framework. The prioritization of the Core Road Network was to be broadlybased on economic importance, connectivity to economic growth centres andstrategically important corridors, traffic volume, share of commercial vehicle,public transport routes, disaster relief and climatic resilence functionalities.TheChief Engineer(Maintenance) has submitted list of roads to be declared as coreroad network after completing the prioritisation exercise
2) Accordingly, Government of Kerala, hereby notify the following roadsfor setting up the Core Road Network in the State.
LIST OF CORE ROAD NETWORKSlNo
District StateHighway
RITES 2001Roads
Other MDRs-Scorewise length(in Km)
Addl MDRs
TotalNo. ofroads
Totallength(in Km)
> 90 > 80 > 701 Thiruva
nanthapuram
201.56 152.45 33.02 10.83 24.00 397.85
2 Kollam 164.19 158.38 23.00 322.573 Alappu
zha170.841 122.29 44.25 22.75 25.00 360.13
4 Pathanamthitta
196.084 138.50 5.30 110.18 34.00 450.05
File No.PWD-H1/6/2020-PWD
Considering the devastation faced by Kerala due to unprecedented
disaster resilient standards and performance based maintenance contracting
5 Kottayam
406.531 122.27 7.46 67.30 34.00 603.56
6 Idukki 959.222 7.43 20.86 17.00 987.517 Ernakul
um325.206 209.54 12.02 14.99 49.00 561.76
8 Thrissur
374.033 17.74 29.36 129.82 19.13 47.00 570.08
9 Palakkad
245.987 191.12 13.08 23.00 450.18
10 Malappuram
374.764 209.57 9.78 35.00 594.11
11 Kozhikkode
359.435 167.09 33.50 61.15 33.00 621.17
12 Wayanad
128.955 172.03 21.96 19.00 322.95
13 Kannur 244.665 227.21 0.51 13.95 22.00 486.3314 Kasara
god141.78 109.38 20.20 9.00 271.36
Totallength(Km)
4293.253 2004.99 66.52 173.19 375.24 86.43 394.00 6999.61
3) The district wise details are appended herewith.
4) The Chief Engineer(Roads), Chief Engineer(Bridges) and ChiefEngineer(Maintenance) should ensure that priority be given to works onthese roads and enhanced climate and disaster risk resilience standards aremaintained. The Chief Engineer(Admin) to take steps to create separatebudget head for Core Road Network(CRN) in FY 2020-21.
By order of Governor
T K JOSEADDITIONAL CHIEF SECRETARY
File No.PWD-H1/6/2020-PWD
Priority I Priority II
Total
length
4293.25 2004.99 614.94 86.43 6999.61 394.00
PWD ROAD MAINTENANCE WING
DRAFT LIST OF CORE ROAD NETWORK
CHIEF ENGINEER
Road
Priority III
Total
length (in
Km)
State
Highways
RITES 2001
Roads
Other MDRs
>70
Additional
MDRs
recommended
Total No
of roads
4360290/2020/OS-PWD67
> 90 > 80 > 70
1
Thiruvananthapur
am
201.56 152.45 33.02 10.83 24.00 397.85
2 Kollam 164.19 158.38 23.00 322.57
3 Alappuzha 170.841122.29 44.25 22.75 25.00
360.13
4 Pathanamthitta 196.084138.50 5.30 110.18 34.00
450.05
5 Kottayam 406.531122.27 7.46 67.30 34.00
603.56
6 Idukki 959.2227.43 20.86 17.00
987.51
7 Ernakulum 325.206 209.54 12.02 14.99 49.00 561.76
8 Thrissur 374.033 17.74 29.36 129.82 19.13 47.00 570.08
9 Palakkad 245.987 191.12 13.08 23.00 450.18
10 Malappuram 374.764 209.57 9.78 35.00 594.11
11 Kozhikkode 359.435 167.09 33.50 61.15 33.00 621.17
12 Wayanad 128.955 172.03 21.96 19.00 322.95
13 Kannur 244.665 227.21 0.51 13.95 22.00 486.33
14 Kasaragod 141.78 109.38 20.20 9.00 271.36
Total length
(Km)
4293.253 2004.99 66.52 173.19 375.24 86.43 394.00 6999.61
CHIEF ENGINEER
PWD ROAD MAINTENANCE WING
DRAFT LIST OF CORE ROAD NETWORK PRUNED DOWN AT HIGHER LEVEL
Sl
No
District
State
Highways
RITES
2001
Roads
Other MDRs-Scorewise
length (in Km)
Addtl
MDRs
recomme
nded
Total
length
(in Km)
Total No.
of roads
4360290/2020/OS-PWD68
Grade ScoreStarting
Node
End
NodeScore Grade Score Category Grade Score Grade Score Present status DLP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1
Cherkala - Jalsoor road
(S.H. No. 55)
km 0/00 to 39/138
Cherkala Jalsoor 39.138 SH
DLP of BM&BC
work expired long
ago. The road is
made trafficable
by patch works
03.05.2015
2
Hosdurg - Panathur
road (S.H. No. 56)km
0/00 to 44/175
HosdurgPanathu
r44.175 SH
Road is trafficable
at present. Km
0/000 to 15/000
DLP expired. Patch
work ongoing in
this reach DLP of
these patch works
is 6 months. Km
15/000 to 24/000
is under DLP upto
29/10/2022.
Km24/000 to
42/000 patch
works were
arranged this
reach and DLP will
expire by June
2020. Km 42/000
to 44/175 is under
DLP upto March
2021.
Km 0/000 to
15/000 -2016,
Km15/000 to
24/000-
29/10/2022, Km
24/000 to
42/000- June
2020 (for patch
works) , 42/000
to 44/175-
March 2021.
KASARAGOD DISTRICT
Core Road Network
SL.
NoName of Road
Details of Link
Length of
Road
Criteria of selection of Road (As per Methodology)
Remark
s
Starting Node Ending Node
Constit
uency
NameChainag
eName Chainage
STATE HIGHWAYS
Traffic Density of Connecting
Corridors
Tribal or Under
Developed Regions
Tourits/Pilgrim
Centers/Ports&HarboursInterstate Connectivity
Total
Score
4360290/2020/OS-PWD69
3
Kasaragod -
Kanhangad road (S.H.
No. 57) km 0/00 to
Kasaragod Kanhan
gad29.500 SH
Road handed over
to KSTP. Work
completed.
4
Kalladka - Cherkala
road km 23/227 to
52/194 (SH 31) km
Adkasthal
a
Cherkal
a28.967 SH
KIIFB work is
ongoing in this
road. The DLP is
3 years after the
completion
2024 (
anticipated)
141.780
1 Uppala Kanyana road Kaikamba 0/00 Kanyana 15/550 15.55 Manjeshwar
This road is
maintained by
RICK. DLP upto
2033 (13 years)
2033
2 Thekkil Alatty road Poinachi 0/00Manimo
ola34/696 34.696 Udma
KIIFB work is
ongoing in this
road. The DLP is
3 years after the
completion
2024 (
anticipated)
3
Nileshwar Raja road &
Nileshwar Edathodu
road
Nileshwar 0/00Edathod
u22/130 22.13
Thrik
aripu
r
KIIFB work is
ongoing in this
road. The DLP is
3 years after the
completion
2024 (
anticipated)
4 Odayanchal Cherupuzha roadOdayanch
al0/00
Cherupu
zha37/00 37.00
Kanh
anga
d&Tri
karip
ur
0/000 to 6/500-
Budget work
ongoing, 6/500 to
16/500-DLP
expired on
30/01/2018 ,
16/500 to 22/000
Budget work
ongoing, 22/000 to
32/000 KIIFB
work ongoing,
32/000 to 37/000
Hill Highway work
ongoing
6/500 to
16/500-
30/01/2018.
TOTAL 109.38
RITES LIST 2001
OTHER MDRs
4360290/2020/OS-PWD70
1
Badiadka-Yethadka-
Sulapadavu Road
Badiadka 0/00 Sulapadavu
20/200 20.200
D
30
b d
5
Tribal(
E)
25
Minor
pilgrim
centre
Z 5 Y 10 75Kasar
agod
KIIFB work is
ongoing in this
road. The DLP is
3 years after the
completion
2024 (
anticipated)
20.200
4360290/2020/OS-PWD71
Grade Score
Starti
ng
Node
End Node Score Grade Score Category Grade ScoreGrad
eScore
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1
SH-30 Thalassery-
Coorg road km
0//0 to 55/128
Thalassery
Koottupuz
ha (State
Border)
55.128 SH Handed over to
KSTP
2
SH 36-
Taliparamba -Iritty
road km 0/00 to
46/470 Taliparamba
(NH17)
Iritty
bridge
46.470 SH Ongoing work
under CRF
3
SH 38-
Puthiyangadi -
Kuttiyadi -
Peringathur -
Panoor -
Kuthuparamba-
Chovva Byepass
road km 66/480 to
80/967 and 82/967
to 102/017
Peringathur
bridge
(District
Border)
Thazhe
Chovva
(NH17)
33.537 SH
100/300 to
103/350 -
work
completed on
30/11/2019
and DLP up
to
28/11/2022
Good
Hill Highway km
134/380 to 243/910
Tribal or
Under
Tourits/Pilgrim
Centers/Ports&Harbours
Interstate
Connectivi
Name
KANNUR DISTRICT
Core Road Network
SL.N
oName of Road
Details of Link
Length of
Road(K
M)
Criteria of selection of Road (As per Methodology)
Total
ScoreConstituency Remarks
Chainage Name Chainage
STATE HIGHWAYS
DLP Status
Starting Node Ending NodeTraffic
Density of Connecting
Corridors
4360290/2020/OS-PWD72
(Kannur Division
portion connecting
Cherupuzha -
Manjakkad -
Alakode -
Karuvanchal -
Thavukunnu -
Naduvil- Chemperi -
Payyavoor- Ulikkal -
Vallithodu -
Anapanthy -
Karikottakari --
Edoor -Aralam-
Kappukadavu -
Perumbunna -
Madapurachal -
Manathana-
Kottiyoor-
Ambayathodu)
Ch. 64/620
to 71/690 -
25.12.2017
Ch. 71/690
to 90/315 -
24.12.2020
Cherupuzha -
Vallithode -
work in
progress
Vallithode to
Ambayathode -
DPR submitted
for AS
Total 244.665
1
Valapattanam
Cheruthazham (
Pilathara
Pappinissery)
Valapattanam 0.000 Pilathara 21.000 21 Azhikode,KalliasseryByepass to
NH
KSTP
2Thaliparamba
Coorg Border road
Thaliparamb
a0.000 coorg 36.985 32.435
Thaliparamba,I
rikkurInter state
connectivity
DLP completed Good
Thalassery 0.000Anjarakka
ndy15.000 32.502
Anjarakkand
y15.000 Chalode 21.330 6.330
Ch. 0/300 to
3/300 -
28.05.2020
&
14.11.2020
work
completed
on
15/01/2019
and DLP up
to
14/01/2022 Good
Chalode 21.330 irikkur 32.502 11.172
work
completed
on
31/01/2016
and DLP up
to
30/01/2019 Good
4
Cherupuzha
(District
Border)
Ambaytho
du109.530 SH
RITES LIST 2001
3 Thalassery Irikkur Mattannur
connecting
NH 66 and
SH 36 via
Kannur
Airport
4360290/2020/OS-PWD73
4 Kannur Mattannur Mele Chovva 0.000 Mattannur 23.023 23.023 Kannur,Mattannur
connecting
NH 66 from
kannur town
and
KannurAirpo
rt
work
completed
on
29/06/2017
and DLP up
to
28/06/2020 Good
5 Thalassery Bavaly Thalassery 15.696Nedumpoi
l38.000 22.304 Thalassery
Inter district
connectivity
6Old NH
Valapattanam
NH JN
Puthiya
Theru
0.000Valapattan
am2.470 2.47 Azhikode
Port
connectivity
DLP
completed
on 4/2015 Good
7
Kannur
Valapattanam road
via Alavil
Padannappal
am0.000 Manna jn 5.690 5.69 Kannur,Azhikode
Byepass to
Kannur town
work
completed
on
30/03/2018
and DLP up
to
29/03/2021 Good
8Alavil Azhikode
roadAlavil 0.000 Azhikode 4.420 4.42 Kannur,Azhikode
Port
connectivity
work
completed
on
23/03/2012
and DLP up
to
22/03/2015 Good
9
Vellur -
Padiyottuchal -
Pulingome -
Rajagiri - Josegiri
road
Vellur 0.000 Josegiri 45.500 45.5 Payyannur CRPF camp 29.04.2021
Good
10 Iritty Nedumpoil Iritty 0.000Nedumpoi
l20.360 20.36 Peravoor
Inter district
connectivity DLP CompletedGood
227.206
OTHER MDRs
4360290/2020/OS-PWD74
1
Old Sub way
kannur (old Bus
stand-
Muneeswaran
Kovil)
Old Bus
stand0.000
Muneeswa
ran Kovil0.511 0.511 A 60 a a 15 nil 0 intermediate y 10 no 0 85.00 Kannur
Kannur town
road
work
completed
on
27/02/2016
and DLP up
to
26/02/2019
(Patch work
was recently
done to
make the
roadway
trafficable
and
completed
on
25/01/2020
DLP of
patch is
upto
24/07/2020
) Good
0.511
2
Old West Coast
(NH Caltex-
Kannur Civil
Station)
NH Caltex 0.000
Kannur
Civil
Station
0.305 0.305 A 60 a a 15 nil 0 Minor z 5 no 0 80.00 KannurKannur town
road
work
completed
on
24/02/2016
and DLP up
to
23/02/2019
(Patch work
was recently
done to
make the
roadway
trafficable
and
completed
on
25/01/2020
DLP of
patch is
upto
24/07/2020
) Good
3
Dharmashala -
Parassinikadavu
road
Dharmashala 0.000Parassinik
kadavu4.500 4.5 B 50 a b 12.5 nil 0 major x 15 no 0 77.50 Thaliparamba
Pilgrim
centre
Parassinikka
davu Sree
Muthappan
Temple Work arrangedTrafficable
4360290/2020/OS-PWD75
4 Kannur Thalap AKG JUNCTION 0.000 BSNL Bhavan 1.910 1.91 A 60 a a 15 nil 0 nil nil 0 no 0 75.00 KannurKannur town
road
work
completed
on
25/06/2013
and DLP up
to
24/06/2016
(Patch work
was recently
done to
make the
roadway
trafficable
and
completed
on
25/01/2020
DLP of
patch is
upto
24/07/2020
) Good
5
Approach road to
Railway
underbridge
Thavakkara
NH JN near
NS 0.000
Plaza
circle1.263 1.263 A 60 a a 15 nil 0 nil nil 0 no 0 75.00 Kannur
Kannur town
road
work
completed
on
24/02/2016
and DLP up
to
23/02/2019
(Patch work
was recently
done to
make the
roadway
trafficable
and
completed
on
25/01/2020
DLP of
patch is
upto
24/07/2020
) Good
6Mahe byepass
RoadRailway Crossing 0.000 Mahe bridge 3.710 3.710 B 50 a a 15 nil 0 intermediate y 10 no 0 75.00 Thalassery
Tourist
centres
7
Link road
connecting NH 17
and approach road
to Payyannur
railway station
NH at
payyannur0.000
Payyannur
railway
station
0.260 0.26 A 60 a b 12.5 nil 0 nil nil 0 no 0 72.50 PayyannurNaval
Academy
Nil Trafficable
4360290/2020/OS-PWD76
8Payyambalam
beach road south
Payyambala
m beach0.000
Payyamba
lam beach2.000 2 B 50 b c 7.5 nil 0 major x 15 no 0 72.50 Azheekode tourism
work
completed
on
12/5/2019
and DLP up
to
11/05/2022 Good
13.948
4360290/2020/OS-PWD77
1CVG Road( Calicut -Vythiri-Gudalur ) SH
:29
Chundel at km
67/000 of NH:212
Choladi-Tamil
Nadu State
Border
30.070 SH 29 KalpettaKIIFB Works ongoing &
Budget work arranged-
2 Kalpetta Varambetta road -SH 54Kalpetta at km
72/400 of
NH:212
Padinjarathar
a at km 82/00
of SH 54
17.725 SH 54 KalpettaKIIFB Works
ongoing -
3Thalassery-Bavali Road(68/200 to
81/000 )
Boys Town at km
68/200 of TB
Road
Mananthavad
y at km
81/000 of TB
Road
12.800 SH 59 MananthavadyProviding BM and
BC work in
progress
-
4Mananthavady-Kalpetta Road 0/000 to
30/800Mananthavady
Kainatty at km
76/00 of
NH:212
30.800 SH 59Mananthavady,
Kalpetta
KIIFB Works
ongoing -
5 Kalpetta -Meppadi road Kalpetta at km
72/00 of NH:212
Kappenkolly
at km 75/800
of CVG road
7.000 SH 59 Kalpetta - 6/19/2020
6 Meppadi-Chooralmala RoadMeppadi-at
km78/050 of
CVG Road
Chooralmala
at km 69/650
of SH 59
12.800 SH 59 KalpettaKIIFB Works
ongoing -
7 Chooralmala - Aranappuzha RoadChooralmala at
km 69/650 of SH
59
Aranappuzha
at km 75/650
of SH 59
6.000 SH 59 KalpettaKIIFB Works
Arranged -
8Vythiri- Tharuvana Road 23/600 to
31/590
Padinjarathara at
km 82/00 of SH
54
Tharuvana at
km 10/240 of
M.P.Road
7.990 SH 59
Kalpetta
Budget work
ongoing-
9Mananthavady-Pakramthalam Road
6/470 to 10/240
4 th Mile at km
6/470 of M.K.
