LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price...

Date post: 27-Dec-2015
Category:
Upload: wilfrid-wilkerson
View: 242 times
Download: 2 times
Share this document with a friend
Popular Tags:
30
LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician
Transcript
Page 1: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND

SUPPORTABILITY ANALYSES IN ACQUISITIONS

Bernard Price

Certified Professional Logistician

Page 2: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Notional System LCC Overview Notional System LCC Overview

100

80

60

40

20

PRODUCTION

OPERATION & SUPPORT

Cum

ulat

ive

Per

cent

LIFE CYCLE COST (LCC)

DETERMINATIONAPPROX 90% OF LCC DETERMINED

ACTUAL FUNDSSPENT

APPROX 10% OF TOTAL COST

A BMilestones C

Page 3: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Cross Referenced to DA LCC Elements

OMA

OPA

MPARDTE“It’s all green”

1.09, 2.02, 2.05, 4.01, 5.01, 5.04...

Total Ownership Cost CategoriesTotal Ownership Cost Categories

Identified Logistics Costs & Non-Logistics Costs Regardless of Fund Type

Page 4: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

04/19/23

• Development Engineering

• Producibility Engineering & Planning

• Development Tooling• Prototype

Manufacturing• Systems Engineering &

Project Management• System Test &

Evaluation

• Data/Reports• Development Facilities• Software Development • Non-Recurring Production• Recurring Production• Production Engineering

Changes• Other Development Costs• Other Production Costs• Military Construction

Non-Logistics Cost CategoriesNon-Logistics Cost Categories(Potential Investment Cost Areas)

Non-Logistics Cost Categories(Potential Investment Cost Areas)

Page 5: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

04/19/23

Logistics Cost CategoriesLogistics Cost Categories (Initial Costs - Red & Recurring Costs - Black)

Logistics Cost Categories (Initial Costs - Red & Recurring Costs - Black)

• Operators• Energy (POL & Batteries)• Field Support• Repair Labor• Contractor Logistics Support• Warranty Costs • Scheduled Maintenance

/Overhaul• Initial Provisioning • Replenishment Spares• Inventory Holding Costs• Support Equipment• Test Program Sets

• System Specific Training• Training Materials• Post Production Software Support• Technical Documentation• Transportation• Integrated Material Management• Post Production Systems

Engineering/Project Management

• System Hardware Changes• Facilities/Sites Activation• System Specific Base Operations• Lease Operations & Maintenance• Demilitarization/Disposal• Industrial Readiness

Page 6: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Supportability Costs Impacted by RAMSupportability Costs Impacted by RAM

• Warranty Costs

Level of Repair Analysis: • Organic Repair Costs • Contractor Logistics Support Costs• Initial Provisioning of Spares & Repair Parts• Replenishment of Spares & Repair Parts • Inventory Holding Costs of Spares • Transportation Costs for Forward & Retrograde

ShipmentsSource of Repair Analysis:• Support Equipment – Common & System Specific• Test Program Sets• Technical Documentation for Repairs

Page 7: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

• Best Value Analysis – Rates & Weights Multiple Factors to Evaluate the Benefits & Cost of Each Alternative (Source Selections & Pre-MS B)

• Logistics Support Optimization Analyses –Lowest Net Present Value Total Cost among Support Alternatives to Achieve the Same Ao (Pre-MS C)

• Economic Analysis - Evaluates the Return on Investment of an Alternative to Status Quo (After Design Frozen & Level of Repair Established)

Types of Analyses to Support DecisionsTypes of Analyses to Support Decisions

Page 8: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

• ROI = Net Present Value Savings of Improvement / Net Investment Cost for Improvement

• Net Present Value Savings from Recurring Cost Differences of Improvement vs. the Status Quo• Net Investment Costs covers Improvement Initial Costs less any Remaining Status Quo Initial Costs

• Alternatives with the Highest ROI are typically worth funding the Improvement Investment Costs

Return on Investment (ROI)Return on Investment (ROI)

Page 9: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Reasons for Estimating Life Cycle Costs (LCC)

Reasons for Estimating Life Cycle Costs (LCC)

• Design Tradeoffs Yield LCC Differences that Aids Decision Making

• Decisions Made Early Drive Future Supportability and Support Costs

• Project Managed Acquisition Programs Require Cost Estimates for Financial Planning & Budgeting

• Quantifying LCC Helps to Identify Drivers

If RAM LCC impacts are measured, If RAM LCC impacts are measured, LCC can be managed and reducedLCC can be managed and reduced

Page 10: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Army LCC Management Models to be DiscussedArmy LCC Management Models to be Discussed

• COMPASS* LOGSA

Computerized Optimization Model for Predicting & Analyzing Support Structures

• ACE IT* DASA(CE) Automated Cost Estimating Integrated Tools

• LCET* CE LCMCLogistics Cost Estimating Tool (Includes Time Phased COMPASS)

