Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 LHC ACCESS SYSTEM 1 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop Chamonix XV – 27 January 2006
Transcript
Page 1: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

1

Access System during the LHC Injection tests

P. Ninin, S. Grau - TS/CSE

Workshop Chamonix XV – 27 January 2006

Page 2: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

2

Agenda

• Introduction

• Motivation

• Requirements

• Interlock chains

• CCC

• Situation after the tests

• Planning

• Conclusions

Page 3: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

3

Motivation

• Protect personnel against radiation hazard during the tests- Access to underground areas around Points 8 and 7 (and the

arc in between) must be fully operational during the test

- Access doors must be interlocked to disable beam in a failsafe way if safety conditions  are violated.

• Test the access control and safety system- Procedure:

• patrol, • nominal operation,• incident management

- Access Equipment - Interlock chains- Control system

Page 4: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

4

Access requirements

• Temporary interlocked gate in Sector 7-6: - To allow safe continued access to 6-7 the  gate should be placed at

800 m from IP7(RP study).  • Dead zone or confined space

- The machine access point at Point 7 (PM76) shall be operational. • The machine access point at Point 8 (PM85) shall be operational.  • The access point between the experimental service cavern and

the LHCb experiment shall be operational and the shield wall in place (PZ85)

• Temporary interlocked gate in Sector 8-1

Page 5: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

5

Access system

• Injection Test zones limited to points LHC 7 & 8

• Deployment- Access safety system at

points 7 & 8- Access control system at

points 7 & 8- CCC control infrastructure- Redundant cable loop- Patrol

LHC 7 LHC8 CCC

Personnel Access 1 6

Material Access 1 5

Sector door 8 11

End of Zone door 2 13

Shielding walls 1 4

racks 12 20 6

sectors 5 13

CCC computers 10

Total 30 72 16

Page 6: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

6

Installation

• Underground access system equipment in sectors 7 / 8 shall be installed before the hardware commissioning.

• Pits head access equipment could be installed during cool down, expected lower traffic.

• During the PM installation the PZ will remain operational.

• Estimation of 500 people that needs the new access card

Page 7: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

7

CCCLASS operation mode selection

EIS-RF

ONOFF

RF

ON OFF

ACCESTUNNEL

POINT 1

ATLAS

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCES RF

ON OFF

ACCESTUNNEL

ALICE

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESSERVICE

ON OFF

ACCESTUNNEL

CMS

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCESTUNNEL

ON OFF

ACCESTUNNEL

LHC-B

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESSERVICE

Electronsstoppers

ONOFF

Electron Sto.

ATLAS

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

POINT 2 POINT 3 POINT 4 POINT 5 POINT 6 POINT 7 POINT 8

LHC

OK OK

EIS-a

ON OFF

ACCES

Key release

ON

FAISCEAU

OFF

EIS-f

Key release

AlarmeFaisceauImminent

DélaiDécroissance

Radiation18 18

Commande pour établir un mode (= retirer un VETO)Allumé = confirmation que le VETO est retiré

Position sûre de tous les EIS (non alimenté, fermé etc.)

Commande pour annuler un mode (= mettre un VETO)Allumé = confirmation que le VETO est mis

MODEAllumé = Mode établiAucun VETO sur le groupe d’EIS correspondant

Position non sûre d’au moins un EIS (alimenté, ouvert, etc.)

Clignotement signalant un incident ou anomalie sur les EIScorrespondants (ex intrusion)

OFF

ON

18 Compteur décroissant

Clef en position insérée et verrouillée

EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a

EIS-a EIS-a EIS-a EIS-a EIS-a

ASB

TI2

EIS-f

FAISCEAU

Key release

OFF ON

ACCES Point 2

Key release

OFFON

EIS-a

TI8

EIS-f

FAISCEAU

Key release

OFF ON

ACCES Point 8

Key release

OFFON

EIS-a

Conditions for Beam Fulfilled ?

OK

MUST BE

Safe and closed

DENYTI8 : Injected Beam

OKSafe and closed

Safe and closed OK

OKSafe and locked

PM85 access point

OKSafe and locked

Sector 1 Safe and closed NOT OK

SELECT

For details select a zone

Point 8 : zone service

Sector 2

Sector 3

Sector 4

Sector 5

Point 8 : zone tunnel

OKSafe and closedUJ83 access point

Sector 8 Safe and closed NOT OK

OKSafe and closedUJ87 access point

Sector 9 Safe and closed NOT OK

Point 8 : zone LHC-BOKSafe and closedUX85 access point

Conditions for Beam Fulfilled ?