Road
Tharuvana at
km 10/240 of
M.P.Road
3.770 SH 59 Mananthavady
no work ongoing
BM and BC DLP
: 30-07-2020
128.955
0/000 3/000 - 6/30/2020
3/000 11/200KIIFB WORK : FS
obtained-
0/000 4/100Budjet work
ongoing-
Sulthan Bathery
Total
RITES LIST 2001
1 Sulthan Bathery- Cherambadi road 11.200
Status DLP
cha
ina
ge
Fro
m
Ch
ain
ag
e T
o
Km
STATE HIGHWAYS
Po
ints
ba
sed
on
To
uri
st S
po
t
Wh
eth
er
Inte
rsta
te
Co
nn
ect
ivit
y
Po
ints
ba
sed
on
In
ters
tate
Co
nn
ect
ivit
y
Wh
eth
er
Co
nn
ect
ivit
y t
o
Tri
ba
l A
rea
To
tal
Po
ints
Co
nst
itu
en
cy
WAYANAD DISTRICT
CORE ROAD NETWORK
Sl.
No Name of Road Cla
ssif
ica
tio
n b
ase
d o
n T
raff
ic
Vo
lum
e
Po
ints
ba
sed
on
Tra
ffic
Vo
lum
e
Cla
ssif
ica
tio
n b
ase
d o
n D
en
sity
at
Sta
rtin
g P
oin
t
Cla
ssif
ica
tio
n b
ase
d o
n D
en
sity
at
En
d P
oin
t
Po
ints
ba
sed
on
De
nsi
ty
Gra
din
g o
n T
ou
rist
Sp
ot
4360290/2020/OS-PWD78
4/100 5/500 - 3/30/2022
5/500 8/000 - 4/10/2020
8/000 14/313 - 7/20/2020
0/000 10/000Budjet work
arranged2007
10/000 15/705 - 2007
4Sulthan Bathery - Pulpally - Perikkalloor
road(MDR)0/000 34/200 34.200 Sulthan Bathery - 2007
5 Vythiri- Tharuvana Road
0/000 22/000 22.000 KalpettaBudget work
ongoing-
50/400 81/000
Providing BM and
BC work in
progress
-
81/000 87/000
Providing renewal
BC work
completed
Providing
renewal BC DLP
: 22/7/20121
87/000 93/000
Providing BM and
BC work
submitted for
-
7 Kattikulam - Tholpetty road (MDR)
0/000 15/300 15.300 Mananthavady providing renewal
BC : agreement to
be executed
main work DLP
year 2011.
patching DLP
29/6/2020
0/000 4/000
work completed
BM and BC DLP
: 29-06-2022
4/000 9/000
Providing BM and
BC work in
progress
9/000 11/200 Providing BM and
BC work in
progress
9/000 to
13/000
patching DLP
30/6/2019
11/200 14/300
Providing BM and
BC work in
progress
Mananthavady
8
Mananthavady - Kandothuvayal road 14.300 Mananthavady
Sulthan Bathery
6 Thalassery - Bavali road (HH)
34.6
3 S.Bathery- Noolpuzha road 15.705
Sulthan Bathery2 Vaduvanchal - Kolagappara road 14.313
4360290/2020/OS-PWD79
9
Mananthavady Kaithakkal road 0/000 10.415 10.415 MananthavadyKIIFBproviding BM
and BC work in
progress
0/000 to 3/000
Patching DLP
6/11/2018.
5/500 to
10/415
patching DLP
4/10/2018
172.033
1
Mananthavady-Pakramthalam
road(MDR)10/240 32/200 21.960 C 40 b b 10 X 15 Yes 10 Yes 75 Mananthavady
KIIFB Works
ongoing -
21.960
OTHER MDRs
4360290/2020/OS-PWD80
Grade ScoreStartin
g Node
End
NodeScore Grade Score Category Grade Score Grade Score
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1
Koyilandy Thamarassery
Mukkom Areacode
Edavanna road upto
Erannymakkal
Koyilandy
(0/000)
Erannymak
kal
(51/245)
51.245 S H Trafficable DLP
Exisiting
0/0 -0/400 DLP
Exisiting up to
28-02-2023
15/700 -16/500
BM & BC work
in Progress,
25/000 to 36/625
good NO DLP
2
Puthiyangadi Ulliyeri
Perambra Kuttiadi
Nadapuram Irringannur
Peringathur Punnur
Kuthuparamba Chovva
Bye pass road
Pavangad
(0/000)
Peringathur
(66/565)66.565 S H Trafficable
DLP
Exisiting
4/400 -10/600
under DLP up to
14-01-2020
3
Kappad Thushargiri
Adivaram Nooranthodu
Go ( Rt) No 147 / 2004
/ pwd dt T v m 6. 2.04
Kappad
(0/000)
Nooramtho
du
(68/000)
68.000 S H Trafficable DLP
Exisiting
0/0 to 3/750 DLP
till 27/01/2021,
60/900to66/045
DLP upto
26/08/2020.
6/600-11/240
Under DLP of
CRF work
4
Kadiyangad
Peruvannamoozhi
Kadiyangad
Km:0.000
Peruvanna
moozhi
Km:7/00
7.000 S.H.
Trafficable No DLP
5
Peruvannamoozhi-
Poozhithodu
Peruvannam
oozhiKM
0/00
Poozhithod
u KM
9/400
9.4 SH
up to 2/280
Traficable
up to 2/280
Traficable and
balance portion
forest area
6
Poozhithodu -
Padinjarathara Road
Poozhithodu
KM 0/00
Padinjarath
ara
KM 27/225
27.225 SH
Trafficable No DLP
7From Vilangad to
kakkadampoil
Vilangad
(520)
Kakkadamp
oil
(650)
130.000
Hill
High
way
No DLP
Proposed Hill
Highway under
KiIFB
TOTAL 359.435
RITES LIST 2001
Interstate
Connectivity Total
Score
Constituen
cyNameChaina
geName Chainage
Starting Node Ending NodeTraffic
Density of Connecting
Corridors
Tribal or Under
Developed
Regions
Tourits/Pilgrim
Centers/Ports&Harbours
STATE HIGHWAYS
KOZHIKKODE DISTRICT
Core Road Network
SL
.N
o
Name of Road
Details of Link
Length of
Road
Criteria of selection of Road (As per Methodology)
Status DLP Remarks
4360290/2020/OS-PWD81
1Kozhikode-Balussery
roadKozhikode 0/000 Balussery 20/500 20.500 Trafficable No DLP
Budget work
sanctioned for
BM&BC
renewal
2Kunnamangalam-
Agastianmuzhi road
Kunnamanga
lam0/000
Agastianmu
zh13/100 13.100 Trafficable No DLP
Work is being
done under
CRF
3Kozhikode-Mavoor
roadKozhikode 0/000
Mavoor
road19/540 19.540 Trafficable No DLP
4Meenchanda- Beypore
roadMeenchanda 0/000
Beypore
road6/000 6.000 Trafficable
DLP
Exisiting
0/0-6/00 DLP
existing up to
28/7/2021
5Kakkodi-Puthiyangadi
roadKakkodi 0/000
Puthiyanga
di4/400 4.400 Trafficable No DLP No DLP
6 Perambra-Vatakara road Perambra 0/000 Vatakara 21/500 21.500 Trafficable DLP
Exisiting
0/0 - 9/800
KIIFB work
completed with
DLP up to
31/03/2023
9/800 - 12/200
and 17/00 -
21/500 work
on going
7Kuttiadi-Pakramthalam
road Kuttiadi0/000
Pakramthal
am17/000 17.000 Trafficable NO DLP NO DLP
8Muttungal-Nadapuram
roadMuttunga 0/000 Nadapuram 12/000 12.000 Trafficable NO DLP
KIIFB work
ongoing
9Padanilam-Nanminda
roadPadanilam 0/000 Nanminda 13/350 13.350 Trafficable NO DLP
10Mankavu-Kanniparamba
roadMankavu 0/000
Kannipara
mba15/800 15.800 Trafficable NO DLP No DLP
11Francis road jn. -
Konthenar road
Francis road
jn0/000 Konthenar 3/900 3.900 Trafficable
DLP
Exisiting
0/0 -3/900
DLP existing
12Pottammal-
Puthurmadam roadPottammal 0/000
Puthurmad
am8/700 8.700 Trafficable NO DLP No DLP
13Pantheerankavu-
M.anakadavu road
Pantheerank
avu0/000 M.davu 3/300 3.300 Trafficable
DLP
Exisiting
0/0 -2/00 BM
& BC work
ongoing
2/0-3/300 DLP
Existing
14Mavoor-Pannikkode
roadMavoor 0/000 Pannikkode 8/000 8.000 Trafficable NO DLP No DLP
Total 167.090
1 Perode Parakkadavu
Chettakandy Road- Perode 0/000 Chettakandy 5/000 5.000 B 50 b b 10 T/U 25 b y 10 N 0 95 Nadapuram
Trafficabl
e
DLP
ExisitingDLP up to
31/03/2022
2 Kuttiadi Mullankunnu -
Pasukadavu Road Kuttiadi 0/000 Pasukadavu 13/000 13.000 B 50 b c 7.5 T/U 25 b y 10 N 0 92.5 Nadapuram
Trafficabl
eNO DLP
NO DLP , work
tenderd
OTHER MDRs
4360290/2020/OS-PWD82
3 Chorod vykkilassery
orkkattery kunjippally
monthal kadavu road
Chorod 0/000 monthal kadavu15/500 15.500 B 50 b c 7.5 T/U 25 b y 10 N 0 92.5 Vadakara
Trafficabl
e
DLP
Exisiting
CRF work
Executed , DLP
up to 2023
march
33.500
4 Bank road Jn- beach
road
Bank road Jn- 0/000 Beach 1/100 1.100
A
60 a a 15 0 a x 15 N 0 90
Kozhiko
de
South
Trafficabl
e
DLP
Exisiting
BM&BC carried
out under
budget work in
2016-17.DLP
up to
29/7/2020
5
Payyoli Perambra Road Payyoli 0/000 Perambra 18/125 18.125 B 50 b b 10 T/U 25 c z 5 N 0 90 Perambra
Trafficabl
e
DLP
Exisiting
Chainage -
0/000 to
18/125 KIFB
work
Completed on
01-03-2020 &
DLP up to 28-
02-2023
6 Parakkadavu-
kadavathur Road Parakkadavu- 0/000 kadavathur 2/000 2.000 B 50 b b 10 T/U 25 c z 5 N 0 90 Nadapuram
Trafficabl
eNO DLP
NO DLP
existing
7 Vatakara Villiappally
Chelakkad Road
Vatakara old NH 0/000 Chelakkad SH PUKC15/985 15.985 B 50 b b 10 T/U 25 c z 5 N 0 90
Vadakar
a,
Kuttiady
&Nadap
uram
Trafficabl
eNO DLP
NO DLP, KIIFB
work Proposed
8 Koodathai Kodencheryi
Road Km 0/000 to
6/200
Koodathai 0/000 Kodencheri 6/200 6.200 C 40 b c 7.5 T/U 25 a x 15 N 0 87.5 Koduvally
Trafficabl
eNO DLP
0/000 to
3/200 included
in NABARD
XXV. Estimate
submitted for
TS. Road is
made
trafficable with
patch repairs
9 Old N.H.Road in FerokeCheruvannur
(0/000)
Ferokepetta
(2/565)2.565
Trafficabl
e
DLP
Existing,
MDR
BM&BC are
being carried
out.Yes DLP
exists.
