Line Balance
Training Pack
7/31/2019 Line Balance 059
2/39
Introduction : What is line balancing?
Where do we use line balancing?
Example
Line Balance A simple example
Pre-requisites for line balancing
The benefits of the pre-requisites
Method
Visual management
Summary - flowchart
7/31/2019 Line Balance 059
3/39
Introduction : What is line balancing?
What is Linebalancing?
Everyone is doing the sameamount of work
Doing the same amount of work tocustomer requirement
No one overburdened
No one waiting
Everyone working together in aBALANCED fashion
Variation is smoothed
7/31/2019 Line Balance 059
4/39
Introduction : What is line balancing?
7/31/2019 Line Balance 059
5/39
Introduction : What is line balancing?
7/31/2019 Line Balance 059
6/39
This is a VISUAL production tool that enables the planning and
organisation of individual, TIMED items of work to create thefoundation for a balanced production line.
It is used as a tool to continuously drive out waste from operationsand processes and it is also a valuable tool in implementingchanges in customer demand,
7/31/2019 Line Balance 059
7/39
Line Balance : Simple Example
1 2 3 4
25 mins5 mins 15 mins 10 mins
ConstraintOverburden
This operatormust WAIT for
operator 2
Overproduction which
causes the other 6wastes
Waiting
Over-processing
Inventory
Rework
Transportation Motion
This operatormust WAIT for
operator 3
5
10
15
20
25
1 2 3 4
mins
7/31/2019 Line Balance 059
8/39
Line Balance : Simple Example
5
10
15
20
25
Redistribute the work
1 2 3 4
15 mins15 mins 15 mins 10 mins
Promotes one-piece FLOW
Avoidsoverburden
Minimises the 7wastes
ReducesVariation
7/31/2019 Line Balance 059
9/39
Pre-requisites to line balancing
Standardise
Calculate Takt
Achieve CONSISTENCY inoperations
Enabling us to achieve ourcustomers requirements bymanaging our production effectively
Variation in our operations demandsmore human intervention which,increases the risk of HUMAN ERROR
Understand the drumbeatof theCUSTOMER
7/31/2019 Line Balance 059
10/39
Takt Time
Takt is a German word
It is the principal that all activity within a business is
synchronised by a pulse, set by the customer
demand
It describes the metronome
Takt = total time available*total customer demand
7/31/2019 Line Balance 059
11/39
Customer demand = 10 units / monthTotal time available = 20 days
Drumbeat = 1 part every 2 days
Each process needs to complete one unit every 2 days
Process 1 Process 2 Process 3 Customer
Every 2days
Process 4 Process 5
Takt time
Takt = total time availabletotal customer demand
Every 2days
Every 2days
Every 2days
Every 2days
7/31/2019 Line Balance 059
12/39
Standardise
Highlight keyinformation
Operationsequence
From:
To:
Cell/ Area
Description: Part No.
Quality check Safety precaution Std in process stockQty of SIPS Takt Time Cycle time
Standard work layout
Name / position Date Name / position Date Name / position Date
Scale:
stores
Workstation 1
Workstation 2
Toolcabinet
PPE MUST BEWORN AT ALLTIMES
6
Workstation 3
Capture the layout
Indicate how the
work flows
7/31/2019 Line Balance 059
13/39
StandardiseNO REVISION DATE LOCATION: SHEET..OF
DEPT: DATE:
PREPARED BY:
AUTHORISATION:
WORK INSTRUCTION SHEETOPERATION NO. OPERATION DESCRIPTION
NO MAIN STEPS Q S E KEY POINTS EXPLANATION/ EXAMPLES/ DIAGRAMS
P.P.E. JIGS/ TOOLS REQUIRED CHECKS TRAINING COMMENTS
TIME
MEPUM
WP HRS
PEGS REF:
TL TL TL PUM ME
OPERATING DESCRIPTIONNO
As per PEGS requirement
7/31/2019 Line Balance 059
14/39
The benefits of the pre-requisites
Takt time
Standard Operations
What do you thinkare the benefits?