OK

MUST BE

Closed

Present

OK

OK

OK

PM85 access point

PM85 access keys

Closed

NOT OK

Point 8 : zone service NOT OK

YCPS01=PM85

YCAPG01=PM85

YCAPG02=PM85

YCAMG01=PM85

OKClosed

Sector 1YCPZ01=SD8

Closed

Closed

OK

OKClosed

YCPS01=US85

Sector 2YCPS01=PM85

Closed

OKYZSQ01=PM85 Reset

MACHINE RESULTANTS STATUS CONDITIONS

MachineAccessLHC TI2 E. S. RF TI8

ACCESS RESULTANTS STATUS

LHC zone Point 2 E.S. zone RF zone Point 8

conditions for TI8 injected beam

4

(5 chains 5 lists + 17 zones 17 lists)

PatrolRestrictedGeneral Closed

Mode selection

CANCEL VALIDATE

PM25

PM45

PM65

PM85

Point 1

Point 2

Point 3

Point 8

ULX15

Zone service Zone Tunnel Zone experimentale

Point 4

Point 5

Point 6

Point 7

USC55

PX24

UPX16

PZ45

UX85

Select ALL

PM56

UP23

PZ33

Uj47

UP55

UP63

UJ27

Ux46

UL55

UJ67

UJ87

UJ23

UJ43

UPX56

UJ63

PM76

UJ83

UJ14 UJ16PM15 PM18

P P

P

Page 8: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

8

Interlock Chains

G. Roy

Page 9: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

9

Interfaces

Access Safety Central Controller

LASS operation mode selection

EIS-RF

ONOFF

RF

ON OFF

ACCESTUNNEL

POINT 1

ATLAS

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCES RF

ON OFF

ACCESTUNNEL

ALICE

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESSERVICE

ON OFF

ACCESTUNNEL

CMS

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESTUNNEL

ON OFF

ACCESSERVICE

ON OFF

ACCESTUNNEL

ON OFF

ACCESTUNNEL

LHC-B

ON OFF

ACCESEXPERIENCE

ON OFF

ACCESSERVICE

Electronsstoppers

ONOFF

Electron Sto.

ATLAS

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

YES NO

DELEGATION

POINT 2 POINT 3 POINT 4 POINT 5 POINT 6 POINT 7 POINT 8

LHC

OK OK

EIS-a

ON OFF

ACCES

Key release

ON

FAISCEAU

OFF

EIS-f

Key release

AlarmeFaisceauImminent

DélaiDécroissance

Radiation18 18

Commande pour établir un mode (= retirer un VETO)Allumé = confirmation que le VETO est retiré

Position sûre de tous les EIS (non alimenté, fermé etc.)

Commande pour annuler un mode (= mettre un VETO)Allumé = confirmation que le VETO est mis

MODEAllumé = Mode établiAucun VETO sur le groupe d’EIS correspondant

Position non sûre d’au moins un EIS (alimenté, ouvert, etc.)

Clignotement signalant un incident ou anomalie sur les EIScorrespondants (ex intrusion)

OFF

ON

18 Compteur décroissant

Clef en position insérée et verrouillée

EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a

EIS-a EIS-a EIS-a EIS-a EIS-a

ASB

TI2

EIS-f

FAISCEAU

Key release

OFF ON

ACCES Point 2

Key release

OFFON

EIS-a

TI8

EIS-f

FAISCEAU

Key release

OFF ON

ACCES Point 8

Key release

OFFON

EIS-a

Access Safety LHC8 Controller

Access Safety LHC7 Controller

18 KV

TED87765

MBIAH 8783M

MSIB 8813M

BIW

BIW

BIC

SPS Access

Access safety network

Access safety network

Page 10: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

10

Authorisation

• Authorisation during the tests will be given by the DSO or the GLIMOS, final decision by OP

• Enrolment campaign and new identifier distribution- New identifier included in the dosimeter

Biometry Enrolment Personal Dosimeter with identifier

Page 11: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

11

Access Procedure

• Before- If necessary access control with restricted list- Patrol

• During (17 days)- Access closed and interlocked- If access necessary : LHC access mode RESTRICTED

• After- Supervised Radiation Area

• Access doors NOT required to define these limits.• Personal Dosimeter required

- New LHC access system will be operational in 7 & 8

Page 12: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

12

Planning

Underground installation

ready

Surface installation

ready

Page 13: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

13

Follow-up tasks and linkmen• LACS installation and commissioning -> L. Scibile, F.Bonthond• LASS development -> T. Ladzinski• LASS installation and commissioning -> T. Ladzinski• Cabling -> J. F. Juget• Equipment Integration -> S. Di Luca• Interface with BIC and SPS access safety system -> T. Ladzinski• Redundant cable loop installation and commissioning -> M. Munoz • LACS, LASS, Cable Loop and Global Access tests -> L. Scibile, T. Ladzinski• Testing procedures and team definition -> L. Scibile, T. Ladzinski• Patrol and operational procedures definition -> P. Ninin• Access cards/dosimeters fabrication, enrolment (500 p) -> L. Scibile, R. Nunes• Training to CCC operators -> P. Ninin•INB documentation -> E.M. Poggioli• Document objectives, requirements, linkmen, milestones, operational modes acess vs.

test modes for the Injection Tests from access point of view -> S.Grau

Coordination – S.Grau

Page 14: LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682

LHC ACCESS SYSTEM

14

Conclusions

• Goals- Ensure personnel safety (radiation hazards) during the tests- Test the access system itself

• More particularly the interlocks and supervision part

• Installation of access system equipment and necessary service is scheduled and organised to achieve this goal.

• 20 % of the final LHC access system- Little specific- Operational procedure to be prepared and tested

• Access system for LHC Injection Test will be coordinated by S.Grau.


Recommended