals of the decision maker.

    Decision depend on beliefs and goals,but we can think about beliefs andgoals separately, without evenknowing what decisions they willaffect.

  • 8/3/2019 Lesson I, Engineering Economy

    12/79

    What is Risk?

    A riskis an event that may possibly occur,and if it did occur would have a negativeimpact on the goals of the organisation.Thus a risk is composed of three elements:1. The scenario,2. Its probability of occurrence,3. The size of its impact if it did occur (either a

    fixed value or a distribution).

    The concept of risk is about our recognition of

    future uncertainty.Risk implies that a given action has more than

    one possible outcome.

  • 8/3/2019 Lesson I, Engineering Economy

    13/79

    What is opportunity?

    An opportunityis an event that maypossibly occur, and if it did occurwould have a positiveimpact on the

    goals of the organisation. Thus anopportunity is composed of the samethree elements as a risk.

  • 8/3/2019 Lesson I, Engineering Economy

    14/79

    Characteristics of Risk

    Risk is either subjective or objective. Flipping a coin is an objective because

    the odds are well known.

    An objective risk can be describedprecisely based on theory, experiment,or common sense.

    Describing the odds for rain nextThursday is not so clear cut, andrepresent a subjective risk.

  • 8/3/2019 Lesson I, Engineering Economy

    15/79

    Subjective Risk

    Given the same information, theory,computers, etc., weatherman A maythink odds of rain are 30% while

    weatherman B may think the odds are65% and neither are wrong!

    Describing a subjective risk is open-ended in the sense that you could

    always refine your assessment withnew information, further study, or bygiving weight to the opinion of others.

  • 8/3/2019 Lesson I, Engineering Economy

    16/79

    Characteristics of Risk

    Deciding that something is risky requirespersonal judgment, even for objectiverisks.

    Flipping a coin where you win $ 1 forhead and loose $1 for tail would not besignificant to most people.

    If the stakes were $100,000 and -$100,000 respectively, most peoplewould find the situation to be quite risky!

  • 8/3/2019 Lesson I, Engineering Economy

    17/79

    Characteristics of Risk

    Risky actions and therefore risk arethings that we often can choose oravoid. Individuals differ in the amount

    of risk they willingly accept.

  • 8/3/2019 Lesson I, Engineering Economy

    18/79

    The Need for Risk Analysis InCivil Engineering

    Construction Will the cost construction materials and labor be

    as forecast?

    Will a labor strike affect the construction

    schedule?

    Structural

    Will the level of stress placed on the structure bypeak load crowds and nature be as forecast?

    Will the structure ever be stressed to the point offailure?

  • 8/3/2019 Lesson I, Engineering Economy

    19/79

    Assessing and Quantifying Risk

    Recognizing a need for risk analysis.

    How do you quantify the risk you haveidentified for a given uncertain

    situation?

  • 8/3/2019 Lesson I, Engineering Economy

    20/79

    Quantifying Risk

    Means determining all possible values arisky variable could take anddetermining the relative likelihood of

    each value. Suppose your uncertain situation is the

    outcome from the flip of a coin. You couldrepeat the flip a large number of timesuntil you had established the fact that halfof the times it comes up tails and half ofthe times heads.

  • 8/3/2019 Lesson I, Engineering Economy

    21/79

    Describing Risk

    Summarize the risk using a probabilitydistribution.

    A probability distribution is a device for

    presenting the quantified risk for avariable.

  • 8/3/2019 Lesson I, Engineering Economy

    22/79

    What is Risk Analysis?

    Risk analysis is any method -qualitative and/or quantitative forassessing the impact of risk on

    decision situations.

  • 8/3/2019 Lesson I, Engineering Economy

    23/79

    WHAT IS ECONOMICS ?

    The study of how limited resources isused to satisfy unlimited human wants.

    The study of how individuals and

    societies chooseto use scarceresources that nature and previousgenerations have provided.

  • 8/3/2019 Lesson I, Engineering Economy

    24/79

    Resources

    Land

    Labor

    Capital

  • 8/3/2019 Lesson I, Engineering Economy

    25/79

    Land

    All gifts of nature, such as:water, air, minerals, sunshine,

    plant and tree growth, as wellas the land itself which isapplied to the production

    process.

