www.dcpuk.com www.dcpuk.com DAWSON CONSTRUCTION PLANT LTD. CHESNEY WOLD, BLEAK HALL MILTON KEYNES MK6 1NE, ENGLAND TEL: +44 (0) 1908 240300 FAX: +44 (0) 1908 240222 EMAIL: [email protected] owners manual operators instructions spare parts list safety precautions maintenance www.dcpuk.com Rev05 safety lifting equipment 2.5t lifting shoe
Transcript
Page 1: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

www.dcpuk.comwww.dcpuk.com

DAWSON CONSTRUCTION PLANT LTD.CHESNEY WOLD,

BLEAK HALLMILTON KEYNES

MK6 1NE, ENGLANDTEL: +44 (0) 1908 240300FAX: +44 (0) 1908 240222

EMAIL: [email protected]

owners manualoperators instructionsspare parts listsafety precautions maintenance w

ww.

dcpu

k.co

m

Rev05

safety lifting equipment

2.5tlifting shoe

Page 2: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting
Page 3: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

contacts

Dawson Construction Plant LtdChesney Wold.Bleak Hall,Milton Keynes,MK6 1NE, EnglandTel: +44 (0) 1908 240300Fax: +44 (0) 1908 240222

www.dcpuk.com

---------------------------------------------------------------------------------

---------------------------------------------------------------------------------

---------------------------------------------------------------------------------

---------------------------------------------------------------------------------

---------------------------------------------------------------------------------

---------------------------------------------------------------------------------

---------------------------------------------------------------------------------

---------------------------------------------------------------------------------

www.dcpuk.com 03

Page 4: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

table of contents

Contacts 3

Table of Contents 4

Safety Checklist 5

Training 6

Maintenance 6

Parts list 7

900 Lifting Shoe pipe handling 8

SHS-908 Pipe handling correct method 9

Examples of correct and incorrect lifting 10-14

Under Separate cover:· IndividualTestCertificate· Pre-DespatchExaminationCertificateiftestcertificateis older than 6 months old.· E.C. Declaration of Conformity

www.dcpuk.com04

Page 5: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

Contacts 3

Table of Contents 4

Safety Checklist 5

Training 6

Maintenance 6

Parts list 7

900 Lifting Shoe pipe handling 8

SHS-908 Pipe handling correct method 9

Examples of correct and incorrect lifting 10-14

Under Separate cover:· IndividualTestCertificate· Pre-DespatchExaminationCertificateiftestcertificateis older than 6 months old.· E.C. Declaration of Conformity

safety check list

1. PRE-INSTALLATION CHECKS

Prior to installing a Lifting Shoe, check the following:-

a. Establish the weight of the lift involved and ensure a shackle with appropriate Safe Working Load is being utilised.

b. The Safe Working Load rating of any Shackle or Shoe is based on a “best condition”. For uneven leg loading on slings, dynamic loading during the lift or any other factor that increases component loading, the SWL of the equipment should be de-rated accordingly.

2. Do not modify the Lifting Shoe or any part of the lifting apparatus.

3. The angle between the two legs of the lifting sling, where applicable should not exceed 90°.

4. Ensure that all appropriate laws, bye-laws and regulations are complied with.

5. Ensure the area of pile that the lifting shoe is in contact with is in good condition, i.e. smooth and with no obstructions.

6. As with all lifting equipment, the lifting shoe should be inspected before each lift.

www.dcpuk.com 05

45-60°+60°

-45°

MAX LOAD 5TLifting Angle Range 45-60°

Sling legs must be of equal length.Angles less than 45° could result in an over loading of the equipment.

Page 6: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

training

Before allowing operators to use the Lifting Shoe, it is important to ensure they have received basic training in lifting and control of heavy loads.

It is strongly recommended that the following areas are included:

1. Basic safety in lifting operations

2. Supervision during lifting operations

3. Dangers and mal-practices

maintenanceTheliftingaccessoryismanufacturedfromhighqualitymaterialanddesignedtoofferlong service with a minimum of maintenance.

In order to preserve the product in this state, it is necessary to ensure that it is not mis-used or used for purposes outside its recommended use and to carry out regular inspection.

Regular checking that the product has not been distorted due to overload and the lifting shoe is not showing a reduction is any section due to wear of more than 5%. These checks should be performed by a competent person.

If in any doubt return the item to the manufacturer immediately for a thorough inspection.

