LEVEL OF SERVICE (LOS) DEFINITIONS
.
907/1052703/397
PEDS 2/12
PEDS 13/2
37/18
85/62
31/80
PEDS 0/068/5922/271049/1241
37/91
21/92
252/80
0
PEDS 0/3
983/1258
* 3/2
27/14
25/5
74
86/1
2810
/21
* 148/
834/4
192/
83
658/225
85/168
990/1094
2
372/597
109/43
164/
122
439/
419
231/
259
65/19
332
/16136/13
0
197/192
217/331356/1252
1208/1734
PEDS 0/0
66/17911/93
PE
DS
0/0
87/8
889
8/10
3472
/34
PE
DS
0/0
136/209
782/899
75/93
PEDS 0/0247/177
157/14463/42
PEDS 0/0
208/108
37/163/1 PEDS 0/0
PEDS
0/0
855/9
725/146
/186
PEDS
0/013
/1610
56/12
732/3
5/0
2/1
2/3
PEDS 0/0
PEDS 0/0
0/027/24
PED
S 0/
043
/23
23/2
6
872/
980
974/
1212
3/0
4/7
PE
DS
0/0
20/6
2
15/0
46/380/0
PE
DS
0/0
PEDS 0/0
9/3
41/1681/29
9/36778/899
91/140
939/115523/35
PE
DS
0/0 PEDS 0/0
48/5644/34
119/84
PEDS 0/0
10/0
8/5
7/0
906/1195264/1721/2
PEDS 0/0
PEDS 0/0
1/5807/924
1/3
PEDS 0/8
105/271
2/14/13
8
7
6
5
4
3
2
1
N. F
OR
D S
T.
FORD ST.
S. GOLDEN RD.
JOH
NS
ON
RD
.
W. COLFAX AVE.
US 6
US 6
HE
RIT
AG
E R
D.
19TH ST.
SH 58
SH
93
US 6
WASHINGTON AVE.
IOWA
C 4
70
JEFF. CO.PKWY.
PINE RIDGE RD.
GOLDEN GATECANYON RD.
5/520/5
5/535/30
5/10
55/3
0
30/3
5
2215
/209
5
2470
/255
5
5/5
25/8
0
60/50
10/5
10/1015/5
2305/2420330/2155/5
5/55/102150/2145
135/340
5/55/20
5/5260/135
50/20 5/5
10/5
2090
/192060
/235
5/5
2615
/2615
20/20
5/510/5
15/5
55/20105/40
15/452090/2110
115/175
5/52285/2385
30/45 150/100
55/45
60/70
20/115
40/11590/250
1975
/201
090
/40
425/
455
95/1051465/1665
170/470
265/175
535/575
735/550
880/500
1630/2100
315/10
00
30/352435/2590
110/80
50/25
40/100
85/75
50/115
30/115
1445/1550
155/25
* 25/5
225/
215
40/6
0
115/
540
55/1
00
10/1
529
0/15
5
450/155
85/135
1420/1460
2
196/551835/2145305/470
1850/1850140/235
285/
260
565/
330
261/
106
66/20
5
60/29
9
75/28
2
298/2658
7
6
5
4
3
2
1
N. F
OR
D S
T.
FORD ST.
S. GOLDEN RD.
JOH
NS
ON
RD
.
W. COLFAX AVE.
US 6
US 6
HE
RIT
AG
E R
D.
19TH ST.
SH 58
SH
93
US 6
WASHINGTON AVE.
IOWA
C 4
70
JEFF. CO.PKWY.
PINE RIDGE RD.
GOLDEN GATECANYON RD.
DOES NOT INCLUDE FLYOVER RAMPS*
DOES NOT INCLUDE FLYOVER RAMPS*
.
EXISTING AND FUTURE TRAFFIC VOLUMES
000/000
AM PE
AK HO
UR
PM PE
AK HO
UR
LEGEND:
LEGEND:
PM PE
AK HO
UR
AM PE
AK HO
UR
000/000
.
19TH ST.
3
C 4
70
1
S. GOLDEN RD.
INT. LOS
W. COLFAX AVE.
2
HE
RIT
AG
E R
D.
JEFF. CO.PKWY.
US 6
RD
.
JOH
NS
ON
US 6
OVERALL INTERSECTION LEVEL OF SERVICE [AM/(PM)]
=
WASHINGTON AVE.
8
5
US 6 4
IOWA
SH 58
6
7
SH
93
CANYON RD.GOLDEN GATE
N. F
OR
D S
T.
PINE RIDGE RD.
56TH AVE.
FORD ST.