  • 8/3/2019 Lesson I, Engineering Economy

    26/79

    Labor

    The efforts, skills, andknowledge of people which are

    applied to the productionprocess.

  • 8/3/2019 Lesson I, Engineering Economy

    27/79

    Capital

    Real Capital (Physical Capital ) Tools, buildings, machinery -- things

    which have been produced which areused in further production

    Financial Capital Assets and money which are used in the

    production process

    Human Capital Education and training applied to labor

    in the production process

  • 8/3/2019 Lesson I, Engineering Economy

    28/79

    Origins of Engineering Economy

    The perspective that ultimateeconomy is a concern to theengineer and the availability of

    sound techniques to address thisconcern differentiate this aspect ofmodern engineering practice fromthat of the past.

  • 8/3/2019 Lesson I, Engineering Economy

    29/79

  • 8/3/2019 Lesson I, Engineering Economy

    30/79

    PRINCIPLES OF ENGINEERING

    ECONOMY

    1. Develop the Alternatives;

    2. Focus on the Differences;

    3. Use a Consistent Viewpoint;4. Use a Common Unit of Measure;

    5. Consider All Relevant Criteria;

    6. Make Uncertainty Explicit;

    7. Revisit Your Decisions

  • 8/3/2019 Lesson I, Engineering Economy

    31/79

    DEVELOP THE ALTERNATIVES

    The final choice (decision) isamong alternatives. The

    alternatives need to beidentified and then definedfor subsequent analysis.

  • 8/3/2019 Lesson I, Engineering Economy

    32/79

    USE A CONSISTENT VIEWPOINT

    The prospective outcomes of thealternatives, economic and other,should be consistently developed

    from a defined viewpoint(perspective).

    USE A COMMON UNIT OF

  • 8/3/2019 Lesson I, Engineering Economy

    33/79

    USE A COMMON UNIT OF

    MEASURE

    Using a common unit ofmeasurement to enumerate as many

    of the prospective outcomes aspossible will make easier theanalysis and comparison of

    alternatives.

    CONSIDER ALL RELEVANT

  • 8/3/2019 Lesson I, Engineering Economy

    34/79

    CONSIDER ALL RELEVANT

    CRITERIA

    Selection of a preferred alternative(decision making) requires the useof a criterion (or several criteria).

    The decision process shouldconsider the outcomes enumeratedin the monetary unit and thoseexpressed in some other unit ofmeasurement or made explicit in adescriptive manner.

    MAKE UNCERTAINTY EXPLICIT

  • 8/3/2019 Lesson I, Engineering Economy

    35/79

    MAKE UNCERTAINTY EXPLICIT

    Uncertainty is inherent in projecting(or estimating) the future outcomesof the alternatives and should be

    recognized in their analysis andcomparison.

    REVISIT YOUR DECISIONS

  • 8/3/2019 Lesson I, Engineering Economy

    36/79

    REVISIT YOUR DECISIONS

    Improved decision making resultsfrom an adaptive process; to theextent practicable, the initial

    projected outcomes of the selectedalternative should be subsequentlycompared with actual results

    achieved.

    ENGINEERING ECONOMY AND

  • 8/3/2019 Lesson I, Engineering Economy

    37/79

    ENGINEERING ECONOMY AND

    THE DESIGN PROCESS

    An engineering economy study isaccomplished using a structuredprocedure and mathematical

    modeling techniques. Theeconomic results are then used in adecision situation that involves two

    or more alternatives and normallyincludes other engineeringknowledge and input.

    ENGINEERING ECONOMIC

  • 8/3/2019 Lesson I, Engineering Economy

    38/79

    ENGINEERING ECONOMIC

    ANALYSIS PROCEDURE

    1. Problem recognition, formulation, andevaluation.

    2. Development of the feasible

    alternatives.3. Development of the cash flows for eachalternative.

    4. Selection of a criterion ( or criteria).

    5. Analysis and comparison of thealternatives.

    6. Selection of the preferred alternative.

    7. Performance monitoring and post-evaluation results.

  • 8/3/2019 Lesson I, Engineering Economy

    39/79

    LIFE-CYCLE COST

    Life-cycle cost is the summation ofall costs, both recurring andnonrecurring, related to a product,

    structure, system, or service duringits life span.

