LHC Upgrade Options Lucio Rossi CERN Grenoble 23 July 2011, HEP-EPS
Transcript
Page 1: LHC Upgrade Options

LHC Upgrade Options

Lucio RossiCERN

Grenoble 23 July 2011, HEP-EPS

Page 2: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 2

Content

• Where we are for LHC ?• Scope of HL-LHC• Main technologies• HL-LHC and the FP7 HiLumi LHC Design Study

– The program– A global collaboration

• HE-LHC– The aim– The challenges

23 July 2011

Page 3: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 3

Lumi today

23 July 2011

Peak lumi: 50-70 pb-1/fill

Page 4: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 4

How the luminosity might evolve here we assume we saturate at nominal

23 July 2011

0.01

0.10

1.00

10.00

100.00

1000.00

0.0E+00

2.0E+33

4.0E+33

6.0E+33

8.0E+33

1.0E+34

1.2E+34

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

Inte

grat

ed lu

min

osity

[fb-1

]

Peak

Lum

inos

ity [c

m-2

s-1]

Peak lumi Int. lumi

Shut

dow

n

Shut

dow

n

Data from M. LamontNot validated by LMC

Page 5: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 523 July 2011

0

3

6

9

12

15

0.1

1.0

10.0

100.0

1000.020

10

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

Hal

ving

tim

e (y

ears

)

Inte

grat

ed Lu

min

osity

[fb-1

]

Int. lumi Halving time

Shut

dow

n

Shut

dow

n

Data from M. LamontNOT validated in LMC

How the luminosity might evolve cont.

220 inv fb by end of 2020

Page 6: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 6

Lumi evolution: more otpimistic(ultimate=2xnominal) is reached

23 July 2011

If LHC performs « nominal »: the upgrade is required by the saturationIf LHC performs better, saturation is 2 years later, but radiation limits may come in earlier

In such case we may reach 320 inv. fb for end of 2020.Data from M. LamontNOT validated in LMC

Page 7: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 7

The goal of HL-LHC(Installing hardware in 2021-22 in LS3)

The main objective of HL-LHC is to implement a hardware configuration and a set of beam parameters that will allow the LHC to reach the following targets:•A peak luminosity of 5×1034 cm-2s-1 with levelling, allowing:•An integrated luminosity of 250 fb-1 per year, enabling the goal of 3000 fb-1 twelve years after the upgrade. This luminosity is more than ten times the luminosity reach of the first 10 years of the LHC lifetime.

0.E+00

2.E+34

4.E+34

6.E+34

8.E+34

1.E+35

0 2 4 6 8 10 12

Lum

inos

ity

(cm

-2s-1

)

time (hours)

Nominal

1035 - no levelling

Levelling at 5 10

35

34

0.E+00

2.E+34

4.E+34

6.E+34

8.E+34

1.E+35

0 5 10 15 20 25

Lum

inos

ity

(cm

-2 s

-1)

time (hours)

1035 - no level Level at 5 1035 34

Average no level

Average level

23 July 2011

• allow design for lower peak L, less pile up• less peak heat deposition ( a factor 2 may be critical especially in the quad triplet)

Page 8: LHC Upgrade Options

For given luminosity teff scales with total beam current

levIP

toteff Ln

N

(s=100 mbarn)

Upgrade Considerations: Beam LifetimeF. Zimmermann, Chamonix 2011

argument for HL-LHC scenarios with maximum beam current teff = 13.9 hours for 5 1014 p/beam

Oliver Brüning BE-ABP 8LIU-HL-LHC Brainstorming meeting, CERN, 24 June 2011

levIPeff

tottot LnN

dt

dN

N(t) = (1-t/teff) Ntot

Page 9: LHC Upgrade Options

Integrated luminosity: run with luminosity decay

Upgrade Considerations: Integrated Luminosity

Lint = ca 0.4 fb-1 over 3 h for a luminosity decay to 2.5 1034 cm-2 s-1

Oliver Brüning BE-ABP 9LIU-HL-LHC Brainstorming meeting, CERN, 24 June 2011

[Stephane Fartoukh]

assuming no emittance growth over th

e fill

the emittance growth due to

IBS and beam-

beam is compensated by radiatio

n damping

Page 10: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 10

Here the critical zonea lot of magnet change… but not only

23 July 2011

ATLAS

1. Changing the interaction region is not enough

2. We need to touch deeply also the matching section

3. For collimation we would like (may be) to change also this part, DS in the continous cryostat

CMS

Crab cavities

Page 11: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 11

The path toward high lumi

23 July 2011

From Chamonix 2011:• Integrate also LHCb and Alice in the upgrade picture (so far they were not)• The shutdown scheme has been shifted of one year : a resource loaded plan under preparation, the length of shutdown(s) is critical• the assessment of what are the LHC bottlenecks is critical

