LHC Machine Advisory Committee Meeting no.19 QRL status. 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team. Content. Layout Fabrication status Installation status Schedule Conclusions. QRL layout. QRL is a continuous cryostat of ~3.2 km length - PowerPoint PPT Presentation
23
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team
Transcript
Page 1: LHC Machine Advisory Committee Meeting no.19 QRL status

LHC Machine Advisory Committee Meeting no19

QRL status

16 June 2006

G Riddone AT-ACROn behalf of the QRL team

MAC No19 15-17 June 2006 GR AT-ACR2

Content

bull Layout

bull Fabrication status

bull Installation status

bull Schedule

bull Conclusions

MAC No19 15-17 June 2006 GR AT-ACR3

QRL layout

QRL is a continuous cryostat of ~32 km lengthQRL is a continuous cryostat of ~32 km lengthno header (4 or 5) sectorisation 9 vacuum sub-sectors vacuum insulation separate from machine

QRL elements in one sectorQRL elements in one sector~ 38 service modules ~ 40 fixed pointvacuum barrier elements ~ 235 straight pipe elements~ 10 stepselbows ~ 1-2 cryogenic extensions

19R617R615R613R611R69R6

4R6 5R6

7L7Return ModuleType ID

ARC 6-7

LSS R6

LSS L7

DS R6 DS L7

Inte

rcon

nect

ion

box

Junction Region

IP6

IP7

34R6L733R631R629R627R625R623R621R6 33L7 31L7 29L7 27L7 25L7 23L7 21L7 19L7 17L7 15L7 13L7 11L7 9L7

BA AB ABAA AA AB ABAA AA AB ACAA AD AA AAAB AB AA AAAB AB AA AAAB AB BA

1R6

EA EA DA CH

EA

6L6 2L7

CC DG

Q5(L)DFBA(M)MB(L)Q4(L)

DFBA(L) Q6(L)Q7(L)

Q10(L)Q11(L) Q13(L) Q15(L) Q17(L) Q19(L) Q21(L) Q23(L) Q25(L) Q27(L) Q29(L) Q31(L) Q33(L) Q33(L) Q31(L) Q29(L) Q27(L) Q25(L) Q23(L) Q21(L) Q19(L) Q17(L) Q15(L) Q13(L) Q11(L) Q9(L)

MAC No19 15-17 June 2006 GR AT-ACR4

QRL layout

Secto

r 3-4

E

F

BD

C

E

F

BD

C

8 sectors- 7 installed by Air Liquide- 1 re-installed by CERN

= 650 mmE-F= 50-75 BCD = 4-20 K

Sector 5

-6

MAC No19 15-17 June 2006 GR AT-ACR5

QRL fabrication status

2C (FR) Tuboplan (PT) SI MI C (I T) FCM (SP) DTA (FR) Tuboplan (PT)

Contract (old target)

[element week]15 3 15 1 01 05

Contract (new target)

[element week]25 6 25 17 1 15

Produced (average)[element week]

30 7 23 18 1 185

1714 441 166 106 39 59

100 99 99 100 100 84

End of the production

CW15 CW25 CW25 CW21 CW21 CW30

StepsElbows

Pipe elementsService modules

Service modules

Service modules

Fixed points special pipe elements

Produced to-date [number of

elements and ]

MAC No19 15-17 June 2006 GR AT-ACR6

QRL installation status

bull External supports (~ 700sector)

Progre

ss 9

7

MAC No19 15-17 June 2006 GR AT-ACR7

QRL installation status

bull Positioning and alignment (~ 325 elementssector)

Progre

ss 8

6

MAC No19 15-17 June 2006 GR AT-ACR8

QRL installation status

bull Welding and testing ~ 325 interconnectionssectors ~ 2000 inner welds made by orbital welding machineraquo ~ 180 ldquoOrdquo type interconnections (1 butt-weld per header)

raquo ~ 75 ldquoCrdquo type interconnections (2 butt-welds per header)

raquo ~ 70 ldquoArdquo type Interconnections (3 welds per header)

1

1 2

Internal compensator

weld during prefabrication of the sleevewith backing gas

13 2

final weldwithout backing gas

weld in situ with backing gas

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 2: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR2

Content

bull Layout

bull Fabrication status

bull Installation status

bull Schedule

bull Conclusions

MAC No19 15-17 June 2006 GR AT-ACR3

QRL layout

QRL is a continuous cryostat of ~32 km lengthQRL is a continuous cryostat of ~32 km lengthno header (4 or 5) sectorisation 9 vacuum sub-sectors vacuum insulation separate from machine

