Lifecycle of reconstruction and key events and stages (short, medium & long term)
TelčMartin KaletaCVUT Prague, Czech
Xavi García MartíUniversidad Politécnica de Valencia
Joao ReisInstituto Superior Técnico
Nyoman JayaUniversity of Salford, UK
Eric LouUniversity of Salford, UK
Norbaya Ab RahimUniversity of Salford, UK
Silvia Adarmes GómezUniversidad Politécnica de Valencia
3
Sustainable planning, customised for Telc
3
Short Term Recovery
3Temporary Health and
Humanity ServicesConstruct temporary hospital Manage local and foreign humanitarian
volunteersIdentify local residence in assisting
humanitarian aidProvide social and physiological help to
the victims
SSHORT TERM ACTIONS
3Housing & Facilities
• More than 11,000 people ‘unhoused’• Provide temporary housing and shelter for
victims and volunteers• Provide basic facilities and utilities for the
victims and volunteers
• Get expert to assess the structure stability• Replace and repair the fixtures and fittings for
temporary electricity supply
NEW ZONES
Affected People
Volunteers
Kitchen
Administration And Information Centre
Health Services
LEGENDHumanitarian Supplies
SSHORT TERM ACTIONS
3Temporary Infrastructure
Reinstate damaged bridgeConstruct temporary bridgeAllocate temporary helipadRepair electrical sub-stationsProvide generatorIdentify area for cemetery (special memory)
SSHORT TERM ACTIONS
3Existing roads and bridges
SSHORT TERM ACTIONS
3Temporary roads and bridges
SSHORT TERM ACTIONS
3Communication & Services
One-stop centre for information
SSHORT TERM ACTIONS
Provide critical information through the official disaster website
Establish satellite mobile services for telecommunications and internet services
Establish collaborative environments with standard interoperability for information interchange (IFC, BIM, GIS)
3Command Centre
• One stop centre for coordination and information interchange
Affected People
Volunteers
Kitchen
Administration And Information Centre
Health Services
LEGENDHumanitarian Supplies
SSHORT TERM ACTIONS
3Humanitarian Aid
Organisation of food aid
SSHORT TERM ACTIONS
Investigate supply of food from nearby factories (meat)/ store
Ensure the provision of clean water to avoid negative effect towards the health
3Transportation and Accessibility
Provide alternative and temporary transport
SSHORT TERM ACTIONS
Provide temporary walking path/roads
Provide temporary signage
3Security
Identify the victims and their possession
SSHORT TERM ACTIONS
Monitor the people with possession list
Tighten the security to avoid further looting
3Security
• Identify the victims and their possession
• Monitor the people with possession list
• Tighten the security to avoid further looting
Affected People
Volunteers
Kitchen
Administration And Information Centre
Health Services
LEGENDHumanitarian Supplies
Security Posts
SSHORT TERM ACTIONS
3Flooding
Develop temporary dam for reservoir
SSHORT TERM ACTIONS
Provide water pump
Install temporary flood wall
Divert water (canalisation)
3Security
• Identify the victims and their possession
• Monitor the people with possession list
• Tighten the security to avoid further looting
Affected People
Volunteers
Kitchen
Administration And Information Centre
Health Services
LEGENDHumanitarian Supplies
Security Posts
SSHORT TERM ACTIONS
3
Mid Term
Recovery
3MMIDDLE TERMIDDLE TERM
WATER
ENERGY
ICT
TRANSPORTS
HOUSING
PUBLIC EQUIPMENTS
INDUSTRY
MANAGEMENT
3WWATERATER
PROBLEMS... SOLUTIONS...
• Damage in the infrastructures - supply pipelines - main pipelines - houses pipelines
• Water contamination (caused by earthquake)
• Waste water production
• Supply increase for reconstrution
•Repair and rebuild pipelines
• Build a new treatment plant
• Build a waste water treatment plant
• New dams
• Increase the current supply
• Using treated wastewater (ex: cleaning, concrete making)
3WWATERATER
New hydroelectric & mini dams
3EENERGYNERGY
PROBLEMS... SOLUTIONS...Electricity
• Damage in the network• Supply increase for the reconstrution
• Price
Gas
• Damage in the infrastructures• Contamination
Fuel
• Damaged petrol station
Electricity
• Repair and rebuild• Assure more electricity from the general network• Alternative energies
Gas
• Repair and rebuild• Alternative energies
Fuel
• New petrol station
3EENERGYNERGY
3IICTCT
PROBLEMS... SOLUTIONS...