• collimation • e-clouds• Beam tune shift due to collision• R2E real limitation• Heat deposition and cryogenic limits

Page 12: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 12

≤ 50% Inom @

3.5 TeVb* ≈ 2m

23 July 2011

≤ 100% Inom @

7.0 TeVb* ≈ 1m

≥ 160% Inom at 7.0 TeV

b* ≈ 55cm

HL-LHC WP5:

Upgrades as

required for HL-

LHC upgrade

But today we are at

1.4 mGoing soon

to 1 m

From R. Assman in 2010

Page 13: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 13

Preparation for upgradethe technologies

• In any case, how good or less good could be the performance, changing the machine to reach potentially 1035 and then levelling at 5 1034 takes a lot of time:

• 10 years wotk is not a luxury: HL-LHC is a jump in hadrton colider technology– High field magnets– Sc crab cavities– Extreme collimation in the collision points (and DS)– Sc links to remove problem of R2E to power supply

23 July 2011

Page 14: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 14

Squeezing the beam High Field SC Magnets

• 13 T, 150 mm aperture Quads for the inner triplet – LHC: 8 T, 70 mm. – sLHC-PP: 8.5 T 120 mm

• More focus strength, * as low as 15 cm (55 cm in LHC). In some scheme even * down to 7.5 cm are considered

• Dipole separators capable of 6-8 T with 150-180 mm aperture (LHC: 1.8 T, 70 mm)

23 July 2011

Page 15: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 15

LARP (US LHC program) Magnets

SQSM TQS

LR

LQS-4m

HQTQC

23 July 2011

Page 16: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 16

Results LARP LQ (90 mm vs 70 mm LHC)

23 July 2011

LHC equivalent today

Page 17: LHC Upgrade Options

Coils Assembly and Alignment

17

Alignment Keys

Collars

Coil & heater

LARP DOE review, FNAL June 1-2, 2011

Page 18: LHC Upgrade Options

ANSYS 3D Analysis

1. Axial pre-load

2. Azimuthal pre-load

3. Cool-down

4. Excitation

1. Low pre-stress during assembly2. Cool-down and high pre-stress 3. No stress overshoot4. Reusable structural components

18LARP DOE review, FNAL June 1-2, 2011

Page 19: LHC Upgrade Options

HQ01 Training (4.4K)

19

HQ01a 13683A (157T/m, 79% of ss) coils 1,2,3,4HQ01b 13308A (153T/m, 77% of ss) coils 1,4,5,6HQ01c 11953A (138T/m, 70% of ss) coils 1,5,7,8HQ01d 14983A (170T/m, 86% of ss) coils 5,7,8,9

LARP DOE review, FNAL June 1-2, 2011

LHC technology 120 T/m - 8.5 T

HL-LHC technology 170 T/m – 13 T

Page 20: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 20

CERN: recent achievement of 12.5 T at 4.2 K in a (first) 400 mm Nb3Sn coil!

23 July 2011

12.5 tesla level

10 tesla level

Page 21: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 21

qcz

crossing angle reduces the luminosity

• luminosity loss comes from imperfect geometric overlap• it becomes significant if szqc/2>sx

* or fpiw>1 with fpiw= szqc/(2sx*) the

“Piwinski angle”

F. Zimmermann & R. Calaga

23 July 2011

Page 22: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 22

crab crossing restores bunch overlap

qc

• RF crab cavity deflects head and tail in opposite direction so that collision is effectively “head on” for luminosity and tune shift

• bunch centroids still cross at an angle (easy separation)• 1st proposed in 1988, in operation at KEKB since 2007

→ world record luminosity!