QRL elements in one sectorQRL elements in one sector~ 38 service modules ~ 40 fixed pointvacuum barrier elements ~ 235 straight pipe elements~ 10 stepselbows ~ 1-2 cryogenic extensions

19R617R615R613R611R69R6

4R6 5R6

7L7Return ModuleType ID

ARC 6-7

LSS R6

LSS L7

DS R6 DS L7

Inte

rcon

nect

ion

box

Junction Region

IP6

IP7

34R6L733R631R629R627R625R623R621R6 33L7 31L7 29L7 27L7 25L7 23L7 21L7 19L7 17L7 15L7 13L7 11L7 9L7

BA AB ABAA AA AB ABAA AA AB ACAA AD AA AAAB AB AA AAAB AB AA AAAB AB BA

1R6

EA EA DA CH

EA

6L6 2L7

CC DG

Q5(L)DFBA(M)MB(L)Q4(L)

DFBA(L) Q6(L)Q7(L)

Q10(L)Q11(L) Q13(L) Q15(L) Q17(L) Q19(L) Q21(L) Q23(L) Q25(L) Q27(L) Q29(L) Q31(L) Q33(L) Q33(L) Q31(L) Q29(L) Q27(L) Q25(L) Q23(L) Q21(L) Q19(L) Q17(L) Q15(L) Q13(L) Q11(L) Q9(L)

MAC No19 15-17 June 2006 GR AT-ACR4

QRL layout

Secto

r 3-4

E

F

BD

C

E

F

BD

C

8 sectors- 7 installed by Air Liquide- 1 re-installed by CERN

= 650 mmE-F= 50-75 BCD = 4-20 K

Sector 5

-6

MAC No19 15-17 June 2006 GR AT-ACR5

QRL fabrication status

2C (FR) Tuboplan (PT) SI MI C (I T) FCM (SP) DTA (FR) Tuboplan (PT)

Contract (old target)

[element week]15 3 15 1 01 05

Contract (new target)

[element week]25 6 25 17 1 15

Produced (average)[element week]

30 7 23 18 1 185

1714 441 166 106 39 59

100 99 99 100 100 84

End of the production

CW15 CW25 CW25 CW21 CW21 CW30

StepsElbows

Pipe elementsService modules

Service modules

Service modules

Fixed points special pipe elements

Produced to-date [number of

elements and ]

MAC No19 15-17 June 2006 GR AT-ACR6

QRL installation status

bull External supports (~ 700sector)

Progre

ss 9

7

MAC No19 15-17 June 2006 GR AT-ACR7

QRL installation status

bull Positioning and alignment (~ 325 elementssector)

Progre

ss 8

6

MAC No19 15-17 June 2006 GR AT-ACR8

QRL installation status

bull Welding and testing ~ 325 interconnectionssectors ~ 2000 inner welds made by orbital welding machineraquo ~ 180 ldquoOrdquo type interconnections (1 butt-weld per header)

raquo ~ 75 ldquoCrdquo type interconnections (2 butt-welds per header)

raquo ~ 70 ldquoArdquo type Interconnections (3 welds per header)

1

1 2

Internal compensator

weld during prefabrication of the sleevewith backing gas

13 2

final weldwithout backing gas

weld in situ with backing gas

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 3: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR3

QRL layout

QRL is a continuous cryostat of ~32 km lengthQRL is a continuous cryostat of ~32 km lengthno header (4 or 5) sectorisation 9 vacuum sub-sectors vacuum insulation separate from machine

QRL elements in one sectorQRL elements in one sector~ 38 service modules ~ 40 fixed pointvacuum barrier elements ~ 235 straight pipe elements~ 10 stepselbows ~ 1-2 cryogenic extensions

19R617R615R613R611R69R6

4R6 5R6

7L7Return ModuleType ID

ARC 6-7

LSS R6

LSS L7

DS R6 DS L7

Inte

rcon

nect

ion

box

Junction Region

IP6

IP7

34R6L733R631R629R627R625R623R621R6 33L7 31L7 29L7 27L7 25L7 23L7 21L7 19L7 17L7 15L7 13L7 11L7 9L7

BA AB ABAA AA AB ABAA AA AB ACAA AD AA AAAB AB AA AAAB AB AA AAAB AB BA

1R6

EA EA DA CH

EA

6L6 2L7

CC DG

Q5(L)DFBA(M)MB(L)Q4(L)