10
Old N.H.portion in
Vatakara
town(Peruvattumthazha
Karinpanapalam road)
Peruvattumt
hazha
(0/000)
Karinpanap
alam
(3/000)
3.000Trafficabl
eMDR
4360290/2020/OS-PWD83
11
Mini Bye pass road from
Meenchanda to West
Hill
Meenchanda
(0/000)
West hill
(11/615)11.615
Trafficabl
e
DLP
Existing,
MDR
0/0 - 5/00
Budget work
arranged,
5/00 -8/00
DLP Existing,
8/140-11/615
KIIIFB work
ongoing
12Approach road to
Eranhikkal bridge
Eanhikkal
(0/000)
Eranhikkal
(0/558)0.558
Trafficabl
eNO DLP MDR
Total61.148
Grand Total 621.173
4360290/2020/OS-PWD84
Startin
g
Node
End
Nod
e
Categor
yGrade
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1
Guruvayoor Altharam
Ponnai
Vanneri-14.858 Ponnani-
28.970
14.112 S.H
Good
km 14/858 to 19/500 -
26.06.2022
km 19/500 to 23/800 -
21/11/2021
km 23/820 to 28/970 -
27/02/2022
2
Trissur Kuttippuram
23/340 to 52/650
Kolikkara- KM
23.340
Kuttippuram-
52.650
18.340 S.H
Good
km 41/400 to 42/300 -
26/08/2020
3
Valanchery-
Angadippuram -
Perintalmanna-
Pandikkad- Wandoor-
Vadapuram Road
Valancheri-
0.000
Vadapuram-
51.505
51.505 S.H
damaged
except work
in progress
area and
0.000 to
2.000
24/555-29/105, 36/595-
51/505- (work in progress)
1) 6.395 to 10.895 DLP
finished Before 2012
2) 10.895 to 14.395 DLP
finished Before 14.03.2013
3) 14.395 to 20.055 DLP
finished Before 18.05.2012
in this Road every year
Pothole developing and
totally damaged
(4) DLP dates km 0/000 to
2/000 - 31/12/2023
4
Kozhikkode -Palakkad
Road
Kondotty-
27.900
Kondotty-
29.500
1.600 S.H
Good
surface renewal completed
5
Malappuram -
Parappanangadi Road
Malappuram-
Kizhakkethala-
0.000
Parappanang
adi-23.000
23.000 S.H
Good
(1) 0/000 to 15/000
Improvements work
(Excluding surface work )
in progressing in DFIP
work (Nadukani -
Parappangadi road )
(2) 15/000 to 23/000
Improvements work
(Excluding surface work )
STATE HIGHWAYS
Ending Node
Traff
ic
Density of
Connecting
Tribal
or
Under
Devel
oped
Tourits/Pilgrim
Centers/Ports&Harbours Interstate
Connectivit
y
Total
ScoreNameChaina
geName
Chaina
ge
MALAPPURAM DISTRICT
Core Road Network
SL.
NoName of Road
Details of Link
Length
of Road
Criteria of selection of Road (As per Methodology)
Present
statusDLP
Starting Node
(Excluding surface work )
in progressing in DFIP
work (Nadukani -
Parappangadi road )
4360290/2020/OS-PWD85
6
Tirur- Malappuram-
Manjeri Road
Tirur-0.000 Manjeri-
39.000
39.000 S.H
Good
(1) Km 13/000 to 24/191
Improvements work in
progressing ( KIIFB ) ,
25/650 to 26/230
Improvements work in
progressing(Budget 2018-
19 ) and (Malappuram
Manjeri road km 8/000 to
10/900) Anakkayam -
Kacheripadi - site handed
over to contractor
(2) Km 13/000 to 24/191
Improvements work in
progressing ( KIIFB ) ,
0/000to 3/000
Improvements work in
completed under DLP
period 8/000 to 11/700 Bc
7Manjeri Bye Pass I st
reach
Manjeri-0.000 Manjeri-1.370 1.370 S.H work in
progress
Site handed over to the
contractor
8Malappuram Bye Pass I
st reach
Melmuri-0.000 Munduparam
ba-1.075
1.075 S.H Good
Condition
9
Perumpilavu - Nilmbur
Road Km 30/00 to
107/112
Pulamanthole-
30.000
Nilambur-
Chanthakunn
u-107.112
77.112 S.H
road surface
severly
damaged in
many
streches
42/780-50/000,54/000-
54/800(bc renewal) 56/000-
56/900(bc renewal)
1) 0.000 to 0.600 BM and
BC work completed in
January 2018 ( Good
Condition)
2) 40.200 to 42.780 BM
and BC work completed in
18.06.2012 ( Road
damaged in this area)
3) 40.000 to 41.700 BC
renewal work in progress
4) Balance portion DLP
finished before 2012 (
Road damaged in this
area)
(5)86/112 to 107/112
under DLP Period
10
Palakkad -
Perintalmanna Road
Km 48/800 to 58/540
Thootha-48.800 Perinthalman
na-58.400
9.700 S.HRoad totally
damaged
48.800 to 58.540 DLP
finished Before 2011 (Road
totally damaged)
11
Perintalmanna-Bye
pass Road I st reach
Perinthalmanna
(Presentation
school)-0.000
Manathuman
galam-1.680
1.680 S.H
Good
Condition
0/000 to 0/700 DLP
1) 0.000 to 0.700 BM patch
and BC renewal Work Just
Finished.
2) 0.700 to 1.680 BC 11
Condition 2) 0.700 to 1.680 BC
renewal Work Completed
in 18.05.2018
(Good Condition)
4360290/2020/OS-PWD86
12Karuvarakundu-
Melattur Road
Punnakadu-
Chungam-
0.000
Melattoor9.82
0
9.820 S.HTrafficable No DLP
13
Kozhikkode -Nilambur-
Gudallur Road Km
38/200 to 103/600
Valluvambrum-
38.200
Nadukani-
103.600
65.400 S.H
Good
Condition
Km 46/050 - Km 46/200,
Km 47/600-64/000 - site
handed over to contractor
, 64/00 to 103/600 -
under DLP Period
14
Koilandi - Edavanna
Road Km 51/200 to
69/750
Valillapuzha-
51.200
Edavanna-
69.750
18.550 S.H
work in
progress
Km 51/200-52/400,
Km 55/800 - Km 56/500,
Km 57/920 - KM 58/180-
site handed over to
contractor,
Km 56/500 -
KM57/250 - under DLP
23/12/2021
15
Parappanangadi-
Areacode Road
Parappanangad
i-0.000
Areacode-
42.500
42.500 S.Hroad surface
severly
damaged in
many
streches
0/000 to 8/000
Improvements work
(Excluding surface work )
in progressing in DFIP
work (Nadukani -
Parappangadi road )
374.764
1
B P Angadi -
kuttipuram road (Upto
NH)
B P Angadi 0.000 kuttipuram 14 14 - - - - - - - -work in
progress
DLP dates ; CRF work in
progress in km 8/100 to
13/300
1/200 to 3/145
Improvements work in
progressing 5/000 to
14/000 CRF work on going
under NH section
kuttipuram
2Thirunavaya -
Kalpakanchery RoadThirunavaya 0.000
Kalpakanch
ery8.2 8.2 - - - - - - - - Trafficable
No DLP
3
Malappuram- Thirur -
Chamravattam
Road(Tirur -
Malappuram -Manjeri
SH 71, Tirur-
Tirur
Thazhepalam0/000
Chamravatt
am Kadavu11/500 11.500 - - - - - - - -
Good
Condition
0/000 to 3/00
Improvements work in
progressing 3/000 to
11/500 competed last
year's
4 Tirur - Kadalundi Road Tirur 0.000 Kadalundi 27.4 27.4 - - - - - - - -
damaged
severly in
some
streches
'0/000 to 27/040
Improvements work in
progressing
5Kadgathukundu -
Panambalam Road
Kadgathukun
du0.000
Panambala
m7.77 7.77 - - - - - - - - Trafficable
No DLP
6Approch road to
AirportKolappuram 0.000 Kodakkad 13 13 - - - - - - - - Trafficable
No DLP
TOTAL
RITES LIST 2001
6Airport
Kolappuram 0.000 Kodakkad 13 13 - - - - - - - - Trafficable
4360290/2020/OS-PWD87
7
Feroke - college -
Vazhakkad Road &
Areekode -
Vazhakkad Road
Azhinjilam 0.000 Areekode 29 29 - - - - - - - - Trafficable
No DLP
8
Chelari -
Parappanangadi
Road
Chelari 0.000 Chettapadi 6.6 6.6 - - - - - - - -Good
Condition
work comleted last year's
9Edavanna - Wandoor -
Velayur RoadEdavanna 0.000 Velayur 26.5 26.5 - - - - - - - - Trafficable
No DLP
10
Manjeri Pandikkad
Road (Manjeri -
Olipuzha Road)
Manjeri 0.000 Pandikkad 16.2 16.2 - - - - - - - -
road surface
severly
damaged in
many
streches
13.300 -16.200 Wandoor
Section No DLP
Km 5/800 (Kuttipara town)-
Under DLP 6/04/2020,
Km 3/410 - km3/970- site
handed over to contractor
2/900 km no dlp
11Manjeri Anakkayam
Puzhakkatiri RoadManjeri 0.000 Tirurkkad 17.5 17.5 - - - - - - - - Trafficable
No DLP
12
Areekode Kavanoor
Manjeri Road
(Areekode - Manjeri
Road)
Areekode 0.000 Manjeri 14.5 14.5 - - - - - - - -
road surface
severly
damaged in
many
streches
Km 3/000 -4/000- site
handed over to contractor
13Changaramkulam -
Cheruvallur Road
Changaramku
lam0.000 Cheruvallur 6 6 - - - - - - - -
Good
Condition
km 0/000 to 0/060 & 2/900
to 6/000 -21.05.2022
km 0/060 to 2/900 -
9.01.2022
14Palakkad - Ponnani
RoadNeeliyad 0.000 Ponnani 11.4 11.4 - - - - - - - -
Good
Condition
km 76/456 to 80/700 -
30.12.2021
km 80/700 to 82/600 -
30.12.2023
km 82/600 to 84/900 -
km 84/900 to 87/515 -
30.12.2023
209.57
1 AK road Kunnummal 0/000 Kottappadi 0/815 0.815 A a a Tourist x 90work in
progress
byepass to NH 966 at
malappuram townHaned
over to NH Subdivision
Perinthalamanna for
Improvement work .
TOTAL
OTHER MDRs
Improvement work .
4360290/2020/OS-PWD88
2 Jubilee roadJubilee
junction 0/000
Collector
bunglow
junction
0/365 0.365 A b a Tourist x 87.5Good
Condition
Resurfacing work
completed.
DLP Period 14.06.2019 to
14.12.2020
3Kumarambathoor -
Olipuzha Road
Kolapparamb
a Jn16/000
Ucharakkad
avu Jn19/390 3.390 A a b
Intermed
iate
Pilgrim
y 82.5 TrafficableNo DLP
4Approach Road to
Calicut Airport
Kolathur
(NH 966)0/000
Calicut
International
Airport
2/000 2.000 A a d NoMajor
Airportx No. 82.5
Good
Condition
Approach road to Calicut
International Airport
5
Melmuri -
Munduparamba
Kootilangadi
bye pass road I st
reach
Machingal 0/000Mundupara
mba1/075 1.075 A a b Tourist y 82.5
work in
progress
Improvements work in
progressing in DFIP work
(Nadukani - Parappangadi
road )
byepass to NH 966 at
malappuram town
6
Melmuri -
Munduparamba
Kootilangadi
bye pass road 2nd
reach
Munduparam
ba 0/000 Kavungal 2/130 2.13 A b a Tourist y 82.5
work in
progress
Haned over to NH
Subdivision
Perinthalamanna for
Improvement work .
Improvement work in
progress in CRF
byepass to NH 966 at
malappuram town
9.775
4360290/2020/OS-PWD89
Starting
Node
End
NodeMarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1
Nattukal-
Velanthavalam 0/00-
11/664
Nattukal junction, 14/200
of Tattamangalam
Nattukal Road
Velanthavalam, State
border11.664 SH 20.06.2021
BC overlay
work (km
0/000 to
11/664 )
completed
2
Nemmara-
Nellyampathy 0/00-
30/714
Nemmara, 14/300 of
Vadakkenchery Pollachi
Road
Paadagiri 30.714 SH 25 b d 5 Yes x 15 0 45
Not executed
NSV Since
included in
Rebuild
Kerala
Ongoing
0/000 - 8/000 Ongoing
3
Palakkad-
Perinthalmanna 12/0-
48/980
Mundur junction, of NH
213
km 48/880,
Thoothappuzha Bridge
starts,District Boundary
36.980 SH
12/000-21/000DLP
Expired
33/900-35/500 7/9/2020
35/500-43/880 09/07/2020
43/880-48/880 8/24/2020
4Palakkad-Pollachi
Road 5/0-29/992
BPL Koottupatha Jn: at
NH 47
Gopalapuram ,State
Border24.992 SH
05/000-11/000 7/26/2020
11/000-17/000 7/27/2020
17/000-29/992 24.07.2020
only patch
work
arranged
5
Palakkad-
Thathamangalam-
Pollachi 0/00 to
35/010
Yakkara, km 209/300 of
OLD NH
Meenakshipuram, State
Border35.010 SH
0/000-4/000DLP
Expired
4/000-6/000 Ongoing
6/000-9/746DLP
Expired
9/746-16/000ongoing BC
overlay work
16/000-35/010DLP
Expired
6Perimbilavu
Nilambur road km
3/347-18/500
Thanathara Bridge,border
of Thrissur District
16/200 of Shornur
Perinthalmanna road15.153 SH
DLP
Expired
Interstate
Connectivity
STATE HIGHWAYS
Chainage Category Grade
Traffic Traffic
Marks
Density of Connecting
Corridors
Tribal or
Under
Developed
Regions
Tourits/Pilgrim
Centers/Ports&Harbours
PALAKKAD DISTRICT
Core Road Network
Sl.
