24
L otte Pakistan PTA Limited has completed 40 Million Man- hours without Lost Time Case on 24 October 2012 of employees and contractors. This significant achievement is an excellent demonstration of the company’s unwavering commit- ment towards Health, Safety & Environment. An unblemished record of 40 Million man-hours since the company’s inception clearly marks the successful implementation of our HSE Policy. Efforts are in progress in making our company a safe working place for our employees, contractors and visitors and to raise HSE performance to the next level of excellence. Since the inauguration of the plant on 7 May, 1998, all safe- ty incidents and unsafe acts are reviewed with reference to behavior, equipment, environment & management to ensure that standards are met. In order to celebrate this significant milestone, a ceremony was arranged on 27 November, 2012 at the Lotte PPTA Plant site. Mr. Asif Saad was the chief guest of the ceremony. Also in attendance were the employees and contractors of the com- Life @ Lotte PPTA is a corporate newsletter intended for employees and partners of Lotte Pakistan PTA Ltd. COVER STORY Completion of 40 Million Man- hours Without Lost Time Case (LTC) IN THIS ISSUE by Shuib Iqbal and Ahmed A. Abedi Continued on page 6 COVER STORY CSR @ LOTTE PPTA @THE PLANT FROM HR & ADMIN @ LOTTE PPTA @ HSES Completion of 40 Million Man Hours Without Lost Time Case Community Wellness Activities Power Automation: The Future of Substations PNRA Compliance Achievement Kitchen Garden at the Plant Faculty Development Program Recruitment Drive at NED University Leisure Keep Learning! Abdul Jabbar Manzar: Our Poet Security Awareness Session Unleashing Creativity to Deliver Strategic Excellence Eid Milan Party 9th Annual Environment Excellence Award 2012 Second Fire & Safety Award 01 06 14 15 17 13 13 20 05 17 08 13 10 03 03 Autumn / Winter 2012
Transcript
Page 1: Life @ Lotte - Autumn/Winter

Lotte Pakistan PTA Limited has completed 40 Million Man-hours without Lost Time Case on 24 October 2012 of

employees and contractors. This significant achievement is an excellent demonstration of the company’s unwavering commit-ment towards Health, Safety & Environment. An unblemished record of 40 Million man-hours since the company’s inception clearly marks the successful implementation of our HSE Policy. Efforts are in progress in making our company a safe working place for our employees, contractors and visitors and to raise

HSE performance to the next level of excellence.Since the inauguration of the plant on 7 May, 1998, all safe-

ty incidents and unsafe acts are reviewed with reference to behavior, equipment, environment & management to ensure that standards are met.

In order to celebrate this significant milestone, a ceremony was arranged on 27 November, 2012 at the Lotte PPTA Plant site. Mr. Asif Saad was the chief guest of the ceremony. Also in attendance were the employees and contractors of the com-

Life @ Lotte PPTA is a corporate newsletter intended for employees and partners of Lotte Pakistan PTA Ltd.

C o v e r S t o r y

Completion of 40 Million Man-hours Without Lost Time Case (LTC)

In thIS ISSue

by Shuib Iqbal and Ahmed A.

Abedi

Continued on page 6

Cover sTory Csr @ LoTTe PPTA @The PLAnT

From hr & Admin

@ LoTTe PPTA

@ hses

Completion of 40 million man hours Without Lost Time Case

Community Wellness Activities Power Automation: The Future of substations

PnrA Compliance Achievement

Kitchen Garden at the Plant

Faculty development Program

recruitment drive at ned University

Leisure

Keep Learning!

Abdul Jabbar manzar: our Poet

security Awareness session

Unleashing Creativity to deliver strategic excellence

eid milan Party

9th Annual environment excellence Award 2012

second Fire & safety Award

01 06 14

15

17

13

13

20

05

17

08

13

10

03

03

Autumn /Winter

2012

Page 2: Life @ Lotte - Autumn/Winter

2 Audited financial results of the Company for the year ended 31 December 2012

Rupees in ‘000

2012 2011

revenue 52,823,257 57,577,198

Cost of sales (53,037,852) (50,914,635)

Gross (loss)/profit (214,595) 6,662,563

Distribution and selling expenses (132,519) (197,208)

Administration expenses (304,659) (330,463)

Other operating expenses (22,346) (502,492)

Other operating income 304,015 22,883

Operating (loss)/profit (370,104) 5,655,283

Finance income 269,970 785,700

Finance cost (146,054) (232,437)

(Loss)/profit before taxation (246,188) 6,208,546

Taxation 62,471 (2,031,015)

(Loss)/profit after taxation (183,717) 4,177,531

Earnings per share - basic and diluted (in Rupees) (0.12) 2.76

Audited financial results of the Group for the year ended 31 December 2012

Rupees in ‘000

2012 2011

revenue 52,823,257 57,577,198

Cost of sales (52,617,057) (50,914,635)

Gross profit 206,200 6,662,563

Distribution and selling expenses (132,519) (197,208)

Administration expenses (304,659) (330,463)

Other operating expenses (46,500) (502,492)

Other operating income 70,615 22,883

Operating (loss)/profit (206,863) 5,655,283

Finance income 291,241 785,700

Finance cost (146,054) (232,437)

(Loss)/profit before taxation (61,676) 6,208,546

Taxation 62,471 (2,031,015)

Profit after taxation 795 4,177,531

Earnings per share – basic and diluted (in Rupees) - 2.76

r e S u l t Se d I t o r I a l

Financial results for the year ended 31 december 2012

The Board of Directors in its meeting held on 25 January

2013 at Karachi has approved the audited 2 financial statements of the Company and the Group for the year ended 31 December 2012.

The group results comprise of Lotte Pakistan PTA Limited (Company) and Lotte Powergen (Pvt) Lim-ited, a wholly owned subsidiary of

the Company.a

Lotte PPTA’s much-awaited, final edi-tion of the 2012 newsletter is here.

The passing year has yet again been a re-markable year of achievements, recogni-tion and success. The highlight of the year was the successful commissioning of the Lotte Co-Generation power plant, with honorable mentions for OHSAS and ISO 18001 certification, and the successful completion of 40 million man hours with-out LTC.

Our CSR efforts were taken to a next level where we saw maximum employee participation in the “community well-ness” month, where a series of activities were carried out, all focusing on the well-being of the community that we operate in. Apart from this, we also continued our partnership with FESF, KUFF and WWF.

For the second year in succession, the learning year extravaganza was also orga-nized for the employees of the Company. This is a clear indication of Lotte PPTA’s commitment to promote a learning cul-ture within the organization.

With this we conclude 2012 and enter 2013 with the hope that we continue to build on our achievements and success.

The editorial team once again thanks every one for the support and encourage-ment shown towards “Life@ lotte PPTA” and hope you all continue sharing your success and achievements with us.

a- Zain Talpur

Au

tu

mn

/ W

int

er

20

12

– e

dIt

or

Ial

Editor Zain Talpur

Editorial Board Arif raza Abdus samad siddiqui Urooj Fatima Khurram Qureshi

Contributors syed hameed hussain shah syed Bilal ishtiaq Aali muazzam Faisal Abid shuaib iqbal Zia Ur rehman sumayya Waheed Ahmed A. Abedi syed sajjad Ahmed Wasif Aziz nizar ismail rizwan Ahmed Waheed Ullah Khan Faiza malik shazia sultana

Design & Layout imedia

Life @ Lotte is compiled and edited by staff at Lotte PPTA. if you would like to contribute to the articles and events covered here, please contact the editorial board.

www.lotte-ppta.com

by Faisal Abid

Leadership is a potent combination of strategy and character. But if you must be without one, be without the strategy.

norman Schwarzkopf

United States Army general and commander of the coalition forces in the Persian Gulf War

Quote

Page 3: Life @ Lotte - Autumn/Winter

3

@ h S e S

Au

tu

mn

/ W

int

er

20

12

– @

hSe

S

Lotte Pakistan PTA Limited was awarded

the 9th Annual Environ-ment Excellence Award on 12th July 2012 at an auspicious award cer-emony organized by the National Forum for En-vironment and Health (NFEH). Lotte Pakistan PTA Limited was named second among 175 re-nowned companies com-peting for the award. The evaluation was carried out by an independent panel of the NFEH gov-erning body.

The ceremony was held at the Marriott Hotel, Karachi. Mr. Tariq Mehdi, HSE and Technical Training Manager accepted this prestigious award on Lotte PPTA’s be-half. Mr. Qamar Haris Manzoor, Mr. Jung Neon Kim, Mr. Oh Hu Lim and Mr. Eun Pyo Hong were also present on that occasion.

Mr. Shaikh Muhammad Afzal, Minister for Environment, Government of Sindh was the Chief Guest while the guests of honor were Mr. Rauf Siddiqui, Minister for Industries and Commerce, Government of Sindh, Mr. Javed Jabbar, Global VP, IUCN and Mr. Khalid Mehmood, President, WWF for Nature. Before the award distribution ceremony, Mr. Shaikh Muham-

mad Afzal and Mr. Javed Jabbar expressed their views on environment and the importance of its conservation.

Ministry of Industry and Commerce awarded an apprecia-tion certificate to Lotte PPTA, acknowledging the company’s efforts in environmental conservation.