GRADE SEPARATED INTERCHANGE
EXISTING LANE
ADDED LANE
BRIDGE WITH NO HIGHWAY ACCESS
=
=
=
FREE FLOW TURN(BYPASSES TRAFFIC SIGNAL)
SIGNALIZED INTERSECTION
=
=
=
LEGEND:
FF
A/(C)
INT. LOS
FF
INT. LOS
A/(A)
FF
INT. LOS
D/(B)
FF
INT. LOS
F/(E)
FF
C/(D)
INT. LOS
FF
INT. LOS
C/(C)
INT. LOS
C/(F)
2
FF
FF
FF
FF
FF
FF
2002 / 2003 EXISTING (MEASURED:
AVERAGE OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MEASURED:
WORST OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MODELED)
2020 NO BUILD / NO ACTION
2020 BUILD OPTION 1 : IMPROVED SIGNALS
AT ALL MAJOR INTERSECTIONS
LEVEL OF SERVICE 1
Northbound AM B B B E US 6: C / SH 93: C Northbound PM B B A E US 6: D / SH 93: C Southbound AM B B C F US 6: D / SH 93: D Southbound PM A B C F US 6: E / SH 93: D
Northbound AM 2.4 3 5.4 6.7 7.4 Northbound PM 3.0 5 4.9 6.9 7.4 Southbound AM 3.2 5 5.9 7.0 7.6 Southbound PM 2.4 4 6.2 7.0 8.0
Northbound AM 58.7 (AT 6/58/93) 87.6 (AT 19TH) 107.3 (AT 19TH) 364.9 (AT WASHINGTON) 50.6 (AT HERITAGE) Northbound PM 61.0 (AT 19TH) 97.5 (AT 19TH) 48.7 (AT 19TH) 322.7 (AT WASHINGTON) 84.6 (AT 6/58/93) Southbound AM 57.8 (AT 19TH) 82.1 (AT WASHINGTON) 147.4 (AT 19TH) 487.0 (AT GOLDEN GATE) 83.4 (AT 19TH) Southbound PM 52.4 (AT 6/58/93) 67.4 (AT 6/58/93) 163.4 (AT HERITAGE) 502.8 (AT GOLDEN GATE) 187.6 (AT 19TH)
Northbound AM 9.4 10.7 10.5 22.4 11.9 Northbound PM 9.3 10.2 8.6 22.5 13.5 Southbound AM 9.8 10.3 11.5 32.3 14.5 Southbound PM 8.7 9.2 12.5 36.3 18.0
2020 BUILD OPTION 2 : INTERCHANGE AT US
6 / 19TH STREET; IMPROVED SIGNALS
AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 3 : INTERCHANGES AT US 6 / HERITAGE ROAD & US 6 / 19TH STREET;
IMPROVED SIGNALS AT ALL OTHER MAJOR
INTERSECTIONS
2020 BUILD OPTION 4 : INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, & US 6 / SH 58 / SH 93; IMPROVED
SIGNALS AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 5 : KILGROE BYPASS ALIGNMENT WITH
INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, US 6 / SH 58 / SH 93, SH 93 / GOLDEN
GATE CANYON; NO HIGHWAY ACCESS AT
IOWA, WASHINGTON, PINE RIDGE ROAD; NO CHANGE TO C470 / US 6 / JOHNSON
ROAD
US 6: C / SH 93: C US 6: C / SH 93: C US 6: C / SH 93: CUS 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: C
US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: DUS 6: D / SH 93: D US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: D
5.6 4.7 1.05.3 4.3 1.05.6 4.7 1.05.8 4.8 1.0
49.4 (AT WASHINGTON) 49.4 (AT WASHINGTON) 34.5 (AT JOHNSON ROAD)86.9 (AT 6/58/93) 87.3 (AT 6/58/93) 37.5 (AT JOHNSON ROAD) 37.5 (AT JOHNSON ROAD)
53.6 (AT 6/58/93) 49.6 (AT IOWA) 33.0 (AT JOHNSON ROAD)108.6 (AT HERITAGE) 81.1 (AT 6/58/93) 44.6 (AT GOLDEN GATE) 42.0 (AT JOHNSON ROAD)
10.8 10.3 8.511.8 11.1 9.6 8.5
11.9 11.0 8.514.3 12.3 10.9 8.6
NOTES:1. LEVEL OF SERVICE IS BASED ON AVERAGE SPEED WHERE SIGNALS ARE SPACED AT 2 MILES OR LESS (URBAN STREET), AND IS BASED ON VEHICLE DENSITY ELSEWHERE (MULTILANE HIGHWAY).2. ALL TRAFFIC OPERATIONS ANALYSES ARE BASED ON THE ASSUMPTION THAT THE IMPROVEMENTS TO ROADWAYS OTHER THAN US 6 / SH 93 IDENTIFIED IN THE NWQFS ARE MADE, AND THAT 2020 TRAFFIC MEETS THE PROJECTIONS OF THE NWQFS.
NUMBER OF STOPS ON THE CORRIDOR FOR A TYPICAL VEHICLE
LONGEST AVERAGE DELAY AT A STOP ON THE CORRIDOR (Seconds)
TRAVEL TIME (Minutes from US 6 / C470 to SH 93 / 56th Avenue)
TRAFFIC CONDITIONS
(PROJECT GOAL: LEVEL OF SERVICE D)
(PROJECT GOAL: 1 OR LESS)
(PROJECT GOAL: 90 SECONDS OR LESS)
(PROJECT GOAL: 2020 TRAVEL TIME NO MORE THAN EXISTING 2002 TRAVEL TIME)
OPTION DOES NOT MEET PROJECT GOAL
OPTION MEETS PROJECT GOAL
LEGEND:
.
19TH ST.
3
C 4
70
1
S. GOLDEN RD.
W. COLFAX AVE.
2
HE
RIT
AG
E R
D.
JEFF. CO.PKWY.
US 6
RD
.
JOH
NS
ON
US 6
WASHINGTON AVE.
8
5
US 6 4
IOWA
SH 58
6
7
SH
93
CANYON RD.GOLDEN GATE
N. F
OR
D S
T.
PINE RIDGE RD.
56TH AVE.
FORD ST.