    Life cycle begins with the

    identification of the economic needor want ( the requirement ) and endswith the retirement and disposalactivities.

    FIXED VARIABLE AND INCREMENTAL

  • 8/3/2019 Lesson I, Engineering Economy

    40/79

    FIXED, VARIABLE, AND INCREMENTAL

    COSTS

    Fixed costsare those unaffected by changesin activity level over a feasible range ofoperations for the capacity or capabilityavailable.

    Typical fixed costs include insurance andtaxes on facilities, general management andadministrative salaries, license fees, andinterest costs on borrowed capital.

    When large changes in usage of resourcesoccur, or when plant expansion or shutdownis involved fixed costs will be affected.

    RECURRING AND NONRECURRING

  • 8/3/2019 Lesson I, Engineering Economy

    41/79

    RECURRING AND NONRECURRING

    COSTS

    Recurring costs are repetitive and occurwhen a firm produces similar goods andservices on a continuing basis.

    Variable costs are recurring costsbecause they repeat with each unit ofoutput .

    A fixed cost that is paid on a repeatablebasis is also a recurring cost:

    Office space rental

    $

    DIRECT INDIRECT AND OVERHEAD

  • 8/3/2019 Lesson I, Engineering Economy

    42/79

    DIRECT, INDIRECT AND OVERHEAD

    COSTS

    Direct costs can be reasonablymeasured and allocated to a specificoutput or work activity -- labor andmaterial directly allocated with a

    product, service or constructionactivity;

    Indirect costs are difficult to allocate to

    a specific output or activity -- costs ofcommon tools, general supplies, andequipment maintenance ;

    DIRECT INDIRECT AND OVERHEAD

  • 8/3/2019 Lesson I, Engineering Economy

    43/79

    Overhead consists of plant operatingcosts that are not direct labor ormaterial costs indirect costs, overhead and burden are

    the same; Prime Cost is a common method of

    allocating overhead costs among

    products, services and activities inproportion the sum of direct labor andmaterials cost ;

    DIRECT, INDIRECT AND OVERHEADCOSTS

    INTEREST & INTEREST RATE

  • 8/3/2019 Lesson I, Engineering Economy

    44/79

    INTEREST & INTEREST RATE

    The fee that a borrowerpays to a lender for the use

    of his or her money. The percentage of money

    being borrowed that is paidto the lender on some timebasis.

    SIMPLE INTEREST

  • 8/3/2019 Lesson I, Engineering Economy

    45/79

    SIMPLE INTEREST

    The total interest earned or charged islinearly proportional to the initial amount ofthe loan (principal), the interest rate and

    the number of interest periods for whichthe principal is committed.

    When applied, total interest I may be

    found by I = ( P ) ( N ) ( i ), where P = principal amount lent or borrowed

    N = number of interest periods ( e.g., years )

    i = interest rate per interest period

    COMPOUND INTEREST

  • 8/3/2019 Lesson I, Engineering Economy

    46/79

    COMPOUND INTEREST

    Whenever the interest charge for any interestperiod is based on the remaining principalamount plus any accumulated interest chargesup to the beginningof that period.

    Period Amount Owed Interest Amount Amount OwedBeginning of for Period at end of

    period ( @ 10% ) period1 $1,000 $100 $1,100

    2 $1,100 $110 $1,210

    3 $1,210 $121 $1,331

  • 8/3/2019 Lesson I, Engineering Economy

    47/79

    ECONOMIC EQUIVALENCE

    Established when we are indifferent between afuture payment, or a series of future payments,and a present sum of money .

    Considers the comparison of alternative options, or

    proposals, by reducing them to an equivalentbasis, depending on:

    interest rate;

    amounts of money involved;

    timing of the affected monetary receipts and/orexpenditures;

    manner in which the interest , or profit on

    invested capital is paid and the initial capital isrecovered.