NoName of Road
Details of Link
Length of
Road
Criteria of selection of Road (As per Methodology)
RemarksStarting Node Ending Node
Total Score DLP Status
Name Chainage Name
4360290/2020/OS-PWD90
7
Shornur-
Perinthalmanna road
0/00-27/600
Kochin Bridge,Border of
Thrissur District
Pulamanthol Bridge
end,District Boundary27.600 SH 50 b b 10 x 15 0 75
Not executed
NSV Hence
include in
RITES list 1
Km 4/000 - 14/000 Ongoing
Km 14/00- 27/350
(BM & BC work)Ongoing
8Thattamangalam-
Nattukal road 0/0 -
14/200
Mettupalayam JunctionNattukal Jn:, 0/00 of
Nattukal Velanthavalam
Road
14.200 SH
0/000-4/000DLP
Expired
4/000-5/500 Ongoing
06/000-14/200 3/16/2021
9Vadakkenchery-
Pollachi road
Km.0 /00to 38/912
Mangalam ,0/200 of
Vadakkancheri Bazar
Road
Govindapuram Border
(State Boundary)38.912 SH
0/000-0/600DLP
Expired
0/600-1/700 7/29/2020
1/700-2/000
SLTF-2019-
2020 In
tender
process
Trafficable
2/000-2/900
SLTF-2019-
2020 In
tender
process
Trafficable
2/900-3/200DLP
Expired
4/900-6/100 7/19/2020
6/100-6/900
SLTF-2019-
2020 In
tender
process
Trafficable
6/900-8/100 7/29/2020
8/100-12/000
SLTF-2019-
2020 In
tender
process
Trafficable
12/000-25/000 Ongoing
25/000-38/912DLP
Expired
10Vallanghy Byepass
road. 0/00 to 0/520
Vallanghy, 14/700 of
Vadakkenchery Pollachi
Raod
Vallanghy 0.520 SH Ongoing
11Vazhakkode-Alathur
22/648-32/890
Plazhi,22/648 of the same
road
Malamalamukku, 4/200 of
Alathur Bazar Road10.242 SH
22/648-29/648DLP
Expired
29/648-32/890DLP
Expired
245.987Total
RITES LIST 2001
4360290/2020/OS-PWD91
1
Palakkad - Ponnani
Road km 0/000 -
45/000, km 66/300 -
76/500
SBI Junction (0/000),
Kootanad Junction
(66/300)
0/000,
66/300
Kulappully (45/000),
Neeliyad (76/500)
45/000,
76/50055.200 B 50 b b 10 x 15 0 75
20/00-22/00 1/30/2021
Km 22/00 - 36/00 Ongoing
Km 36/000 - 45/000,
Km 66/300 - 69/500Ongoing
2Old NH Road km
204/600 - 215/000Kalmandapam 204/600 Kannannur 215/000 10.400 C 40 a a 15 x 15 0 70
213/00-215/00 24.1.2022
kazchaparambu
junction27.1.2023
3
Mannarkkad -
Chinna Thadagam
Road km 0/000 -
52/692
Nellipuzha Junction 0/000 Anakatti 52/692 52.692 C 40 c c 5 Yes x 15 10 70
Urgent Patch Repair
works to
Mannarkkad -
Chinnathadakam
road km.0/000-8/000
(Price ID -
27.8.2020
Stripped BT works to
Mannarkkad-
Chinnathadakam
road km8/000-
15/000 (Price ID -
RD/2019/5801)
28.8.2020
Stripped BT works to
Mannarkkad-
Chinnathadakam
road km15/000-
22/000 (Price ID -
RD/2019/5802)
28.8.2020
Urgent Patch Repair
works to
Mannarkkad -
Chinnathadakam
road km.43/000-
45/000 (Price ID -
RD/2019/5861)
30.9.2020
UPR works to
Mannarkkad -
Chinnathadakam
road km 3/000 -
8/000 (Price ID -
RD/2019/7130)
18.8.2020
4360290/2020/OS-PWD92
UPR to Mannarkkad
Chinnathadakam
Road KM from
11/500 to 15/000
(Price ID -
RD/2019/6792)
28.8.2020
UPR to Mannarkkad
Chinnathadakam
Road KM from
18/500 to 22/500
(Price ID -
RD/2019/6795)
28.8.2020
UPR to Mannarkkad
Chinnathadakam
Road KM from
24/000-26/000 (Price
ID -RD/2019/6799)
30.9.2020
4
Kollengode -
Pudunagaram Road
km 0/000 - 8/414
Kollengode 0/000 Pudunagaram 8/414 8.414 C 40 b b 10 x 15 0 65DLP
Expired
5
Ottapalam -
Perinthalmanna
Road km 0/000 -
17/800
Ottapalam 0/000Cherppulassery
Kacherikunnu17/800 17.800 C 40 b b 10 y 10 0 60
Km 4/000 - 8/000 Ongoing
Km 16/000 - 17/800 Ongoing
6
Palakkad -
Malampuzha 100
Feet Road km 0/000 -
6/850
Victoria College Junction 0/000 Malampuzha Garden 6/850 6.850 C 40 c c 5 x 15 0 60DLP
Expired
7
Palakkad - Chittur
Road km 0/000 -
13/620
Fort Maidan 0/000 Annikode Junction 13/620 13.620 C 40 b b 10 z 5 0 55
0/000-0/740 30.5.2021
0/000 - 5/750 3/16/2021
7/420 - 13/000 3/16/2021
8
Kuzhalmannam -
Mankara Road km
0/000 - 15/180
Chanthapura Junction 0/000 Kaalikavu Bridge 15/180 15.180 C 40 c c 5 y 10 0 55
0/000 - 6/500non
motorable
Estimate
submitted
for revised
AS
6/500 - 8/000 8/31/2020
8/000 - 10/500 7/24/2021
10/500 - 11/200
Work yet
to be
started
4360290/2020/OS-PWD93
11/200 - 12/800
Work yet
to be
started
9
Pathiripala - Kongad
Road km 0/000 -
10/960
Pathiripala Junction 0/000 Kongad Junction 10/960 10.960 C 40 b b 10 0 0 50
4/700-4/800 19.6.2020
191.116
1
Kalmandapam -
Kalpathy Road km
0/000 - 3/550
Kalmandapam 0/000 Sekharipuram Junction 3/550 3.550 B 50 a c 10 x 15 0 75
0/250-1/500 18.12.2022
0/00-0/525
2/300-3/550
2GVC- Kalpathy Road
km 0/000 - 2/030Sai Junction 0/000 GVC 2/030 2.030 B 50 c a 10 x 15 0 75
0/000-1/200 25.06.2021
3
Gopalapuram -
Meenakshipuram
Road km 0/000 -
7/500
Gopalapuram 0/000 Meenakshipuram 7/500 7.500 C 40 b b 10 x 15 10 75
1/500 to 6/500 4/4/2021
13.080
26.12.2022
OTHER MDRs
4360290/2020/OS-PWD94
Grade ScoreStarting
Node
End
NodeScore Grade Score Category Grade
Scor
eGrade Score
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1Thrissur - Mannuthy
Road
District
hospital
Junction,
Thrissur
Round
Ch.0/000
Mannuthy Bye
pass at NH 47
Ch.5/020
5.020Old
N.H.2021-May 31
BC overlay
completed on
01/06/2019
2
Thrissur -
Kuttippuram Road
(S.H. 69)
Paramekkavu
Temple -
Thrissur
Round
Ch.0/000
Kadavallur
(Thrissur -
Malappuram
District Boundary)
Ch.34/315
34.315 S.H. NiL
FD Work 2018-19
Flood rectification
work to Thrissur
Kuttipuram road
Ch 6/950 to 10-900
Site handed over
to Contractor.
From ch.29/100 to
29/300 ,33/000 to
34/315 BW on
going. From km
0/000 to 33/000
proposed under
rebuild kerala
3Thrissur - Thalore
Road
Thrissur
Round -
District
Hospital
South Corner
Ch.0/000
Manaly Bridge at
NH 47 - Ch.10/58310.583
Old
N.H.NIL BC overlay due
Thrissur District
DLP Present status
NameChainag
eName
Chaina
ge
Traffic Density of Connecting
Corridors
Tribal or
Under
Developed
Regions
Tourits/Pilgrim
Centers/Ports&HarboursSL.
NoName of Road
Details of Link
Length of
Road Total
Score
STATE HIGHWAYS
Remarks
Starting Node Ending Node
Constituency
Criteria of selection of Road (As per Methodology)
Interstate
Connectivity
4360290/2020/OS-PWD95
4Kodungallur Shornur
Road (SH-22)
Kodungallur
Ch.0/000
Devamatha
School,
Patturaikkal
Ch.38.163
Koorkanchery -
Elite Mission
Hospital Ch.33/963
Kochin Bridge -
Cheruthuruthy
(Thrissur -
Palakkad District
Boundary)
Ch.67.512
63.312 S.H.
from 14/500 to
22/160 DLP
due,from ch 50/805
to 53/605 DLP ends
on 27-01-2022,From
ch 53/940 TO
54/940 ends on 30-
12-2021,from
54/940 to 55/185
DLP ends on 30-12-
2022. from 53/605
to 53/940 DLP ends
on 30-03-2023.
1,B/W 2017-19
Improvements of
Kodungalur-
Shornur Road from
ptturaikal to
kolazhy(37/860 to
42/000) on going
work 2,B/W 2017-
19 Improvements
of Kodungalur-
Shornur Road from
ptturaikal to
kolazhy(42/000 to
46/780) on going
work.from 62/605
to 70/600 BW on
going.from 58/200
to 61/200 ongoing
FD work .From
55/235 to 58/200
5Thrissur - Kanjani -
Vatanappilly Road
Chungam -
West Fort
Ch.0/580
NH-17 at
Vatanappilly
Ch.16.120
15.540 S.H. nil
FD work 9/000-
16/002 Initial level
reported (BM& BC
Road surface).
2,Improvements to
Thrissur- Kanjani
Vadanappilly Road
from Km0/000 to
9/000 on going
work
6
Potta -
Moonnupeedika
Road (S.H.-
61)
Potta at old
NH-47
Ch.0/000
Moonupeedika at
NH-17 Ch.22/05822.058 S.H.
0/000 to 1/000 on
going work,1/000 to
6/000 DLP up to
20/05/2021,6/000 to
10/200 and 12/658
DLP up to
07/03/2021,12/895
to 22/058 DLP due
Good
7Kodakara Bazar
Road
NH-47 at
Santhi
Hospital
Ch.0/000
NH-47 at
Kodakara
Ch.1/100
1.100Old
N.H.up to 29/11/2022
in good condition
8
Kodakara -
Kodungallur Road
(SH-51)
Kodakara
Junction at
old NH-47
Ch.0/000
Keetholy at NH-17
Ch.25/95625.956 S.H.
DLP period
completed from
km 0/000 to
4/000, km 4/000
to 16/800 DLP
due, km 16/800
to 17/100 DLP up
to 2022,km
17/100 to 25/956
DLP Due
0/00 to 4/00 BC
OVERLAY
Proposed
Submitted for TS
4360290/2020/OS-PWD96
9
Chavakkad -
Wadakkanchery
Road (S.H. - 50)
Chavakkad
Junction
Ch.0/000
Ottupara Junction
in Thrissur shornur
road Ch.31/015
31.015 S.H.
From ch 15/000 to
19/015 DLP upto 02-
02-2023.
BM&BC road.Ch
0/000-5/785
surface condition
not satisfactory.AS
obtained in budget
work.work can be
done after KWA
AMRUT pipe
laying .ch 9/400
to 13/000 work
arranged.
10
Kuranchery - Velur
Road (S.H. -
76)
Kuranchery
Railway Over
Bridge in
Kuranchery
Bye pass
Road
Ch.0/000
Kechery Junction
in Thrissur -
Kuttippuram road
Ch.13/228
13.228 S.H. NIL
Work arranged.
From 10/838 to
12/838 on going
work.From
ch.0/000 to 10/838
AS obtained
11
Perumbilavu -
Nilambur Road
(S.H. 39)
Perumbilavu
Ch.0/000
Thanathara bridge
(Thrissur -
Palakkad District
Boundary)
Ch.3/372
3.372 S.H. OR work ongoing.Road surface
satisfactory.
12Vazhkode -Alathur
Road (S.H. 74)
Vazhakode
Junction in
Thrissur -
Shornur Road
Ch.0/000.
Plazhy Bridge
(Thrissur -
Palakkad
boundary)
Ch.22.642
22.642 S.H.under DLP of OR
work only
OR work
completed.Road
surface
satisfactory.
13
Chalakudy -
Anamala Road
(S.H. 21)
Chalakudy
(Anamala
Junction)
Malakkappara
Check Post
(Kerala - Tamil
Nadu State
Boundary)
Ch.88/403
88.403 S.H.
18/200 to 21/300
DLP upto
26/06/2021,21/000
to 40/000 BC Patch
DLP up to
25.02.2021,
56/000 to 88/403
KIIFB work
tendering stage
0/000 to 2/000 BC
overlay work
ongoing. 2/000 to
18/000 and 40/000
to 56/000 surface
is satisfactory,
14
Guruvayur -
Choondal Road
(S.H. 49)
Manjulal -
Guruvayur
Ch.0/000
Choondal Junction
in Thrissur -
Kuttippuram Road
Ch.7/288
7.288 S.H. DLP upto 19/5/2021
BM&BC completed
on 20/5/2019
.Surface is
satisfactory
15
Guruvayur - Althara
- Ponnani Road
(S.H. 62)
Guruvayur at
Km.0/050 of
Guruvayur-
Choondal
Road
Vanneri
(Thrissur-
Palakkad District
Boundary)
Ch.14/858.
14.858 S.H. DLP upto 29/5/2020
BM&BC completed
on 30/5/2017
.Surface is
satisfactory
16
Portion of Old
Kodungallur -
Shornur Road
Athani
Ch.0/000
Arafa School
Junction
Ch.0/000
Vyasa College
Junction Ch.3/000
Attoor Over Bridge
Ch.1.122
3.000
1.122
Old
S.H.
0/000 to 1/122 DLP
of patch work
0/000 to 1/122
patch work
completed. 0/000
to 3/000 No work
arranged and
condition is
satisfactory
17Pattikkad Bazar
Road
NH-47 at
Peechi Jn.
Ch.0/000
NH-47 at
Kallidukku
Ch.3/621
3.621Old
N.H.NIL
Budget work in
progress
4360290/2020/OS-PWD97
18Mannuthy Bazar
Road
NH-47 at
Mannuthy
Junction
Ch.0/000
NH-47 at
Mannuthy Church
Ch.0/520
0.520Old
N.H.NIL Saisfactory
19 Old NH Chalakudy
NH-47 at
P.M.G.
Junction
Ch.0/000
NH-47 at South
Junction,
Chalakudy
Ch.4/430
4.430Old
N.H.NIL
0/00 to 2/700 BM &
BC ongoing , 2/700
to 4/430
satisfactory
20 Old NH Koratty
NH-47 at
Koratty
Junction
Ch.0/000
NH-47 at
Chirangara
Junction Ch.2/650
2.650Old
N.H.NIL
CRF work
arranged
374.033
1 Arattupuzha Temple
Road
Near Raja
Company
0/000 Arattupuzha
Temple
1/816 1.816 Nattika .Length
Corrected as per
asset.Included in
CRN List 2001 DLP upto
31.01.2023
BM & BC work
completed.