This achievement is a result of Lotte’s commitment to maintaining best practices in environmental compliance, re-sulting in a better environment at the plant site. The company strongly believes that the 3R’s of Environment - Reduce, Re-cycle and Reuse - are essential for long term economic sustain-ability.

a

Lotte Pakistan PTA Limited achieved its second Fire & Safety

Excellence Award and Certificate from the National Forum for Environ-ment & Health (NFEH) & Fire Protec-tion Agency Pakistan (FPAP), at the Marriott Hotel, Karachi, on 13th De-cember 2012.

Mr. Tariq Mehdi (HSE & Tech-nical Training Manager) wa presented the award and certificate on behalf of Lotte PPTA by Mr. Mu-hammad Hussain Syed (Administrator Karachi). Mr Eun Pyo Hong was present on the occasion while senior represen-tatives of many other renowned com-panies were also present. Around eighty-six companies participated for this award, out of which twenty-four companies were recognized for their achievements.

a

9th Annual Environment Excellence Award 2012 for Lotte PPTA

second Fire & Safety Award

by Shuaib Iqbal

Left: Mr. Tariq Mehdi received the award and certificate from Chief Guest Mr. Shaikh Muhammad Afzal

Top: Standing for the National Anthem

by Ahmed A. Abedi

Page 4: Life @ Lotte - Autumn/Winter

4

Au

tu

mn

/ W

int

er

20

12

– C

ov

er

Sto

ry

pany and employees from neighboring industries in the Port Qasim area.

The celebration program was com-menced with the recitation from `The Holy Quran` by Mr. Anwar Hussain (As-sistant Purchase Manager).

In his opening remarks, Mr Tariq Me-hdi (HSE & Technical Training Manager) lauded the clear and strong commitment

by the senior management in maintain-ing excellence in HSE standards.

Mr. Qamar H. Manzoor (GM Manu-facturing) talked about the exceptional safety record set by Lotte PPTA.

Mr. Mohammad Wasim (GM Opera-tions) highlighted that this achievement is practical evidence of the commit-ment of the employees & contractors

with HSE&S standards at Lotte-PPTA. He also talked about the background of HSE implementation and performance in organization is at its climax in spite of change of major shareholders at vari-ous times. He emphasized for the same commitment on HSE performance in the upcoming overhaul as well.

Mr. Asif Saad appreciated the efforts of the employees and contractors in helping achieve this world-class bench-mark. He explained how this significant achievement is a matter of pride for all Lotte PPTA employees and contractor staff for their continued commitment, positive attitude, adherence to safety rules and responsible approach towards HSE. He stressed on continued efforts in making Lotte PPTA a safe working place for our employees, contractors and visi-tors and raise HSE performance to the next level of excellence.

In the end certificates were distrib-uted to all contractors recognizing their efforts and contribution in achieving the millstone. Based upon evaluation on HSE performances, following contrac-tors were awarded with prizes/shields.

1st Prize M/s Descon Engineering

2nd PrizeM/s Hassan Farooqui & Company.

3rd Prize M/s Bilal Associate

Special Award M/s Health Line

Special Award Mrs Rahat Haq

Appreciation certificates were given to all contractors working with Lotte Pakistan PTA to acknowledge their valu-able contribution. The ceremony was ended by following high tea arranged by the HSE department.

a

C o v e r S t o r y

Completion of 40 Million Man-hours without Lost Time Case (LTC)continued from page 1

Two sessions were organized on ‘Building Beautiful Minds’ for Lotte PPTA employees on 8 November 2012 and

19 November 2012. The sessions were conducted by Mr. Nasser Aziz, who has been teaching/training at schools, colleges, universities and major corporations in Pakistan for the last two decades.

The purpose of these sessions, which was at-tended by 37 employees from various departments of Lotte PPTA, was to educate the participants on how

beautiful minds can help people achieve great results in their personal and professional life.

The sessions helped employees identify their poten-tial and define the role they can play in the betterment of society and success of organization.

HR department plans to hold a number of such sessions in the future to enhance the skills of Lotte

PPTA employees.a

By Arif Raza

@ l o t t e p p t a

Building Beautiful minds!

Page 5: Life @ Lotte - Autumn/Winter

5

@ l o t t e p p t a

Keep Learning!

Live as if you were to die tomorrow and Learn as if you were to live forever. Lotte PPTA employees believe in this and are always enthusiastic for any learning opportunity. To quote a Lotte PPTA employ-ee: “Life is a never ending school as we never stop learning each and every day”.

Lotte PPTA’s philosophy has always been to nurture and de-velop its employees, to offer them more challenging roles,

and ensure that every effort is made to enable them to achieve higher levels of success.

Last year, the Human Resource department organized a Learning Extravaganza, an event that proved to be hugely pop-

ular with the company. As a result, we re-visited the idea of another such event in 2012. Professional trainers were invited to conduct a series of sessions that pro-vided Lotte PPTA employees with new skills, management expertise, and gen-eral knowledge. The sessions were open to all employees, and each session war-ranted a huge audience.

The Extravaganza came to a conclu-sion with a session on Lotte’s Values, conducted at the DHA Creek Club. The

session turned into an official ending to the whole affair, with a cel-

ebratory High Tea following the event.

After attending last train-ing program of the Learn-

ing Extravaganza, employees shared their feedback about the

event; “The Lotte PPTA Learning Extrava-ganza has set its value amongst employees and we will wait for this event every year.”

a

Below: Participants of the Lotte Values Training event pose with their trainer after the session. The training was followed by refreshments, and certificates were presented to participants of the Extravaganza by Lotte PPTA’S CEO, Asif Saad.

Au

tu

mn

/ W

int

er

20

12

– F

ro

M h

r a

nd

ad

MIn

By Syed Bilal Ishtiaq

Page 6: Life @ Lotte - Autumn/Winter

6

C S r @ l o t t e

The ‘Community Wellness Activities’ was an initiative taken by the senior

management of Lotte PPTA. A month long series of activities were planned un-der the supervision of Mr. Raja Waheed Ullah Khan which were whole heartedly supported by the HR and admin team

The purpose of planning such series of activities was to promote community service culture amongst the employees of the organization. The series of activi-ties arranged were as follows:

Following Health Awareness Pro-gram was delivered:

Juice competitions

This provided the Company with an opportunity to create awareness amongst the employees about the haz-ards of soft drinks on the human body.

Tug of War

A fun activity arranged for the em-ployees of Lotte PPTA to test their phys-ical strength and team work. All employ-ees and contractors participated in this

event with full sprit.

Cricket match

A cricket match was organized for the employees to promote outdoor physical activity. In total four teams from all the departments participated in this competition with the Engineering department emerging as the winners.

mangroves/ tree plantation at Port Qasim

Lotte PPTA supported this program for the concept of “Better Tomorrow”. Employees of Lotte PPTA voluntarily visited the Gharoo Creek High Water Coastal Area of Port Qasim region for plantations of mangroves and trees.

make A Wish, Pakistan

Make a Wish being a global NGO grants wishes of young children who are terminally ill. Lotte PPTA joined hands with the Make a Wish Foundation to help over 30 children wishes

come true.

visit to sos village

SOS Children's Village (Orphanage Malir Cantt,) provides permanent sup-port in form of health care, education and counseling to families. Lotte PPTA employee volunteers visited this village to spend time with these children

medical Camp

A Medical Camp was set-up at Mehmood Goth near Ghaghar Phattak by the Company. This area was selected due to lack of medical facilities available for the locals. Medical camp was set up by Lotte PPTA to provide free of cost check up for the locals. Medicines were also distributed to those in need.

Beach cleaning

A beach cleaning activity was ar-ranged at Hawks Bay, where all volun-

teer employees cleaned the beach.a

Community Wellness Activities

by Rizwan Ahmed & Raja Waheed Ullah

Khan

Au

tu

mn

/ W

int

er

20

12

– C

Sr @

lo

tt

e

Page 7: Life @ Lotte - Autumn/Winter

7

C S r @ l o t t e

Au

tu

mn

/ W

int

er

20

12

– C

Sr @

lo

tt

e

Top: The Tug-of-War competition comprised of teams from within Lotte PPTA”s employee pool, divided by department.

Above: Participants of the Lotte PPTA Inter-team Cricket Tournament pose for a photograph after the event. In all, four teams took part, also from the Lotte PPTA community.

Below Left: The juice competition, designed to highlight the pitfalls of imbibing soft drinks regularly, was eagerly competed.

Below Right: A walk as organized within the Plant premises for all the employees of Lotte PPTA

More images overleaf

Page 8: Life @ Lotte - Autumn/Winter

8

@ l o t t e p p t a

C S r @ l o t t e

The prevailing law and order situation in Karachi continues to be a matter of concern for all. The menace of un stable

political situation, terrorist activities, targeted and ethnic killings, agitations combined with politically motivated violence and upsurge in criminal activity is affecting

the routine life of all adversely. At Lotte PPTA due importance is always given to the per-

sonal safety and security of staff. As part of security management program, security awareness sessions

were conducted at Plant as well as at City Office to make staff aware of vari-ous prevailing risks and way forward to mitigate and manage these. The sessions were conducted on 29 Nov and 21 Dec 2012 and were attended by all available staff. The sessions lasted for more than an hour at each location .

We all need to under-stand that security is a common sense and hence a common responsibility of all. Often staying safe and secure is a matter of choice and is therefore one's own decision.

a

security Awareness session

By Asad Ullah Chughtai

Au

tu

mn

/ W

int

er

20

12

– C

Sr @

lo

tt

e

Top Right, and Top Left: The Make-A-Wish presentation included gifts for terminally ill children, and refreshments and snacks.

Bottom Left: Lotte PPTA employees enjoy a refreshing moemnt in the sea after cleaning the beach.