    ECONOMIC EQUIVALENCE FOR FOUR REPAYMENT

  • 8/3/2019 Lesson I, Engineering Economy

    48/79

    Q

    PLANS OF AN $8,000 LOAN

    Plan #1: $2,000 of loan principal plus 10% of BOY principal paidat the end of year; interest paid at the end of each year isreduced by $200 (i.e., 10% of remaining principal)

    Year Amount Owed Interest Accrued Total Principal Total endat beginning for Year Money Payment of Yearof Year owed at Payment( BOY ) end of

    Year

    1 $8,000 $800 $8,800 $2,000 $2,800

    2 $6,000 $600 $6,600 $2,000 $2,600

    3 $4,000 $400 $4,400 $2,000 $2,400

    4 $2,000 $200 $2,200 $2,000 $2,200

    Total interest aid $2 000 is 10% of total dollar- ears $20 000

  • 8/3/2019 Lesson I, Engineering Economy

    49/79

    Plan #2: $0 of loan principal paid until end of fourthyear; $800 interest paid at the end of each year

    Year Amount Owed Interest Accrued Total Principal Total end

    at beginning for Year Money Payment of Yearof Year owed at Payment( BOY ) end of

    Year

    1 $8,000 $800 $8,800 $0 $8002 $8,000 $800 $8,800 $0 $800

    3 $8,000 $800 $8,800 $0 $800

    4 $8,000 $800 $8,800 $8,000 $8,800

    Total interest paid ($3,200) is 10% of total dollar-years ($32,000)

    ECONOMIC EQUIVALENCE FOR FOURREPAYMENT PLANS OF AN $8,000 LOAN

    ECONOMIC EQUIVALENCE FOR FOUR

  • 8/3/2019 Lesson I, Engineering Economy

    50/79

    ECONOMIC EQUIVALENCE FOR FOUR

    REPAYMENT PLANS OF AN $8,000 LOAN

    Plan #3: $2,524 paid at the end of each year; interestpaid at the end of each year is 10% of amount owedat the beginning of the year.

    Year Amount Owed Interest Accrued Total Principal Total end

    at beginning for Year Money Payment of Yearof Year owed at Payment( BOY ) end of

    Year

    1 $8,000 $800 $8,800 $1,724 $2,5242 $6,276 $628 $6,904 $1,896 $2,524

    3 $4,380 $438 $4,818 $2,086 $2,524

    4 $2,294 $230 $2,524 $2,294 $2,524

    Total interest paid ($2,096) is 10% of total dollar-years ($20,950)

    ECONOMIC EQUIVALENCE FOR FOUR

  • 8/3/2019 Lesson I, Engineering Economy

    51/79

    ECONOMIC EQUIVALENCE FOR FOUR

    REPAYMENT PLANS OF AN $8,000 LOAN

    Plan #4: No interest and no principal paid for first three years. Atthe end of the fourth year, the original principal plusaccumulated (compounded) interest is paid.

    Year Amount Owed Interest Accrued Total Principal Total end

    at beginning for Year Money Payment of Yearof Year owed at Payment( BOY ) end of

    Year

    1 $8,000 $800 $8,800 $0 $0

    2 $8,800 $880 $9,680 $0 $0

    3 $9,680 $968 $10,648 $0 $0

    4 $10,648 $1,065 $11,713 $8,000 $11,713

    Total interest paid ($3,713) is 10% of total dollar-years ($37,128)

    CASH FLOW DIAGRAMS / TABLE NOTATION

  • 8/3/2019 Lesson I, Engineering Economy

    52/79

    CASH FLOW DIAGRAMS / TABLE NOTATION

    i = effective interest rate per interest periodN = number of compounding periods (e.g., years)

    P = present sum of money; the equivalent value of oneor more cash flows at the present time reference

    pointF = future sum of money; the equivalent value of one or

    more cash flows at a future time reference point

    A = end-of-period cash flows (or equivalent end-of-

    period values ) in a uniform series continuing for aspecified number of periods, starting at the end of thefirst period and continuing through the last period

    G = uniform gradient amounts -- used if cash flowsincrease b a constant amount in each eriod

    CASH FLOW DIAGRAM NOTATION

  • 8/3/2019 Lesson I, Engineering Economy

    53/79

    CASH FLOW DIAGRAM NOTATION

    1 2 3 4 5 = N

    1

    1Time scale with progression of time moving from left toright; the numbers represent time periods (e.g., years,months, quarters, etc...) and may be presented within atime interval or at the end of a time interval.