2 Chavakkad
Mullurkayal
Road(Amalanagar
pavaratty road)
0/000 11/500 11.500 Manalur,
Guruvayur
Included in CRN
List 2001
DLP up to
27/09/21( BM &
BC road surface)
Good
3 Azhikode Padakulam
road
Padakulam 0/000 Azhikode 4/426 4.426 Kodungallur
,Kaipamang
alam
Included in CRN
List 2001
NIL
Budget work
ongoing
17.742
1 Karunakaran Nambiar
Road
Swaraj Round 0/000 Aswini Junction 0/950 0.950 A 60 a a 15 No 0 M ajor x 15 No 0 90 Thrissur Connects Swaraj
Round at
Thrissur to
Thrissur-
Kuttippuram
State Highway
NIL
Budget work for
BC overlay
awarded
2 Kodungallur Scout
Road
South Nada
Kodungallur
0/000 West Nada
Kodungallur
0/501 0.501 A 60 a a 15 No 0 Major x 15 No 0 90 Kodunagllur Road
surrounding
Kodungallur
Temple
NIl
Good
3 Chembukkavu -
Museum - Bishop
Palace - East Fort -
Jubilee Hospital -
Chelakkottukara Road
chembukkav 0/000 Chelakkottukara 3/900 3.900 A 60 a b 12.5 No 0 Major x 15 No 0 87.5 Thrissur Important Road
passing infront
of Zoo and
Mueseum
Thrissur
Satisfactory
Bc overlay work
pending due to
KWA cutting for
first 700m only
Total
RITES LIST 2001
OTHER MDRs
4360290/2020/OS-PWD98
4 Amballur Palapilly
Echippara Road
Amballur
junction @
279.400 of
NH 47
0/000 ECHIPPARA 24/004 24.004 C 40 c c 5 Yes 25 Major x 15 No 0 85 Pudukkad Road passing
through Tribal
residential area
and Chimmoni
Dam Tourism
project
From Km 0/00 to
6/000 DLP UP TO
13/06/2020
Fom KM 6/000
TO 14/500
ESTIMATE
SUBMITTED
FOR FS under
KIIFB
29.355
5 Pattikkad - Peechi
Road
Pattikad
centre
0/000 Peechi Dam Gate 6/622 6.622 B 50 a b 12.5 No 0 Major x 15 No 0 77.5 Ollur Peechi Dam and
Tourism project
DLP period
completed Good
6 Cherpu Thriprayar
Road
Perumbillisser
y
0/000 Thriprayar Centre 14/070 14.070 B 50 b a 12.5 No 0 Major x 15 No 0 77.5 Nattika Access to
Thriprayar sree
rama temple.
Nil
KWA cutting.
Restoration work
arranged
7 Cheruthuruthy
Ponnani Road
Cheruthuruthy 0/000 Arangottukara 9/352 9.352 B 50 b a 12.5 No 0 Major x 15 No 0 77.5 Chelakkara Connects
Thrissur and
Palakkad
Districtsfrom 5/300 to
9/300 on DLP 19-
07-2021
Nabard work
0/000 to 5/300
on going
8 Muthuvattur
Guruvayur Road
Muthuvattur 0/000 West Nada
Guruvayur
1/051 1.051 B 50 a b 12.5 No 0 Major x 15 No 0 77.5 Guruvayur Guruvayur
Temple
DLP upto
23/03/2020
BM&BC surface
is satisfactory
9 Guruvayur Northern
Link Road
Manjulal
Junction.
0/000 Thahani Junction 1/070 1.070 B 50 a b 12.5 No 0 Major x 15 No 0 77.5 Guruvayur Guruvayur
Temple
DLP upto
23/03/2020
BM&BC surface
is satisfactory
10 Thrissur
Mannamagalam Road
Chelakkottuka
ra
0/000 Puthur 8/200 8.200 B 50 a b 12.5 No 0 Major x 15 No 0 77.5 Thrissur,Oll
ur
Proposed Zoo
NIL Good
4360290/2020/OS-PWD99
11 Thriprayar Kanjani
Chavakkad Road
Peringottukar
a 3 way
Junction
0/000 Chavakkad 24/000 24.000 B 50 b a 12.5 No 0 Major x 15 No 0 77.5 Nattika,
Manalur,
Guruvayur
Palayur Church
Thriprayar
temple
NIL
This road is
BM&BC
road.KWA
(AMRUTH )
Water Cutting is
progress .
Budget work
0/000-
1/500,7/000-
14/600
Terminated due
to Amruth
scheme.ch
17/000-22/000
proposed for
budget work and
22/000-24/000
AS obtained in
budget work
.(14/600-17/100
BM&BC,0/000-
14/600 CC)
12 Muringoor Kadukutty
Road
NH 47@
301.950
0/000 Naralakadavu
bridge
6/600 6.600 C 40 b c 7.5 Yes 25 Minor z 5 No 0 77.5 Chalakudy BM&BC work
agreement
executed.
Connects Mala NIL
Budget work (BM
& BC) ongoing
13 Kolothumpadam Road Aswini
Junction
0/000 Peringavu 0/953 0.953 A 60 a a 15 No 0 No NA No 0 75 Thrissur Connects
Thrissur-
Kuttippuram SH
and Kodungallur
Shornur SH
NIL
B/W 2019-20
Improvements to
Kovilakathumpad
am Road and
Food path with
BM and BC
0/000 to
0/953(MDR332)(
4lane) TS
14 Edakkunni Road
(Mannuthi-Nadathara-
Ollur-Anakkallu-
Poochinippadam)
Mannuthy
junction under
pass
0/000 Poochinippadam 12/860 12.860 B 50 a a 15 No 0 No Inter
medi
ate
y 10 75 Ollur Connect NH 544
and Thrissur
Thalore Road
(SH)
NIL
KIIFB work in
progress
15 Koratty
Pulikkakadavu Road
Pallinada Old
NH Koratty
0.325
0/000 Pulikkakadavu
river
4/000 4.000 B 50 b b 10 No 0 Major x 15 No 0 75 Chalakudy Koratty St Marys
Church
Pilgrimage
Centre
DLP up to
10/11/2022 Good
16 Guruvayur Karakkad
Road
Karakkad
Junction
0/000 Pancharamukku
Junction
1/050 1.050 B 50 b b 10 No 0 Major x 15 No 0 75 Guruvayur Access to
Guruvayur
Temple
NIL
This road is
BM&BC
road.surface
condition not
satisfactory.AS
obtained in
4360290/2020/OS-PWD100
17 Chavakkad - Blangad -
Chettuvai road
Mullathara 0/000 Munamkallu -
Chettuvai
8/315 8.315 B 50 b b 10 No 0 Major x 15 No 0 75 Guruvayur Chettuva
Tourism,
Chavakkad and
Blangad Beach
DLP upto
8/10/2021 for the
ch 0/000-6/000
This road is
BM&BC road.ch
6/000-8/315
surface condition
not
satisfactory.TS
obtained in
Budget work
,tendered no
response
18 Irinjalakuda Kattur -
Edamuttam Road
Irinjalakuda
Bus stand
0/000 Edamuttam NH 66 11/480 11.480 B 50 b b 10 No 0 Major x 15 No 0 75 Irinjalakuda,
Nattika
Irinjalakuda
Koodalmanikya
m Temple7/712 to 11/480
DLP upto
28/02/2023
Buget work
ongoing ch 0/000
to 3/000 (BM &
BC)
19 Anjoor Road Girls High
School
Junction
0/000 Mukhammoodimuk
ku
4/785 4.785 B 50 a b 12.5 No 0 Interme
diate
y 10 No 0 72.5 Guruvayur
NIL
Proposed for BC
overlay.This road
is BM&BC road
20 Arakkulam -
Azhikode Road
Cheraman
Mosque
0/000 Puthenpally
Church
4/495 4.495 B 50 b c 7.5 No 0 Major x 15 No 0 72.5 Kodungallur .Pilgrim centres
of Cheraman
Mosque and
Marthoma
Church are
situated besides
of this road.
0/000 to 2/800
DLP 21/12/2022
2/800 to 4/260
DLP 27/6/2022
4/260 to 4/495
DLP 20.4.2022
BM&BC surface
is satisfactory
21 Kondazhy Mayannur
Road
Kayampoova
m
0/000 Mayannur kadavu 10/914 10.914 C 40 b c 7.5 Yes 25 No NA No 0 72.5 Chelakkara Passes near
Bharathapuzha.
Connects
Thrissur and
Palakkad
Districts.
Navodaya NIL
on going OR
works only.
129.817
22 Veemb Road Mar APREM
church
0/000 Veemb temple 5/289 5.289 B 50 a b 12.5 No 0 Minor z 5 No 0 67.5 Ollur
NIL good
23 Chalakkudy Mala
Road
Chalakudy
North junction
0/000 Ashtamichira 9/940 9.940 B 50 a b 12.5 No 0 Minor z 5 No 0 67.5 Chalakud,K
odungallur
Chalakudy
Railway Station
km5/830 to
7/940km DLP Due
0/000 to 5/830
budget work
ongoing, 7/940
to 9/940 CRF
work arranged
Additional list of roads to be replaced with LSGD Roads
4360290/2020/OS-PWD101
24 Ayyanthole Road West Fort
Junction
0/000 TOYOTA Junction
at Thrissur
Kuttippuram Road
3/901 3.901 B 50 a a 15 No 0 No NA No 0 65 Thrissur Connect SH
Kodungallur
Shornur Road
and NH 544,
District Head
Quarters,
District Court
and Court
DLP up to
29.08.2020 Good
19.130
4360290/2020/OS-PWD102
Star
ting
Nod
e
End
Nod
e
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16
1SH -1 M .C . Road - 187/800 -
233/250 Chorakuzhy
Kalady Sree
Sankara Bridge45.450 SH Perumbavoor
Newly repaired and
trafficable
30-01-2020 for ch 215/400
to 224/000 ,ch 208/000
to224/000,ch224/100 to
225/600,ch 226/600 to
227/000, ch 227/100 to
228/150
PerumbavoorNewly repaired and
trafficable
08-07-2021 for ch224/000 to
224/100 ,ch 225/700 to
226/500, ch 227/000 to
227/100 ,ch 228/150 to
230/000
PerumbavoorNewly repaired and
trafficable
28-01-2021 for ch 230/000
233/230
2SH - 8 P. M .Road - 137/000 -
153/000 Achan Kavala
Muvattupuzha
P.O.Jn.16.000 SH
Sabarimala work
ongoing(Ch 137/000
to 140/500 &
143/850 to 152/449).
BC overlay required
at ch 140/500 to
143/850
S/F work ongoing
3SH -16 A . M .Road - 7/600 -
35/226
Thadiyittaparamb
uKothamangalam 27.626 SH Kothamangalam
Urgent rectification
needed
BMBC work is proposed in
KIIFB.
Perumbavoor&k
unnathunadu
pot hole
free,closegradede
pacth arranged at
most damaged
areas.BM BC
work proposed in
KIIFB
Ch 20/000 to 22/100 & 22/400
to 23/000 DLP upto 22.05.2020,
22/100 to 22/400 & 27/100 to
28/000 DLP up to 23.02.2021
and Ch 25/000 to 27/100 Patch
work started
29-06-2020 for ch 15/670 to 20/500
ch 7/600 to 9/600,ch 9/600 to
10/700,ch10/800 to 11/995,ch
12/000 to 15/670 work in
progress
4SH - 40 Alappuzha - Madura
Road - 0/000 - 16/000
Perumbadavom
P.O.Jn.
Koothattukulam
Panchayath Office16.000 SH
Ch 11/200 to 20/000
BC overlay required
, Ch 0/000 to 1/900
BM& BC
Upgradation
required.
5SH - 41 Ernakulam - Thekkady
Road - 11/300 - 50/400
Manakkakkadavu
BridgeParakkadavu 35.930 SH DLP Existing
Traff
ic
Density of
Connecti
Tourits/Pilgri
CategoryGra
de
Ending Node
Chainage
Present physical
status (pothole
free/newly
repaired/damage
d/Urgent
rectification
needed)
DLP
STATE HIGHWAYS
Total
Score Name
Inter
state
Conn
ectivi
ty
Trib
al or
Und
er
Dev
elop
Ernakulam
Core Road Network
SL.
NoName of Road
Details of Link
Length
of Road
Criteria of selection of Road (As per
Constituency Remarks
Starting Node
NameChainag
e
4360290/2020/OS-PWD103
ch 10/800 to 29/000 is under
KIIFB work,ch 29/000 to
31/700 is under Budget work
6
SH - 42 Kumarakom -
Kambammed Road - 0/000 -
29/680
Koduvely Marika bridge 29.680 SH
Ch 27/200 to 31/200
BC overlay work
ongoing, Ch 5/000
to 8/100, ch 10/115
to 20/500,Ch 25/000
to 27/200 BM & BC
surface Renewal
required
DLP nil
7SH - 43 Muvattupuzha -Theni
Road - 0/000 - 15/790
Kavumkara NH-
49
Vengalloor - Kaloor
road15.790 SH
Taken in Rebuild
KeralaDLP nil
8
SH - 44 Sabarimala - Kodaikanal
Road (Vengalloor - Oonnukal
portion) - 4/750 - 30/000
Kumaramangalam Neendapara 18.250 SH
16 km comes under
roads
sectionpothanicad,2k
m work arranged
under SLTF
work.Balance km is
pothole free now
No DLP
9SH - 16 Kothamangalam Bye -
pass Road - 0/000 - 2/800Thankalam Kozhippilly 2.800 SH
Urgent rectification
needed
BMBC work is proposed in
KIIFB.