F. Zimmermann & R. Calaga

23 July 2011

Page 23: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 23

Improve beam overlapSC RF Crab cavities

• Crab cavities to rotate the beam and colliding with good overlap

• Providing « easy » way for levelling

• Necessary to fully profit of the low *

• Very demanding phase control (better than 0.001) and protection

• Very compact design• 40-80 MV (16 MV in LHC)

23 July 2011

Page 24: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 24

Compact 400 MHz Completely new domain

23 July 2011

LHCpipe1

LHCpipe2

194 mm

Technical space for He tank, etc..

New idea for a very compact elliptical 800 MHz

All these 400 MHz can fit into the standard 194 mm LHC beam separation with cavities in a common cryostat (but not easy…)

Page 25: LHC Upgrade Options

New Ridged waveguide deflector (Z. Li, SLAC)

• Transverse dimension: 250mmX270mm• Fit both H and V crabbing schemes

Z. Li & L. Ge Crab Cavity LARP CM16 May 16-18, 2011

Operating mode Frequency 400 MHzOperating Mode TE11 like modeLowest acc mode Frequency 671 MHzLowest vertical HOM Frequency 617 MHzLowest horizontal HOM Frequency 698 MHzIris aperture (diameter) 84 mmTransverse dimension 250 mmVertical dimension 270 mmLongitudinal dimension 525 mmTransverse Shunt Impedance 330 ohm/cavityRequired deflecting voltage per cavity 5 MVPeak surface magnetic field 94 mTPeak surface electric field 45 MV/m

Page 26: LHC Upgrade Options

Evolution of the parallel bar design into a ridged deflector (J. Delayen, ODU)

Page 27: LHC Upgrade Options

News on Crab Cavities

• The two designs by Zenghai Li (SLAC) and Jean Delayen (ODU) are now similar and it was agreed in Montauk (US-LARP meeting, May ‘11) that they will join forces to work on a single design!

Page 28: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 28

R2E: Removal of Power Converter (200kA-5 kV SC cable, 100 m height)

23 July 2011

Φ = 62 mm

7 × 14 kA, 7 × 3 kA and 8 × 0.6 kA cables – Itot120 kA @ 30 K

MgB2(or other HTS)

Also DFBs (current lead boxses) removed to surface Definitive solution to R2E problem – in some pointsMake room for shielding un-movable electronicsMake much easier maintenance and application of ALARA

Page 29: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 29

Technical reasons for the upgrade(or at least for important improve)

• The zone of the triplets will wear out– Radiation damage limit (300-400 fb-1 ? More?)– Hardware and shielding that has not been really optimized for very

high radiation• Better and increased shielding of the triplet and other elements• Better design (absorbers, TAS) also for background• Removing power supply, longer lines, necessity of a re-layout

– Necessity to increase to heat removal capacity• Restoring cooling capacity in IR5 Left and decouple RF from Magnets in

2017• Local removal (inside triplet) and transport away• Cooling capacity• Cooling sectorization (complete decoupling of IRs form Arcs: this will allow

more budget for e-clouds, 25 ns will may re-favourite)

23 July 2011

Page 30: LHC Upgrade Options

HL-LHC Performance Estimates

30

Parameter nominal 25ns 50ns

N 1.15E+11 2.0E+11 3.3E+11nb 2808 2808 1404beam current [A] 0.58 1.02 0.84

x-ing angle [mrad] 300 475 520

beam separation [s] 10 10 10b* [m] 0.55 0.15 0.15en [mm] 3.75 2.5 3.0eL [eVs] 2.51 2.5 2.5

energy spread 1.00E-04 1.00E-04 1.00E-04

bunch length [m] 7.50E-02 7.50E-02 7.50E-02IBS horizontal [h] 80 -> 106 25 17IBS longitudinal [h] 61 -> 60 21 16Piwinski parameter 0.68 2.5 2.5geom. reduction 0.83 0.37 0.37beam-beam / IP 3.10E-03 3.9E-03 5.0E-03Peak Luminosity 1 1034 7.4 1034 8.4 1034

minimum b*

(Leveled to 5 1034 cm-2 s-1)

nominal bunch length and minimum b*: ‘HL-LHC Kickoff+’

Events / crossing 19 141 257 95 190

Oliver Brüning BE-ABPLIU-HL-LHC Brainstorming meeting, CERN, 24 June 2011

OK for

HL

goal

s (‘

k’ =

4)

(Eve

n b

ette

r if e

mitta

nce

s

can b

e fu

rther

red

uce

d:

still

a fac

tor

1.2

to 2

.5

wrt

bea

m-b

eam

lim

it)

