+ All Categories
Home > Documents > Leveraging Transportation Impact Fees to Build Art in Transit Shelters Cyndi Raskin-Schmitt Manager...

Leveraging Transportation Impact Fees to Build Art in Transit Shelters Cyndi Raskin-Schmitt Manager...

Date post: 16-Dec-2015
Category:
Upload: horace-bond
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
19
eraging Transportation Impact F to Build Art in Transit Shelter Cyndi Raskin-Schmitt Manager of Communications Pinellas Suncoast Transit Authority APTA Marketing & Communications Workshop 2014 #APTA marketing2014
Transcript

Leveraging Transportation Impact Feesto Build Art in Transit Shelters

Cyndi Raskin-SchmittManager of Communications

Pinellas Suncoast Transit Authority

APTA Marketing & Communications Workshop 2014#APTA marketing2014

“Traditional” Art in Transit Projects

2

Art in Transit Bus Shelters

3

Minneapolis, MNMinneapolis, MN Orlando, FLOrlando, FL

Scottsdale, AZScottsdale, AZ Ventura, CAVentura, CA

Transportation Impact Fees• Developers pay Transportation Impact Fees to

cities as part of permitting fees• In lieu of all or part of the fee, Pinellas County

ordinance allows a transportation improvement project that will add capacity to the surrounding system, or to increase mobility and reduce the dependence on automobile travel

4

Bus Shelter Art Projects• PSTA partners with cities to use TIF toward

construction of bus shelters and associated amenities (bench, bike rack, trash can, lighting, etc.)

• $50,000 budget (slab provided, artist team responsible for all other costs including design, plans, engineering, production, transport, installation, permits, etc.)

• Local arts council coordinates call to artists

5

Call to Artists• Statement of Interest• Artist’s Resume• References• Portfolio Photos

• Design selection team representing PSTA, city, arts council, and developero $1200 honorarium each for top three finalist to

build models to present

6

Artist Selection• Evaluated entries, narrowed to three• Invited finalists to present their concept

including construction plan and cost• Select winner and award contract• Construction complete

within 6 to 9 months (depending on site)

7

Shopping Center Partnership

8

9

Gimme Shelter by Mark Fuller

Gimme Shelter by Mark Fuller

10

11

Bay Pines Development Project

12

13

Bay Pines Development Project

14

Bay Pines Development Project

The Epic at Gateway Centre

15

The Epic at Gateway Centre

16

17

The Epic at Gateway Centre

18

The Epic at Gateway Centre