DFBA(L) Q6(L)Q7(L)

Q10(L)Q11(L) Q13(L) Q15(L) Q17(L) Q19(L) Q21(L) Q23(L) Q25(L) Q27(L) Q29(L) Q31(L) Q33(L) Q33(L) Q31(L) Q29(L) Q27(L) Q25(L) Q23(L) Q21(L) Q19(L) Q17(L) Q15(L) Q13(L) Q11(L) Q9(L)

MAC No19 15-17 June 2006 GR AT-ACR4

QRL layout

Secto

r 3-4

E

F

BD

C

E

F

BD

C

8 sectors- 7 installed by Air Liquide- 1 re-installed by CERN

= 650 mmE-F= 50-75 BCD = 4-20 K

Sector 5

-6

MAC No19 15-17 June 2006 GR AT-ACR5

QRL fabrication status

2C (FR) Tuboplan (PT) SI MI C (I T) FCM (SP) DTA (FR) Tuboplan (PT)

Contract (old target)

[element week]15 3 15 1 01 05

Contract (new target)

[element week]25 6 25 17 1 15

Produced (average)[element week]

30 7 23 18 1 185

1714 441 166 106 39 59

100 99 99 100 100 84

End of the production

CW15 CW25 CW25 CW21 CW21 CW30

StepsElbows

Pipe elementsService modules

Service modules

Service modules

Fixed points special pipe elements

Produced to-date [number of

elements and ]

MAC No19 15-17 June 2006 GR AT-ACR6

QRL installation status

bull External supports (~ 700sector)

Progre

ss 9

7

MAC No19 15-17 June 2006 GR AT-ACR7

QRL installation status

bull Positioning and alignment (~ 325 elementssector)

Progre

ss 8

6

MAC No19 15-17 June 2006 GR AT-ACR8

QRL installation status

bull Welding and testing ~ 325 interconnectionssectors ~ 2000 inner welds made by orbital welding machineraquo ~ 180 ldquoOrdquo type interconnections (1 butt-weld per header)

raquo ~ 75 ldquoCrdquo type interconnections (2 butt-welds per header)

raquo ~ 70 ldquoArdquo type Interconnections (3 welds per header)

1

1 2

Internal compensator

weld during prefabrication of the sleevewith backing gas

13 2

final weldwithout backing gas

weld in situ with backing gas

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 4: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR4

QRL layout

Secto

r 3-4

E

F

BD

C

E

F

BD

C

8 sectors- 7 installed by Air Liquide- 1 re-installed by CERN

= 650 mmE-F= 50-75 BCD = 4-20 K

Sector 5

-6

MAC No19 15-17 June 2006 GR AT-ACR5

QRL fabrication status

2C (FR) Tuboplan (PT) SI MI C (I T) FCM (SP) DTA (FR) Tuboplan (PT)

Contract (old target)

[element week]15 3 15 1 01 05

Contract (new target)

[element week]25 6 25 17 1 15

Produced (average)[element week]

30 7 23 18 1 185

1714 441 166 106 39 59

100 99 99 100 100 84

End of the production

CW15 CW25 CW25 CW21 CW21 CW30

StepsElbows

Pipe elementsService modules

Service modules

Service modules

Fixed points special pipe elements

Produced to-date [number of

elements and ]

MAC No19 15-17 June 2006 GR AT-ACR6

QRL installation status

bull External supports (~ 700sector)

Progre

ss 9

7

MAC No19 15-17 June 2006 GR AT-ACR7

QRL installation status

bull Positioning and alignment (~ 325 elementssector)

Progre

ss 8

6

MAC No19 15-17 June 2006 GR AT-ACR8

QRL installation status

bull Welding and testing ~ 325 interconnectionssectors ~ 2000 inner welds made by orbital welding machineraquo ~ 180 ldquoOrdquo type interconnections (1 butt-weld per header)

raquo ~ 75 ldquoCrdquo type interconnections (2 butt-welds per header)

raquo ~ 70 ldquoArdquo type Interconnections (3 welds per header)

1

1 2

Internal compensator

weld during prefabrication of the sleevewith backing gas

13 2

final weldwithout backing gas

weld in situ with backing gas

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 5: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR5

QRL fabrication status

2C (FR) Tuboplan (PT) SI MI C (I T) FCM (SP) DTA (FR) Tuboplan (PT)

Contract (old target)

[element week]15 3 15 1 01 05

Contract (new target)