10
Old NH 47(NH 47 at North of HMT
Jn to Municipal Office ,
Kalamassery
HMT JnIn front of Municipal
office Kalamassery1.530
Old
NH 47Good condition DLP Up to 19.07.2021
11 Old NH 47 Edapally Edapally Bank Jn Edapally School Jn 0.500Old
NH 47Good condition Under DLP
12 Old NH 47 Palarivattom SN Jn St Martin Church 0.600Old
NH 47
KSEB
Restoration
works in
progress.Minor
potholes
DLP Expired
13Old NH 47 ( Aluva Ernakulam
road 342/150 to 352/00 )
Edapally Station
KavalaThevara bridge 10.050
Old
NH 47minor potholes
DLP Expired other than (
Ch: 350/200-352/200- will
be expired on 08-07-2021)
14
Old NH 47 (Thevara Venduruthy
Bridge to Mattanchery Bridge)
352/200 to 355/400
Venduruthy Bridge Mattanchery Bridge 3.200Old
NH 47minor damages
354/000 to 355/300
portion of Road is under
DLP and expaires on
08.04.2021 - and
352/200 to 352/400 -
reach - nearing
completion,
15 Old NH 47 km 356/000 to 363/600 Thoppumpady Aroor Police station 7.600Old
NH 47Good condition
in reach 356/400 to
360/000 - bill under
preparation,- in reach
360/000 to 363/000 work
is on going
16Old NH 17 from cheranellore Bus
stand to Manjummel Jn
Cheranellore
BusstandManjummel 1.800
Old
NH 17trafficable. DLP Expired
17Kothamangalam Tripunithura road
39/980 to 40/800 Karingachira Tripunithura 1.420 SH 20 Good condition DLP up to 19/12/2020
18 P.T Jacob Road Thoppumpady Soudi Jn 1.900
Portio
n of
SH 66
Good conditionThe road is under DLP
and expires on 18.03.2021
19 Pandikudy Chellanam road Pandikudy Chellanam 17.900
Portio
n of
SH 66
minor damages
This road is not under DLP
except Ch.6/850 to 7/000
& 9/900 to 10/050(CC Tile
work on going)
4360290/2020/OS-PWD104
20
Ettumanoor Ernakulam road
37/800 to 51/700,52/700 to
55/200,55/200 to 57/330
Poothotta Bridge
S.N. Jn ( 37/800)Pallimukku 18.530 SH 15
Minor
damages.Work
started for the
damaged portions.
CH: 37/800 to 38/500 ,
40/000 to 46/900, 48/00 to
49/00 ( DLP Up to 30-11-
2021)
21Palarivattom Kumarapuram road up
to Manakkadavu bridge 0/000 to
11/300
Palarivatom Manakkadavu Bridge 11.300
Portio
n of
SH 41
minor potholes DLP Expired
22 Aluva Munnar Road Aluva Vazhakulam 8.000 SH
16
1/000 to 5/000 &6/000-
7//600 27/08/2020,other
portion not in dlp
23 M.C Road Kalady Angamaly 7.300 SH 1
24 month(bm&bc work
is on going ch233/300 to
240/600)24 Vypin Pallipuram road Vypin Pallipuram 25.200 SH 63 Good condition DLP period completed
25Old NH 17. Moothakunnam Ferry
to Gothuruth Junction in NH 17
Moothakunnam
Ferry
Gothuruth Juction NH
170.850
Portio
n of
Old
NH 17
Good condition DLP period completed
TOTAL 325.206
1 Aluva - Paravur - Cherai Road Aluva 0/000 Cherai 20/020 20.020
Aluva,Kalama
ssery,Paravur,
Vypin
Good condition
except for a few
KWA cuttings
Aluva paravur ch3/000
to 15/500 DLP up to
5/12/2020,ch11/400 to
15/500 DLP up to
27/05/2021,paravur -
cherai 0/000 to 2/674
DLP period completed.
Included in
CRN List
2001
2Angamaly -Ayiroor-
Thuruthippuram RoadAngamaly 0/000 Thuruthippuram 24/000 24.000
Angamaly,Alu
va,Kalamasser
y,
Paravur
Good condition
Ayiroor -
Thuruthipuram road
0/000 to 11/050 DLP
up to 04/06/2020.
Included in
CRN List
2001
3
Angamaly -Manjapra Road
and Manjapra-Malayattoor
Road
Angamaly 0/000 Malayattoor 16/000 16.000 Angamaly work on going
Angamaly-manjapra
road Transferred to
NH ,BM&BC work
ongoing& 6 month dlp
for Manjapra -
Malayattoor
road,work is ongoing.
Included in
CRN List
2001
4 Aluva-Perumbavoor Road Aluva 0/000 Perumbavoor 18/000 18.000
Kunnathunadu
, Aluva
pot hole
free,closegradede
pacth arranged at
most damaged
areas
9/600 to 11/400 DLP
Up to
27/08/2020,14/850 to
16/126 -27/08/2020
Included in
CRN List
2001
on going work
RITES LIST 2001
4360290/2020/OS-PWD105
5Perumbavoor-Puthencruz
roadPerumbavoor 0/000 Puthencruz 18/200 18.200
Kunnathunadu
, Perumbavoor
Pot hole free ,
trafficable 12/200
to 18/200
damaged (
KIIFBwork on
going. After
completion of this
work road would
be in good
condition)
CH 0/000 to 2/600
work in progress,4/000
to 8/250 work in
progress ,8/250 to 9/650
DLP 13/08/2020 ch
9/600 to 12/200 is in
good condition, 12/200
to 18/200 is under
KIIFBwork
Included in
CRN List
2001
6Ponjassery- Kizhakkambalam-
Chithrappuzha RoadPonjassery 0/000 Chithrappuzha 20/000 20.000
Kunnathunadu
, Perumbavoor
Pot hole free,
Urgent
rectification
needed
handed over from
KSTP on 7/1/2020 after
DLP
Included in
CRN List
2001
7 Pulluvazhi-Thattamugal Road Pulluvazhi 0/000 Thattamugal 7/750 7.750
Kunnathunadu
, Perumbavoor
Pot hole free,
trafficable
Ch 0/000 to 1/000 Patch
work started 1/000 to
1/600 is in good codition
1/600 to 2/200 overlap in
KIIFB work Mannoor
Ponjassery & Ch2/2000 to
7/750 DLP upto
30.01.2023
Included in
CRN List
2001
8Mangalathunada-Pancode
RoadMangalathunada 0/000 Ponnode 8/000 8.000
Kunnathunadu
Newly repaired
and trafficable
under DLP, Road in
good condition
Included in
CRN List
2001
Choondi 0/000 Ramamangalam 5/800 5.800 pot hole free,
trafficable
Ramamangalam 0/000 Thodupuzha 18/070 18.07
Ch 8/650 to
10/480 (Existing
20 mm chipping
carpet suface )
upgradation
required
Choondi- Ramamangalam-
Thodupuzha Road
Kunnathunadu
,Piravom,
Muvattupuzha
In ch 0/000 to 0/420
patch work started,
0/420 to 1/400 & 3/100
to 5/800 is in good
contion ch 1/400 to
3/100 is in DLP
10/12/2020
Included in
CRN List
2001,Choondi
-
Ramamangala
m 0/000 -
5/800,Ramam
angalam to
Thodupuzha
0/000 -18/070
Total length
23.87km
9
4360290/2020/OS-PWD106
10
Kothamangalam- Keeranpaara-
Kuttanpuzha- Perimbankuthu
Road
Kothamangalam 0/000 Perumbankuth 40/000 40.000
Kothamangala
m
Damaged surface
will be rectified in
KIIFB
Budget Work and
KIIFB work is
arranged from ch
0/000 to 4/700 and
11/300 to 19/000
respectively, patch
work arranged from ch
9/200 to 11/000 and
20/000 to 23/000, DLP
existing for ch 4/800 to
9/000 and Road is
trafficable till ch
28/000 only,Rest of the
porton is under the
custody of Forest Dept.
Included in
CRN List
2001
11Muvattupuzha- Anchalpetty
RoadMuvattupuzha 0/000 Anchalpetty 13/700 13.700
Muvattupuzha
,Piravom
BM& BC surface
Renewal required
for ch 0/000 to
13/700
DLP Nil
Included in
CRN List
2001
209.540
1 Goshree RoadKin-Co boat
jetty0/000 Goshree Jn. 1/000 1.000 A a a No Major x No 90.00 Ernakulam
Good
condition.Hand
overed to CSML
DLP will be expired on
26-12-2020
Starts from
High Court Jn
and ends in
front of the
culvert near to
CMFRI .
( From here
the
Chathiayath
road of GIDA
starts and
other road
towards
Goshree
bridge.)
2 Kariyad Matoor Rd Kariyad 0/000 Mattoor 6/900 6.900 A a a No Major x No 90.00
Angamaly,Alu
va
Good condition
ch. 2/300 to 6/900
29.05.2021, ch.0/000 to
1/800 - 6
month,ongoing work.
3 High Court Road High court Jn. 0/000 Banerji Road 0/410 0.410 A a a No Major x No 90.00 Ernakulam trafficable. DLP Expired
4 Broadway Road Rest house 0/000 Ernakulathappan
ground1/020 1.020 A a a No Major x No 90.00 Ernakulam
minor pot
holes(handover to
CSML)
DLP Expired other than
(Ch: 0/300 to 0/500-will
be expired on 31-10-
2020),(Ch: 0/200 to 0/300-
will be expired on 31-07-
2020)
All these
roads together
form the
roads in
Marine Drive,
OTHER MDRs
4360290/2020/OS-PWD107
5 Banerji Road Kin-Co boat
jetty0/000
Madhavana
pharmacy Jn.0/800 0.800 A a a No
Intermedi
atey No 85.00 Ernakulam
Good
condition.Hand
overed to CSML
DLP will be expired on 26-
09-2021
6 Shanmugham Road Rest house 0/000 Kin-Co boat jetty 0/900 0.900 A a a NoIntermedi
atey No 85.00 Ernakulam
minor pot
holes(handover to
CSML)
DLP Expired
7 Road Behind Guest House Rest house 0/000 Taj hotel 0/280 0.280 A a a NoIntermedi
atey No 85.00 Ernakulam
Trafficable(hand
over to CSMLDLP Expired
8 Parallel Shanmugham Road Taj hotel 0/000 Kin-Co boat jetty 0/710 0.710 A a a NoIntermedi
atey No 85.00 Ernakulam
minor pot
holes(handover to
CSML)
DLP Expired
12.020
9 Vengoor Nayathodu RdM C
Road(Vengoor)0/000 Nayathodu 3/500 3.500 B a a No Major x No 80.00 Angamaly on going work
36 month,bm&bc work
ongoing
10 Vyttila Palarivattom Road Vyttila 0/000 Palarivattom 4/400 4.400 A a a No Minor z No 80.00 Thrikkakara Good condition Work just completed
Starts
fromVytilla
NH junctions
and reaches
Palarivattom
Jn in PK Road
SH through
Thammanam.
( Corporation
Road:-
Thammanam
Pulepady road
and GCDA
road Kaloor
Kathrikadavu
Kadvanthara
Road and
Corporation
SA road and
Subhas Bose
Road need to
be connected
to this net
work.)
Marine Drive,
front and back
of Guest
House , front
of childrens
Park .
Here DH road
(corporation
road) starting
in front of
BTH Hotel
end ending at
Jose JN in
MG Road to
be included in
core net work
4360290/2020/OS-PWD108
11 Foreshore RoadErnakulathappan
ground0/000 TDM hall 0/550 0.550 A b b No
Intermedi
atey No 80.00 Ernakulam Trafficable DLP Expired
Starts from
BTH Junction
towards Fine
Arts Hall.
Road from
Fine Arts
(Corporation
road) to
Medical Trust
Jn to be
included in
core network.
12 HMT Road HMT JN. 0/000 Manalimukku 5/000 5.000 A a a No Minor z No 80.00 Kalamassery Good condition not in dlp
13 Chithrapuzha RoadHill palace main
gate0/000 Vilakku JN 1/540 1.540 B a a No Major x No 80.00 Piravom good condition Work almost completed
Road in front
of Hill Palace
leading
towards
Refinery Road
14.990
4360290/2020/OS-PWD109
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1Punaloor - Muvattupuzha road Km.
122/605 to 137/000 (SH -8)Nellappara Vengalloor 14.395 SH
Work completed by KSTP and handed over over to PWD,
the Road is in good conditionDLP completed
2Erattupetta - Peermade road (SH -
14)Wagamon Elappara 17.000 SH
Road is in CC surface ,SLTF work arranged and the Road
is trafficable, BM BC to be arranged
3Aluva - Munnar road Km. 113/650 to
114/100 (SH- 16)
Devikulam
junction
Marayoor
junction0.450 SH
BM & BC completed, road under DLP and in good
condition. DLP up to April 2022
4Northern - Outlet road Km. 0/000 to
59/170 (SH - 17)Munnar chinnar 59.170 SH
Km. 0/000 to 40/000 BM & BC completed, road is under
DLP
Km. 40/000 to 59/170 is in CC surface, pot hole free and
trafficable
Km. 0/000 to 40/000 DLP
upto April 2023
5Munnar - Top station road Km. 0/000
to 32/150 (SH- 18)Munnar Topstation 32.150 SH
BC overlay arranged, no response on tendering. Hence
estimate is revised and retedering process is in progress
6Munnar - Kumily road Km. 31/200 to
106/010 (SH - 19) Munnar Kumily 74.810 SH BM & BC surface, BC overlay completed
road is under DLP up to
March 2021
7Thodupuzha - Puliyanmala road
Km. 0/000 to 92/167 (SH - 33)Thodupuzha Puliyanmala 66.267 SH
Km. 0/000 to 8/000 BC overlay completed, DLP completed.
Km. 8/000 to 39/500 BC overlay done by KSTP, DLP
completed and handed over to PWD. Km. 39/500 to 42/000
CC completed and DLP completed, Km. 42/000 to 60/000
BM &BC work arranged and is going on. Km. 60/000 to
85/900 handed over to NH (NH 185) Km. 85/900 to 92/167
BC overlay completed road under DLP
Km. 85/900 to 92/167is
DLP up to March 2022
8Alappuzha - Madhurai road
(SH - 40)Marika
Cumbumme
ttu128.740 SH
Marika to Udumbannoor, BM & BC,road under DLP.
Arappamattom to Blathikkavala CC surface road trafficable
DLP completed. Blathikkavala to Chelachuvadu (18.1Km)
CC road Chelachuvadu to periyar Bridge (2.5Km) BM & BC
completed.Periyar Bridge to Melechinnar CC road road
trafficable. Melechinnar to nedumkandom (14.250Km) CC
road, road trafficable, nedumkandom to seventh mile,
Closed graded CC, road trafficable. Seventh mile to
Cumbummettu CC surface, road is trafficable.
Marika Udumbannoor road
DLP up to December
2020.chelachuvadu to
periyar DLP upto April 2023
9Eranakulam - Thekkady road
(SH-41)Parakkadavu Thekkady 102.538 SH
Parakkadavu to Irukkumpuzha BM & BC road, road under
DLP, Irukkumpuzha to Manappady gate, CC surface, road
trafficable DLP completed. Pullikkanam gate to Parappu BM
BC work tendered. Chelachuvadu to Chelimada (6.8Km)
Handed over to NH (NH185), Chelimada to Kumily CC
surface, road trafficable,
Parakkadavu to
Irukkumpuzha road DLP up
to May 2022
10Kumarakom - Cumbum
(SH -42)Marika
Cumbumme
ttu74.574 SH
Marika to Inchiyani BM & BC road under DLP, Inchiyani to
Pannimattom Kulamavu CC surface road, road trafficable.