2002 / 2003 EXISTING (MEASURED:
AVERAGE OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MEASURED:
WORST OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MODELED)
2020 NO BUILD / NO ACTION
2020 BUILD OPTION 1 : IMPROVED SIGNALS
AT ALL MAJOR INTERSECTIONS
LEVEL OF SERVICE 1
Northbound AM B B B E US 6: C / SH 93: C Northbound PM B B A E US 6: D / SH 93: C Southbound AM B B C F US 6: D / SH 93: D Southbound PM A B C F US 6: E / SH 93: D
Northbound AM 2.4 3 5.4 6.7 7.4 Northbound PM 3.0 5 4.9 6.9 7.4 Southbound AM 3.2 5 5.9 7.0 7.6 Southbound PM 2.4 4 6.2 7.0 8.0
Northbound AM 58.7 (AT 6/58/93) 87.6 (AT 19TH) 107.3 (AT 19TH) 364.9 (AT WASHINGTON) 50.6 (AT HERITAGE) Northbound PM 61.0 (AT 19TH) 97.5 (AT 19TH) 48.7 (AT 19TH) 322.7 (AT WASHINGTON) 84.6 (AT 6/58/93) Southbound AM 57.8 (AT 19TH) 82.1 (AT WASHINGTON) 147.4 (AT 19TH) 487.0 (AT GOLDEN GATE) 83.4 (AT 19TH) Southbound PM 52.4 (AT 6/58/93) 67.4 (AT 6/58/93) 163.4 (AT HERITAGE) 502.8 (AT GOLDEN GATE) 187.6 (AT 19TH)
Northbound AM 9.4 10.7 10.5 22.4 11.9 Northbound PM 9.3 10.2 8.6 22.5 13.5 Southbound AM 9.8 10.3 11.5 32.3 14.5 Southbound PM 8.7 9.2 12.5 36.3 18.0
2020 BUILD OPTION 2 : INTERCHANGE AT US
6 / 19TH STREET; IMPROVED SIGNALS
AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 3 : INTERCHANGES AT US 6 / HERITAGE ROAD & US 6 / 19TH STREET;
IMPROVED SIGNALS AT ALL OTHER MAJOR
INTERSECTIONS
2020 BUILD OPTION 4 : INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, & US 6 / SH 58 / SH 93; IMPROVED
SIGNALS AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 5 : KILGROE BYPASS ALIGNMENT WITH
INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, US 6 / SH 58 / SH 93, SH 93 / GOLDEN
GATE CANYON; NO HIGHWAY ACCESS AT
IOWA, WASHINGTON, PINE RIDGE ROAD; NO CHANGE TO C470 / US 6 / JOHNSON
ROAD
US 6: C / SH 93: C US 6: C / SH 93: C US 6: C / SH 93: CUS 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: C
US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: DUS 6: D / SH 93: D US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: D
5.6 4.7 1.05.3 4.3 1.05.6 4.7 1.05.8 4.8 1.0
49.4 (AT WASHINGTON) 49.4 (AT WASHINGTON) 34.5 (AT JOHNSON ROAD)86.9 (AT 6/58/93) 87.3 (AT 6/58/93) 37.5 (AT JOHNSON ROAD) 37.5 (AT JOHNSON ROAD)
53.6 (AT 6/58/93) 49.6 (AT IOWA) 33.0 (AT JOHNSON ROAD)108.6 (AT HERITAGE) 81.1 (AT 6/58/93) 44.6 (AT GOLDEN GATE) 42.0 (AT JOHNSON ROAD)
10.8 10.3 8.511.8 11.1 9.6 8.5
11.9 11.0 8.514.3 12.3 10.9 8.6
2020 BUILD OPTION 1TRAFFIC CONDITIONS
INT. LOSINT. LOS
C/(D) FF C/(C)
FF
FF
D/(D)
INT. LOS
FF
FF
FF
FF
FF
FF
C/(D)
INT. LOS
FF
FF
FF
FF
FF
E/(F)
INT. LOS
FF
FF
FF
INT. LOS
C/(D)
FF
FF
D/(E)
INT. LOS
FF
INT. LOS
E/(E)
FF
2
FF
FF
FF
FF
FF
FF
FF
INT. LOS OVERALL INTERSECTION LEVEL OF SERVICE [AM/(PM)]
=
GRADE SEPARATED INTERCHANGE
EXISTING LANE
ADDED LANE
BRIDGE WITH NO HIGHWAY ACCESS
=
=
=
FREE FLOW TURN(BYPASSES TRAFFIC SIGNAL)
SIGNALIZED INTERSECTION
=
=
=
LEGEND:
FF
NUMBER OF STOPS ON THE CORRIDOR FOR A TYPICAL VEHICLE
LONGEST AVERAGE DELAY AT A STOP ON THE CORRIDOR (Seconds)
TRAVEL TIME (Minutes from US 6 / C470 to SH 93 / 56th Avenue)
(PROJECT GOAL: LEVEL OF SERVICE D)
(PROJECT GOAL: 1 OR LESS)
(PROJECT GOAL: 90 SECONDS OR LESS)
(PROJECT GOAL: 2020 TRAVEL TIME NO MORE THAN EXISTING 2002 TRAVEL TIME)
NOTES:1. LEVEL OF SERVICE IS BASED ON AVERAGE SPEED WHERE SIGNALS ARE SPACED AT 2 MILES OR LESS (URBAN STREET), AND IS BASED ON VEHICLE DENSITY ELSEWHERE (MULTILANE HIGHWAY).2. ALL TRAFFIC OPERATIONS ANALYSES ARE BASED ON THE ASSUMPTION THAT THE IMPROVEMENTS TO ROADWAYS OTHER THAN US 6 / SH 93 IDENTIFIED IN THE NWQFS ARE MADE, AND THAT 2020 TRAFFIC MEETS THE PROJECTIONS OF THE NWQFS.
OPTION DOES NOT MEET PROJECT GOAL
OPTION MEETS PROJECT GOAL
LEGEND:
.
19TH ST.
3
C 4
70
1
S. GOLDEN RD.
W. COLFAX AVE.
2
HE
RIT
AG
E R
D.
JEFF. CO.PKWY.
US 6
RD
.
JOH
NS
ON
US 6
WASHINGTON AVE.
8
5
US 6 4
IOWA
SH 58
6
7
SH
93
CANYON RD.GOLDEN GATE
N. F
OR
D S
T.