5.6 1014 and 4.6 1014

p/beam

sufficient room for leveling (with Crab Cavities)

Virtual luminosity (25ns) ofL = 7.4 / 0.37 1034 cm-2 s-1

= 20 1034 cm-2 s-1 (‘k’ = 4)

Virtual luminosity (25ns) ofL = 8.4 / 0.37 1034 cm-2 s-1

= 22.7 1034 cm-2 s-1 (‘k’ = 4.5)

Page 31: LHC Upgrade Options

HL-LHC Performance Estimates

31

Parameter nominal 25ns 50ns

N 1.15E+11 1.7E+11 2.5E+11nb 2808 2808 1404beam current [A] 0.58 0.86 0.64

x-ing angle [mrad] 300 480 430

beam separation [s] 10 10 10b* [m] 0.55 0.15 0.15en [mm] 3.75 2.5 2.0eL [eVs] 2.51 2.5 2.5

energy spread 1.00E-04 1.00E-04 1.00E-04

bunch length [m] 7.50E-02 7.50E-02 7.50E-02IBS horizontal [h] 80 -> 106 25 10IBS longitudinal [h] 61 -> 60 21 13Piwinski parameter 0.68 2.56 2.56geom. reduction 0.83 0.37 0.36beam-beam / IP 3.10E-03 3.0E-03 5.6E-03Peak Luminosity 1 1034 5.3 1034 7.2 1034

minimum b*

Events / crossing 19 101 274 95 190

Oliver Brüning BE-ABPLIU-HL-LHC Brainstorming meeting, CERN, 24 June 2011

intensity and leveling room marginal

Virtual luminosity ofL = 5.3 / 0.36 1034 cm-2 s-1

= 14 1034 cm-2 s-1 (‘k’ = 2.8)

L = 7.2 / 0.36 1034 cm-2 s-1

= 20 1034 cm-2 s-1 (‘k’ = 4)

IBS growth rates need to be re-evaluated for ATS optics!

nominal bunch length and LIU estimates for injector complex:

25ns

slig

htly

short

of H

L goal

s (k

< 4

)

50ns

requir

es >

80%

mac

hin

e

effici

ency

4.8 1014 and 3.5 1014

p/beam

Page 32: LHC Upgrade Options

LIU 25ns goal: 25ns; 4.8 1014 p/beam k = 2.8

Upgrade Considerations: Integrated Luminosity

teff = 13.3 h and leveling time: 5.4 h

Turnaround time: 5.4h + 3h + 5h = 13.4h 1.8 fills /day Lint / fill = 1 fb-1 + 0.4 fb-1

60% efficiency on 150 days 225 fb-1

Oliver Brüning BE-ABP 32LIU-HL-LHC Brainstorming meeting, CERN, 24 June 2011

LIU 50ns goal: 3.5 1014 p/beam k = 4 teff = 9.7 h and leveling time: 4.9 h

Turnaround time: 4.9h + 3h + 5h = 12.9h 1.9 fills /day Lint / fill = 0.9 fb-1 + 0.4 fb-1

60% efficiency on 150 days 115 fb-1

Page 33: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS201123 July 2011 33

Nominal barc (180m) in s45/56/81/12

Pre-squeezed optics: b* = 60 cm in IR1 and IR5: “1111”

NEW scheme ATS:It may improve present LHCS. Fartoukh, sLHC-PR0049 &

LMC 21/07/2010R. D. Maria, S. Fartoukh,

sLHC-PR00502011 MD: works excellently

S. Fartouk at IPAC2011 !!

Page 34: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS201123 July 2011 34

barc increased by a factor of 4 in s45/56/81/12

Squeezed optics (round): b* = 15 cm in IR1 and IR5: “4444”

Page 35: LHC Upgrade Options

L.Rossi @ HL kick off internal day 35

HL-LHC composition

WP1 Project Management and Technical Coordination

WP2 Accelerator Physics and Performance

WP3 Magnet Design

WP5 IR Collimation

WP6 Cold Powering

WP4 Crab Cavities

HiLumi LHC

WP7 Machine Protection

WP8 Collider-Experiment Interface

WP9 Cryogenics

WP10 Energy Deposition and shielding

WP11 11 tesla dipole two-in-one

WP12 Integration & (de)installation

Non-HiLumi LHC

HL-LHC Design Study

CollimationProject

Matching section and correctors

Beam Diagnostics

High Field Magnets R&D

HE-LHC Studies Hardware Commissioning

15-04-2011

Page 36: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 36

Large participation FP7 HiLumiapplication 25 Nov 2010

23 July 2011

Participant no.