Cheruthony to Karimban (6.450Km) under NH(NH 185).
Karimban to Murikkassery BM & BC work arranged.
Murikkassery to Vettikkamattom CC road, road trafficable.
Vettikkamattom to cumbummettu CC surface road
trafficable.
Marika to Inchiyani road
DLP upto June 2021
11Muvattupuzha - Theni
(SH - 43)
Perumankando
m
Cumbumme
ttu98.010 SH
Perumankandom to paramada CC surface, road trafficable.
Painavu to Asokakkavals (21Km) road handed over to
Rebuild kerala. Idukki to Nalumukku (17.990Km) BM & BC
road, road under DLP Nalumukku to Erattayar BM & BC
work in progress and Erattayar to kattappana BM & BC
work completed, road under DLP . Amayar Chettukuzhy
(2.5Km) BM & BC. Chettukuzhy to cumbummettu CC
surface, road trafficable.
Idukki to Nalumukku road
DLP up to December 2021.
Erattayar to kattappana road
DLP upto December 2020
NameChaina
geName
Chaina
ge
Startin
g Node
End
Node
Interstate
Connectivi
tyCateg
oryGrade
STATE HIGHWAYS
Status of DLP
IDUKKI
Core Road Network
SL.
NoName of Road
Details of Link
Length of
Road
Criteria of selection of Road (As per Methodology)
TOTAL
SCOREStatusStarting Node Ending Node
Traffic
Density of
Connecting
Corridors
Tribal or
Under
Developed
Regions
Tourits/Pilgrim
Centers/Ports&
Harbours
4360290/2020/OS-PWD110
12Sabarimala - Kodaikanal
(SH -44)Thonikallu Kadavoor 134.180 SH
Thonikkallu to Pallikkavala BM & BC, road under DLP,
Pallikkavala to Vengalloor Bridge CC surface, road
trafficable.. Neriyamangalam to Pakuthipalam (30.320Km)
BM & BC work arranged(under CRF by NH). Pakuthipalam
to Chappath (2Km) Earthen road. Chappath to Kallarkutty
CC surface, road trafficable.
thonikallu to Pallikkavala
DLP up to Januvary 2022
13Hill Highway
(SH - 59)Mundakayam
Kuruthikkud
y.156.938 SH
Mundakkayam to Kuttikkanam under the control of NH183,
Kuttikkanam to chappath 19Km. Hill Highway work in
progress. Chappath to Kattappan (15.500Km) hill Highway
work arranged and to be tendered.Kattappana to
Myladupara BM & BC road.Myladumpara rajakkadu 15Km.
BM & BC work arranged Rajakkadu Ellackal 7.1Km. Road
under DLP . Iruttukanam anachal 5Km. BM & BC
completed. Anachal Ellackal 5Km. BM & BC in progress.
Kallar mankulam (18Km) BM & BC work arranged. Balance
8km portion Forest land
Puliyanmal to myladumpara
road DLP up to December
2020. Rajakakdu Ellackal
road DLP up to December
2020
959.222
1 Ramakkalmedu - Cumbummettu road Cumbummettu 0Ramakkalme
du6.35 6.35
Already selected road under Core Road Network .CC surface road
trafficable.
2 Devikulam Town loop road Periyakanal 0 Muttukadu 1.08 1.08 Already selected road under Core Road Network . CC road road trafficable.
7.43
1 Vandanmedu - Cumbummettu road Chettukuzhy 2.2Cumbummet
tu10.8 8.60 HIGH 60 Nil Z 5 10 75
Chettukuzhy ,Manthippara,Cumbummettu BM & BC road, road under
DLP
Vandenmedu cumbummettu
road DLP up to December
2020
2 Puliyanmala - Cumbumettu road puliyanmala 0cumbummett
u12.26 12.26 HIGH 60 Nil Z 5 10 75 Puliyanmala,Annarthollu,cumbummettu. BM & BC road, road under DLP
Puliyanmala Cumbummettu
road DLP uo to April 2022
20.86
OTHER MDRs
TOTAL
RITES LIST 2001
4360290/2020/OS-PWD111
Starting
Node
End
Node
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17
18 19
1Main Central Road
(131/300Km to 187/685Km)Laikad Puthuvely 56.385 High
165/000187/685 No connects NH183 No
taken over
ch131/330 to
142/000 from KSTP
on 27/01/2020 Good condition
2Punaloor-Muvattupuzha Road
(61/800 Km to 122/680Km)Plachery Nellappara 60.880 SH
84/000-96/000
DLP period
expired on 25-
03.2018
Good condition
61/800 to 84/00
handed over to kstp,
84/00- 96/00- BC
surface and
3
Kottayam-Kurukachal-
Mallappally-Kozhencherry
Highway (0/00 - 22/065)
Kanjikuzhy Jn Nedungadapally 22.065 High
4/000 22/065 No
connects
Pathanamthit
ta District No
As per Asset
Register, road
incuded as MDR.
4
Alappuzha-Pallathuruthy-
Nedumudi-Kidangara-
Changanachrry Highwy
(19/600 to 24/200)
Kidangoor East Perunna Jn 4.600 SH
19/600 24/200 No
connects MC
road and NH
66 No
Taken over ch
19/600 to 24/200
from KSTP on
27/01/2020 Good condition
5
Erattupetta-Teekoy-Vellikulam-
Vagaman-Peerumedu
Highway( 0/00 to 24/300
Erattupetta Wagamon 24.300 SHVagamon
Tourist
Centre Major SH-32
Connecting
Ettumanoor-Poonjar
SH way
Patch repair work
arranged. DLP is
6 months
SLTF19-20. patch
work arranged. work
in progress.
6
Ettumanoor-Kaduthuruthy-
Thalayolaparambu-Vaikom-
Thrupunithura-Ernakulam
Highway(0/00 37/220)
Pattithanam Jn Poothatta Bridge 37.220 SH
0/000 14/200 No
Sabarimala
Idathavalam-
Kaduthuruth
y temple and
via to
Ettumannoor
& Vaikom
Mahadeva
temple(Pilgri
m) No
Patch repair work
arranged. DLP is
26.10.2020,CH:20/5
00-27/000 KM patch
work ongoing,
ch27/000-29/000
km BC overlay
ongoing, ch:29/000-
35/200kmDLP is
24/04/2021
Patch repair work
arranged. DLP is
26.10.2020,CH:20
/500-27/000 KM
patch work
ongoing,
ch27/000-29/000
km BC overlay
ongoing,
ch:29/000-
35/200kmDLP is
24/04/2021 Trafficable
7
Ettumanoor-Kummannoor-
Kadapattoor-Pala-
Bhranganam-Erattupetta-
Poonjar road( 0/00 to 34/400
Ettumanoor Poonjar 34.400 SH
Sabarimala
Idathavalam-
Kadappattoo
r temple
(Pilgrim)
Patch repair work
arranged. DLP is
26.10.2020 Trafficable
DLP period
Core Road Network
SL.
NoName of Road
Details of Link
Length of
Road
Criteria of selection of Road (As per Methodology)
Total
Score Remarks
Starting Node Ending Node
STATE HIGHWAYS
Status of roadName Chainage Name Chainage Category Grade
Traffic
Density of
Connecting
Corridors
Tribal or
Under
Developed
Regions
Tourits/Pilgrim
Centers/Ports&HarboursInterstat
e
Connect
ivity
4360290/2020/OS-PWD112
8Alappuzha-Madurai Road
24/634 to 54/850Km
Thanneermukko
m Bund EastAverma 23.996 SH
no no
Thalayolaparamb
u Koothattukulam
road Ch 4/100-
11/200 BC
overlay
arranged.thaneer
mukkom bund
road ch:0/00-
1/780 km dlp is
25/06/2020,vaiko
m-vechoor road
ch:5/000-7/000
km DLP is
25/06/2020,pulinc
huvadu
cherumchuvad
road 0/000-2/212
kmDLP is
27/01/2022 ,EE
Road ch:20/500-
26/000 km patch
work arranged trafficable
9Kumarakom-Cumbam road
0/00 to 43/104Km
Kumarakom Boat
Jetty Jn
Kothalapady in
T.K. road35.400 SH
Kallara-Vechoor
road ch:3/044-
7/524 km DLP is
23/06/2020,vaiko
m-vechoor road
Ch:7/800-12/200
not in DLP Trafficable
10Sabarimala--Kodaikkanal road
29/000 to 87/785KmKanamala Thonikallu 58.785 SH
kanjirappally
Erumely-:0/000-
11/815DLP
period expired
on 30/12/2019
KPLY Subdivision
(1) SH kanjirapally
erattupetta (Ch
0/00 to 7/00)-
handed over to
RICK-BC Suface&
trafficable (2)
SH:Kanjirapally-
erumely- (Ch 0/00
to 11/815,- reach
from 26th mile to
erumely . )-BC
Suface , trafficable
4360290/2020/OS-PWD113
11 Hill Highway 0/00 to 22/050km Mundakayam Plachery 22.050 SH
Erumely -
Mukkada work in
progress -DLP
peirod 18 months
Placherry -
Mukkada road
will expired on
10.08.2021
The reach from
Karimkallumoozhy to
Placherry in under
Erumely section.It
consists of Two roads
,Erumely-Mukkada
&Placherry -Mukkada
one SF work recently
completed other one
is in Progress
12
Mundakayam-Elavungal
S.H.(Mundakayam-Koruthodu-
Mukkampetty-Pampavally)
0/00 to 21/250Km
Varikani Jn Kanamala 21.250 SHDLP peirod
expired Trafficable
13Changanacherry-By pass road
0/00 to 5/200Palathrachira Laikkad 5.200 High
0/000 5/200 No Railway station No
from ch 0/000 to
2/500 -20/11/2020
and from ch 2/500
to 4/200 -
11/12/2020 Good condition
TOTAL 406.531 KM
1Thalayolaparambu
Koothattukulam Road
Thalayolaparamb
u 0/000 koothattukulam 11/500 11.5 2001 CRN list
1/500-4/000
Patch repair work
arranged. Trafficable
2 Kottayam Kumarakom road Illickal Jn 0/000 Boat Jetty Jn 7/000 7 MDR
list Connecting
Illikkal Junction to
Boat Jetty 2001
CRN list
Patch Work
Tendered Trafficable
3 Kumarakom Vechoor road Boat Jetty Bridge 0/000Kaipuzhamuttu
Bus Stand6/350 6.35 SH
Connecting Boat
Jetty to
Kaipuzhamutt in
Patch Work
Tendered Trafficable
4Vadakkenada and landing
pagoda road 0/000-1/655
Valiyakavala -
Vaikom in EE
27/000 & South
Gate of Vaikom
Temple
0/000
WestGate of
Vaikom Temple &
Boat Jetty
Vaikom
0/805 &0/850 1.655
list Connecting
SH15 and Vaikom
Boat Jetty road -
2001 CRN list
Vadakkenada
road no DLP & LP
road DLP is on
11/08/2020 Trafficable
5 EV road Valiyakavala 0/000 Boat Jetty 1/200 1.2
Connecting
valiyakavala and
Vaikom temple- -
2001 CRN list
DLP peirod is
on 06/01/2021 Trafficable
6Manarcad - Kidangoor road
0/000-13/272Manarcadu 0/00 kidangoor 13/272 13.272 high 0/000
13/27
2No
Pilgrim
centreMajor No
Connecting NH 183
and Ettumanoor -
Poonjar SH way -
2001 CRN listGood condition,traffic
7Marangattupally-Uzhavoor
roadMarangattupally 0/000 Uzhavoor 13/228 13.228 2001 CRN list
24.07.2019 Good condition
8Manarcad-Puthuppally-
Thenganal road 0/000-15/267Manarcadu 0/000 Thenganal 15/267 15.267 High 0/000 15/267 No
pilgrim
centre
Connecting NH
183( at Manarcadu
Jn) to MC Road (at
Perunthuruthy Jn)
and also connects
Thenganal Jn in Satisafactory
RITES LIST 2001
4360290/2020/OS-PWD114
9Meenachil Kaduthuruthy road
0/000-4/000Meenachil 0/000 Kaduthuruthy 8/000 8.000 high 0/000 4/000 No
pilgrim
centreMajor
Conne
cting
to SH1
Connecting
Kuravilangad-
Kuruppanthara
road and
Ettumanoor -
Not in Defect
liability period Good condition
10
Changanacherry Vazhoor
karukachal-pathanamthitta
road 0/000-25/540
Changanassery
Boat Jetty0/000 Manimala 33/800 33.8 high 0/000 No
pilgrim
centre
Connecting
Vazhoor Jn in
NH183 to MC road
at Changanacherry
Central Jn
,Sabarimala leading
satisfactory
11 Anthinadu- Melukavu road Anthinadu 0/000 Melukavu 11/0000 11 Nil Major
Conne
cting
SH8
2001 CRN list
DLP Expired
Allegated cracks
with undulations
122.272
1Koothattukulam - Ramapuram
road Perumkutty 3/600 Ramapuram 11/056 7.456 high No
Nalambalam
Temple
(pilgrim)
Major No 75Nalambalam
Temple (pilgrim)Not in Defect
liability period
Trafficable.Cracks
and depressions
formed along the
7.456
282nd mile MC Road to 5th
mile CW road 0/480 - 8/190Kallukadavu 0/480 Thengana 8/190 7.71 High 0/480 8/190 No
Pilgrim
centre42.5
CW(Changanacherr
y Vazhoor) road
and MC road linktrafficable
3Kottayam Municipal bus stand
road Starts at Green Park Junc@on0/000
Nagambadom
Muttabalam
Nagambadam
End
0/340 0.34 high NO No 45
Road connecting to
Kottayam Railway
Station Agreement ExecutedTrafficable
4 Lower Bazar road Baker Jn 0/000 Alumood Jn 2/660 2.66 high NoKumarakom
(Tourist)Major 55
Connecting MC
road to Aruthootty Budget Work in ProgressTrafficable
5Vazhoor Puliyannoor road
0/000-19/588Vazhoor 0/000 Puliyannoor 19/588 19.588 medium No
Sabarimala
(Pilgrim)Major no 55
Connecting
Kodungoor Jn in
NH183 to Mutholy
CH 0/000 TO
2/000-DLP period
expired. Trafficable
6Thalappara Neerpara road
0/000-6/000
Thalappara Jun:
TK road Ch:
1/300 km
0/000Neerpara Jun:
(District boundry)6/000 6 high 0/000 6/000 No NA NA No 52.5
Connecting SH40
and SH15 leading
road to Ernakulam
patch work
arranged trafficable
7Gandhi Nagar road 0/000-
2/000Gandhinagar Jn 0/00
Medical college
Jn2/00 2 high No na Major no 42.5
Connecting MC
road to Medical
College road
trafficable
8 Pala Ramapuram road Pala 0/000 Ramapuram 11/600 11.6 Medium noNalambalam
(Pilgrim)Major no 42.5
Connecting
Ettumanoor
Poonjar SH way and
Ramapuram
Work done by
KSTP. DLP
expired
Road made
trafficable by
carrying out
patch repairs
9 Pala Kozha road 0/000-15/630 Pala 0/000 Kozha 15/630 15.63 Medium No Major No 45
Connecting MC
road and
Ettumanoor
Poonjar SH
Work done by
KSTP Trafficable
10 Thiruvathukkal Illikkal road Thiruvathukkal jn 0/000 Illickal Bridge 1/770 1.77 medium NoKumarakom
(Tourist)Major 55 Leading to Illickal
DLP period
expired on
22.07.2019 Trafficable
67.298
OTHER MDRs
Additional Roads recommended for addition
4360290/2020/OS-PWD115
Grade Score
Startin
g Node
End
Nod
e Score Grade Score
Catego
ry Grade Score
Grade Score
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 M.C. Road Adoor 83/315 Manthuka 108/100 24.785 S.H.