PINE RIDGE RD.
56TH AVE.
FORD ST.
2002 / 2003 EXISTING (MEASURED:
AVERAGE OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MEASURED:
WORST OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MODELED)
2020 NO BUILD / NO ACTION
2020 BUILD OPTION 1 : IMPROVED SIGNALS
AT ALL MAJOR INTERSECTIONS
LEVEL OF SERVICE 1
Northbound AM B B B E US 6: C / SH 93: C Northbound PM B B A E US 6: D / SH 93: C Southbound AM B B C F US 6: D / SH 93: D Southbound PM A B C F US 6: E / SH 93: D
Northbound AM 2.4 3 5.4 6.7 7.4 Northbound PM 3.0 5 4.9 6.9 7.4 Southbound AM 3.2 5 5.9 7.0 7.6 Southbound PM 2.4 4 6.2 7.0 8.0
Northbound AM 58.7 (AT 6/58/93) 87.6 (AT 19TH) 107.3 (AT 19TH) 364.9 (AT WASHINGTON) 50.6 (AT HERITAGE) Northbound PM 61.0 (AT 19TH) 97.5 (AT 19TH) 48.7 (AT 19TH) 322.7 (AT WASHINGTON) 84.6 (AT 6/58/93) Southbound AM 57.8 (AT 19TH) 82.1 (AT WASHINGTON) 147.4 (AT 19TH) 487.0 (AT GOLDEN GATE) 83.4 (AT 19TH) Southbound PM 52.4 (AT 6/58/93) 67.4 (AT 6/58/93) 163.4 (AT HERITAGE) 502.8 (AT GOLDEN GATE) 187.6 (AT 19TH)
Northbound AM 9.4 10.7 10.5 22.4 11.9 Northbound PM 9.3 10.2 8.6 22.5 13.5 Southbound AM 9.8 10.3 11.5 32.3 14.5 Southbound PM 8.7 9.2 12.5 36.3 18.0
2020 BUILD OPTION 2 : INTERCHANGE AT US
6 / 19TH STREET; IMPROVED SIGNALS
AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 3 : INTERCHANGES AT US 6 / HERITAGE ROAD & US 6 / 19TH STREET;
IMPROVED SIGNALS AT ALL OTHER MAJOR
INTERSECTIONS
2020 BUILD OPTION 4 : INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, & US 6 / SH 58 / SH 93; IMPROVED
SIGNALS AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 5 : KILGROE BYPASS ALIGNMENT WITH
INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, US 6 / SH 58 / SH 93, SH 93 / GOLDEN
GATE CANYON; NO HIGHWAY ACCESS AT
IOWA, WASHINGTON, PINE RIDGE ROAD; NO CHANGE TO C470 / US 6 / JOHNSON
ROAD
US 6: C / SH 93: C US 6: C / SH 93: C US 6: C / SH 93: CUS 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: C
US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: DUS 6: D / SH 93: D US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: D
5.6 4.7 1.05.3 4.3 1.05.6 4.7 1.05.8 4.8 1.0
49.4 (AT WASHINGTON) 49.4 (AT WASHINGTON) 34.5 (AT JOHNSON ROAD)86.9 (AT 6/58/93) 87.3 (AT 6/58/93) 37.5 (AT JOHNSON ROAD) 37.5 (AT JOHNSON ROAD)
53.6 (AT 6/58/93) 49.6 (AT IOWA) 33.0 (AT JOHNSON ROAD)108.6 (AT HERITAGE) 81.1 (AT 6/58/93) 44.6 (AT GOLDEN GATE) 42.0 (AT JOHNSON ROAD)
10.8 10.3 8.511.8 11.1 9.6 8.5
11.9 11.0 8.514.3 12.3 10.9 8.6
2020 BUILD OPTION 2TRAFFIC CONDITIONS
INT. LOSINT. LOS
_/(C) FF _/(C)
FF
FF
_/(C)
INT. LOS
FF
FF
FF
FF
FF
FF
_/(C)
INT. LOS
FF
FF
FF
FF
FF
_/(_)
INT. LOS
FF
INT. LOS
_/(D)
_/(F)
INT. LOS
FF
_/(E)
INT. LOS
FF
2
FF
FF
FF
FF
FF
FF
FF
INT. LOS OVERALL INTERSECTION LEVEL OF SERVICE [AM/(PM)]
=
GRADE SEPARATED INTERCHANGE
EXISTING LANE
ADDED LANE
BRIDGE WITH NO HIGHWAY ACCESS
=
=
=
FREE FLOW TURN(BYPASSES TRAFFIC SIGNAL)
SIGNALIZED INTERSECTION
=
=
=
LEGEND:
FF
NUMBER OF STOPS ON THE CORRIDOR FOR A TYPICAL VEHICLE
LONGEST AVERAGE DELAY AT A STOP ON THE CORRIDOR (Seconds)
TRAVEL TIME (Minutes from US 6 / C470 to SH 93 / 56th Avenue)
(PROJECT GOAL: LEVEL OF SERVICE D)
(PROJECT GOAL: 1 OR LESS)
(PROJECT GOAL: 90 SECONDS OR LESS)
(PROJECT GOAL: 2020 TRAVEL TIME NO MORE THAN EXISTING 2002 TRAVEL TIME)
NOTES:1. LEVEL OF SERVICE IS BASED ON AVERAGE SPEED WHERE SIGNALS ARE SPACED AT 2 MILES OR LESS (URBAN STREET), AND IS BASED ON VEHICLE DENSITY ELSEWHERE (MULTILANE HIGHWAY).2. ALL TRAFFIC OPERATIONS ANALYSES ARE BASED ON THE ASSUMPTION THAT THE IMPROVEMENTS TO ROADWAYS OTHER THAN US 6 / SH 93 IDENTIFIED IN THE NWQFS ARE MADE, AND THAT 2020 TRAFFIC MEETS THE PROJECTIONS OF THE NWQFS.