• Damaged infrastructures (telephone lines, mobile comunication)
• Inefficient of convencional conections
• Repair
• Wireless Internet (WiMax)
3TTRANSPORTSRANSPORTS
PROBLEMS... SOLUTIONS...
• Damage in the infrastructures - roads; railways; bridges
• Need transports for people - inhabitants - project staff - tourists
• Restablishment of the infrastructures - Repair - Reconstrution - Improvement
• Establishment of public transport system
3TTRANSPORTSRANSPORTS
3HHOUSINGOUSING
PROBLEMS... SOLUTIONS...
• Damage of the Historical Center
• Damage of the existing houses
• Slow process of reconstrution
• Reconstrution structure of
buildings + Restoration of facets
• Reconstrution or building new houses (depending on available budget)
• Maintainence of temporary acomodation
3HHOUSINGOUSING
3PPUBLIC EQUIPMENTSUBLIC EQUIPMENTS
PROBLEMS... SOLUTIONS...
• Damaged buildings / public spaces
- Schools - Hospital - Local Administration - Parks - Cemeterys
• Repair or Rebuilding
3PPUBLIC EQUIPMENTSUBLIC EQUIPMENTS
3IINDUSTRYNDUSTRY
PROBLEMS... SOLUTIONS...
• Necessity of products for the reconstrution process (ex: material supply)
• Needs for Telc inhabitants and people involved in the project
• Damaged preexisting industries and new necessities
• Build temporary local factories involved with the project (creating local jobs and attracting money)
• Assure restaurants, bars, pubs or shops
• Restablishment of industrial areas
3MMANAGEMENTANAGEMENT
PROCUREMENT
FUNDING
LEGAL ISSUES
HUMAN RESOURCES
MONITORING
3
Long Term
Recovery
3
Take into consideration the recovery, reconstruction and regeneration of Telc.
Unfortunately, in disasters, there are opportunities to change the town.
LLONG TERM ACTIONS
3LLONG TERM ACTIONS
Social
SLEEPT concept
Legal
Economical
Political
Technical
Evironmental
3LLONG TERM ACTIONS
Education
Energy
Infrastructures
Industries
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
26 Public Universities available in Czech
38 Private Universities available in Czech
Only ONE University in Vysočina area (West Movarian University of Trebac)
Only 30+ registered students
Higher Education
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
European strategies & funds•EU Seventh Framework Programme (FP7 & FP8)•Lisbon Strategy 2000 - Education and Training Contribution•Government Commissioner for European Research - Professor Ivan Wilhelm•European Research Council•European Social Fund (ESF)
National strategies & funds•National Programme for the Development of Education in Czech Republic•The Ministry of Education, Youth and Sports (MEYS) MŠMT - provisions of Section 33 of Act No. 130/2002•National Action Plan for Employment - Resolution No. 696
Regional strategies & funds •Vysocina Regional Council for Education•Vysocina Fund
Higher Education
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
Dec JulyJuly
inco
me
Tou
rism
Stu
dent
s
Sustainable economy
Higher Education
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
• Increase skilled workers in the region• Provide consistent number of skilled labor within the region• Balance and improve age demography
• Environmental Information & Protection• Land Use Planning• Integrated Prevention Pollution Control• Air, water & land protection• Nature, landscape and forest protection• Chemicals & Genetically modified organisms• Health protection against noise and vibrations• Nuclear Safety
• European Union & European Commission Treaties• Czech Environmental Legislation Constitutional Act No. 1/1993
Higher Education
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
Pre-contract submission
Pre-contract evaluation
Choose 2 for negotiated PPP
Infrastructure Private-Public Partnership (PPP) process
Higher Education
3LLONG TERM ACTIONS
Higher Education Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
Infrastructure Transfer of risk through Private-Public Partnership (PPP) process
Sample requirements:To provide classrooms and learning space15 years contractTo be reviewed after 8 years
To use modular constructionTo use at least 20% local materialsTo use at least 10% recycled materialsTo use at least 30% off-site manufactured materialsTo use at least 20% local workforce
3LLONG TERM ACTIONS
Energy Politi
cal
Econ
omic
al
Sustainable Energy
Renewable Energy
Green Energy
• Lowering cost of energy
• Reduce dependency for energy consumption
Solar
Biomass
Heating
Water