Bottom Right: A large number of people arrived to take advantage of the Medical Camp.

Page 9: Life @ Lotte - Autumn/Winter

9

With the passage of time, the use of lotus notes database has in-

creased tremendously in our organiza-tion. Its usage has been increased from an e-mail system to a level where users are now demanding more systems and applications. In the year 2012 various applications and systems were devel-oped and implemented, ranging from plant related systems to human resource related applications. Following is a brief introduction of the important systems and applications that were developed / modified during 2012:

Post-Training Feedback system

This system was developed for HR department. The staff attend a training session / course must fill out the post training feedback form. The feedback form is an auditable form and failure to complete these forms could result in a non-compliance issue. With the in-troduction of electronic version of the form, it has now become easy to gener-ate, send and keep track of these forms.

market research system

This system was developed for the Commercial department. The market research team was finding it difficult to consolidate their documents. With this system, all their documents now are in one place making it possible to manage and search them easily.

Plant modification system

This system has been running for quite some time. Over the years, this system evolved and matured. Last year, valuable changes were made in the sys-tem and now it is fully digitized up to step 6. The advantage is easy tracking & retrieval of a mod.; raising a query and its resolution.

eCm database

This system was developed to ensure that ECM members are notified of ECM related notifications. Moreover, it also provides them a place where they could find relevant documents and other ma-terial easily.

hr Library system

The HR department maintains an internal library. The books are regularly borrowed and returned by the readers. The problem with the manual system was that not all people were aware of books availability and its addition in the library. With the implementation of this system, the users can now read book’s profile, informed queued; informed about returning the book before its due date. Moreover, the librarian can eas-ily track each book that has been issued and manage other tasks easily.

Benefits Processing system

The system was developed for the HR department. It is being used to pro-cess car loan, house rent advance, and house building assistance. The advan-tage is quick processing and tracking of these benefits. Moreover, users can also view that in the past which benefits they have availed.

exit interview system

The system was developed for the HR department. The purpose of this sys-tem is to record reasons for employee resignation. The form is initiated by im-mediate supervisor and finally reviewed by the Chief Executive. With the imple-mentation of this system, the HR depart-ment would be better able to analyze the leaving reasons.

show Cause / demand database

This system was developed for the Finance department. The finance de-partment received various notices and demands from various govt. depart-ment / bodies. These notices are time bound and therefore, need to be replied within a certain time. With the develop-ment of the system, it would be easy for them to keep track of these notices and demands. Moreover, it would also help them to quickly search for a particular notice / demand and its reply along with the documentation sent to them.

Progress review report

As all of you are aware of the perfor-

mance appraisal system for the manage-ment and non-management employee. A similar system exists to evaluate the performance of management probation-ers and trainee employees. Earlier, the PRR of these categories of employees were paper based. With the introduc-tion of this system, their periodic prog-ress review reports can raise electroni-cally. This would essentially help the concerned manager and HR to keep track of their progress and performance.

hse database

A number of changes in the HSE da-tabase have been made. Notably, ISO 14001 and OHSAS 18001 related pro-cedures, internal and external reports, manuals, audit schedules, etc. has been segregated and can now be viewed sepa-rately.

Performance Appraisal system

The development section of the performance appraisal system has re-vamped to make it more understandable and easy to enter the training and devel-opment needs of employees. The new format would also help the HR and train-ing departments to view the progress of the training and development needs mentioned in the appraisal system.

You may have noticed that last year HR and other departments were very keen to improve their old / manual sys-tems. All the requested systems have developed and implemented which re-sults in increase efficiency and reduce cost in terms of time and paper.

Therefore, we encourage other de-partments to come forward and share their ideas and feedback of IT systems that are being used. We consider this to be an important tool which will not only help identify our strengths but, more im-portantly, will allow us to focus on areas of improvement in existing systems and to develop and implement appropriate solutions which ultimately save time and cost to the company and allow us to pro-vide better service. So, let go of paper, embrace technology tools to automate systems.

Our Slogan is “Information Technolo-gy… helping you do, what you do better”

a

Lotus notes Applications / systems developed in 2012

t e C h n o l o g y @ l o t t e

Au

tu

mn

/ W

int

er

20

12

– t

eC

hn

olo

gy

@ l

ot

te

Page 10: Life @ Lotte - Autumn/Winter

10

speak Up

l I F e @ l o t t e p p t a

eid milan Party

As part of the Eid-ul-Fitr celebra-tions, Lotte Pakistan PTA staff

gathered for an Eid Milan Party on 24 August 2012. The party was at-tended by all staff members includ-

ing trainees, apprentices, contrac-tors and employees.

Lunch was hosted for all. Special arrangements were made for shift staff to partici-

pate in the celebrations.a

By S. Hameed Hussain Shah

@ W o r k

Keeping in view with the best governance practices, the com-

pany announced a new “Speak Up” program.

This speak up policy serves to provide a channel for the company’s staff to raise concerns, expose irreg-ularities and to help the company’s management identify financial mal-practices and potential fraud with-out any fear of reprisal or adverse consequences.

The Human Resource Depart-ment conducted a session to intro-duce this policy to the employees of the Company.

a@ l o t t e p p t a

The first step towards success is the belief in success. This is what Abdus

Samad has tried to communicate through his book “Yes I Can”, which was pub-lished by LAMBERT Academic Publishing GmbH & Co. (LAP), Germany.

The book, at 88 pages, is about enriching self-moti-vation for success. As per the author, “Success is a choice - You can suc-ceed, if you believe you can”.

Through his book, Abdus Samad hopes to inspire others to make a difference in their lives. He high-lights eight elements that create a passion

to succeed, which are Know Yourself, Crush the Enemy Called Fear, Nothing is Impossible, Think Big and Innovative, There is Always a Choice, ‘Never Give Up’

Approach, Game without Ball and Disability is Lack of an Ability.

The book encourages its read-ers to appreciate minor success-es, recognize one’s hidden talents

and work to polish them. This book is available at Am-

azon.com and other leading on-line bookstores. The ISBN of the book is 978-3-8484-2000-1.

Abdus Samad works in the Lotte Engineering department as Manager E&I Reliability. He has more than 20 published ar-ticles in Dawn and the Express Tribune blog.

a

Yes I Can - Book review

by Sumayyah Waheed

Au

tu

mn

/ W

int

er

20

12

– l

IFe

@ l

ot

te

pp

ta

Page 11: Life @ Lotte - Autumn/Winter

11

reverse Engineering is one of the very

helpful tools to counter the soaring expenditures incurred in the procure-ment of spares from OEMs. Utilizing this tool, a techno-commercial initiative was taken to develop the most costly spares of our high speed Sun-dyne Pumps and ETP centrifu-gal chiller through a credible supplier in South Korea. Owing to the criticality of these equip-ments, a comprehensive technical evaluation was carried out by the Engineering team to ensure that the quality is not compromised at any

stage of the development. Inducer, impeller, high

and low speed shafts of gearbox and journal bearings of idler and driven shaft were developed for Sundyne Pump while for ETP Centrifugal Chiller, impeller and high speed shaft were developed. This initiative

resulted in a net saving of PKR 4.67 Million. Bravo to the

Engineering and Com-mercial teams for tak-ing such a remarkable

initiative and delivering the much needed saving

to the business. a

@ t h e p l a n t

Au

tu

mn

/ W

int

er

20

12

– @

th

e p

lan

t

Process Air Compressor (PAC) is one of the most critical pieces of equip-

ment installed at the plant. Its 20.5 MW synchronous motor is an engineering wonder and it has state-of-the-art con-trol, protection and starter systems. The expertise of such a complex system is not available in Pakistan.

In order to reduce the cost of spares and procurement, the Electrical team initiated to repair the cards and mod-ules of the PAC. The Electrical team approached the manufacturer of the Excitation unit and after thorough tech-nical and commercial discussions, OEM agreed to repair the unit and reprogram it as per the existing setup. For the re-pair, the unit was sent to France and was received after repairs. This repair has resulted in a cost saving of PKR 1.7 million approximately. On this techno-commercial initiative, good team work was displayed by Mr. Muhammad Bashir

and Mr. Nafees Ahmed from com-mercial and Mr. Abdus Samad from Engineering.

In addition to this, a measur-ing interface card of the Static Frequency Converter, which is a starter for the PAC motor, has been repaired in-house. Good efforts were put in by Mr. Abid Qayyum and Mr. Umar, Siemens Technician. The in-house repair

has resulted in a cost saving of around PKR 1 mil-

lion, which was only one advantage. The other prominent ad-vantage is the devel-

opment of the team for repairing these so-

phisticated cards in-house with-out OEM support.

Well done E&I team! a

Lotte Pakistan PTA Lim-ited has successfully

achieved certifications of OHSAS 18001:2007 and ISO 14001:2004 after a formal external audit conducted by URS on April 2012. For an effective implemen-tation and continuous improvement, HSE and Technical Training department orga-nized one day training session on Internal Auditing for the internal auditors’ team. The session was conducted by URS.

a

repairs of sophisticated electronic modules

reverse engineering: A Techno-commercial endeavour

Training on internal Auditing for ohsAs 18001:2007 and iso 14001:2004

by Abdus Samad H. Siddiqui

by Wasif Aziz

by Ahmed A. Abedi

Page 12: Life @ Lotte - Autumn/Winter

12

Au

tu

mn

/ W

int

er

20

12

– @

lo

tt

e p

pta

@ l o t t e p p t a

The world’s leading expert on Creativity and Lateral

Thinking has delivered this training session on 15th Novem-ber 2012 in Karachi Marriott Hotel. Around 60 people from various organizations attended this training.