Participant organisation name Short name

Country

1 (Coord-inator)

European Organization for Nuclear Research CERN IEIO1

2 Commissariat à l'Énergie Atomique et aux énergies alternatives

CEA France

3 Centre National de la Recherche Scientifique CNRS France

4 Stiftung Deutsches Elektronen-Synchrotron DESY Germany

5 Istituto Nazionale di Fisica Nucleare INFN Italy

6 Budker Institute of Nuclear Physics BINP Russia

7 Consejo Superior de Investigaciones Cientificas CSIC Spain

8 École Polytechnique Fédérale de Lausanne EPFL Switzerland

9 Royal Holloway, University of London RHUL UK

10 University of Southampton SOTON UK

11 Science & Technology Facilities Council STFC UK

12 University of Lancaster ULANC UK

13 University of Liverpool UNILIV UK

14 University of Manchester UNIMAN UK

15 High Energy Accelerator Research Organization KEK Japan

16 Brookhaven National Laboratory BNL USA

17 Fermi National Accelerator Laboratory (Fermilab)

FNAL USA

18 Lawrence Berkeley National Laboratory LBNL USA

19 Old Dominion University ODU USA

20 SLAC National Accelerator Laboratory SLAC USA

1 International European Interest Organisation

Page 37: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 37

HiLumi is the focal point of 20 years of converging International collaboration

• The collaboration wiht US on LHC upgrade started during the construction of LHC

• EU programs have been instrumental in federating all EU efforts

• With Hi-Lumi the coordination makes a step further: from coordinated R&D to a common project

• CERN is not anymore the unique owner, rather is the motor and cathalizer of a wider effort.

• Managed like a large detector collaboration (with CERN in special position as operator of LHC)

23 July 2011

Page 38: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 38

Budget FP7 HiLumi

23 July 2011

Waiving effect

CERN waives all technical works: LHC is core program.Only kept the CERN cost for managem.

50%85% of CERN gen. mngt

Only EU research area

Perfect score 15/15, 100% budget

Page 39: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 39

Budgetfor FP7 HiLumi Design Studyand for total HL-LHC project

23 July 2011

Design in FP7 HiLumi

Extra effort for Design

R&D and proto

Industrialization & Construction TOT Industry

W1-WP6 27 10 50 200 287 160WP7-12 0 15 30 100 145 80Other 0 5 10 50 65 40TOT 27 30 90 350 497 280

Personnel for HiLumi by WP1. Manag and Tech. Coord. (6%)2. Acc. Physics and beam3. Magnets for IR4. Crab Cavities5. Collimators6. Sc links

Estimated cost for the the whole HL-LHC over 10 years in M€

Page 40: LHC Upgrade Options

L.Rossi @ HL kick off internal day 40

HL-LHC management

CERN Council

CERN DG

Collaboration Board Scientific Advisory Board

Project Coordinator

Steering Committee

WP1 WP11

Project Office EC DG Research

WP6 to to WP7

Key:

Strategic decisions

Specific to HiLumi LHC

HiLumi LHC

management structure

extended to whole

HL-LHC Design Study

15-04-2011

Page 41: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 41

Is there a further exploitation of the LHC tunnel and infrastructure?

23 July 2011

We need to go faster than for LHC.But LHC « suffered » from LEP and LEP II endeavour

Page 42: LHC Upgrade Options

LucioRossi@Esgard 42

Evolution in magnet size

0

5

10

15

20

0 20 40 60 80

Op

erat

iona

l fie

ld (T

)

Coil width (mm)

HE-LHC

LHCSSC

Hera

Tevatron

RHIC

D20 (max. reached)

HD2(max. reached)

1980s

1990s

2000s

2010s

10 May 2011

• All coils in cos shape• Joverall is about the same

350 A/mm2 !• Too low J, too big coil• Very high density low field (see later) low copper for stabilization and protection

• All good designs fall within ± 10% For a perfect dipole with current J cos, the field scales with

the current density and coil thickness a : B J a

Page 43: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 43

The Superconductor « space »