OPTION DOES NOT MEET PROJECT GOAL
OPTION MEETS PROJECT GOAL
LEGEND:
.
19TH ST.
3
C 4
70
1
S. GOLDEN RD.
W. COLFAX AVE.
2
HE
RIT
AG
E R
D.
JEFF. CO.PKWY.
US 6
RD
.
JOH
NS
ON
US 6
WASHINGTON AVE.
8
5
US 6 4
IOWA
SH 58
6
7
SH
93
CANYON RD.GOLDEN GATE
N. F
OR
D S
T.
PINE RIDGE RD.
56TH AVE.
FORD ST.
2002 / 2003 EXISTING (MEASURED:
AVERAGE OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MEASURED:
WORST OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MODELED)
2020 NO BUILD / NO ACTION
2020 BUILD OPTION 1 : IMPROVED SIGNALS
AT ALL MAJOR INTERSECTIONS
LEVEL OF SERVICE 1
Northbound AM B B B E US 6: C / SH 93: C Northbound PM B B A E US 6: D / SH 93: C Southbound AM B B C F US 6: D / SH 93: D Southbound PM A B C F US 6: E / SH 93: D
Northbound AM 2.4 3 5.4 6.7 7.4 Northbound PM 3.0 5 4.9 6.9 7.4 Southbound AM 3.2 5 5.9 7.0 7.6 Southbound PM 2.4 4 6.2 7.0 8.0
Northbound AM 58.7 (AT 6/58/93) 87.6 (AT 19TH) 107.3 (AT 19TH) 364.9 (AT WASHINGTON) 50.6 (AT HERITAGE) Northbound PM 61.0 (AT 19TH) 97.5 (AT 19TH) 48.7 (AT 19TH) 322.7 (AT WASHINGTON) 84.6 (AT 6/58/93) Southbound AM 57.8 (AT 19TH) 82.1 (AT WASHINGTON) 147.4 (AT 19TH) 487.0 (AT GOLDEN GATE) 83.4 (AT 19TH) Southbound PM 52.4 (AT 6/58/93) 67.4 (AT 6/58/93) 163.4 (AT HERITAGE) 502.8 (AT GOLDEN GATE) 187.6 (AT 19TH)
Northbound AM 9.4 10.7 10.5 22.4 11.9 Northbound PM 9.3 10.2 8.6 22.5 13.5 Southbound AM 9.8 10.3 11.5 32.3 14.5 Southbound PM 8.7 9.2 12.5 36.3 18.0
2020 BUILD OPTION 2 : INTERCHANGE AT US
6 / 19TH STREET; IMPROVED SIGNALS
AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 3 : INTERCHANGES AT US 6 / HERITAGE ROAD & US 6 / 19TH STREET;
IMPROVED SIGNALS AT ALL OTHER MAJOR
INTERSECTIONS
2020 BUILD OPTION 4 : INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, & US 6 / SH 58 / SH 93; IMPROVED
SIGNALS AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 5 : KILGROE BYPASS ALIGNMENT WITH
INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, US 6 / SH 58 / SH 93, SH 93 / GOLDEN
GATE CANYON; NO HIGHWAY ACCESS AT
IOWA, WASHINGTON, PINE RIDGE ROAD; NO CHANGE TO C470 / US 6 / JOHNSON
ROAD
US 6: C / SH 93: C US 6: C / SH 93: C US 6: C / SH 93: CUS 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: C
US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: DUS 6: D / SH 93: D US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: D
5.6 4.7 1.05.3 4.3 1.05.6 4.7 1.05.8 4.8 1.0
49.4 (AT WASHINGTON) 49.4 (AT WASHINGTON) 34.5 (AT JOHNSON ROAD)86.9 (AT 6/58/93) 87.3 (AT 6/58/93) 37.5 (AT JOHNSON ROAD) 37.5 (AT JOHNSON ROAD)
53.6 (AT 6/58/93) 49.6 (AT IOWA) 33.0 (AT JOHNSON ROAD)108.6 (AT HERITAGE) 81.1 (AT 6/58/93) 44.6 (AT GOLDEN GATE) 42.0 (AT JOHNSON ROAD)
10.8 10.3 8.511.8 11.1 9.6 8.5
11.9 11.0 8.514.3 12.3 10.9 8.6
2020 BUILD OPTION 3TRAFFIC CONDITIONS
C/(C) FF C/(C)
FF
INT. LOS
FF
INT. LOS
D/(C)
FF
FF
FF
INT. LOS
FF
FF
FF
INT. LOS
C/(C)
FF
FF
FF
FF
FF
FF
INT. LOS
C/(D)
INT. LOS
D/(F)
FF
2
FF
FF
FF
FF
INT. LOS OVERALL INTERSECTION LEVEL OF SERVICE [AM/(PM)]
=
GRADE SEPARATED INTERCHANGE
EXISTING LANE
ADDED LANE
BRIDGE WITH NO HIGHWAY ACCESS
=
=
=
FREE FLOW TURN(BYPASSES TRAFFIC SIGNAL)
SIGNALIZED INTERSECTION
=
=
=
LEGEND:
FF
NUMBER OF STOPS ON THE CORRIDOR FOR A TYPICAL VEHICLE
LONGEST AVERAGE DELAY AT A STOP ON THE CORRIDOR (Seconds)
TRAVEL TIME (Minutes from US 6 / C470 to SH 93 / 56th Avenue)
(PROJECT GOAL: LEVEL OF SERVICE D)
(PROJECT GOAL: 1 OR LESS)
(PROJECT GOAL: 90 SECONDS OR LESS)
(PROJECT GOAL: 2020 TRAVEL TIME NO MORE THAN EXISTING 2002 TRAVEL TIME)
NOTES:1. LEVEL OF SERVICE IS BASED ON AVERAGE SPEED WHERE SIGNALS ARE SPACED AT 2 MILES OR LESS (URBAN STREET), AND IS BASED ON VEHICLE DENSITY ELSEWHERE (MULTILANE HIGHWAY).2. ALL TRAFFIC OPERATIONS ANALYSES ARE BASED ON THE ASSUMPTION THAT THE IMPROVEMENTS TO ROADWAYS OTHER THAN US 6 / SH 93 IDENTIFIED IN THE NWQFS ARE MADE, AND THAT 2020 TRAFFIC MEETS THE PROJECTIONS OF THE NWQFS.