Lotte PPTA nominated six-teen managers to attend this training to expand their creativ-ity and lateral thinking skills by learning various tools.

The training session empha-sized the following:

z Turning on your Creativity

z The Practical Application of Conceptual Thinking in your Organization

z Taken Advantage of Cre-ativity

z Six Thinking Hats for Fo-cused Thinking

z Value Monopolies z Lateral Thinking for Busi-

ness z How to Use the Key Ele-

ments of Lateral Thinking z Harvest New Ideas z Key Focus Areas z How to Become an Idea

Generator z Putting Creativity to Work

a

Unleashing Creativity to deliver strategic excellence

@ l o t t e p p t a

As a commitment towards the timely commissioning of a power plant, Lotte

PPTA Power Gen’s electrical team showed remarkable self-reliance in commissioning Uninterrupted Power Supplies (UPS) and DC chargers. Gutor Electronics, the ven-dor from whom this equipment was pur-chased, had declined to send engineers to Pakistan for security reasons.

Uninterrupted Power Supplies and DC Chargers are essential to electrical and control systems as they provide continu-

ous power to critical equipment. The unavail-ability of the vendor’s engineer at the most critical phase of commissioning would have resulted in delays. However, the genuine can-do attitude of Mr. Imranullah Khan and Mr. Mansoor Alam came to the rescue. They pro-

ceeded to commission the UPS and DC chargers themselves, proving that

the Projects team has the potential to get past all obstacles in order to meet a deadline.

a

Power of self-reliance

By Faiza Malik

by Arif Raza

Page 13: Life @ Lotte - Autumn/Winter

13

Au

tu

mn

/ W

int

er

20

12

– F

ro

M h

r &

ad

MIn

F r o M h r a n d a d M I n

Lotte PPTA Faculty development Program

Lotte Pakistan PTA has always encouraged and supported developing a Learning Culture where employees continu-

ally share their learning with their colleagues. Lotte Pakistan PTA Faculty Development program is a plat-

form for creating this learning culture. The following training sessions were conducted by employees from July-Sept 2012:

introduction to Project management

The use of Project Management techniques has become an increasingly popular method for perform-ing a wide range of organizational tasks.

IT Analyst, Mr. Syed Arif Hussain conducted an hour long session on Project Management on 30 August 2012 at Plant site. The session provided participants with an insight on Project Management.

Whale Done – The Power of Positive relationship

Based on the book “Whale Done” by Ken Blanchard, Mr.

Muhammad Bashir, Assistant Manager Contracts, conducted the session on 27 September 2012 at City Office.

This session addressed the Power of Positive relationship through ‘Whale Done’ approach. This session focused on pro-moting positive customer relationships and to redirect energy in order to build trust.

Performance management

Training Coordinator, Shazia Sultana conducted an hour long session on Performance Management

on 19 July 2012 at City Office. During this session, Shazia shared her learning’s from the training which

she had attended earlier and discussed how to avoid sur-prises in the appraisal process. She also highlighted ways to deal with employees who give an average performance.

This session served as a refresher as similar in-house train-ing program had been arranged previously.

a

By Shazia Sultana & Arif

Raza

Lotte PPTA HR team visited NED University of Engineer-ing & Technology on December 13, 2012 and gave a talk to

BE Chemical Engineer-ing and Polymer & Pet-rochemical Engineer-ing students at NED Auditorium. Arif Raza, Manager HR & Training, gave an introductory presentation on Lotte PPTA and Lotte group, HR practices at Lotte PPTA. The presentation was then followed by a Q/A session.

The entire batches of above two disci-plines were tested for their analytical, techni-cal and communication skills. Interviews will be conducted soon to

offer Trainee Engineer position to the successful engineers.a

recruitment drive at NED University

Page 14: Life @ Lotte - Autumn/Winter

14

Au

tu

mn

/ W

int

er

20

12

– @

th

e p

lan

t

@ t h e p l a n t

shifting of instrument Air Compressor’s Power supply to Gas Turbine

@ t h e p l a n t

Power Automation: The Future of substations

due to changes in electrical network after commissioning of Gas Turbine, Instrument Air Compressor’s (C1-2902A)

supply was through utility during normal plant operation. Un-stable power supply from utility company resulted in frequent tripping, which could lead to mechanical damages on the com-pressor. Therefore, Electrical team took an initiative to shift power supply of IAC from utility supply to Gas Turbine, thus making the supply more reliable and stable.

The job was completed efficiently within agreed time frame during which motor power and control connections were mod-ified and motor protection relay was installed and tested. The job was carried out in-house and this proactive solution has prevented mechanical damages. Mr. Talha Mustafa, Mr. Syed Raza Anis, Mr. Kamran Khan and Mr. Hassan Kazmi provided a good support in the designing and execution phases.

a

With the commission-ing of Cogeneration

power plant, the concept of power automation has materialized in the form of Supervisory Control and Data Acquisition (SCADA) system. SCADA system has been implemented for the first time in the history of LOTTE Pakistan PTA Lim-ited.

SCADA system provides a full range of features ac-cessible through the work-stations in Control Rooms of Cogen plant and PTA plant. Major functions of SCADA include monitoring of power generation and distri-bution network, controlling of circuit breakers, moni-toring of trips and alarms, changing-over between KESC and diesel generators for critical loads, synchronization of Gas Turbine Generator (GTG) with KESC grid, indicating alarms, re-cording events history, generating trends for electrical param-eters and health-monitoring of various equipment like UPS, DC chargers, distribution transformers and MV/LV switchgear.

SCADA system has a multi-layer architecture based on the IEC-61850 protocol for communication between Intelli-gent Electronic Devices (IEDs) in a substation. The backbone of SCADA is an extensive ring-topology based optical fiber data network, through which various substations and control rooms of LPPTA plant are interconnected. Being compatible with multi-vendor equipment over a standardized platform, protection relays from Schneider Electric and ABB have been seamlessly integrated with the core of SCADA i.e. ABB 800xA Industrial IT System. The system has redundancy on server, controller & network levels to minimize downtime. Multi-user environment with specific privileges prevents unauthorized access to the SCADA system.

The implementation of SCADA system was throughout a unique challenge right from the start of design phase till com-

missioning and testing. Operation and control philosophy of the new electrical network of Co-gen plant was vigorously tested and fine-tuned alongside with the design engineer from ABB Slo-vakia and commissioning engineers from Schnei-der Electric and ABB Pakistan. The dedication

and untiring efforts put in by the Projects E&I team were re-markable The E&I team was led by Mr. Farhad Jamil and com-prised of Faiza Owais, Hassan Shahid, Hassaan Ayaz and Im-ranullah Khan.

As awareness increases about the benefits of SCADA sys-tem, it is being adapted gradually by the Production teams of Cogen plant as well as PTA plant. Productivity will increase further with the increase in level of familiarization with the system. Time saving through minimized manual operations and centralized control of electrical network in critical conditions to ensure plant availability is perhaps the most obvious benefit of SCADA. Long term benefits will include ease in preventive and corrective maintenance, ensuring equipment availability and reliability, which in turn translates into cost saving.

a

By Raza Anis

By Hassaan Ayaz

Page 15: Life @ Lotte - Autumn/Winter

15

Au

tu

mn

/ W

int

er

20

12

– @

Wo

rk

@ W o r k

@ t h e p l a n t

improved maintenance philosophies along with innovative approaches

have always been the conceit of our maintenance team; their latest exploit included a Boiler Main Steam Isolation Valve. A few months back, one of the two main steam isolation valves (6”, 1500lb gate valve) of Boiler ‘A’ was leaking ex-cessively from the pillars supporting the hand wheel, apparently due to a dam-aged body-bonnet gasket. Due to the unavailability of spares, the body-bonnet gasket was welded to contain the leak-age. The ultimate solution was either the

refurbishment of the existing valve or replacement with a spare dur-ing overhaul. Rising to the occa-sion, the area maintenance team found an identical but old, dis-carded valve in the yard area. Since the valve was already discarded, there was no guarantee of the valve’s internal condition. The team decided to reuse the valve body and replace the valve in-ternals with the original valve. Using a new repair kit to make the repairs, two 1500lb flanges were temporarily welded to the valve to conduct pressure testing,

which was successfully done up to a maximum of 80 barg. The valve is now ready for use and is being planned to be in-

stalled in 2013. The cost of a new valve

would have been around PKR 1.6 Mn while a repair kit was procured for PKR 0.4 Mn resulting in a net saving of PKR 1.2 Mn. Many thanks to the work-shop team for valve refurbishment and pressure testing.

a

reclaiming a Boiler main steam isolation valve

Achievement of 100% Compliance in PnrA Annual Audit of sealed radiation sources at Lotte PPTA

There are 61 sources in-stalled throughout the

plant at various locations for level and density measurement. To ensure safe use of radia-tion sources, strict control and monitoring system is available at Lotte PPTA including regular inspection with radiation me-ters and monitoring of radiation dose level of selected workers by providing Thermo Lumines-cent Dosimetry (TLDs).

On basis of dose limit analy-sis set by Pakistan Nuclear Regulatory Authority (PNRA), all necessary precau-tions are taken where applicable and Lotte PPTA’s strict standards ensure that all exposure is below limit values.

The installation and use and stor-age of radiation sources are with extreme caution and comply with the rules and regulations of the Govern-ment of Pakistan.