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
European strategies & funds•EU Seventh Framework Programme (FP7) - € 2.35 billion •European Research Council•European Social Fund (ESF)
National strategies & funds•National Programme for the Development of Education in Czech Republic•The Ministry of Education, Youth and Sports (MEYS) MŠMT - provisions of Section 33 of Act No. 130/2002•National Action Plan for Employment - Resolution No. 696
Regional strategies & funds •Vysocina Regional Council•Vysocina Fund
Energy
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
• Lower dependency on external energy resources• Lower cost for home energy• Environmentally friendly solutions
• Environmental Information & Protection• Land Use Planning• Integrated Prevention Pollution Control• Air, water & land protection• Nature, landscape and forest protection• Chemicals & Genetically modified organisms• Health protection against noise and vibrations• Nuclear Safety
• European Union & European Commission Treaties• Czech Environmental Legislation Constitutional Act No. 1/1993
Energy
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
Reform the institutional framework for the energy sector and made it
more consistent with that of other EU countries
The New law Act No. 180/2005 Coll. on Support of Electricity
Production from renewable energies
Renewable Act should ensure an 8% share of renewable energy in
the Czech Republic’s gross domestic electricity consumption by
2010
Currently 20% is generated by nuclear, future projection is 40%
Energy Regulatory OfficeState Energy Inspection BoardMinistry of Industry and Trade: www.env.cz Ministry of the Environment: www.mpo.cz Energy Regulatory Office (ERO): www.eru.cz
State Environment Fund (CR SEF): www.sfzp.cz
Energy
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
Hydroelectric (Water)• Transforming canals for mini-hydroelectric for homes • Transforming lakes into miniature dams for industries
Wind • Installing wind turbines at home roofs for homes• Installing wind propellers at wind fields
Bio-mass• Installing bio-mass facilities for heating (Water and solid waste)
Solar• Installing solar panels for individual homes from existing temporary fascilities
Energy
3LLONG TERM ACTIONS
Infrastructure
UNESCO Historical City
Market Telc as the hub of tourism in Vysocina
Develop infrastructure for higher education and technology park
New Tourist infrastructuresPedal Board Port & other Lake activities
Handicraft fair
Tulip tree park
Agri-tourism & Eco-tourism
Other actions
Multi-lingual (HHRR)
Improve Hotel facilities
The possibility to rent a Castle
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
European strategies & funds•EU Seventh Framework Programme (FP7) - € 2.35 billion •European Research Council•European Social Fund (ESF)
National strategies & funds•National Programme for the Development of Education in Czech Republic•The Ministry of Education, Youth and Sports (MEYS) MŠMT - provisions of Section 33 of Act No. 130/2002•National Action Plan for Employment - Resolution No. 696
Regional strategies & funds •Vysocina Regional Council•Vysocina Fund
Infrastructure
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
Infrastructure
Telĉ citizens and tourism
Smart homes – renewable energies and ICT
Suppliers (tourism large companies)
Museums and monuments for disaster
Lifecycle – temporary housing to hostels
Comply with environmental issues
Financial support – European, national and regional
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
Regenerate local economy for the local community
Encourage expansion of R&D
Promotion of industries
Comply with environmental issues
Infrastructure
3LLONG TERM ACTIONS
New Industries
Meat industry
Food Technologies
Politi
cal
Econ
omic
al
Soci
al
Lega
l
Tech
nica
l
Envi
ronm
enta
l
National, Regional and Local government
Stakeholder
Users (Telĉ citizens)
Food industries and agricultural Companies
Private financial support
Consulters
Main Construction Companies and Subcontractor
Law
Act no. 137/2006 Law about public commisions
Act no. 183/2006 Building law
Act no. 513/1991 Trade law
Act no. 185/2001 Law about waste
Act no. 406/2000 Law about economy with energy
3LLONG TERM ACTIONS
ICT Politi
cal
Econ
omic
al
Enabler for Telc – common platform for all industries – standard platform for communication
Promote Vysocina as Region for Information Technologies