7/31/2019 Line Balance 059
15/39
Takt time maximises the productivity due to:
Easily managed processes
Output of each process matches customer demandStandard Operations provide:
Capable and repeatable processes
Process control at source Improves accuracy of planning Better adherence to plans A platform from which continuous improvement can be made Reduced costs Improved quality Basis for training
The benefits of the pre-requisites
7/31/2019 Line Balance 059
16/39
Method - capture current state
Customer demand = 19 units a month
Time available = 20 days a month
TAKT = Available timeCustomer demand
TAKT = 25 hrs
TAKT = 20 days19 units
( x 24 hrs in a day)
TAKT
Total workcontent
Line BalanceRatio
Line BalanceEfficiency
25hrs
Current State
Ops 3
Calculate TAKT
7/31/2019 Line Balance 059
17/39
Method - capture current state
Why video?- Used to visually record activity- Accurate method of recording- Irrefutable and unambiguous
- Modern approach to establishing method
4. Identify which of the elements are Value-addedand which are non-value added
1. Capture a representative sample of the process
2. Review the video with the operators present
3. Break down the elements of workand record a time for each one
Calculate TAKT
Time the process
7/31/2019 Line Balance 059
18/39
Method capture current state
Calculate Takt time
Time the process
Break down thework elements
g
The operators cycle is broken down into elementsThese elements are put into three main categories, these being :
1. Working (man or machine)2. Walking3. Waiting
COMPANY DATE ORIGINATOR CHECKED
PART NAME SECTION
PART NUMBER VOLUME
PROCESS TAKT TIME SEC
WORKING
SEQUENCE MANUAL AUTO WAIT WALK
KEY:
Manual Walk
ISSUER COORDINATOR MGR ISSUER Auto Waiting
TIME OPERATION TIMEOPERATION NAME
STANDARDISED WORKCOMBINATION TABLE
TOTAL
10 3 41
10 4 2
152
0 0 0
1 Fit bracket A
Walk to bench
Inspect
1
Machine 2 10 5
TAKT
18 of 43
7/31/2019 Line Balance 059
19/39
Method - capture current state
Calculate total workcontent (stacked time) : 15 + 30 + 17 = 62 hrs
Takt
Line BalanceRatio
Line BalanceEfficiency
25 hrs
62 hrs
Current State
Ops 3
Total workcontent
Constraint customerdemand not being met
30
25
20
15
10
1 2 3
5
Takt (25 hrs)
15
30
17
Draw current stateLine Balance
Calculate Takt time
Time the process
Break down thework elements
7/31/2019 Line Balance 059
20/39
Method - capture current stateOr alternatively ..
1. Identify the business area to be balanced
Machining Treatments Assembly
4. Agree estimated time for each job andnumber of operators involved
i. Estimate a time for each sub elementii. Add up all the elements
iii. Write on the main post it the total time and total operators
Is it 1, 5 or 10 hours(use a rough guide)
Total estimated time
Number of operators
1
5 hrs
2
2
5hrs
1
3
1
5 hrs
2
2
5hrs
1
1
5 hrs
2
2
10hrs
1
1
5 hrs
2
21hr
1
3. Break down each process by task
i. Use post it notesii. Write on the process nameiii. Place on a board in sequence
Op1
Op 2
Subelementsof work
Mainprocesssteps
2. Form small group with team leaders/operators
7/31/2019 Line Balance 059
21/39
Method - capture current state
1
5 hrs
2
2
5hrs
1
3
1
5 hrs
2
2
5hrs
1
1
5 hrs
2
2
10hrs
1
1
5 hrs
2
21hr
1
Lay all the post its out insequence so that all of theprocesses are visible
Draw on the TAKT line (or usestring)
TAKT
Calculate TAKT
Time the process
Draw current stateLine Balance
Break down thework elements
2
5hrs
1
7/31/2019 Line Balance 059
22/39
Method - capture current state
Target Manpower = Total Work ContentTakt time
= 2.48
= 3 operators
Takt time = 25 hrs
Total work content = 62 hrs
30
25
20
15
10
1 2 3
5
Takt (25 hrs)
15
30
17
Calculate Takt time
Time the process
Draw current stateLine Balance
Calculate targetmanpower
Break down thework elements
Takt
Line BalanceRatio
Line BalanceEfficiency
25 hrs
62 hrs
Current State
Ops 3
Total workcontent
7/31/2019 Line Balance 059
23/39
Method capture current state
Line balance ratio = Total work content
No. of stations x longest operation
Line balance Efficiency = Total work content
Target manpower x Takt
Line Balance Ratio = 62 hrs(3 x 30)
X 100 = 69%
Line Balance Efficiency = 62 hrs
(3 x 25)
X 100 = 83%
Takt
Stackedtime
Line BalanceRatio
Line BalanceEfficiency
25 hrs
62 hrs
Current State
Targetmanpower 3
69%
83%
What could be achieved withoutreducing waste and still meetingTAKT simply REBALANCING!!