[element week]25 6 25 17 1 15

Produced (average)[element week]

30 7 23 18 1 185

1714 441 166 106 39 59

100 99 99 100 100 84

End of the production

CW15 CW25 CW25 CW21 CW21 CW30

StepsElbows

Pipe elementsService modules

Service modules

Service modules

Fixed points special pipe elements

Produced to-date [number of

elements and ]

MAC No19 15-17 June 2006 GR AT-ACR6

QRL installation status

bull External supports (~ 700sector)

Progre

ss 9

7

MAC No19 15-17 June 2006 GR AT-ACR7

QRL installation status

bull Positioning and alignment (~ 325 elementssector)

Progre

ss 8

6

MAC No19 15-17 June 2006 GR AT-ACR8

QRL installation status

bull Welding and testing ~ 325 interconnectionssectors ~ 2000 inner welds made by orbital welding machineraquo ~ 180 ldquoOrdquo type interconnections (1 butt-weld per header)

raquo ~ 75 ldquoCrdquo type interconnections (2 butt-welds per header)

raquo ~ 70 ldquoArdquo type Interconnections (3 welds per header)

1

1 2

Internal compensator

weld during prefabrication of the sleevewith backing gas

13 2

final weldwithout backing gas

weld in situ with backing gas

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 6: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR6

QRL installation status

bull External supports (~ 700sector)

Progre

ss 9

7

MAC No19 15-17 June 2006 GR AT-ACR7

QRL installation status

bull Positioning and alignment (~ 325 elementssector)

Progre

ss 8

6

MAC No19 15-17 June 2006 GR AT-ACR8

QRL installation status

bull Welding and testing ~ 325 interconnectionssectors ~ 2000 inner welds made by orbital welding machineraquo ~ 180 ldquoOrdquo type interconnections (1 butt-weld per header)

raquo ~ 75 ldquoCrdquo type interconnections (2 butt-welds per header)

raquo ~ 70 ldquoArdquo type Interconnections (3 welds per header)

1

1 2

Internal compensator

weld during prefabrication of the sleevewith backing gas

13 2

final weldwithout backing gas

weld in situ with backing gas

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 7: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR7

QRL installation status

bull Positioning and alignment (~ 325 elementssector)

Progre

ss 8

6

MAC No19 15-17 June 2006 GR AT-ACR8

QRL installation status

bull Welding and testing ~ 325 interconnectionssectors ~ 2000 inner welds made by orbital welding machineraquo ~ 180 ldquoOrdquo type interconnections (1 butt-weld per header)

raquo ~ 75 ldquoCrdquo type interconnections (2 butt-welds per header)

raquo ~ 70 ldquoArdquo type Interconnections (3 welds per header)

1

1 2

Internal compensator

weld during prefabrication of the sleevewith backing gas

13 2

final weldwithout backing gas

weld in situ with backing gas

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 8: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR8

QRL installation status

bull Welding and testing ~ 325 interconnectionssectors ~ 2000 inner welds made by orbital welding machineraquo ~ 180 ldquoOrdquo type interconnections (1 butt-weld per header)

raquo ~ 75 ldquoCrdquo type interconnections (2 butt-welds per header)

raquo ~ 70 ldquoArdquo type Interconnections (3 welds per header)

1

1 2

Internal compensator

weld during prefabrication of the sleevewith backing gas

13 2

final weldwithout backing gas

weld in situ with backing gas

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 9: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR9

QRL installation status

ldquoCrdquo type interconnections

ldquoArdquo type interconnections

Special interconnections

Inner weld pro

gress

85

- Nominal r

ate 2

0 int

w

- Ach

ieved rate

30 in

tw

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 10: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR10

QRL installation status

Mounting of superinsulation

Welding of external compensators and visual check

External weld progress 81

- Nominal rate 20 intw

- Achieved rate 35 intw

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 11: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR11

QRL installation status

bull NDT testsraquo Internal (video camera) and external

visual control 100raquo Radiography tests from 100 to 10 as a function of weld

qualityraquo Leak tightness tests 100

bull Helium to insulation vacuumndash each weld

(header pressurization at 1 bar) lt 10-9 mbarls

ndash each sub-sector (header pressurization at 3 bar) lt 10-8 mbarls

ndash each sector (in parallel with pressure test) lt 10-7 mbarls

bull Air to insulation vacuum 10-5 mbarls

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 12: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR12

QRL installation status

bull Percentage of defects of inner welds (visual and radiographic inspections) for the 3 types of interconnectionsraquo According to machine parameters two categories are defined

