+ All Categories
Home > Documents > Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Date post: 01-Oct-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
19
Liquefied Natural Gas Industry and Pacific NorthWest LNG Project Update July 14, 2014 Greg Kist, President Pacific NorthWest LNG
Transcript
Page 1: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Liquefied Natural Gas Industry and Pacific NorthWest LNG Project Update July 14, 2014

Greg Kist, President Pacific NorthWest LNG

Page 2: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

0

100

200

300

400

500

600

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Operational & Under Const'n New Supply Demand

MTPA

Global LNG Material Balance

Current market tightness expected to remain until 2019

Page 3: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

MTPA

0

50

100

150

200

250

300

350

400

450

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Pacific Contracted Pacific Uncontracted Atlantic Contracted (Base Case) Pacific New Supply Demand

Pacific LNG Material Balance

New projects will ease the gap temporarily

Page 4: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

B.C.’s LNG Advantage

4

Page 5: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Big Canadian Aspirations (based on NEB export license applications)

Project Location LNG mtpa

Partners

1 Pacific NorthWest Prince Rupert 19.7 PETRONAS, Japex

2 LNG Canada Kitimat 24.0 Shell, PetroChina, KoGas, Mitsubishi

3 Kitimat LNG Kitimat 10.0 Chevron, Apache

4 Prince Rupert LNG Prince Rupert 21.6 BG Group

5 BC LNG Co-op Kitimat 1.8 Cooperative/Golar

6 WCC LNG TBD 30.0 Exxon/Imperial

7 Woodfibre LNG Squamish 2.1 Pacific Oil & Gas

8 Triton LNG TBD 2.3 AltaGas, Idemitsu

111.5

Largest LNG Producer

Qatar 80 Existing capacity

Expected to be the largest LNG Producer

Australia 120 Existing (20) + under construction + planned

5

Page 6: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Project Overview

• Proposed development on Lelu Island administered by the Prince Rupert Port Authority

• 2 trains of 6 million tonnes per annum; option for a third; Lelu Island likely capable of hosting a fourth train

• Initial estimate of facility capital cost in range of $11 billion capital

• Triple FEED approximately 90% complete

• Final investment decision expected late 2014

• Construction slated to occur 2015-2018

• First cargo anticipated in early 2019

• Partners now represent 38% of integrated project

• Environmental Impact Statement filed on February 28, 2014; Decision anticipated late in 2014

Page 7: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Company Overview

7

Page 8: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Project Timeline

8

Page 9: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Project Schedule

9

Key Activities 2012 2013 2014 2015 2016 2017 2018 2019

Regulatory Review Process

• Submit Project Description

• Submit EA

Front End Engineering Design (FEED) Competition

• Submission of EPCC Bids

Final Investment Decisions (FID)

Engineering Procurement Construction and Commissioning (EPCC)

First Cargo

52 Months to RFSU

Page 10: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Environmental Application

• In dual EA process

• Additional information request has come from CEAA

• Developing responses to the request

• PNW is the first LNG terminal to go through the revised CEAA 2012 process

10

Page 11: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Facility Location

• Site is Lelu Island near Prince Rupert

• Secured exclusivity of the site until FID and subject to execution of Project Development Agreement (PDA)

• Feasibility Assessment Agreement requires both parties to execute definitive agreements which is anticipated in July 2014

11

Page 12: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Prince Rupert Port Authority - Federal

• Lelu Island located in the District of Port Edward (pop. ~600)

• Land is administered by the Prince Rupert Port Authority.

• Next nearest town is Prince Rupert (pop. ~12,500)

12

Potential BG site

Page 13: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Pacific NorthWest LNG Facility Overview

• Two liquefaction plants

• Two LNG storage tanks

• Expansion capability to 3 trains

• A bridge connecting Lelu Island to Port Edward

• Power generation infrastructure

• Administrative buildings

• Materials offloading facility

• A jetty trestle and marine terminal

13

Page 14: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Typical LNG Plant Plot Plan

14

Plot plan includes space for: i. 2 + 1 trains of 6 MTPA/train ii. 2 + 1 LNG tanks iii. Flare system iv. General offices v. Layout and construction camp vi. Material Offloading Facilities

(MOF) vii. LNG jetty, trestle and 2 berths viii.Bridge from mainland

Page 15: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

PETRONAS Shipping

• PETRONAS has one of the largest LNG carrier fleets in the world

• Operates Malaysian Maritime Academy

• Not all vessels will be PETRONAS vessels but all vessels calling will comply with PETRONAS standards

Page 16: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

PETRONAS Fleet

16

Page 17: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

Substantial Economic Benefits

• $11 billion investment

• Up to 4,500 construction jobs at peak

• 330 local jobs in operation

• Over 300 spinoff jobs in the community

• 1.3 billion new tax revenues

17

Page 18: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...

“Nation Building” Scale of Investment

• Recognize that we are in an extremely competitive energy world

• Capital will move quickly to the highest, risk-adjusted return projects

• Time is of the essence

• Regulatory environment must remain robust but timely

• Fiscal environment must account for massive capital investment

• A successful Canadian LNG industry will set us on the world energy stage

18

Page 19: Liquefied Natural Gas Industry and Pacific NorthWest LNG ...