    CASH FLOW DIAGRAM NOTATION

  • 8/3/2019 Lesson I, Engineering Economy

    54/79

    CASH FLOW DIAGRAM NOTATION

    1 2 3 4 5 = N

    1

    1Time scale with progression of time moving from left toright; the numbers represent time periods (e.g., years,months, quarters, etc...) and may be presented within atime interval or at the end of a time interval.

    P =$8,000 2

    2 Present expense (cash outflow) of $8,000 for lender.

    CASH FLOW DIAGRAM NOTATION

  • 8/3/2019 Lesson I, Engineering Economy

    55/79

    CASH FLOW DIAGRAM NOTATION

    1 2 3 4 5 = N

    1

    1Time scale with progression of time moving from left toright; the numbers represent time periods (e.g., years,months, quarters, etc...) and may be presented within atime interval or at the end of a time interval.

    P =$8,000 2

    2 Present expense (cash outflow) of $8,000 for lender.

    A = $2,524 3

    3 Annual income (cash inflow) of $2,524 for lender.

    CASH FLOW DIAGRAM NOTATION

  • 8/3/2019 Lesson I, Engineering Economy

    56/79

    CASH FLOW DIAGRAM NOTATION

    1 2 3 4 5 = N

    1

    1 Time scale with progression of time moving from left toright; the numbers represent time periods (e.g., years,months, quarters, etc...) and may be presented within atime interval or at the end of a time interval.

    P =$8,000 2

    2 Present expense (cash outflow) of $8,000 for lender.

    A = $2,524 3

    3 Annual income (cash inflow) of $2,524 for lender.

    i = 10% per year4

    4 Interest rate of loan.

    CASH FLOW DIAGRAM NOTATION

  • 8/3/2019 Lesson I, Engineering Economy

    57/79

    CASH FLOW DIAGRAM NOTATION

    1 2 3 4 5 = N1

    1Time scale with progression of time moving from left to right;the numbers represent time periods (e.g., years, months,quarters, etc...) and may be presented within a time interval orat the end of a time interval.

    P =$8,000 2

    2 Present expense (cash outflow) of $8,000 for lender.

    A = $2,524 3

    3 Annual income (cash inflow) of $2,524 for lender.

    i = 10% per year4

    4 Interest rate of loan.

    5

    5Dashed-arrow line indicates

    amount to be determined.

    RELATING PRESENT AND FUTURE EQUIVALENT

  • 8/3/2019 Lesson I, Engineering Economy

    58/79

    RELATING PRESENT AND FUTURE EQUIVALENT

    VALUES OF SINGLE CASH FLOWS

    Finding F when given P: Finding future value when given present

    value

    F = P ( 1+i ) N

    (1+i)N single payment compoundamount factor

    functionally expressed as F = ( F / P,

    i%,N )

    P

    0

    N =

    F = ?

    RELATING PRESENT AND FUTURE EQUIVALENT

  • 8/3/2019 Lesson I, Engineering Economy

    59/79

    Finding P when given F: Finding present value when given future

    value

    P = F [1 / (1 + i ) ] N (1+i)-N single payment present worth

    factor

    functionally expressed as P = F ( P / F,i%, N )

    VALUES OF SINGLE CASH FLOWS

    P = ?

    0 N =F

    RELATING A UNIFORM SERIES (ORDINARY

  • 8/3/2019 Lesson I, Engineering Economy

    60/79

    RELATING A UNIFORM SERIES (ORDINARYANNUITY) TO PRESENT AND FUTURE EQUIVALENT

    VALUES

    Finding F given A:

    Finding future equivalent income (inflow) valuegiven a series of uniform equal Payments

    ( 1 + i ) N - 1

    F = A

    i

    uniform series compound amount factor in [ ] functionally expressed as F = A ( F / A,i%,N )

    RELATING A UNIFORM SERIES (ORDINARY

  • 8/3/2019 Lesson I, Engineering Economy

    61/79

    ANNUITY) TO PRESENT AND FUTURE EQUIVALENT

    VALUES

    Finding F given A:

    Finding future equivalent income (inflow) value givena series of uniform equal Payments

    ( 1 + i )N

    - 1F = A

    i

    uniform series compound amount factor in [ ]

    functionally expressed as F = A ( F / A,i%,N )

    predetermined values are in column 4 ofAppendix C of text F = ?