30
25
20
15
10
1 2 3
5
Takt (25 hrs)
15
30
17
Calculate Takt time
Time the process
Draw current stateLine Balance
Calculate LineBalance Ratio &
Efficiency
Calculate targetmanpower
Break down thework elements
7/31/2019 Line Balance 059
24/39
Method balance to TAKT
example
Target 83%Efficiency
30
25
20
15
10
1 2 3
5
Takt (25 hrs)
15
30
17
1 2 3
25 25
12
Takt (25 hrs)30
25
20
15
10
5
7/31/2019 Line Balance 059
25/39
Method balance to TAKT
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &
re-balance
Can thisbeimproved?
No
Yes
Complete workinstruction
(standardise) &implement
No
30
25
20
15
10
1 2 3
5
Takt (25 hrs)
15
30
17
1. Identify the elements of work that exceed TAKT
2. Refer to Standard Work Combination table
3. Identify where work can be re-allocated
COMPANY DATE ORIGINATORCHECKEDPART NAME SECTIONPART NUMBER VOLUMEPROCESS TAKT TIMESECWORKINGSEQUENCE MANUALAUTOWAITWALK
KEY:Manual WalkISSUER COORDINATOR MGR ISSUER Auto Waiting
TIME OPERATION TIMEOPERATION NAME
STANDARDISED WORKCOMBINATION TABLE
TOTAL
10 3 4 1
10 4 2
152
0 0 01 Fit bracket A
Walk to benchInspect
1Machine
2 10 5
TAKT
7/31/2019 Line Balance 059
26/39
Method balance to TAKT
Or alternatively
1. Refer to the post itnotes on the wall
3. Using the experience of the teamleaders/ operators, invite them torebalance the work to below TAKT
2. Use magnetic strips to signify the post
it notes (elements of time)
1
5 hrs
2
2
5hrs
1
3
1
5 hrs
2
2
5hrs
1
1
5 hrs
2
2
10hrs
1
1
5 hrs
2
2
1hr
1
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &
re-balance
Can thisbe
improved?
No
Yes
Complete workinstruction
(standardise) &implement
No
Method Identify value added and non value added
7/31/2019 Line Balance 059
27/39
MethodIdentify value added and non-value addedtime
What is Value added and non-valueadded time?Value Adding:Any process that changes thenature, shape or characteristicsof the product, in line withcustomer requirements e.gmachining, assembly
Non-Value Adding,but unavoidablewith current technology or methods.Any work carried out that does not increaseproduct value e.g inspection, part movement,tool changing, maintenance
WasteAll other meaningless, non-essentialactivities that do not add value to theproduct you can eliminate immediately e.g.looking for tools, waiting time
And dont forget !!
Method Identify value added and non value added
7/31/2019 Line Balance 059
28/39
MethodIdentify value added and non-value addedtime
ValueAdded
Waste
Traditional Focus
Work Longer-Harder-Faster
Add People or Equipment
Lean Manufacturing
Improve the Value
Stream to EliminateWaste
LEAD TIME
Method reduce non value added time and eliminate
7/31/2019 Line Balance 059
29/39
Methodreduce non-value added time and eliminatewaste
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &
re-balance
Can thisbe
improved?
No
Yes
Complete workinstruction
(standardise) &implement
No
COMPANY DATE ORIGINATOR CHECKED
PART NAME SECTION
PART NUMBER VOLUME
PROCESS TAKT TIME SEC
WORKING
SEQUENCE MANUAL AUTO WAIT WALK
KEY:
Manual Walk
ISSUER COORDINATOR MGR ISSUER Auto Waiting
TIMEOPERATION TIMEOPERATION NAME
STANDARDISED WORKCOMBINATION TABLE
TOTAL
10 3 41
10 4 2
152
0 0 0
1 Fit bracket A
Walk to bench
Inspect
1
Machine 2 10 5
TAKT
So, identify the category of work on thestandard work combination table
29 of 43
7/31/2019 Line Balance 059
30/39
Method balance to TAKT
Detail each process step (on format above)Indicate whether the work is :
Wait
Walk Work
Now you can split the operations on
the board into elements of Value added
and non value added work
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &
re-balance
Can thisbe
improved?
No
Yes
Complete workinstruction
(standardise) &implement
No
Or alternatively
Method reduce non value added time and eliminate
7/31/2019 Line Balance 059
31/39
Methodreduce non-value added time and eliminatewaste
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &
re-balance
Can thisbe
improved?No
Yes
Complete workinstruction
(standardise) &implement
No
Highlight the Value added and the non-valueadded work elements on the line balance board
Non value added activity
Value added activity
Takt (25 hrs)
1 2 3
5
30
25
20
15
10
Use red strips tosignify non-valueadded work
Method reduce non value added time and eliminate
7/31/2019 Line Balance 059
32/39
Method - reduce non-value added time and eliminatewaste
Takt
Stackedtime
Line BalanceRatio
Line BalanceEfficiency
27 hrs
57 hrs
Future State
Ops 2
Non value added activity
Value added activity
Reduce the NVA activity by applyingwaste removal tools (changeoverreduction, 5C, process mapping etc)
Attack thered,
redistributethe green !!
