GR +12SFL 3.658
L1 +30SFL 9.140
Y10 Y20
BENNELONG PASSAGE
VOID
SERVICES ZONE
GR.007D07
FFL 3.78 FFL 3.75EX.RL 3.69
EX.RL 6.39
550
725
725
725
SPLIT BATTENS @550 AND 725 MM CENTERS
ACCESS HATCH AH-102
4CD520
18290 1690
130 460 17700 560 1080
300
810
820
2685
775
90
3040
2415
2003101304102820275 16085 16901565
1CD501
4S SPEAKER IN CEILING 5950
4S SPEAKER IN CEILING 4795
4S SPEAKER IN WALL4400
4S SPEAKER IN WALL4000
4S SPEAKER IN WALL4095
AM-202
AM-201
IWS-252
GR +12SFL 3.658
L1 +30SFL 9.140
Y10Y20 3CD210
SERVICES ZONE
BENNELONG PASSAGE
3CD200
4CD200
2CD515
FFL 3.78FFL 3.75 EX.RL 3.69
GR.003D03
550
725
725
725
SPLIT BATTENS @550 AND 725 MM CENTERS
ACCESS HATCH AH-102
2CD516
1690 18155 135
9042
8081
030
0
3740
630
1110
1303102008351516016551690
560 17745 540
5480
3690
555
4275
4040
3805
3685
ACCESS HATCH AH-104
10S LOUD SPEAKERS AS SPECIFIED BY OTHERS
FIXED TO AM-202
AM-201
AM-202
GR +12SFL 3.658
L1 +30SFL 9.140
X50
1CD200
2CD200
SERVICES ZONE
SERV
ICES
ZON
E
SERV
ICES
ZON
E
PROJECTOR AS SPECIFIED BY OTHERS
GR.002D02
FFL 3.78FFL 3.75
190 1450 115 2435 2150 115 190 115
5480
300
810
4250
120
300
810
160
65
2400
175 270
14501
CD5101
CD515
01
GR +12SFL 3.658
L1 +30SFL 9.140
X50
1CD200
2CD200
PROJECTOR AS SPECIFIED BY OTHERS
SERVICES ZONE
SERI
VES
ZONE
SERI
VES
ZONE
FFL 3.78 FFL 3.75
1CD516
115 2455 3375
5360
120
300
01
0 0.5 1 1.5 2 2.5 mSydney Opera House Trust
Phone: +61 2 9250 7541 email: [email protected]
Sydney Opera House Trust
A1Rev:Sheet:Drawing No:Location
Project
Title
Date
Status
Dwn
Contract
Ckd Scale
LocationDateApvdDrwnDescriptionIssue
©SOH-583
GENERAL NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE
SAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.
4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANT AUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.
COPYRIGHTTHIS DRAWING AND DESIGN ARE SUBJECT TO COPYRIGHT AND SHALL NOT BE COPIED IN ANY FORM WITH THE WRITTEN PERMISSION OF THE SYDNEY OPERA HOUSE TRUST
GPO Box 4274 Sydney NSW Australia 2001
Level One, One Chifley Square Sydney NSW 2000 Australiawww.scottcarver.com.au +61 2 9957 3988
1 : 100 @ A3
49-FB-SC029SF GF
GENERAL NOTES:1. THESE DRAWINGS SHOULD BE READ IN
CONJUNCTION WITH ALL RELEVANT STRUCTURAL, CIVIL AND SERVICE CONSULTANTS DRAWINGS AND/OR COMPUTATIONS AND WITH ANY OTHER WRITTEN INSTRUCTIONS ISSUED IN THE COURSE OF THE CONTRACT;
2. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.3. DO NOT SCALE DRAWINGS.4. ALL WALL THICKNESSES DIMENSIONED OR NOTED
ARE NOMINAL.5. INFORMATION INDICATED IN THIS DOCUMENT MAY
BE CRUCIAL TO THE SAFE AND PROPER FUNCTIONING OF THE PROJECT. DO NOT ALTER ANY ASPECT WITHOUT REFERENCE TO THE ARCHITECT.
6. INFORM THE ARCHITECT OF ANY DISCREPANCIES.7. GREY TYPICALLY DENOTES EXISTING STRUCTURE.8. REFER ARCHITECTURAL FINISHES AND FIXTURES
SCHEDULE FOR FINISHES AND FITMENTS DETAILS.9. ALL INTERIOR FINISHES AS SCHEDULED/SPECIFIED
AND IN LINE WITH THE STANDARD SOH SPECIFICATIONS
10. ALL MATERIALS AND WORK PRACTICES SHALL COMPLY WITH, BUT NOT LIMITED TO THE BUILDING CODE OF AUSTRALIA AND ALL RELEVANT CURRENT AUSTRALIAN STANDARDS (AS AMENDED) REFERRED TO THEREIN.