    1 2 3 4 5 6 7 8 A =

    RELATING A UNIFORM SERIES (DEFERRED ANNUITY)

  • 8/3/2019 Lesson I, Engineering Economy

    62/79

    RELATING A UNIFORM SERIES (DEFERRED ANNUITY)

    TO PRESENT / FUTURE EQUIVALENT VALUES

    If an annuity is deferredjperiods, wherej < N

    And finding P given A for an ordinary annuity isexpressed by:

    P = A ( P / A, i%,N )This is expressed for a deferred annuity by:

    A ( P / A, i%,N -j) at end of periodj

    This is expressed for a deferred annuity by:A ( P / A, i%,N -j) ( P / F, i%,j)as of time 0 (time present)

  • 8/3/2019 Lesson I, Engineering Economy

    63/79

    NOMINAL AND EFFECTIVE INTEREST RATES

    Nominal Interest Rate - r - For rates compounded morefrequently than one year, the stated annual interestrate.

    Effective Interest Rate - i - For rates compounded morefrequently than one year, the actual amount of interestpaid.

    i = ( 1 + r / M )M - 1 = ( F / P, r / M, M ) -1

    M - the number of compounding periods per yearAnnual Percentage Rate - APR - percentage rate per

    period times number of periods.

    APR = r x M

    Effective Interest Rate

  • 8/3/2019 Lesson I, Engineering Economy

    64/79

    Effective Interest Rate

    Ex: the nominal rate is 16%/yearcompounded quarterly. What iseffective rate?

    r= 16%/year divided by 4= 4%quarter.On an annual basis, this equals16.99%/year. The general formula is

    ieff= (1+ r/M)M 1

    ieff = (1+ 0.16/4)4 1= (1.04)4 1=1.1699-1= .01699= 16.99%

    Effective Interest Rate

  • 8/3/2019 Lesson I, Engineering Economy

    65/79

    Effective Interest Rate

    A credit company advertises a nominalrate of 16% on unpaid balancescompounded daily. What is the

    effective interest rate per year beingcharged?

    r = 16%/year, M= 365 days/ year

    ieff= (1+0.16/365)365-1=0.1735=17.35%

    Effective Interest Rate

  • 8/3/2019 Lesson I, Engineering Economy

    66/79

    Effective Interest Rate

    In the beginning of this section, I wasdefined simply as the interest rate perinterest period. A more precise

    definition, we know, is that Iis theeffective interest rate per period. Whencompounding is continuous, we havespecial case in which

    ieff = er-1

    PRESENT WORTH METHOD ( PW )

  • 8/3/2019 Lesson I, Engineering Economy

    67/79

    PRESENT WORTH METHOD ( PW )

    Based on concept of equivalent worth of allcash flows relative to the present as a base

    All cash inflows and outflows discounted

    to present at interest -- generally MARR PW is a measure of how much money

    can be afforded for investment in excessof cost

    PW is positive if dollar amount receivedfor investment exceeds minimumrequired by investors

    FINDING PRESENT WORTH

  • 8/3/2019 Lesson I, Engineering Economy

    68/79

    FINDING PRESENT WORTH

    Discount future amounts to the present by using theinterest rate over the appropriate study period

    PW = P Fk ( 1 + i ) k

    i = effective interest rate, or MARR per compoundingperiod

    k = index for each compounding period

    Fk = future cash flow at the end of period k

    N = number of compounding periods in study period

    interest rate is assumed constant through project

    The higher the interest rate and further into future a cash flowoccurs, the lower its PW

    k = 0

    N

    Discount Rate

  • 8/3/2019 Lesson I, Engineering Economy

    69/79

    Discount Rate

    Three main factors must be considered: Investment opportunities: what alternative opportunities are

    available for investment?

