MEGA Symposium May 19 – May 22, 2003, Washington, D.C. LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros Riley Power Inc., a Subsidiary of Babcock Power Inc. Linton Hutcheson Duke Energy Mark Barger, Scott Rutherford Cormetech, Inc.
Transcript
Page 1: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium May 19 – May 22, 2003, Washington, D.C.

LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST

Terence Ake, Clayton Erickson, William MedeirosRiley Power Inc., a Subsidiary of Babcock Power Inc.Linton HutchesonDuke EnergyMark Barger, Scott RutherfordCormetech, Inc.

Page 2: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 2Riley Power Inc.

Introduction & Background

• Gaseous Arsenic Poisoning Predominant Deactivation Mechanism

• CaO Potential Poison at High Percentages• Gaseous As Controllable with CaO from

– Naturally in Coal– Limestone Addition to Fuel– Fuel Blending

Page 3: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 3Riley Power Inc.

Arsenic Control Through Limestone Addition

• Gaseous Arsenic (AsO3) as Catalyst Poison

• Addition of Limestone (CaCO3) to Coal form solid Non-Poisoning Form ((Ca3(AsO4)2)

Page 4: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 4Riley Power Inc.

European And Japanese Experience

• Japanese Experience Good, Low As Coals -Dry Bottom Units

• European Experience Good, Low As Coals -Dry Bottom Units

• Bad European Experience, Low As Coals -Wet Bottom Ash Recirculation

• Recirculation Revaporized As to Gaseous Phase

Page 5: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 5Riley Power Inc.

United States Coals

• USGS Coal Database - 22 ppm As Average• Coal Cleaning Reduces As by 35 to 83%• Utilities Need for Fuel Flexibility

Page 6: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 6Riley Power Inc.

Arsenic Variation in Coals

Page 7: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 7Riley Power Inc.

First US Limestone Addition• Large Variation in As Concentration with

Low CaO• Arsenic Levels as High as 24 ppm • Unit Had Past History of Slagging• Approach

– Temporary Limestone Feed System– Measure Gaseous Arsenic (AsO3)– Observe Boiler Performance

Page 8: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 8Riley Power Inc.

Effect of Limestone Addition

Page 9: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 9Riley Power Inc.

Limestone Addition Experience

Page 10: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 10Riley Power Inc.

Limestone Addition Experience

Page 11: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 11Riley Power Inc.

Duke Energy Cliffside Unit 5

• 50% of Fuels Did Not Require Limestone• Two Fuels Cannot Achieve Continuous

Operation With Limestone Addition• Using Limestone Addition System and Fuel

Knowledge Two Initial Catalyst Layers• Cormetech FIELD Guide Developed for

Fuel Range

Page 12: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 12Riley Power Inc.

Duke Energy Cliffside Unit 5

Page 13: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 13Riley Power Inc.

Mark Barger

SCR Catalyst Supplier for Cliffside 5 Project

Project Manager – Cliffside 5

Page 14: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 14Riley Power Inc.

FIELD Guide

• Fuel Impact and Evaluation of Life Determination

• Unit Design Specific• Assumes Constant Fuel Sulfur Level• For Arsenic poisoning SCR applications

Page 15: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 15Riley Power Inc.

FIELD Guide

20K+hours

16-20Khours

12-16Khours

0-12Khours

CaO%

As (ppm)

Page 16: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 16Riley Power Inc.

Cliffside 5 with 2002 fuels plotted

Page 17: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 17Riley Power Inc.

Cliffside 5 with 2003 fuels plotted

Page 18: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 18Riley Power Inc.

Linton Hutcheson

Page 19: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 19Riley Power Inc.

Cliffside Unit 5 SCR Management

Page 20: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 20Riley Power Inc.

Limestone Injection

Page 21: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 21Riley Power Inc.

FIELD GUIDE

Page 22: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 22Riley Power Inc.

Cliffside Unit 5 SCR Management

Page 23: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 23Riley Power Inc.

Coal Data Information

Page 24: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 24Riley Power Inc.

Cliffside Unit 5 SCR Management

Page 25: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 25Riley Power Inc.

Fly-ash Data Information

Page 26: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 26Riley Power Inc.

Cliffside Unit 5 SCR Management

Page 27: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 27Riley Power Inc.

CS5’s SCR PI Performance Data

More than 100 Additional SCR Data Points Stored

Page 28: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 28Riley Power Inc.

Cliffside Unit 5 SCR Management

Page 29: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 29Riley Power Inc.

Viewing Short Version of PI Data

Page 30: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 30Riley Power Inc.

Viewing Short Version of PI Data

Page 31: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 31Riley Power Inc.

Cliffside Unit 5 SCR Management

Page 32: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 32Riley Power Inc.

Time Passing Across the Catalyst

Page 33: LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST · SCR CATALYST Terence Ake, Clayton Erickson, William Medeiros ... SCR Catalyst Supplier for Cliffside 5 Project Project Manager

MEGA Symposium, Washington, D.C. 33Riley Power Inc.

Conclusions• Optimum Catalyst Designs are Achievable

With Current and Future Fuel Knowledge• Limestone Addition Reduces Gaseous As• Limestone Addition Protects• Limestone Adds to Fuel Flexibility• Limestone System is Part of an Integrated

SCR Reactor Design, Fuel Purchase, Catalyst Management, and Plant Operation Approach


Recommended