23 July 2011

0 5 10 15 20 25 30 35 40 4510

100

1,000

10,000YBCO: Parallel to tape plane, 4.2 KYBCO: Perpendicular to tape plane, 4.2 K2212: Round wire, 4.2 KNb3Sn: High Energy Physics, 4.2 KNb-Ti (LHC) 1.9 K

Applied Field (T)

JE (A

/mm

²)

YBCO B|| Tape Plane

YBCO B|_ Tape Plane

2212RRP Nb3SnNb-Ti, 1.9 K

Maximal JE for entire LHC Nb Ti strand

production (–) CERN-

T. Boutboul '07, and (- -) <5 T data from Boutboul et al. MT-19, IEEE-TASC’06)

Compiled from ASC'02 and ICMC'03

papers (J. Parrell OI-

ST)

427 filament OI-ST strand with Ag alloy outer sheath tested at NHMFL

SuperPower "Turbo"

Double Layer Tape

Nb-Ti Nb3SnHTS

Page 44: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 44

Look back at LHC timeline (SC magnet dominated)

23 July 2011

1985 1987 1990 1994 2000 2006 2010

9 T - 1 m single bore

9 T -10 m long

protoype

9 T-15 m final

protoype

Last LHC dipole

LHC start-up

LHC study

Decision for Nb-Ti

10 T-1m Nb3Sn dipole

Industry contracts Nb-Ti

Page 45: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 45

What is the possibile for HE-LHC?

23 July 2011

2005 2010 2015 2020 2025 2030 2035

US 16 T small dipole

EuCARD 13 T large dipole+

18 T small insert

US 13 T Quads FP7-HiLumi

US NbSn-HTS development

15-20 T dip final proto &

Industrialization

Final delivery Magnets HE-LHC

HE-LHC start-up

HE-LHC preliminary

study

HTS for HE-LHC:

yes.or.no

LARP 11 T long quadEuCARD

R&D

Industry contracts, start

constrution

US basic programs and

LARP R&DEU FP6-CARE-NED

EuCARD2 full bore

dipole HTS

15-20 T R&D dipole

models and prototypes

Page 46: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 46

Malta Workshop: HE-LHC @ 33 TeV c.o.m.14-16 October 2010

23 July 2011

0

20

40

60

80

0 20 40 60 80 100 120

y (m

m)

x (mm)

HTS

HTS

Nb3Snlow j

Nb-Ti

Nb-TiNb3Snlow j

Nb3Snlow j

Nb3Snhigh j

Nb3Snhigh j

Nb3Snhigh j

Nb3Snhigh j

Material N. turns Coil fraction Peak field Joverall (A/mm2) Nb-Ti 41 27% 8 380 Nb3Sn (high Jc) 55 37% 13 380 Nb3Sn (Low Jc) 30 20% 15 190 HTS 24 16% 20.5 380

Magnet design: very challanging but not impossible. 300 mm Work with multiple power supply.Work for 4 years to assess HTS for 2X20T: to open the way to 16.5 T/beam .Otherwise limit field to 15.5 T for 2x13 TeVHigher INJ energy is desirable (2xSPS)

The synchrotron light emission is not a stopper: we can deal with it by operating the beam screen at 60 K. The beam physics may appear even « easier » than LHC thanks to dumping time.Collimation is amny be not more difficutl than HL-LHC. The big problem apart magnet technology is beam handling for INJ & beam dump: new kicker technology is needed.

Page 47: LHC Upgrade Options

LHC Upgrade - L.Rossi@HEP-EPS2011 47

Conclusion• HL-LHC project is starting, forming a large international collaboration• HL-LHC has a flexible 10 year plan: however the development of the

main hardware is –almost – traced• HL-LHC builts on the strength and expertise of:

– CERN injectors (that will deliver the needed beam)– LHC operation and MD (for understanding the real limitation)– HL-LHC needs a long preparation, because it will use new hardware, beyond

state-of-the-art and as such, in addition to the pyhsics goal, it may pave the way toward a high energy LHC.

• HE-LHC is may be the ultimate upgrade of the LHC: 26-33 TeV c.o.m– All project relies on the Very High Field Magnet Development: 16-20 T!– Injection, Beam Dump, Vacuum and Cryogenics, together with Collimation,

are also a big challenge. Beam handling technology must be improved by a factor 1.5 to 2.