1 2 3
5
30
25
20
15
10
Takt (25 hrs)
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &
re-balance
Can thisbe
improved?No
Yes
Complete workinstruction
(standardise) &implement
No
7/31/2019 Line Balance 059
33/39
Method re-allocate & re-balance
1 2 3
5
30
25
20
15
10
Takt (25 hrs)
1 2 3
5
30
25
20
15
10
Takt (25 hrs)
Operator freedup for other
process orimprovement
team
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &re-balance
Can thisbe
improved?No
Yes
Complete workinstruction
(standardise) &implement
No
7/31/2019 Line Balance 059
34/39
Method - update the calculations
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &re-balance
Can thisbe
improved?No
Yes
Complete workinstruction
(standardise) &implement
No
Line balance ratio = Total work content
No. of stations x longest operation
Line balance Efficiency = Total work content
Target manpower x Takt
Line Balance Ratio = 44 hrs(2 x 24)
X 100 = 92%
1 2
5
30
25
20
15
10
Takt (25 hrs)
Line Balance Efficiency = 44 hrs(2 x 25)
X 100 = 88%Previous balance ratio = 69%Improvement of 23%
Takt
Total workcontent
Line BalanceRatio
Line BalanceEfficiency
25 hrs
44 hrs
Future State
Ops 2
92%
88%
7/31/2019 Line Balance 059
35/39
Method - Continuous Improvement
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &re-balance
Can thisbe
improved?
Yes
Complete workinstruction
(standardise) &implement
No ValueAdded Waste
LEAD TIME
Continuously usewaste elimination tools
P
DC
A
Plan
DoCheck
Act
7/31/2019 Line Balance 059
36/39
Method - standardise
Highlight keyinformation
Operationsequence
From:
To:
Cell/ Area
Description: Part No.
Quality check Safety precaution Std in process stockQty of SIPS Takt Time Cycle time
Standard work layout
Name / position Date Name / position Date Name / position Date
Scale:
stores
Workstation 1
Workstation 2
Tool
cabinet
PPE MUST BEWORN AT ALLTIMES
6
Capture the NEWlayout
Indicate how thework flows
Scale:
storesToolcabinet
Workstation 3
7/31/2019 Line Balance 059
37/39
Method - standardiseNO REVISION DATE LOCATION: SHEET..OF
DEPT: DATE:
PREPARED BY:
AUTHORISATION:
WORK INSTRUCTION SHEETOPERATION NO. OPERATION DESCRIPTION
NO MAIN STEPS Q S E KEY POINTS EXPLANATION/ EXAMPLES/ DIAGRAMS
P.P.E. JIGS/ TOOLS REQUIRED CHECKS TRAINING COMMENTS
TIME
MEMgr
WP HRS
PEGS REF:
TL TL TL PUM ME
OPERATING DESCRIPTIONNO
7/31/2019 Line Balance 059
38/39
Visual Management
The new line balance chart should bedisplayed on the cell
The impact of changes in resource orTakt on operator cycle times can be
seen instantly
Opportunities for Kaizen activities canbe easily identified
S
7/31/2019 Line Balance 059
39/39
Summary
Capture the current state Balance to TAKT & eliminate waste
Update calculations
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &re-balance
Can thisbeimproved?
Yes
Complete workinstruction
(standardise) &implement
No
Balance to TAKT
Reduce Non ValueAdded and
eliminate waste
Re-allocate work &re-balance
Update calculations
Can thisbeimproved?
Complete workinstruction
(standardise) &implement
Takt
Total workcontent
Line BalanceRatio
Line BalanceEfficiency
25 hrs
44 hrs
Ops 2
92%
88%
Future State
Takt
Total workcontent
Line BalanceEfficiency
Line Balance
Ratio
25 hrs
62 hrs
Current State
Operators 3
69%
83%
Calculate Takt time
Time the process
Draw current stateLine Balance
Calculate LineBalance Ratio &
Efficiency
Calculate target
manpower
Break down the
work elements
Calculate Takt time
Calculate LineBalance Ratio &
Efficiency
Time the process
Break down the
work elements
Draw current stateLine Balance
Calculate target
manpower
2
5hrs
1