The PNRA team visited Lotte PPTA site on July 04, 2012 for an annual audit of installed radioac-tive sources to ensure compliance with pro-cedures, standards and the implementation of safe management of radiation sources. The team appreciated Lotte PPTA’s Radiation Safety Management

System and observed 100% compliance without any dis-

crepancy or observation. a

The Job Qualifying Program (JQP) is a program to develop

skilled and competent Opera-tors, Technicians, and Analysts in HSE&S and the defined job stan-

dards. This program also facilitates the employees

in attaining additional skills and knowledge and enables them to

perform their job safe-

ly, efficiently and more effectively.HSE & Technical Training de-

partment organized JQP examina-tions from 24th to 28th September 2012 for nominated candidates with the purpose to assess their acquired skills. The list of success-ful candidates has been issued and they will receive the merit awards and certificates soon.

a

JQP examinations – sept 2012

by Wasif Aziz

By Shuaib Iqbal

By Ahmed A. Abedi

1PR

2AC

3TI

4CA

5BI

6LI

7TY

UNHOUER8R

9SIDEARM

10COTTAGE

HAWPOTIL11TINA

12SABLE

13KNEE

HT14MRI

15EEN

16EXECUTE

17COLLECT

BSVL18ON

19ESTE

20P

21CLIM

22ATE

AXYLHSTS23TRAM

24BARON

25ZEUS

OC26UUR

27ELN

28UTTERED

29ARCHIVE

TOEILHES30TREADTHEBOARDS  

Answers to the crossword on page 20

Solutions to the Cryptograms on page 20

1. Ultimately, the only power to which man should aspire is that which he exercises over himself. – Elie Wiesel2. It is impossible to imagine Goethe or Beethoven being good at billiards or golf. – H.L. Mencken

Page 16: Life @ Lotte - Autumn/Winter

16

Au

tu

mn

/ W

int

er

20

12

– h

SeS

@ h S e S

F r o M h r & a d M I n

F r o M h r a n d a d M I n

Training results in an effective work-place; because it helps to build a

more structured work environment it leads to enhanced productivity.

The HSE and Technical Training de-partment organized an HSE Training Week for contract staff from 9th to 13th July 2012, as part of ongoing efforts to enhance their skills and capabilities.

Several important topics were cov-ered during training week, such as:

z Why HSE is important at work place?

z Fire, Toxic and Medical Emergen-cies

z Office Work Safety z Working at Height z Use of Personal Protective Equip-

ment z Conservation of Hearing z Use of Fire Extinguishers z Slip, Trip and Fall Hazards and

Injury z Health Awareness and Biological

Hazards & Controls z MSDS of PTA Powder, Para-

xylene & Acetic Acid z Gas Cylinder Safety z Electrical Safety

The training sessions were covered through presentations, vid-eos and printed material and in-cluded practical demonstrations. A large number of contract workers participated in the training sessions and benefit-ed from the training week.

HSE and Technical Training department is very thankful to Dr. Feroze Patel, Mr. Muhammad Kamran Khan and Mr. Mansoor Ahsan Khan for their valuable contribution to make this training week successful.

a

As part of the company’s Trainee Engineer Scheme to hire fresh Engineers from

reputable Universi-ties across Pakistan, Lotte PPTA orga-nized Trainee Engi-neer tests for Me-chanics & Electronics. These tests were held at Pak Naval College for Engineering & Technology, Karachi,

affiliated with NUST (National University of Science &Technol-ogy), on 7 August 2012.

Sixty engineers par-ticipated in the recruit-ment test and went through the interview process with Lotte PPTA. Successful candi-dates were offered the position of Trainee En-gineers in the company.

a

hse Training Week for Contractors

Trainee engineers recruitment drive

in-house Training on Problem solving & decision making

By Shazia Sultana

An in-house training session on problem solving and decision making was organized on 10-11 Septem-

ber 2012 at Ramada Hotel for Lotte PPTA employees. This training session was facilitated by Mr. Saadi Insha.

The training was aimed to provide out-of the box con-cepts to resolve problems

a

By Ahmed A. Abedi

By Arif Raza

Page 17: Life @ Lotte - Autumn/Winter

17

Au

tu

mn

/ W

int

er

20

12

– l

IFe

@ l

ot

te

pp

ta

Under the Go-green concept, different type’s vegetables were grown our plant site.

The first batch of the organic vegetables planted resulted in harvesting of following quantities:

Spinach 50 kgs Ridge Gourd (Tori) 60 kgs

Mint 10 kgs Radish 40 kgs

Cluster Beans (Gavar) 05 kgs Cucumber (Kakdi) 60 kgs

Green Chilies 30 kgs Lady Finger 50 kgs

Coriander Leaves 10 kgs Lettuce Leaves 20 kgs

These vegetables were distributed amongst the staff members.

a

@ t h e p l a n t @ t h e C I t y o F F I C e

l I F e @ l o t t e p p t a

Kitchen Garden at the Plant

Zindagi main bus aik kam kiaDil tou dil jan ko tery nam kia

Poetry is one of the most difficult ways to expresses our thoughts

and emotions. The poets have beautiful minds and sensitive hearts to join simple words to create a stunning rhyme. Lotte Pakistan PTA team is full of talented people and Abdul Jabbar is one of them. Jabbar discovered his talent many years ago when he wrote his first poem.

Dil main hai aftab sa chehraEk kushada kitab sa chehraHe was born in Rohri but spent most

of his life in Karachi with Lotte PPTA. He is currently employed in a technical position at the plant and is well known for his skills and experience in this role. The poetry is taken as a pas-sion by him and this passion urged him to go for a Mas-ters in Urdu

In his first book “Patton Kee Pazaib” he gave a new aesthetic sense to fallen leaves as a symbol of lost love. This book contains about 18 Poems, 68 Ghazals, Haiku and Ma-hiya. He has commendably articulated

softer side of love with bit-ter side of social unjust and other harsh facts of life. He also writes in Sindhi lan-guage fluently.

His friends at Lotte deeply appreciate his liter-ary work and wish him suc-cess in his future endeav-ors.

Mehfilon ke beech main tan-hai mili

Zindagi main hum ko ruswai mili

a

A “Breakfast Day at Work” was organized at the city of-fice for the staff in which traditional halwa puri with lassi

was served. The aim of this light recreational activity was to provide an opportunity for all to interact and develop better understanding and respect for each other.

All participants highly appreciated the spirit behind the event and greatly enjoyed the food.

a

Abdul Jabbar Manzar: our Poet

Breakfast at the Workplace

by Asad Ullah Chughtai

By Celestia Henry

by S. Hameed Hussain Shah

Page 18: Life @ Lotte - Autumn/Winter

18

F r o M h r a n d a d M I n

Long service Awards

Congratulations to the recipients of the Long Ser-vice Awards in the 3rd and 4th Quarters of 2012

for completing 15 years of service. We wish them a long and prosperous association with the Company.

by Nizar Ismail

Syed Sibtain Haider Administration Officer Completed 15 years of service in August-2012

Naveed Iqbal Assistant Purchase Manager Completed15 years of ser-vice in September-2012

Ahmed Ali Khan Senior Assistant Lab Officer Completed15 years of ser-vice in September-2012

M. Nadeem Bhatti Assistant Engineer Instru-mentation Completed15 years of service in August-2012

Sajid Habib Lodhi Senior Lab Officer Completed15 years of ser-vice in September-2012

M. Hanif Balouch Assistant Lab Officer Completed15 years of ser-vice in September-2012

Asghar Ali SoomroJunior Engineer ProcessCompleted 15 years of service in October-2012

Sabir AliJunior Engineer ProcessCompleted 15 years of service in October-2012

Faisal Masood AhmedAssistant Engineer Process (Utilities)Completed 15 years of service in October-2012

Muhammad KalamJunior Engineer ProcessCompleted 15 years of service in October-2012

Imran Ahmed Senior Assistant Lab Officer Completed15 years of ser-vice in September-2012

Sana Ullah HayatSub Engineer Process –ICompleted 15 years of service in October-2012

Syed Azhar ZaidiAdministration OfficerCompleted 15 years of service in November-2012

Nadeem FurqanSub Engineer Process - IICompleted 15 years of service in October-2012

Mohammad Arif AwanAssistant Purchase ManagerCompleted 15 years of service in November-2012

M. Waheed Uz Zaman ShaikhSub Engineer Process - IICompleted 15 years of service in October-2012

Badar NizamSub Engineer Process - ICompleted 15 years of service in Novem-ber-2012

Syed Khurram AliDatabase & Setcim Admin-istratorCompleted 15 years of ser-vice in December-2012

Syed Jamal Haider NaqviAdministration OfficerCompleted 15 years of service in December-2012

Shabbir Asghar AliSalaries & Funds ManagerCompleted 15 years of ser-vice in December-2012

Arshad Ali KhanAssistant Manager PurchaseCompleted 15 years of service in December-2012

Karim SulemanAdministration Officer - IICompleted 15 years of service in November-2012

M. Khalid Rana Sub Engineer Mechanical - ICompleted 10 years of service in December-2012

Ijaz Ali Khan Assistant Engineer Process (Utilities) Completed 15 years of service in July-2012

M. Asif Farooqui Shaikh Assistant Engineer Instru-mentation Completed 15 years of service in July-2012

Haroon Ur Rashid Khan Administration Officer-I Completed 15 years of service in August-2012

M. Abid Qayyum Khan Assistant Engineer Electrical (Purification) Completed 15 years of service in July-2012

Syed Musarrat Qaiser Nadeem Sub Engineer Process-II Completed 15 years of service in July-2012

Mahfooz Ul Hasan Khan Assistant Lab Officer Completed15 years of ser-vice in September-2012

Au

tu

mn

/ W

int

er

20

12

– F

ro

M h

r &

ad

MIn

Page 19: Life @ Lotte - Autumn/Winter

19

Au

tu

mn

/ W

int

er

20

12

– F

ro

M h

r &

ad

MIn

F r o M h r a n d a d M I n

Keeping the tradition of celebrating birthdays of our employees, the HR department sent birth-

day cakes to the following employees in Q3 2012.a

employee Birthday’s at Lotte PPTA

Apprentices’ Classroom Training

by Arif Raza

Clockwise from the top: Asif Saad, Farida Dotiwalla and Mohammad Wasim

Welcome Aboard We heartily extend a very warm welcome to managers as part of the Lotte PPTA family and wish them an enjoyable and

productive stay with the Company.