Eachunitisissuedwithatestcertificateguaranteeingperformance.

IftheliftingShoeismodifiedinanywaythetestcertificateisno longer valid.

www.dcpuk.com06

Page 7: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

parts list

www.dcpuk.com 07

Pt. 5

44(6

.5t)

Page 8: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

900 Lifting Shoe pipe handling

The 900 Lifting Shoe can be used for lifting steel pipe but the size and capacity that can be handled is limited.

Lifting pipe using the SHS-908 Steel Pipe Shoe increases the range of steel pipe that can be handled and also the capacity

www.dcpuk.com08

PT. 544(6.5t)

Page 9: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

SHS-908 Pipe handling correct method

www.dcpuk.com 09

1/2

TUBE

LEN

GTH

x 1

.414

= M

IN S

LIN

G L

EG L

ENG

TH

TUBE

LEN

GTH

MAX

LO

AD 1

2T S

HO

E -

24T

16T

SH

OE

- 32

T

2

4T S

HO

E -

48T

Lifti

ng A

ngle

Ran

ge 4

5-60

°Sl

ing

Legs

mus

t be

of e

qual

leng

th.

Angl

es le

ss th

an 4

5° c

ould

resu

lt in

an

over

load

ing

of th

e eq

uipm

ent.

45-6

+60°

-45°

Cor

rect

Met

hod

of L

iftin

g St

eel P

ipe

Usi

ng S

HS-

908

Han

dlin

g Sh

oe

Page 10: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

This is the correct method for lifting H Section beams with one pair of 900 shoes.

This is the correct method for lifting H Section beams with two pairs of 900 shoes. A short chain should also be connected between the pairs of shoes to prevent them from spreading as shown in the diagram below.

This is the incorrect method for lifting H Section beams with one pair of 900 shoes.

Examples of correct and incorrect lifting

www.dcpuk.com10

Page 11: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

Examples of correct and incorrect lifting

This is the incorrect method for lifting a single Froddingham pile with one pair of 900 shoes.

This is the correct method for lifting a single Froddingham pile with one pair of 900 shoes.

www.dcpuk.com 11

Page 12: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

Examples of correct and incorrect liftingThisisthecorrectmethodforliftingaLXpilewithonepairoff900shoes.

This is the incorrect method for lifting a LX pile with one pair of 900 shoes.

www.dcpuk.com12

Page 13: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

Examples of correct and incorrect lifting

This is the correct method for lifting a pair of LX piles with two pairs of 900 shoes. Notethepairsofslingsareofdifferentlengthstoensurethepilesarelifteduniformly.

This is the incorrect method for lifting a pair of LX piles with two pairs of 900 shoes.

www.dcpuk.com 13

Page 14: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

Examples of correct and incorrect lifting

This is the correct method for lifting a pair of AZ piles with two pairs of 900 shoes.

This is the incorrect method for lifting a pair of AZ piles with two pairs of 900 shoes.

www.dcpuk.com14

Page 15: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

notes

www.dcpuk.com 15

Page 16: lifting shoe 2 - dcpuk.com Shoe 2.5t Ver05.pdf · This is the incorrect method for lifting a LX pile with one pair of 900 shoes. 12 . Examples of correct and incorrect lifting

www.dcpuk.com

DAWSON CONSTRUCTION PLANT LTD.CHESNEY WOLD,

BLEAK HALLMILTON KEYNES

MK6 1NE, ENGLANDTEL: +44 (0) 1908 240300FAX: +44 (0) 1908 240222

EMAIL: [email protected]

ww

w.dc

puk.

com

D.C.P. RESERVES THE RIGHT TO DISCONTINUE EQUIPMENT AT ANY TIME, OR CHANGE

SPECIFICATIONS OR DESIGNS WITHOUT NOTICE OR INCURRING OBLIGATIONS

HYDRAULIC PILING HAMMERS

EXCAVATOR MOUNTED VIBRATORS

EXCAVATOR MOUNTED DRILLS

QUIET, VIBRATIONLESS PUSH-PULL PILING

PILE EXTRACTION

SHEET PILE GUIDE FRAMES

SHEET PILE CAPPING SYSTEMS

CFA CLEANERS

PILE POINTS & SPLICERS

SAFETY HANDLING / LIFTING EQUIPMENT

SHEET PILE THREADERS

CHAIN CLAMPS

INNOVATIVE PILING EQUIPMENT

lifting shoe2.5t


Recommended