Assess the readiness of Telc and Vysocina in adapting ICT into everyday lives
3LLONG TERM ACTIONS
ICT
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
European strategies & funds• EU Seventh Framework Programme (FP7) - €9.1 billion • European Research Council• European Construction Technology Platform (ECTP)• Europa i2010
National strategies & funds•National information and communication policy (e-Czech 2006) - nr.453+P/2004
Regional strategies & funds •Vysocina Regional Council•Vysocina ICT Fund
3ICT in Vysočina
LLONG TERM ACTIONS
3ICT in Telč
LLONG TERM ACTIONS
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
ICT to make the Region more attractive for young people
Supporting the vision of an open, accessible and professional
Regional Authority
Initiating co-operation in European projects, the transfer of experience,
support for partnership, and implementation of the best practises
Sustainable technologies
ICT
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
• European Union & European Commission Treaties• ICT standardisation and interoperatability• Electronic Signature Law• Cyber Law
• Managing interoperatability of software and databases• Enhancing security and hacking prevention• Encourage the use of collaborative environments• Encourage the use of free software
• ICT courses • ICT in higher education
ICT
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
ICT
Collaborative Environment
Design & Planning
IFCBIMGIS
Archiving
eGovernmentServices
Communication & E-mailsWorking
Documents
3LLONG TERM ACTIONS
Transportation Econ
omic
al
New and improved transportation links
• Land
• Air
• Rail
• Local transportation
3LLONG TERM ACTIONS
Transportation Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
European strategies & funds• EU Seventh Framework Programme (FP7) - €4.1 billion • European Research Council• Europa transport• EU Road Safety Action Programme (2003-2010)
National strategies & funds• Ministry of Transport• Rail Authority• Transport R&D organisations (COST, OECD, CEMT)
Regional strategies & funds • Vysocina Regional Council
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
• Better transportation = economic growth• New connection with Prague (middle Czech)• Improved connectivity with Prague and Vienna• Alternative airport at Jihlava
• Environmental Information & Protection• Land Use Planning• Integrated Prevention Pollution Control• Air, water & land protection• Health protection against noise and vibrations
• European Union & European Commission Treaties• Czech Environmental Legislation Constitutional Act No. 1/1993
Transportation
3LLONG TERM ACTIONS
Politi
cal
Econ
omic
al
Soci
al
Envi
ronm
enta
l
Lega
l
Tech
nica
l
Safety Directive (2004/49/EC) Rail systems no. 266/1994 Coll (as amended)
Regulation No. 376/2006 Coll (safety certification)
European Rail System (2001/12) comply with European Transport Lawavoid land acquisition
Transportation
3Transportation - Road
LLONG TERM ACTIONS
Telč
3Transportation - Train
LLONG TERM ACTIONS
Vienna Bratislava
Telc
3
Key points
3KKEY POINTS
• New areas are dedicated for victims• Temporary housing, facilities and infrastructures are prepared for victims• Social and physiological support for victims• ICT will be used to enable management, planning and media• Temporary communication through satellite transmission
• Old town – facets of buildings to be reconstructed at best possible• New and improved facilities:
• Water Housing• Energy Public buildings• ICT Industry• Transportation
• Future focus on:• Education – higher education and research and development• Energy – renewable and green energies• Infrastructures – tourism, education, R&D and smart homes• Industries – local economy and people• ICT – technological, people and process push• Transportation – improved links internally (Prague, Brno) and Vienna
3LLONG TERM ACTIONS
• Feasible long-term plans to Telc• Extravagant ideas, but not feasible
Super Casino(eg. Las Vegas)
International Airport(eg. Frankfurt)
Super Skyscraper(eg. Dubai)
Long term sustainable plan, customised for Telc
3Security
• Identify the victims and their possession
• Monitor the people with possession list
• Tighten the security to avoid further looting
Affected People
Volunteers
Kitchen
Administration And Information Centre
Health Services
LEGENDHumanitarian Supplies
Security Posts
MMAPPING
Hostels
Mini dam &hydroelectric