(B and CDEF)

Air Liquide target value 3Main defects porosity lack of fusion metallic inclusions

Number of weldsHeader

BHeaders CDEF

Header B

Headers CDEF

Header B

Headers CDEF

Sector 8-1 2205 11 49 05 05 09 07

Sector 4-5 2169 09 47 02 02 03 02

Sector 3-4 1984 08 29 06 03 07 04

Sector 5-6 2120 04 16 00 00 01 02

Sector 6-7 1938 00 26 02 01 02 00

Sector 2-3 1734 01 17 03 02 05 01

A Type I nterconnection

C Type I nterconnection

O Type I nterconnection

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 13: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR13

QRL installation status

bull Number of internal leaks (helium to insulation vacuum) raquo on installation welds 812000

bull 7 detected with the clamp shellsbull 1 detected in sector 6-7 during the test of the sub-sector

(reason operator error during the test with clamp shells) raquo on internal compensators 2 (sector 3-4)raquo on backing rings 2 (sector 4-5)raquo on service modules (header F) 7 (6 in sector 8-1 and 1 in sector

4-5) bull Number of external leaks (air to insulation vacuum) on

installation welds raquo Sector 8-1 124250raquo Sector 4-5 104250raquo Sector 3-4 114250raquo Sector 5-6 34250raquo Sector 6-7 64250

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 14: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR14

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Heat inleaks [W]

E+F (50-75 K)

B+C+D (4-20 K)

Calculated 9850 593

Measured9000 +- 400 (~ 28 Wm)

634 +- 50 (~02 Wm)

Sector 8-1 - installation completed- pressure leak and cold tests successfully performed

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 15: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR15

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 4-5 - installation completed- pressure and leak test without the JR successfully performed - JR and sub-sector A pressure tested in parallel with the magnets

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 16: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR16

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 3-4 - installation completed- pressure and leak test successfully performed- repair of an external leak in sub-sector I under way

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 17: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR17

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 5-6 - installation completed - pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 18: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR18

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 6-7 - installation completed- pressure and leak test successfully performed

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 19: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR19

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 2-3 - 3 teams working in sub-sectors A to I- installation progress 744 - 3 sub-sectors under pumping

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 20: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR20

QRL installation status

Week 24

J R A B C D E F G H I

5 5 5 5 5 5 5 5 5 5 100 100

4 4 5 5 5 5 5 5 5 5 100 995

5 5 5 5 5 5 5 5 5External

leakR 100 100

5 5 5 5 5 5 5 5 5 5 987 999

5 5 5 5 5 5 5 5 5 5 991 992

1 2 2 2 4 4 4 2 3 2 963 744

1 1 1 1 2 2 2 2 1 883 117

Installation progress (except 7-8) 975 835

1 2 3 4 5 RInstallation of

external supports

Leak tightness test successfully performed

Welding of internal headers

Sector 3-4

Sector 5-6

Sector 2-3

Sector 1-2

Progress [ ]

Sector 6-7

INSTALLATION - ALL SECTORS (EDMS 681375)

Welding of external compensators

Pumping and leak tightness test

at 3 bar

Ext

ern

al s

up

po

rts

Ele

men

ts

Leak repair

Sector 8-1

Sector 4-5

Sector 1-2 - 3 teams working in sub-sectors E to H- installation progress 117

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 21: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR21

QRL schedule

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 22: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR22

QRL dashboard

Total to be installed

cont

ract

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions
Page 23: LHC Machine Advisory Committee Meeting no.19 QRL status

MAC No19 15-17 June 2006 GR AT-ACR23

Conclusions

bull Fabricationraquo Production of pipe elements fixed points and service

modules under completionraquo Production of stepselbows foreseen to be completed in

CW30 (compatible with installation schedule)

bull Installation raquo Installation of the last two sectors under way

bull Thermo-mechanical validationraquo Sectors 8-1 4-5 3-4 5-6 and 6-7 (and 7-8 sub-sectors A

and B) successfully leak and pressure testedraquo Sector 8-1 (and 7-8 sub-sectors A and B) successfully cold

tested

bull Scheduleraquo At present installation is about 25 weeks in advance

(schedule revised in November 2005)

  • LHC Machine Advisory Committee Meeting no19 QRL status
  • Content
  • QRL layout
  • QRL layout
  • QRL fabrication status
  • QRL installation status
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • QRL schedule
  • QRL dashboard
  • Conclusions