OPTION DOES NOT MEET PROJECT GOAL
OPTION MEETS PROJECT GOAL
LEGEND:
.
19TH ST.
3
C 4
70
1
S. GOLDEN RD.
W. COLFAX AVE.
2
HE
RIT
AG
E R
D.
JEFF. CO.PKWY.
US 6
RD
.
JOH
NS
ON
US 6
WASHINGTON AVE.
8
5
US 6 4
IOWA
SH 58
6
7
SH
93
CANYON RD.GOLDEN GATE
N. F
OR
D S
T.
PINE RIDGE RD.
56TH AVE.
FORD ST.
2002 / 2003 EXISTING (MEASURED:
AVERAGE OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MEASURED:
WORST OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MODELED)
2020 NO BUILD / NO ACTION
2020 BUILD OPTION 1 : IMPROVED SIGNALS
AT ALL MAJOR INTERSECTIONS
LEVEL OF SERVICE 1
Northbound AM B B B E US 6: C / SH 93: C Northbound PM B B A E US 6: D / SH 93: C Southbound AM B B C F US 6: D / SH 93: D Southbound PM A B C F US 6: E / SH 93: D
Northbound AM 2.4 3 5.4 6.7 7.4 Northbound PM 3.0 5 4.9 6.9 7.4 Southbound AM 3.2 5 5.9 7.0 7.6 Southbound PM 2.4 4 6.2 7.0 8.0
Northbound AM 58.7 (AT 6/58/93) 87.6 (AT 19TH) 107.3 (AT 19TH) 364.9 (AT WASHINGTON) 50.6 (AT HERITAGE) Northbound PM 61.0 (AT 19TH) 97.5 (AT 19TH) 48.7 (AT 19TH) 322.7 (AT WASHINGTON) 84.6 (AT 6/58/93) Southbound AM 57.8 (AT 19TH) 82.1 (AT WASHINGTON) 147.4 (AT 19TH) 487.0 (AT GOLDEN GATE) 83.4 (AT 19TH) Southbound PM 52.4 (AT 6/58/93) 67.4 (AT 6/58/93) 163.4 (AT HERITAGE) 502.8 (AT GOLDEN GATE) 187.6 (AT 19TH)
Northbound AM 9.4 10.7 10.5 22.4 11.9 Northbound PM 9.3 10.2 8.6 22.5 13.5 Southbound AM 9.8 10.3 11.5 32.3 14.5 Southbound PM 8.7 9.2 12.5 36.3 18.0
2020 BUILD OPTION 2 : INTERCHANGE AT US
6 / 19TH STREET; IMPROVED SIGNALS
AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 3 : INTERCHANGES AT US 6 / HERITAGE ROAD & US 6 / 19TH STREET;
IMPROVED SIGNALS AT ALL OTHER MAJOR
INTERSECTIONS
2020 BUILD OPTION 4 : INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, & US 6 / SH 58 / SH 93; IMPROVED
SIGNALS AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 5 : KILGROE BYPASS ALIGNMENT WITH
INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, US 6 / SH 58 / SH 93, SH 93 / GOLDEN
GATE CANYON; NO HIGHWAY ACCESS AT
IOWA, WASHINGTON, PINE RIDGE ROAD; NO CHANGE TO C470 / US 6 / JOHNSON
ROAD
US 6: C / SH 93: C US 6: C / SH 93: C US 6: C / SH 93: CUS 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: C
US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: DUS 6: D / SH 93: D US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: D
5.6 4.7 1.05.3 4.3 1.05.6 4.7 1.05.8 4.8 1.0
49.4 (AT WASHINGTON) 49.4 (AT WASHINGTON) 34.5 (AT JOHNSON ROAD)86.9 (AT 6/58/93) 87.3 (AT 6/58/93) 37.5 (AT JOHNSON ROAD) 37.5 (AT JOHNSON ROAD)
53.6 (AT 6/58/93) 49.6 (AT IOWA) 33.0 (AT JOHNSON ROAD)108.6 (AT HERITAGE) 81.1 (AT 6/58/93) 44.6 (AT GOLDEN GATE) 42.0 (AT JOHNSON ROAD)
10.8 10.3 8.511.8 11.1 9.6 8.5
11.9 11.0 8.514.3 12.3 10.9 8.6
2020 BUILD OPTION 4TRAFFIC CONDITIONS
C/(C) FF C/(C)
FF
INT. LOS
FF
D/(C)
INT. LOS
FF
FF
FF
INT. LOS
FF
FF
FF
C/(C)
INT. LOS
FF
FF
FF
FF
FF
FF
C/(D)
INT. LOS
2
FF
INT. LOS OVERALL INTERSECTION LEVEL OF SERVICE [AM/(PM)]
=
GRADE SEPARATED INTERCHANGE
EXISTING LANE
ADDED LANE
BRIDGE WITH NO HIGHWAY ACCESS
=
=
=
FREE FLOW TURN(BYPASSES TRAFFIC SIGNAL)
SIGNALIZED INTERSECTION
=
=
=
LEGEND:
FF
NUMBER OF STOPS ON THE CORRIDOR FOR A TYPICAL VEHICLE
LONGEST AVERAGE DELAY AT A STOP ON THE CORRIDOR (Seconds)
TRAVEL TIME (Minutes from US 6 / C470 to SH 93 / 56th Avenue)
(PROJECT GOAL: LEVEL OF SERVICE D)
(PROJECT GOAL: 1 OR LESS)
(PROJECT GOAL: 90 SECONDS OR LESS)
(PROJECT GOAL: 2020 TRAVEL TIME NO MORE THAN EXISTING 2002 TRAVEL TIME)
NOTES:1. LEVEL OF SERVICE IS BASED ON AVERAGE SPEED WHERE SIGNALS ARE SPACED AT 2 MILES OR LESS (URBAN STREET), AND IS BASED ON VEHICLE DENSITY ELSEWHERE (MULTILANE HIGHWAY).2. ALL TRAFFIC OPERATIONS ANALYSES ARE BASED ON THE ASSUMPTION THAT THE IMPROVEMENTS TO ROADWAYS OTHER THAN US 6 / SH 93 IDENTIFIED IN THE NWQFS ARE MADE, AND THAT 2020 TRAFFIC MEETS THE PROJECTIONS OF THE NWQFS.