Talha Mustafa, BSc (Electrical Engi-neering), University of Engineering & Technology, Lahore, has joined the Company as Assistant Manger Electri-cal, with effect from 2 July 2012.

Arslan Nisar, BSc (Chemical Engineer-ing – Polymer), University of Engineer-ing & Technology, Lahore, has joined the Company as Trainee Engineer, with effect from 2 July 2012.

Naveed Raza, BSc (Chemi-cal Engineering), University of Engineering & Technology, Lahore, has joined the Company as Trainee Shift Manager, with effect from 2 July 2012.

Syed Mohammad Taha Iqbal, BS (Me-chanical Engineering), Ghulam Ishaq Khan Institute of Engineering Sciences & Technology, Topi, has joined the Com-

pany as Trainee Engineer, with effect from 2 July 2012.

Muhammad Sohaib Iqbal, BS (Electri-cal Engineering), Lahore University of Management Sciences, Lahore, has joined the Company as Trainee Engi-neer, with effect from 11 July 2012.

Fahid Mehmood, BSc (Chemical En-gineering), Punjab University, La-

hore, has joined the Company as Trainee Shift Manager, with ef-fect from 1 October 2012.

Syed Muhammad Farhan Ali, BSc

(Chemical Engineering), Punjab Univer-sity, Lahore, has joined the Company as Trainee Shift Manager, with effect from 1 October 2012. Faisal Tariq, BE (Mechanical Engineer-ing), National University of Sciences &

Technology (NUST), Karachi, has joined the Company as Trainee Engineer, with effect from 1 October 2012.Akbar Chaudry, BE (Mechanical En-gineering), National University of Sci-ences & Technology (NUST), Karachi, has joined the Company as Trainee En-gineer, with effect from 1 October 2012. Muhammad Abdullah Bin Azhar, BE (Electronics Engineering), National University of Sciences & Technology (NUST), Karachi, has joined the Compa-ny as Trainee Engineer, with effect from 1 October 2012. Abdul Shaafi Shaikh, BS (Materials Sci-ence Engineering), Ghulam Ishaq Khan Institute of Engineering Sciences & Technology, Topi, has joined the Compa-ny as Trainee Engineer, with effect from 15 October 2012.

a

by Nizar Ismail

The special screening of the movie ‘Batman – The Dark Knight Rises’

was arranged for LOTTE PPTA employ-ees and their families at the Atrium Cinema. The screening of this much

anticipated movie was arranged within a few days of its release.

Employees and their families thoroughly enjoyed the movie and

expressed their desire to have more events like these in the near future.

a

Apprenticeships Training Program ensure that our workforce has the prac-tical skills and qualifications that organisation needs now and in the fu-

ture. The mixture of on and off job learning ensures they learn the skills that work best for our business.

Believing in that, LPPTA Technical Training Centre (TTC) orga-nized 03 months’ classroom training for the 18 newly inducted

apprentices with an aim to enhance skills, efficiency and safety knowledge of new apprentices.

Training was completed on 31 December 2012, and then all apprentices were handed over to their respected dept.

a

The dark Knight rose

by Zain Talpur

By Ahmed A. Abedi

Page 20: Life @ Lotte - Autumn/Winter

20

Au

tu

mn

/ W

int

er

20

12

– l

eIS

ur

e

l e I S u r e

ACROSS1 Mostly training and skill show

how easily something can be done (14)

9 Admires new weapon (7)10 Company chief ordered to get a

small house (7)11 A fool rejected Turner perhaps

(4)12 Transaction includes black fur

(5)13 Endlessly show respect by go-

ing down on one? (4)16 Cut head off...cut head off

exotic flower first (7)17 Get together for prayer (7)18 A very short dance? (3-4)21 The weather worried Tim and

Alec (7)23 Transport for vagrant mostly

(4)24 Embargo on nobleman (5)25 God whose reflection is seen in

canal (4)28 Spoke but spoke indistinctly

first off (7)29 He worked with vicar to keep

records (7)30 Deborah started changing act

(5,3,6)

DOWN1 Launch sailing vessel and

celebrate lavishly (4,3,4,3)2 Composition by an Italian poet

(7)3 Melt some of the path away (4)4 Announcer on the radio for

match (7)5 Rustic leaders of British union

get tummy ache (7)6 Permit takes time for Latvian

(4)7 Apprentice from Aintree

messed up (7)8 Again advanced smaller sum to

head, showing persistence (14)14 Damp has to destroy finally (5)15 The King lives – that’s crazy! (5)19 One demands former thespian

(7)20 I put lad off with praise (7)21 Piece of music for choir at end

of perfomance (7)22 Studio is refurbished late –

that’s right (7)26 River associated with a waste

product (4)27 Copy Spain and Switzerland,

love (4)

super sudoku!

Symbols to use: 123456789ABC

Cryptograms

Cryptograms are simple-substitution ciphers where every letter of the alphabet has been switched. Your task is to use pattern recogni-tion and your grammar and vocabulary abilities to decipher the hidden quotes. Hint: start with the 1, 2 and 3 letter words, and remember that the most common letters in the English language are E-T-A-I-O-N, in roughly that order. Good luck!

Use separate ciphers to decrypt these two cryptograms:

Quotes

Cryptic Crossword

Answers on page 15

“ Teachers open the door but you must walk through it your-self.”

Chinese Proverb

“The first rule of any technology used in a business is that automation applied to an efficient operation will magnify the efficiency. The second is that automation applied to an inef-ficient operation will magnify the inefficiency”

Bill Gates, founder of microsoft

“No enterprise can exist for itself alone. It ministers to some great need, it performs some great service, not for itself, but for others.. or failing therein, it ceases to be profitable and ceases to exist.”

Calvin Coolidge, 30th President of the united States

“Always forgive your enemies. Nothing annoys them more.” Oscar Wilde

M H U J W X U K H Z , U L K P O H Z V P R K E U P

R L J B L W XO D L P M H T X DVJ E K J D U L X U

R L J B L L K KC K E B J D K D P F K E L J W D K H A .

T I TG T X L S G G TC KQ I S T X P N T F Q N S Q I E Q

S M C Q Q I E S W Q F C QT F N N S S U P I C T K K T P -

M U G S M N S K D.

— H.L. Mencken— Elie Wiesel

Page 21: Life @ Lotte - Autumn/Winter

21

Au

tu

mn

/ W

int

er

20

12

– u

rd

u

کمیونٹی ویلنیس ایکٹیویٹیز›کمیونٹی ویلنیس ایکٹیویٹز‹ ایک ایسا اقدام تھا جو پہلی مرتبہ لوٹی پی پی ٹی اے کی انتظامیہ نے نگرانی زیر کی خان اللہ وحید راجہ جناب کیا۔ منصوبہ کی رسگرمیوں کی دورانیہ کے ماہ ایک بندی کی گئی جن کو ایچ آر اور ایڈمن کی ٹیم کی

دلی معاونت حاصل تھی۔

منصوبہ کی سلسلہ کے رسگرمیوں کی قسم اس بندی کرنے کا مقصد ادارہ کے مالزمین میں سامجی خدمت کی روایت کو فروغ دینا تھا۔ رسگرمیوں کے جس سلسلہ کا بندوبست کیا گیا وہ کچھ یوں تھا:

انعقاد کا پروگرام ذیل مندرجہ کے صحت آگاہی کیا گیا:

جوس کے مقابلے

اس سے کمپنی کو مالزمین کے اندر ہلکے مرشوبات

اور انسانی جسم پر ان کے مرض اثرات کے متعلق آگاہی پیدا کرنے کا موقع مال۔

رسہ کشی

کے لوٹی انعقاد کا جس رسگرمی لطف پر ایک کام کر ہو متحد اور قوت جسامنی کی مالزمین

کرنے کی صالحیت کا امتحان لینے کیلئے کیا گیا۔

کرکٹ میچ

کو رسگرمی وال��ی جانے کی میں فضاء کھلی کرکٹ ایک کیلئے مالزمین خاطر کی دینے فروغ میچ کا انعقاد کیا گیا۔ کل مال کر متام شعبہ جات )ڈیپارٹمنٹس( سے چار ٹیمز4 نے اس مقابلہ میں رشکت کی جن میں سے انجینرئنگ ڈیپارٹمنٹ کی

ٹیم فاتح بن کر ابھری۔

پورٹ قاسم پر مینگرووز لگانا/ شجر کاری

لوٹی پی پی ٹی اے نے اس پروگرام کا »بہرت کل« لوٹی پی پی کیا۔ کیلئے کے تصور کو فروغ دینے ٹی اے کے مالزمین نے مینگرووز اور درخت لگانے کیلئے رضاکارانہ طور پر پورٹ قاسم کے بلند سطح