11. THE CONTRACTOR SHALL SITE-CHECK AND VERIFY ALL DIMENSIONS, EXISTING CONDITIONS, SET-BACKS, LEVELS SPECIFICATIONS AND ALL OTHER RELEVANT DOCUMENTATION PRIOR TO THE COMMENCEMENT OF ANY WORKS, SUBMIT SHOP DRAWINGS, ORDERING OF MATERIALS ETC. AND SHALL REPORT ANY DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION
12. IT IS INTENDED THAT ALL THE WORKS SHOWN ON THE DRAWINGS SHALL BE CARRIED OUT BY THE CONTRACTOR. IT IS NOT INTENDED TO SHOW ON THE DRAWINGS EACH AND EVERY ITEM REQUIRED TO CARRY OUT THE CONTRACT WORKS, IT IS EXPECTED THAT THE CONTRACTOR WILL VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXTENT OF WORKS;
13. THE CONTRACT INCLUDES FOR ALL NECESSARY LABOUR, MATERIAL, APPLIANCES, TRANSPORTATION AND SERVICES REQUIRED TO COMPLETE THE CONTRACT WORKS;
14. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND CARRY OUT ALL ALTERATIONS, ADJUSTMENTS, ETC TO COMPLETE THE CONTRACT WORKS;
15. THE CONTRACTOR SHALL, BEFORE ANY WORKS COMMENCE, MAKE-SAFE THE FIRE SPRINKLERS AND EMERGENCY SYSTEMS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL COSTS ASSOCIATED WITH ANY BUILDING FIRE ALARM BEING ACTIVATED BY THE CONTRACTOR;
16. THE CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS, INCL. HOT WORK PERMITS ARE OBTAINED PRIOR TO ANY SUCH WORKS GOING AHEAD;
17. THE CONTRACTOR IS TO ENSURE THAT ANY SMOKE ALARMS OR THE LIKE ARE ISOLATED WHEN ANY SMOKE OR FUME PRODUCING WORKS ARE LIKELY TO BE CARRIED OUT;
18. THE CONTRACTOR IS TO SIGN IN AT STAGE DOOR AND ENSURE THAT THERE ARE NO LAST MINUTE SHOWS, REHEARSALS, ETC. SCHEDULED TO OCCUR THAT WILL PREVENT ANY WORKS FROM BEING CARRIED OUT;
19. PROVIDE A COMPREHENSIVE LIST OF SUPPLIERS/INSTALLERS OF ALL PROPRIETY AND CUSTOM MADE MATERIALS AND EQUIPMENT USED WITHIN THE CONTRACT WORKS, OTHER THAN THOSE GENERALLY AVAILABLE FROM BUILDERS MERCHANTS AND THE LIKE;
20. THE CONTRACTOR SHALL, AT THE COMPLETION OF WORKS, PROFESSIONALLY CLEAN ALL SURFACES AND ENSURE THAT NO CONSTRUCTION DEBRIS REMAINS;
21. THE CONTRACTOR SHALL ACQUAINT THEMSELF WITH THE ACCESS ROUTES TOGETHER WITH THE SIZE OF ENTRIES TO ENABLE ALL EQUIPMENT, MATERIALS, COMPONENTS ETC. TO BE SAFELY DELIVERED TO SITE;
22. THE CONTRACTOR IS RESPONSIBLE FOR THE TIMELY ARRIVAL OF ALL EQUIPMENT, MATERIALS, ETC. TO SITE AND SHALL MAKE HIMSELF FULLY AWARE OF LEAD TIMES FOR ANY MATERIALS, ETC. AND SHALL INFORM THE SUPERINTENDENT, 5 DAYS PRIOR TO THE CONTRACT START, OF ANY SPECIFIED ITEMS THAT WOULD NOT BE AVAILABLE IN TIME TO MEET THE CONTRACT DATES. IF NO SUCH ADVICE IS GIVEN TO THE SUPERINTENDENT THEN THE RESPONSIBILITY FOR SUCH DELAYS WILL FALL ON THE CONTRACTOR;
23. CONTRACTOR SHALL REMOVE ALL SURFACE MOUNTED SERVICES WITHIN PLANT IN ACCORDANCE WITH CONSULTANTS DETAIL DOCUMENT AND COORDINATE ALL SERVICE REMOVAL WORKS AND NEW PENETRATIONS WITH SOH BEFORE PROCEEDING WITH WORKS.
Nom. Architect Doug Southwell/7362
IFCSF
SYDNEY OPERA HOUSEWHITE BOX
1 : 50 @ A11
1/11/201912:28:35 PM
1 : 50 @ A1
PROPOSED SECTIONS
IFC
DS
YYCD200
1 : 50
PROPOSED SECTION1
1 : 50
PROPOSED SECTION2
1 : 50
PROPOSED SECTION3 1 : 50
PROPOSED SECTION4
A PRELIMINARY YY DS 23.09.2019B PRELIMINARY YY DS 02.10.2019C PRELIMINARY YY DS 11.10.2019D PRELIMINARY 25.10.20191 ISSUED FOR CONSTRUCTION 01.11.2019