OPTION DOES NOT MEET PROJECT GOAL
OPTION MEETS PROJECT GOAL
LEGEND:
.
2002 / 2003 EXISTING (MEASURED:
AVERAGE OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MEASURED:
WORST OF ALL TRIPS OVER 2 HOURS)
2002 / 2003 EXISTING (MODELED)
2020 NO BUILD / NO ACTION
2020 BUILD OPTION 1 : IMPROVED SIGNALS
AT ALL MAJOR INTERSECTIONS
LEVEL OF SERVICE 1
Northbound AM B B B E US 6: C / SH 93: C Northbound PM B B A E US 6: D / SH 93: C Southbound AM B B C F US 6: D / SH 93: D Southbound PM A B C F US 6: E / SH 93: D
Northbound AM 2.4 3 5.4 6.7 7.4 Northbound PM 3.0 5 4.9 6.9 7.4 Southbound AM 3.2 5 5.9 7.0 7.6 Southbound PM 2.4 4 6.2 7.0 8.0
Northbound AM 58.7 (AT 6/58/93) 87.6 (AT 19TH) 107.3 (AT 19TH) 364.9 (AT WASHINGTON) 50.6 (AT HERITAGE) Northbound PM 61.0 (AT 19TH) 97.5 (AT 19TH) 48.7 (AT 19TH) 322.7 (AT WASHINGTON) 84.6 (AT 6/58/93) Southbound AM 57.8 (AT 19TH) 82.1 (AT WASHINGTON) 147.4 (AT 19TH) 487.0 (AT GOLDEN GATE) 83.4 (AT 19TH) Southbound PM 52.4 (AT 6/58/93) 67.4 (AT 6/58/93) 163.4 (AT HERITAGE) 502.8 (AT GOLDEN GATE) 187.6 (AT 19TH)
Northbound AM 9.4 10.7 10.5 22.4 11.9 Northbound PM 9.3 10.2 8.6 22.5 13.5 Southbound AM 9.8 10.3 11.5 32.3 14.5 Southbound PM 8.7 9.2 12.5 36.3 18.0
2020 BUILD OPTION 2 : INTERCHANGE AT US
6 / 19TH STREET; IMPROVED SIGNALS
AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 3 : INTERCHANGES AT US 6 / HERITAGE ROAD & US 6 / 19TH STREET;
IMPROVED SIGNALS AT ALL OTHER MAJOR
INTERSECTIONS
2020 BUILD OPTION 4 : INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, & US 6 / SH 58 / SH 93; IMPROVED
SIGNALS AT ALL OTHER MAJOR INTERSECTIONS
2020 BUILD OPTION 5 : KILGROE BYPASS ALIGNMENT WITH
INTERCHANGES AT US 6 / HERITAGE ROAD, US 6 /
19TH STREET, US 6 / SH 58 / SH 93, SH 93 / GOLDEN
GATE CANYON; NO HIGHWAY ACCESS AT
IOWA, WASHINGTON, PINE RIDGE ROAD; NO CHANGE TO C470 / US 6 / JOHNSON
ROAD
US 6: C / SH 93: C US 6: C / SH 93: C US 6: C / SH 93: CUS 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: B US 6: D / SH 93: C
US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: DUS 6: D / SH 93: D US 6: D / SH 93: D US 6: D / SH 93: C US 6: D / SH 93: D
5.6 4.7 1.05.3 4.3 1.05.6 4.7 1.05.8 4.8 1.0
49.4 (AT WASHINGTON) 49.4 (AT WASHINGTON) 34.5 (AT JOHNSON ROAD)86.9 (AT 6/58/93) 87.3 (AT 6/58/93) 37.5 (AT JOHNSON ROAD) 37.5 (AT JOHNSON ROAD)
53.6 (AT 6/58/93) 49.6 (AT IOWA) 33.0 (AT JOHNSON ROAD)108.6 (AT HERITAGE) 81.1 (AT 6/58/93) 44.6 (AT GOLDEN GATE) 42.0 (AT JOHNSON ROAD)
10.8 10.3 8.511.8 11.1 9.6 8.5
11.9 11.0 8.514.3 12.3 10.9 8.6
2020 BUILD OPTION 5TRAFFIC CONDITIONS
GRADE SEPARATION,BUT NO HIGHWAY ACCESS
2
GRADE SEPARATION,BUT NO HIGHWAY ACCESS
3
C 4
70W. COLFAX AVE.