* TOOLS ARE LINKED FOR INTEGRATED LCC ESTIMATING

Page 11: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

ACE IT UsefulnessACE IT Usefulness

• Integrates Cost Estimates or Data From Other Computer Programs

• Often Used for Program Office Estimates & LCC Estimates

• Provides Credible Estimates for Time Phased Non-Logistics Acquisition Costs

Page 12: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

LCET Model UsefulnessLCET Model Usefulness

• More Credible Logistics Costs in LCC Estimates• Time-Phased COMPASS Module Results Yield

Highest Fidelity Support Cost Estimates• Relates Item Reliability to Readiness & Support Costs• Adjusts Results for Worth of Warranty

• Logistics Cost Spreadsheet Module Covers• Macro-Level Logistics Costs w/o Item Level Reliability• Non-COMPASS Logistics Costs After Items Known

• Merges Multiple Runs of Different Time Frames• Links COMPASS & ACE IT to Permit Concurrent

Supportability Optimization & LCC Estimation

Page 13: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Logistics Costs CoverageLogistics Costs CoverageLogistics Cost Spreadsheet Categories Time Phased COMPASS Cost Categories

1 Military Operators

2 Energy

3 Field Support

4 Repair Labor Common Labor + Screening + Contact Team + Special Repairmen

5 Contractor Logistics Support Contractor Fixed Cost + Recurring Contractor Repair

6 Warranty Costs not included in Unit Costs

7 Scheduled Maintenance/Overhaul

8 Initial Provisioning (Includes Retail & Wholesale) Initial Spares

9 Replenishment Spares Consumption Spares

10 Inventory Holding Costs Inventory Holding

11 Support Equipment Common & Peculiar Support Equipment

12 Test Program Sets Test Program Sets

13 System Specif ic Training

14 Training Materials Development & Maintenance

15 Post Deployment Softw are Support

16 Technical Documentation Documentation

17 Transportation (Includes Shipping, Packaging & Handling) Transportation

18 Integrated Materiel Management Requisition + Cataloging + Bin

19 Post Production Project Management/Systems Eng

20 System Hardw are Changes

21 Facilities/Sites Activation

22 System Specif ic Base Operations

23 Lease Operations and Maintenance

24 Demilitarization/Disposal

25 Industrial Readiness

Time Phased COMPASS Covers 10 of 25 Logistics Cost CategoriesWith More Fidelity Than the Logistics Cost Spreadsheet Module

Page 14: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

What Each Model in Integrated Tool Set Determines

What Each Model in Integrated Tool Set Determines

• COMPASS - Optimizes Viable Support Concepts to Ao• Least Cost Initial Provisioning• 2-Level vs. 3-Level Maintenance• Return LRU vs. SRU• Organic vs. Contractor• Repair vs. Throwaway

• Time Phased COMPASS - Annual COMPASS Costs• LCET Spreadsheet - Adds in Other Logistics Costs• ACEIT – LCC Tool Adds in Non-Logistics Costs

Optimizes Supportability & Optimizes Supportability & Computes LCC ConcurrentlyComputes LCC Concurrently

Page 15: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

N/A Red

Green Yellow

N/A

Integrated/Linked Models

ACEIT

COMPASS

LCET

SupportabilityAnalysis

Green

LogisticsCost

Estimating

Green

Green

Non-LogisticsCost

Estimating

N/A

N/A

Green*

Green*

Improving Supportability Analysis & LCC Estimating Concurrently

Improving Supportability Analysis & LCC Estimating Concurrently

Page 16: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Acquisition Policies Supported by Integrated Tools

Acquisition Policies Supported by Integrated Tools

DoD Policies:• Perform Design & Supportability Tradeoffs to LCC• Perform Supportability Analysis Integral to Systems

Engineering• Aid Performance Based Logistics Implementation for

Product Support

Army Policies:• Manage TOC Reduction• Evaluate TOC as a Factor in Source Selection• Makes Supportability Co-Equal to Cost, Schedule &

Performance

Page 17: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Offeror A Offeror B

Contract Cost $25M $20M

Technical

Past Performance

Product Support

Source Selection ExampleSource Selection Example

Is “Outstanding” Product Is “Outstanding” Product Support Worth $5M?Support Worth $5M?

Page 18: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Offeror A Offeror B

TOC $50M $60M

Technical

Past Performance

Product Support

Is “Outstanding” Product Is “Outstanding” Product Support Worth $5M?Support Worth $5M?

Yes!

Source Selection ExampleSource Selection Example

Page 19: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

• Easy For Bidders/Contractor

• Can Be Used Over Life Cycle

• Common Baseline• Encourages Meeting

Modeling Objectives• Ease Of Evaluation• Proven/Validated

Technique

• Govt. Needs To Validate/Understand

• Prolongs Evaluations• Lack Source Selection

Common Baseline

• More Upfront Work for Bidder/Contractor

• Chance of Initial User Error

Everybody Everybody Uses Their Uses Their

Own Own ModelModel

Use Use Govt. Govt.