آب والے ساحلی عالقہ گھارو ندی کا دورہ کیا۔

میک اے وش- پاکستان

رسکاری غیر عاملی ایک کہ جو وش اے میک دلی کی بچوں ایسے جو ہے او( جی )این ادارہ ناقابل عالج مرض پوری کرتا ہے جو کسی خواہش بچوں نے 03 ٹی اے پی پی لوٹی ہوں۔ کا شکار کی خواہشات کو حقیقت کا روپ دینےکیلئے میک اے وش فاؤنڈیش کے ساتھ ہاتھوں میں ہاتھ

ڈالے۔

ایس او ایس ولیج کا دورہ

ایس او ایس چلڈزنز ولیج )یتیم خانہ ملیر چھاؤنی،( خاندانوں کو مشاورت اور تعلیم سہولیات، طبی کی شکل میں دامئی معاونت فراہم کرتا ہے۔ لوٹی پی پی ٹی اے کے رضاکار مالزمین نے ایسے بچوں کے ساتھ وقت گزارنے کیلئے اس

ولیج کا دورہ کیا۔

طبی کیمپ

کے پھٹاک گھاگھر سے جانب کی کمپنی کیمپ طبی ایک میں گوٹھ محمود نزدیک کا اہتامم کیا گیا۔ اس عالقہ کا انتخاب مقامی افراد کو دستیاب طبی سہولیات کی کمی کے باعث کیا گیا۔ لوٹی پی پی ٹی اے کی جانب کو افراد مقامی اہتامم کا کیمپ طبی سے بال معاوضہ معائنہ کی سہولت فراہم کرنے

کیلئے کیا گیا تھا۔

ساحل کی صفائی

ہاکس بے پر ساحل کی صفائی کی رسگرمی کا اہتامم کیا گیا، جہاں متام رضا کار مالزمین

نے ساحل کی صفائی کی۔

a

از: رضوان احمداور راجہ وحید اللہ خان

Page 22: Life @ Lotte - Autumn/Winter

22

جاسکے اور ان سے منٹنے کیلئے درکار اقدامات کا ایگزیکٹیو درجہ پر نگرانی کی جاتی ہے۔

منانے خوشی کی حصول کے میل سنگ اہم اس کیلئے 27 نومرب 2012 میں Lotte PPTA کی پالنٹ سائٹ پر ایک تقریب کا اہتامم کیا گیا تھا۔ جناب آصف سعد )چیف ایگزیکٹو Lotte PPTA ملیٹڈ( اس تقریب کے مہامن خصوصی تھے۔ اس میں کمپنی داران( نے )ٹھیکہ کنٹریکٹرز اور کے متام مالزمین پورٹ میں فہرست اور مہامنوں کی شمولیت کی قاسم کے عالقہ کی ہمسایہ صنعتوں کے مالزمین

بھی شامل تھے۔

حسین ان��ور جناب آغ��از کا پروگرام کے تقریب )اسسٹنٹ پرچیز مینیجر( نے ›قرآن پاک‹ کی تالوت

سے کیا۔

ابتدائی کلامت میں، جناب طارق مہدی )ایچ ایس کے پالنٹ نے مینیجر( ٹریننگ ٹیکنیکل اینڈ ای فعال ہونے سے اب تک ایچ ایس ای کی کارکردگی کا اور Lotte میں حفاظت کے بلند ترین معیارات کے رسبلند رکھے جانے کا پس منظر پیش کیا جس لگن مضبوط جانب سے کی مینیجمنٹ سینرئ کو

اور یکساں نفاذ سے قوت ملتی ہے۔

مینیوفیکچرنگ( ایم )جی منظور ایچ قمر جناب نے Lotte ایل پی پی ٹی اے کی جانب سے قائم اور کی بات متعلق کے ریکارڈ امتیازی گئے کئے سمجھایا کہ یہ کس طرح ایچ ایس ای کی پالیسیز

اور طریقہ ہائے کار کے سختی کے ساتھ نافذ کئے جانے اور 1998 میں امور کے آغاز سے لے کر اب تک سائٹ پر کام کرنے والے ہر مالزم اور کنٹریکٹرز )ٹھیکہ داران( کی کارکردگی پر انتظامیہ کی شدید

توجہ کا نتیجہ ہے۔

پر اس نے آپریشنز( ایم )جی وسیم محمد جناب روشنی ڈالی کہ یہ کامیابی Lotte- پی پی ٹی اے اینڈ ای ایس ایچ کے کنٹریکٹرز اور مالزمین میں ثبوت عملی کا لگاؤ ساتھ کے معیارات کے ایس متعلق کے نفاذ کے ای ایس ایچ نے انہوں ہے۔ بھی بات کی اور اس بارے میں بھی بات کی کہ )شئیر ب��رداران سقوق مرکزی میں ادوار مختلف ہولڈرز( کی تبدیلی کے باوجود ادارہ میں کارکردگی اپنی چوٹی پر ہے۔ انہوں نے آئندہ آرہی اوور ہال

میں بھی اس ہی لگن کیلئے زور دیا۔

ایگزیکٹو( نے اس عاملی جناب آصف سعد )چیف حصول کے م��ارک( )بنچ حوالہ نقطہ کے درجہ میں مدد کیلئے متام مالزمین اور کنٹریکٹرز )ٹھیکہ نے انہوں کی۔ تعریف کی کاوشوں کی داران( -Lotte وضاحت کی کہ کس طرح یہ اہم کامیابیکنٹریکٹرز اور مالزمین متام کے اے ٹی پی پی مثبت لگن، مسلسل کی ان کیلئے داران( )ٹھیکہ ایس ایچ اور پابندی کی اصولوں حفاظتی رویہ، ای کے متعلق ایک ذمہ دارانہ رویہ کی وجہ سے باعث فخر ہے۔ انہوں نے Lotte PPTA کو ہامرے مالزمین، کنٹریکٹرز )ٹھیکہ داران( اور دورہ پر آنے والوں کیلئے کام کرنے کی ایک محفوظ جگہ بنانے

اور ایچ ایس ایف کی کارکردگی کو اعلی معیار کے اگلے مرحلہ تک لے جانے کیلئے جاری رہنے والی

کوششوں پر بھی زور دیا۔

آخر میں متام کنٹریکٹرز میں یہ سنگ میل حاصل کرنے میں ان کی کاوشوں اور کردار کے اعرتاف میں سندیں تقسیم گی گئیں۔ ایچ ایس ای کی کارکردگی کی جانچ کاریوں کی بنیاد پر، ان کنٹریکٹرز )ٹھیکہ

داران( کو انعامات/شیلڈز دی گئیں۔

ایم/ایس۔ ڈیسکون پہال انعامانجینرئنگ

ایم/ایس۔ حسن فاروق اینڈ دورسا انعامکمپنی

ایم/ایس۔ بالل ایسوسی ایٹستیرسا انعام

ایم/ایس۔ ہیلتھ الئنخصوصی انعام

بیگم۔ راحت حق خصوصی انعام

متام وال��ے کرنے ک��ام ساتھ کے Lotte PPTA

کنٹریکٹرز )ٹھیکہ داران( کو ان کے گراں قدر کردار پر تعریفی اسناد دی گئیں۔ تقریب کا اختتام بعد میں آنے والی ہائی ٹی سے ہوا جس کا اہتامم ایچ

ایس ای ڈیپارٹمنٹ نے کیا تھا۔

a

Au

tu

mn

/ W

int

er

20

12

– u

rd

u

Lotte PPTA ملیٹڈ کو 12 جوالئی 2012 کو نیشنل

ایچ( ای ایف )این ہیلتھ اینڈ اینوائرمنٹ فار فورم میں تقریب وقار پر ایک 9منقدہ سے جانب کی 9واں ساالنہ اینوائرمنٹ ایکسیلنس ایوارڈ )امتیازی

Lotte PPTA اعزاز برائے ماحولیات( عطاء کیا گیا۔کو اس اعزاز کی دوڑ میں شامل 175 نامور کمپنیز میں دورسے منرب پر نامزد کیا گیا۔ جانچ کاری این غیر ایک کے منتظمین مجلس کی ایچ ای ایف

جانبدار پینل نے کی۔

یہ تقریب میریئٹ، کراچی میں منعقد کی گئی اور ای ایس ایچ مہدی، طارق جناب تھی۔ Lotte PPTA نے مینیجر ٹریننگ ٹیکنکل کی جانب سے اس شاندار اعزاز کو وصول کیا۔ جناب قمر حارث منظور، جناب جنگ

نیون کم، جناب اوہ ہو لم اور جناب ایون پئو ہانگ بھی اس موقع پر موجود تھے۔

جناب شیخ محمد افضل، وزیر ماحولیات، حکومت مہامنان معزز جبکہ تھے مہامن خصوصی سندھ میں شامل تھے جناب رؤف صدیقی، وزیر صنعت و تجارت، حکومت سندھ، جناب جاوید جبار، گلوبل محمود، خالد جناب اور این سی یو آئی پی، وی تقسیم تقریب نیچر۔ فار ایف ڈبلیو ڈبلیو صدر، اور افضل محمد شیخ جناب قبل، سے اع��زازات

Lotte PPTA کیلئے 9واں ساالنہ اینوائرمنٹ ایکسیلنس ایوارڈ )امتیازی اعزاز برائے ماحولیات(