S. GOLDEN RD.
1
2
HE
RIT
AG
E R
D.
JEFF. CO.PKWY.
RD
.
US 6
19TH ST.
JOH
NS
ON
US 6
WASHINGTON AVE.
RIDGE RD.
5
US 6 4
IOWA
SH 58
GOLDEN GATE
6
CANYON RD.
7
N. F
OR
D S
T.56TH AVE.
REL
OC
ATED
PINE
SH 9
3
OLD
SH
93/
WA
SH
ING
TO
N A
VE
.E
XT
EN
SIO
N8
FORD ST.
INT. LOS OVERALL INTERSECTION LEVEL OF SERVICE [AM/(PM)]
=
GRADE SEPARATED INTERCHANGE
EXISTING LANE
ADDED LANE
BRIDGE WITH NO HIGHWAY ACCESS
=
=
=
FREE FLOW TURN(BYPASSES TRAFFIC SIGNAL)
SIGNALIZED INTERSECTION
=
=
=
LEGEND:
FF
C/(D)
INT. LOS
NUMBER OF STOPS ON THE CORRIDOR FOR A TYPICAL VEHICLE
LONGEST AVERAGE DELAY AT A STOP ON THE CORRIDOR (Seconds)
TRAVEL TIME (Minutes from US 6 / C470 to SH 93 / 56th Avenue)
(PROJECT GOAL: LEVEL OF SERVICE D)
(PROJECT GOAL: 1 OR LESS)
(PROJECT GOAL: 90 SECONDS OR LESS)
(PROJECT GOAL: 2020 TRAVEL TIME NO MORE THAN EXISTING 2002 TRAVEL TIME)
NOTES:1. LEVEL OF SERVICE IS BASED ON AVERAGE SPEED WHERE SIGNALS ARE SPACED AT 2 MILES OR LESS (URBAN STREET), AND IS BASED ON VEHICLE DENSITY ELSEWHERE (MULTILANE HIGHWAY).2. ALL TRAFFIC OPERATIONS ANALYSES ARE BASED ON THE ASSUMPTION THAT THE IMPROVEMENTS TO ROADWAYS OTHER THAN US 6 / SH 93 IDENTIFIED IN THE NWQFS ARE MADE, AND THAT 2020 TRAFFIC MEETS THE PROJECTIONS OF THE NWQFS.
OPTION DOES NOT MEET PROJECT GOAL
OPTION MEETS PROJECT GOAL
LEGEND:
6 93 Corridor&
Comparison of Average Delay per Vehicle for Roundabouts and Signals
US 6, SH 93 & SH 58 (2020 PM PEAK)
MOVEMENT
Roundabout Delay (seconds)
Signal Delay (seconds)
Overall
254.4
83.4
EB
Right Turn
3.8 Thru 11.5 89.0
Left Turn
11.8 43.0
EB 9.4 74.5 NB
Right Turn
318.2
Thru
372.2
87.3
Left Turn
385.7 76.0
EB
360.7
86.6
WB
Right Turn
5.9
Thru
12.5
64.0
Left Turn
14.4
88.1
EB
10.3
82.5
SB
Right Turn
331.7
Thru
519.2
81.1
Left Turn
534.7
89.4
EB
516.9
82.6
US 6
SH 58
SH
93
US
6
US 6
SH
93
SH 58
US
6
SH 9
3
US 6
US 6
SH 58
FIGURE 2 FIGURE 3 FIGURE 4
ROUNDABOUT FEASIBILITY STUDY
SHOWS NB THRU TRAFFIC YIELDING TO SB LEFT TURNING TRAFFIC.
SHOWS GOOD OPERATIONAL CHARACTERISTICS AND FLOW WHEN THERE AREN'T CONFLICTS (WITHIN THE ROUNDABOUT)
SHOWS HEAVY QUEUING ON SH 93 AND ON US 6.
19 ST.3600'
2300
'
IOW
A S
T.
WASHINGTON AVE.
INTERCHANGE
2400'
6 93 Corridor&
GOLDEN GATE
SH
93
SH
93
US
6
SH 9
3
US 6
SH
93
GOLDEN GATECANYON ROAD
SH
93
SH
93
GOLDEN GATECANYON ROAD
SH
93
Comparison of Average Delay per Vehicle for Roundabouts and Signals
SH 93 & Golden Gate Canyon Road (2020 PM PEAK)
MOVEMENT Roundabout Delay (seconds) Signal Delay (seconds)
Overall 68.5 29.5 EB
Right Turn 1.8
Thru 3.1 55.6
Left Turn
9.7 58.7
EB
3.0 58.1
NB
Right Turn
23.8
Thru
17.7 5.0
Left Turn
19.1 57.3
EB
17.9 10.7
WB
Right Turn 19.0
Thru 48.0 55.6
Left Turn 9.7
55.8
EB 23.0
55.7 SB
Right Turn 130.7
Thru 137.9 44.6
Left Turn 149.3 45.3
EB
137.9
44. 6
ROUNDABOUT FEASIBILITY STUDY
FIGURE 6 FIGURE 7 FIGURE 8
WASHINGTON AVE.1000'
CANYON ROAD
SHOWS GOOD OPERATIONAL CHARACTERISTICS AND FLOW WHEN THERE ARE NO CONFLICTING MOVEMENTS. (WITHIN THE ROUNDABOUT)
SHOWS SB THRU TRAFFIC YIELDING TO NB LEFT TURNING TRAFFIC.
SHOWS SB QUEUE WITH GOOD FLOW WITHIN THE ROUNDABOUT.
PINE RIDGE RD.1100'