Selected Selected ModelModel

Advantages Disadvantages

Source Selection Modeling Alternatives

Source Selection Modeling Alternatives

Page 20: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

• Provides a Common Evaluation Baseline among Bidders

• Expedites Evaluation by Government After Data or Analyses are Obtained

• Improves Government/Industry Teaming with Common Analyses

• Permits Contractor to Determine an Optimum Support Effectiveness/Logistics Chain Structure & LCC Baseline

• Permits Contractor to Evaluate the Impact of Proposed Changes to a LCC Baseline

Reasons Contractors Should Use Integrated Tools in Acquisitions

Reasons Contractors Should Use Integrated Tools in Acquisitions

Page 21: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Data Required to Analyze TOCData Required to Analyze TOC

• Appropriate Data is Needed to estimate Government & Contractor Responsible Costs

• Data Depends on Proposed Contractor Support• When contractor fixes end items, only end item

level data needed• When Govt fixes end items & Contractor fixes

LRUs, need to know how often LRUs are removed and costs for LRU repair

• When Govt fixes LRUs with SRUs, need to know how often LRUs & SRUs are removed and costs for their repair or replacement

Page 22: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

When A Tailored Spreadsheet Is A Good Evaluation Alternative

When A Tailored Spreadsheet Is A Good Evaluation Alternative

• Contractor Repaired End Item

• Small Number of Known TOC Driver LRUs that are Contractor Repaired

• Legacy End Item where Maintenance is Not a TOC Driver

Page 23: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Which Integrated Tool Combo to Use for TOC Evaluation

Which Integrated Tool Combo to Use for TOC Evaluation

• ACEIT & LCET - In Development Prior to Knowing LRUs

• ACEIT, LCET & COMPASS – In Development or LRIP When LRUs Known & Government Repairs End Item

• LCET & COMPASS – In Production or Re-Procurement If Maintenance is a TOC Driver

Page 24: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Source Selection Plan Evaluating Total Ownership Costs

Source Selection Plan Evaluating Total Ownership Costs

TECHNICAL TOC*PRAG

SUBFACTOR MANAGEMENT SUBFACTOR

GOVTCOSTS

CONTRACTORCOSTS

COST ADJUSTMENTS

TECHNICAL INPUTRISK FACTORS

COST INPUTRISK FACTORS

TOC REDUCTION PLANDATA SHARING PLAN

FACTORS

CONTRACTCOSTS/PRICES

COST REALISM (if not Fixed Price)

COST/PRICE

* TOC EVALUATION RESULTS IN AN ESTIMATED AMOUNT OF DOLLARS

Page 25: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Costs that Tend to be Drivers in Many Systems

Costs that Tend to be Drivers in Many Systems

Non-Logistics Costs:• Software Development• Recurring Production Cost

Logistics Costs:• Post Deployment Software Support• Replenishment Spares• Contractor Logistics Support - or -

Organic Repair

Page 26: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Logistics Cost Drivers that Tend to Vary by System

Logistics Cost Drivers that Tend to Vary by System

• Systems with Platforms• Operators• System Specific Training • Energy – POL

• Man-pack Equipment/ Some Sensors• Energy - Batteries

• Low Reliability or High Operational Availability• Initial Provisioning• Inventory Holding Costs (Frequent Item Upgrades)

• Long Term, Failure Free Warranties• Warranty Costs

Page 27: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

• Low Density, Highly Complex Equipment• System Engineering/Program Management• Integrated Material Management

• High Density, Highly Complex Systems• System Specific Training• Training Material Development & Maintenance

• Some Secure, Sensitive Systems• Facilities/Site Activations• System Specific Base Operations

Logistics Cost Drivers that Tend to Vary by System

Logistics Cost Drivers that Tend to Vary by System

Page 28: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Source Selection Plan Evaluating Total Ownership Cost Drivers

Source Selection Plan Evaluating Total Ownership Cost Drivers

FACTORS TECHNICALCOST/PRICE PRAG

MANAGEMENT SUBFACTORCONTRACT

COSTS/PRICES

COST REALISM (if not Fixed Price)

TOC REDUCTION PLANDATA SHARING PLAN

TOC DRIVER METRICS*

TECHNICAL INPUTRISK FACTORS

COST INPUTRISK FACTORS

* TOC EVALUATION RESULTS IN AN ADJECTIVAL RATING FOR QUANTITATIVE THRESHOLDS

Page 29: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

How Current Acquisition Practices Can Improve

How Current Acquisition Practices Can Improve

• Analyze System Reliability and Operational Availability Requirements

• Use Government Ao Driven LCC Models for Best Value Decisions & Plan to Encourage Industry to Use Them

• Use TOC and/or Ao as an Evaluation Factor in Source Selection

• Provide Incentives to Industry for TOC Reduction

• Establish a Shared Data Environment

Page 30: LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Influence of RAM and LCC Reduction on System Cost Effectiveness

Influence of RAM and LCC Reduction on System Cost Effectiveness

ProductEffectiveness

Effectiveness

System

Effectiveness

Probability System is Available to Accomplish Mission (C)

Support

Design Product to Reduce Life Cycle Costs (Relates to A, B & C)

System CostEffectiveness

Probability System Lasts Mission Without Failing (B)

Probability System Performs Appropriately In Mission (A)

Support Effectiveness Optimization (Relates to B & C)

CostEffectiveness

Basically Contractor Responsibility

Typically Government and Contractor Responsibility


Recommended