    Risk: is the proposed project more or less risky than the otheroptions?

    Inflation: how much will inflation reduce the future purchasingpower of our money?

    Discount Rate

  • 8/3/2019 Lesson I, Engineering Economy

    70/79

    Discount Rate

    It is possible to think of the discount rate asbeing made up of three components relatedto these three factors:

    The rate-of-return for risk-free investments, such

    as bank accounts or government bonds (i%) A risk premium that reflects the amount of risk in

    the project (r%)

    A premium to offset the expected effects of

    inflation (inf%)

    DEPRECIATION

  • 8/3/2019 Lesson I, Engineering Economy

    71/79

    DEPRECIATION

    Decrease in value of physical propertieswith passage of time and use

    Accounting concept establishing annualdeduction against before-tax income

    - to reflect effect of time and use on assetsvalue in firms financial statements

    - to match yearly fraction of value used byasset in production of income over assets

    economic life

    PROPERTY IS DEPRECIABLE IF IT

  • 8/3/2019 Lesson I, Engineering Economy

    72/79

    MUST :

    be used in business or held to produceincome

    have a determinable useful life which is

    longer than one year wear out, decay, get used up, become

    obsolete, or lose value from naturalcauses

    not be inventory, stock in trade, orinvestment property

    DEPRECIATION CONCEPTS

  • 8/3/2019 Lesson I, Engineering Economy

    73/79

    Adjusted cost basis -- allowableadjustment (increase or decrease) tooriginal cost basis, used to calculate

    depreciation and depletion deductionsBasis, or cost basis -- also called

    unadjusted cost -- initial cost of

    acquiring an asset, plus sales tax,transportation, and normal costs ofmaking asset serviceable

    DEPRECIATION CONCEPTS

  • 8/3/2019 Lesson I, Engineering Economy

    74/79

    DEPRECIATION CONCEPTS

    Market Value (MV) -- Amount paid by willingbuyer to willing seller for property where noadvantage and no compulsion to transact

    -- approximates present value of what willbe received through ownership of property,including time-value of money (or profit)

    DEPRECIATION CONCEPTS

  • 8/3/2019 Lesson I, Engineering Economy

    75/79

    The following terms are used in the classical(historical) depreciation method equations:N = depreciable life of the asset in yearsB = cost basis, including allowable adjustmentsd k = annual depreciation deduction in year k (1< k

  • 8/3/2019 Lesson I, Engineering Economy

    76/79

    ( )

    Simplest depreciation method:Assumes constant amount is depreciatedeach year over depreciable (useful) life

    d k = ( B - SVN ) / Nd k* = kdk for 1 < k < N

    BVk = B - d k*

    This method requires an estimate of the finalSV ( also the final book value at the end ofyear N )

    DECLINING BALANCE (DB) METHOD

  • 8/3/2019 Lesson I, Engineering Economy

    77/79

    Sometimes called constant percentage method or

    Matheson formulaAssumed annual cost of depreciation is fixedpercentage of BV at beginning of year

    R is constantR = 2 / N when 200% declining balance

    used R = 1.5 / N when 150% decliningbalance used

    d 1 = B ( R )d k = B ( 1 - R )

    k - 1 ( R )d

    k*

    = B [ 1 - (1 - R ) k ]BV k = B ( 1 - R )

    kBV N = B ( 1 - R )

    N Because declining balance method never reaches

    BV = 0, its permissible to switch from this to straight-line method so assets SV

    Nwill be zero or other

    desired value

    SUM-OF-THE-YEARS-DIGITS (SYD) METHOD

  • 8/3/2019 Lesson I, Engineering Economy

    78/79

    Book value at the end of year k

    2(B - SVN) (B - SV

    N)

    BVk = B - ----------------- k + ----------- k (k + 1 )N N (N + 1)

    The cumulative depreciation through the kth year

    d k* = B - BV k

    ( )

  • 8/3/2019 Lesson I, Engineering Economy

    79/79

    Thursday 11th

    Preliminary Data Analysis1. Read Against the Gods pp.1-

    39

    2. Homework posted at my.poly