اور ماحول نے جبار جاوید جناب اپنے پر اہمیت کی تحفظ کے اس خیاالت کا اظہار کیا۔ وزارت صنعت تحفظ ماحولیاتی کو، Lotte PPTA نے اعرتاف کے کاوشوں کی کمپنی سے حوالے کے

میں، ایک تعریفی سند سے نوازا۔

کیمیکل پی کے او، ای کم، سی چینگ-یو جناب ذریعے کے خط تعریفی ایک نے کارپوریشن، پر کامیابی اس کی ان کو ٹیم کی Lotte PPTA

چیف سعد، آصف جناب کی۔ پیش باد مبارک ٹیم بھی نے ملیٹڈ اے ٹی پی Lotte ایگزیکٹیو،

کو ان کی قابل تحسین کارکردگی پر رساہا اور اعلی معیار کے اگلے درجہ کی جانب پیش قدمی جاری

رکھنے کی رضورت پر زور دیا۔

یہ کامیابی Lotte کی ماحولیاتی تعمیل کے بہرتین طریقہ ہائے کار برقرار رکھنے کے عزم کا نتیجہ ہے، جس کا نتیجہ پالنٹ سائٹ پر ایک بہرت ماحول کی صورت میں ہے۔ کمپنی کا سختی سے ماننا ہے کہ Reduce, Recycle and Reuse - ‘R’ ماحول کے تین

– طویل مدتی معاشی بقاء کیلئے الزم ہیں۔

a

صفحہ ۲۰ سےجاری

Lotte Pakistan PTA میں لوسٹ ٹائم کیس )ایل ٹی

سی( کے بغیر چالیس ملین افرادی-گھنٹوں کی تکمیل

از: شعیب اقبال

Page 23: Life @ Lotte - Autumn/Winter

23

جئیں اس طرح جیسے آپ نے کل مر جانا ہو اور سیکھیں اس طرح جیسے آپ نے ہمیشہ زندہ رہنا ہو۔ Lotte PPTA کے مالزمین اس پر یقین رکھتے ہیں اور ہمیشہ سیکھنے کے کسی بھی موقع کیلئے پر جوش رہتے ہیں۔ Lotte PPTA کے ایک مالزم کا کہنا ہے: »زندگی ایک نہ ختم ہونے والی درسگاہ ہے کیونکہ ہامرا ہر روز کچھ نہ کچھ سیکھتے رہنا

کبھی ختم نہیں ہوتا۔«

Lotte PPTA کا فلسفہ ہمیشہ یہ رہا ہے کہ اپنے

استعداد ان کی اور تربیت کی جائے مالزمین کی بڑھائی جائے، ان کو زیادہ محنت طلب کردار دیے جائیں، اور یقینی بنایا جائے کہ ان کو کامیابی کے بلند تر درجات حاصل کرنے کے قابل بنانے کیلئے

ہر ایک کوشش کی جائے۔

سیکھتے رہیئے!ایک نے ڈیپارٹمنٹ ریسورس ہیومن سال، گزشتہ ایسی ایک کیا، انعقاد کا ویگنزا ایکسٹرا لرننگ تقریب جو کہ کمپنی میں بہت زیادہ مقبول ثابت اور ایک ایسی میں 2012 نے ہم نتیجتا، ہوئی۔ والے دینے تربیت کیا۔ غور پر خیال کے تقریب سلسلہ ایک کا سیشنز ایسے کو افراد ور پیشہ Lotte PPTA منعقد کرنے کیلئے مدعو کیا گیا جومہارت، انتظامی صالحیتیں، نئی کو مالزمین کے متام سیشنز یہ کرے۔ فراہم عامہ معلومات اور میں سیشن ہر اور تھے، دستیاب کیلئے مالزمین

سامعین کی ایک کثیر تعداد کو یقینی بنایا گیا۔

یہ ایکسٹرا ویگنزا Lotte کی اقدار پر ایک سیشن پر اختتام پذیر ہوا، جو کہ ڈی ایچ اے کریک کلب میں منعقد کیا گیا۔ یہ سیشن اس متام معاملہ کے میں جس گیا، کر اختیار شکل کی اختتام رسمی

Au

tu

mn

/ W

int

er

20

12

– u

rd

u

تقریب کے بعد جشن منا ہائی ٹی کا اہتامم تھا۔

ایکسٹرا ویگنزا لرننگ اقدار کے متعلق Lotte کی

مالزمین بعد، کے رشکت میں سیشن آخری کے کیا؛ تبادلہ کا اپنے خیاالت متعلق تقریب کے نے »Lotte PPTA کے ایکسٹرا ویگنزا نے مالزمین کے اس سال ہر ہم ہےاور لی منوا قدر اپنی درمیان

تقریب کا انتظار کریں گے۔«

کے تقریب تربیتی کی اقدار کی Lotte کیپشنز: دہندہ کے ساتھ تربیت اپنے بعد رشکاءشیشن کے تصویر کھنچواتے ہوئے۔ تربیت کے بعد ناشتہ پیش -te PPTA ییا گیا، اور ایکسٹرا ویگنزا کے رشکاء کوLot کے سی ای او، آصف سعد نے اسناد پیش کیں۔

a

Lotte PPTA نے دورسا فائر اینڈ سیفٹی ایکسلنس

ہیلتھ اینڈ اینوائرمنٹ فار فارم نیشنل اور ایوارڈ ایجنسی پروٹیکشن فائر اور ایچ( ای ایف )این دسمرب 13 سند کی پی( اے پی )ایف پاکستان کی۔ حاصل میں کراچی ہوٹل میریئٹ کو 2012

ٹیکنکل اینڈ ای ایس )ایچ مہدی طارق جناب ٹریننگ مینیجر( نے Lotte PTTA کی جانب

سے اعزاز اور سند جناب محمد حسین سید کئے۔ وصول سے کراچی( )ایڈمنسٹریٹر جناب ایون پئو ہانگ اس موقع پر موجود

کے کمپنیوں مشہور دیگر کئی جبکہ تھے اعزاز اس تھے۔ موجود بھی منائندے سینرئ

کیلئے لگ بھگ 86 کمپنیز نے حصہ لیا، تاہم رصف 24 کمپنیز اہل قرار پائیں اور ان کو یہ اعزاز عطاء

کیا گیا۔

a

از: احمد اے۔ عابدی

دورسا فائر سیفٹی ایوارڈ - ۲۰۱۲

از: سید بالل اشتیاق

Page 24: Life @ Lotte - Autumn/Winter

از: شعیب اقبال اور احمد اے۔

عابدی

Lotte PPTA کیلئے 9واں ساالنہ اینوائرمنٹ

برائے اع��زاز )امتیازی ای��وارڈ ایکسیلنس ماحولیات(

۲۲

اس اشو میں...

صفحہ ۱۸ پرجاری

Lotte Pakistan PTA میں لوسٹ ٹائم کیس

)ایل ٹی سی( کے بغیر چالیس ملین افرادی-گھنٹوں کی تکمیل

دورسا فائر سیفٹی ایوارڈ - ۲۰۱۲

۲۴

۲۳

کمیونٹی ویلنیس ایکٹیویٹیز

سیکھتے رہیئے!

۲۱

۲۱

Life @ Lotte PPTA is a corporate newsletter intended for employees and partners of Lotte Pakistan PTA Ltd. خزان اورسما ۲۰۱۲

Lotte PPTA نے 24 اکتوبر 2012 کو لوسٹ ٹائم

کیس کے بغیر مالزمین اور کنٹریکٹرز )ٹھیکہ داران( کے 40 ملین افرادی-گھنٹے مکمل کر لئے ہیں۔ یہ بڑی کامیابی صحت، حفاظت اور ماحول کے متعلق کمپنی کی غیر متزلزل لگن کا ایک شاندار مظاہرہ 40 بغیر کے سی ٹی ایل سے آغاز کے کام ہے۔ ملین افرادی گھنٹوں کا ایک بے داغ ریکارڈ کا حاصل کار ہائے طریقہ اور پالیسی ای ایس ایچ جانا کیا

ایس ایچ میں Lotte PPTA اور نفاذ کامیاب کے ای کی کارکردگی پر انتظامیہ کی پر زور توجہ کی نشاندہی کرتا ہے۔ ہامری کمپنی کو ہامرے مالزمین، والے آنے پر دورہ اور داران( )ٹھیکہ کنٹریکٹرز بنانے مہامنان کیلئے کام کرنے کی محفوظ جگہ اعلی معیار کے ای کی کارکردگی کو ایس ایچ اور جاری کوششیں کیلئے کرنے بلند تک درجہ اگلے

ہیں۔

اعلی کے حفاظت کمپنی سے آغ��از کے پالنٹ ہے، جس آرہی کرتی چلی نافذ کو معیارات ترین حفاظت ہوئے کرتے رشوع سے 1998 مئی 7 کو 14سالہ شاندار ریکارڈ )ایل ٹی سی کے کے تقریبا کے حفاظت ہے۔ ملتی تقویت ساتھ کے بغیر( رویہ، کو اقدامات محفوظ غیر اور واقعات متام حوالہ کے نظام انتظامی اور ماحول سازوسامان، کیا زد نشان کو خامیوں تاکہ ہے جاتا دیکھا سے

Lotte Pakistan PTA میں لوسٹ ٹائم کیس )ایل ٹی سی( کے بغیر چالیس ملین افرادی-گھنٹوں کی تکمیل


Recommended