KSTP ROAD KM 90/300-
93/300-bm AND bc.DLP
Period.
DLP Period.
2 M.C. Road Thiruvalla 121/400 Idinjillam 131/300 9.900 S.H. kstp ROAD
3Kayamkulam - Pathana puram
road
Pazhakula
m19/400 Adoor HS Jn. 25/00 5.600 S.H.
BC overlay
completed.DLP up to
2022
DLP up to
2022
4Kayamkulam - Pathanapuram
roadAdoor 27/056 Pathanapuram 42/520 15.464 S.H.
BC overlay completed
for 27/050-35/000.DLP
up to 2022.km 35/000-
42/520 BC overlay work
ongoing
DLP up to
2022
5 Punalur - Muvattupuzha road Pathanapu
ram13/796 Placherry 61/700 47.904 S.H. KSTP ROAD
6 Kayamkulam - Thiruvalla road Parumala 21/400 Thiruvalla 30/560 9.160 S.H. bm and bc
completed.DLP ended.DLP ended.
7 Thiruvalla - Kumbazha road Thiruvalla 0/00 Kumbazha 33/000 33.000 S.H. bm and bc
completed.DLP ended.DLP ended.
8 Ambalappuzha - Thiruvalla road Neerettup
uram18/800 Thiruvalla 22/500 3.700 S.H.
bm and bc
completed.DLP period. Under DLP
9 Mannarakulanji - Pamba road Mannarak
ulanji32/000 Pampa 53/500 21.500 S.H.
Bm and bc
completed.DLP period.Under DLP
10 Kottayam - Kozhencherry road Nedungad
a ppally24/660 Pullad 40/890 16.230 S.H.
bm and bc completed.
For 28/000-29/600 DLP
period. Balance portion
work started by NH.
up to 28/000
DLP
completed
28/000-29/600
under DLP
From 29/600
to 40/890
11 Mavelikkara - Kozhencherry Aickadu
Palam19/925 Kozhencherry 28/766 8.841 S.H.
bm and bc
completed.DLP period.Under DLP
Total 196.084
STATE HIGHWAYS
DLP
Starting Node Ending Node
Traffic
Density of
Connecting Corridors
Tribal or Under
Developed Regions
Tourits/Pilgrim
Centers/Ports&Harbours
Interstate
Connectivity
Name Chainage Name Chainage
Pathanamthitta
Core Road Network
SL.
No Name of Road
Details of Link
Length of
Road
Criteria of selection of Road (As per Methodology)
Total
Score
Constitue
ncy Remarks
4360290/2020/OS-PWD116
1 Thiruvalla- Mallappally Road Thiruvalla 0/000 Mallappally 14.160 14.160 Thiruvalla
included in the KIIFB
project 2016-17.(to be
executed through RICK)
2 Vennikkulam -Ranny Road
Vennikkul
am 0/000 Ranny 15.500 15.500 Ranni
from 4/500-15/600 BM
and BC work
completed.(nabard
work )completed
Under DLP
3 Mannarakulanji - Kozhencherry Mannarakulanji0/000 Kozhencherry 15.635 15.635 Aranmula
project nearing
completion under KIIFB
project 2016-17
Under DLP
4
Vadasserikkara - Plappally
Road
Vadasserik
kara 0/000 Plappally 37.000 37.000 Ranni & Konni
DLP period up to
7/2024.BM and BC
completed
DLP period up
to 7/2024.
5
Pathanamthitta- Kaipattoor -
Kodumon - Ezhamkulam Road
Pathanam
thitta 0/000
Ezhamkulam
Road 17.500 17.500 Adoor
Pathanamthitta
Kaipattoor (6.33km) is
part of NH
183A.kaippattoor-
Kodumon -Ezhamkulam
road has been included
in the KIIFB project
2017-18.DPR
submitted for A.s.
6
Kochalummodu- Pandalam-
Kaipattoor Road
Ayranikuz
hy 0/000 Kaipattoor 13.900 13.900 Adoor
Kochalummoodu-
Pandalam BC overlay
completed.DLp up to
2022.pandalam-
kaippattoor Road.DLP
ends.
DLP
7 Pandalam - Omalloor Road Kulanada 0/000 Omalloor cross Jn11.800 11.800 Aranmula
BM and BC work under
Nabard ongoing.
8
Pandalam - Aranmula Road &
Temple approach Road Kulanada 0/000 Aranmula 13.000 13.000 Aranmula
Pandalam-aranmula
road DLP period of BM
and BC work up to
DLP period
of BM and BC
work up to
138.495
1 Ring Road 0/000 - 5/300 Aban Jn 0/000 Aban Jn 5.300 5.300 A 60 a a 15 NO Pilgrim x 15 no 0 90.0 Aranmula
BC overlay
completed.DLP up to
05/2023
DLP up to
05/2023
5.300
RITES LIST 2001
OTHER MDRs
4360290/2020/OS-PWD117
2 Cherukolppuzha-Ranny Road Cherukolpuzha0/000 Cheukolpuzha 9.200 9.200 B 50 a a 15 Under Developed x x 15 no 4 80.0 Ranni
included under KIIFb
project 2017-18
3 Adoor Anandappally Kaippattoor Adoor 0/000 Kaippattor 10/980 10.980 B 50 a a 15 NO X X 15 no 5 80.0 Adoor
BM and BC work
completed.DLP period
up to 2022
DLP period up
to 2022
4 Pathanamthitta - Mylapra Road 0/000 - 2/290Pathanamthitta0/000 Maylapra 2.290 2.290 B 50 a b 12.5 NO Pilgrim x 15 no 6 77.5 Aranmula DLP period up to 05/2023
DLP period up
to 05/2023
5 Kumbazha -Konni Kumbazha 0/000 Konni 5/200 5.200 B 50 a b 12.5 Under Developed x x 15 no 7 77.5 konni PM road. KSTP
6 Chandanappalli - Konni Chandanappalli 0/000 Konni 12/200 12.200 B 50 b a 12.5 Under Developed x x 15 no 8 77.5 konni
patch works completed.
DLP up to 7/2020
DLP up to
7/2020
7 Thannithodu-Chittar Thannithodu0/000 Chittar 5/965 5.965 B 50 a b 12.5 Under Developed x x 15 no 9 77.5 konni Patch work ongoing .
8 Konni-Kalleli Eliyarakkal 0/000 Kalleli 6/120 6.120 B 50 a b 12.5 Under Developed x x 15 no 10 77.5 konni BM and BC Road .DLP ended.DLP ended.
9 Mannarakulanji-Puthukkulam Mannarakulanji0/000 Puthukulam 7/200 7.200 B 50 a b 12.5 Under Developed x x 15 no 11 77.5 konni Patch work completed.
DLP up to
7/2020
10 Kaippattoor -Vallicodu Kaipattoor 0/000 Vallicodu 3/400 3.400 B 50 a b 12.5 Under Developed x x 15 no 12 77.5 konni
patch work
completed.DLP up to
8/2020
DLP up to
8/2020
11 Thumpamon - Kozhencherry Thumpamon 0/000 Kozhencherry 13.500 13.500 B 50 b a 12.5 Under Developed x x 15 no 13 77.5 Aranmula
A.s received for the
KIIFB project 2017-18.
12 Pathanamthitta-Ayroor Pathanamthitta0/000 Ayroor 10.000 10.000 B 50 a b 12.5 Under Developed x x 15 no 14 77.5 Aranmula
patch work
completed.DLP up to
7/2020
DLP up to
7/2020
13 Manjanikkara-Elavumthitta-Kidangannoor RoadManjinikkara0/000 Kidangannoor 17.700 17.700 B 50 a b 12.5 Under Developed x x 15 no 15 77.5 Aranmula Ongoing kiifb project
under DLP
(Ongoing kiifb
project)
14 Varattar Bridge in MC road Kallisserry - Eraviperoor roadAratukadavu in MC road0/000 Othera 4.420 4.420 A 60 a b 12.5 NO Z Z 5 no 16 77.5 Aranmula
patch work
completed.DLP up to
07/2020
DLP up to
07/2020
15 Kavumbhagom-Muthoor-KuttappuzhaKavumbhagom0/000 Kuttappuzha 2.000 2.000 A 60 a b 12.5 NO Z Z 5 no 17 77.5 Thiruvalla DLp up to 2022
DLp up to
2022
110.175
4360290/2020/OS-PWD118
Name Chainage NameChainag
e
1Alappuzha-Madhura road
km.0/000 to 24/634
Power
house
bridge
junction
Including
Thanneermu
kkom bund
24.634 SH 40
From Ch : 12/954 to
24/634Budget work
2018-19
Improvements to
Alappuzha-Madhura
road by providing
BM & BC overlay
work arranged, work
arranged from ch :
2
Alappuzha-Changanassery
road km.0/000 to 19/800
including Nedumudy &
Pallathuruthy landings
Alappuzha Kidangara 20.562 SH 11 Good condition
3Ambalapuzha-Thiruvalla
road km.0/000 to 18/800
Ambalapp
uzha
Neerettupur
am18.800 SH 12
KIIFB Work
Completed
4
Alappuzha-Arthunkal-
Chellanam road km.0/000 to
32/720
Thumpoly Chellanam 32.720 SH 66
Ch 11/500 to 15/000,
good condition patch
work completed on
31.12.2019- . From
Ch.17/500 to 20/500-
good condition patch
work completed on
10.05.2019. ch
28/000 to 32/720
handover to NH and
ch 21/040 to 28/000 -
good condition (
patch work done)
5Kayamkulam-Pathanapuram
road km.0/000 to 19/400
Kayamkul
am
Adikkattuku
langara
Continuing
in
Pathanamthi
tta Dist.
19.400 SH 5 good
6Kayamkulam-Thiruvalla
road km.0/000 to 21/400
Kayamkul
am
Pannayi
Bridge at
Mannar
Continuing
in
Pathanamthi
tta Dist.
21.400 SH 6 On going work
7Mavelikara-Kozhencherry
road km.0/000 to 19/925
Mavelikka
ra
Ayikkattu
Bridge at
Puthencavu
Continuing
in
Pathanamthi
tta Dist.
19.925 SH 10 good
Currently not in DLP
3/30/2023
From Ch: 11/500 to
15/000 DLP period is
upto 30.06.2020 ,
From Ch: 17/500 to
20/500 DLP period
upto 09.11.2019. from
Ch:16/000 to 17/500
DLP period upto
04.05.2019. from ch
21/040 to 28/000 DLP
period upto
20.07.2020
07.04.2023
NA
26.12.2020
28/10/2021 (ch :
0/000 - 3/000)
CORE ROAD NETWORK
ALAPPUZHA DISTRICT
Sl
No Name of Road
Road Code
No
Details of linkLink
Length
(Km)
Pavem
ent
width
in
Lane
Base
year
traffic
(in
PCU)
Remarks
Current Status
of Road (
Work
Ongoing/ Good
Condition/
DLP Period Starting node Ending node
STATE HIGHWAYS
4360290/2020/OS-PWD119
8Main Central road
km.108/000 to 121/400Karakadu Kuttoor 13.400 SH - 1 NA
TOTAL 170.841
1Mavelikkara -
Krishnapuram roadSA32
Mavelikka
ra0.000
Krishnapur
am11.900 11.900 IL 4289 good
2Thattarambalam -
ThrikkunnapuzhaSA34
Thattaram
balam0.000
Thrikkunna
puzha13.070 13.070 IL 4649 good
3
Sasthamkotta -
Charummod road &
Chaarumood Pallikal road
SA63 & SA36Sasthamk
otta 0.000
Chengannu
r15.000 15.000 IL 5517 NA
4Kayamkulam deviation
roadSA52
Kayamkul
am0.000
Kayamkula
m2.300 2.300 DL 4380
work on going under
NABARD
5Ochira Thamarakkulam
roadSA69 Ochira 0.000
Thamarakk
ulam14.000 14.000 IL 3641
KIIFB Work under
Roads Division
Kollam ongoing
6
Edathua Veeyapuram road
& Haripad Veeyapuram
road
SA237
&SA86Edathua 0.000 Haripad 9.822 9.822 IL 7375
Edathua
Veeyapuram - DLP
till March 2022
Harippad
Veeyapuram not in
DLP
7
Cherthala - Arthunkal road
& Alappuzha Arthunkal
road
SA103 &
SA88
Cherthala
Arthunkal
0.000
7.000
Arthunkal
Thumpoly
junction
7.000
25.00025.000 DL 1520
Cherthala Arthunkal
road From Ch: 0/000
to 0/500 BM- BC
Road good
condition., From Ch:
0/500 to 4/200 Good
condition-Patch work
completed . From
Ch:5/000 to 7/000
Good condition
Patchwork
completed. From Ch:
4/200 to 5/00 work
required
8
Kanichukulangara road &
Kanichukulangara Chethy
road
SA107
&SA123
Kanichuk
ulangara0.000 Chethy 3.500 3.500 SL 6362
Good condition (
BM&BC Road )
9Kanjikuzhy Muhamma
roadSA109
Kanjikuzh
y0.000 Muhamma 3.500 3.500 SL 4975
Good condition (
BM&BC Road )
10
Alappuzha - Nedumudi -
Kidangara -
Changanassery road
SH11 Kalarcode 0.000 Perunna 24.200 24.200 DL 5023 Good condition
122.292
Starting
Node
End
NodeScore Grade
1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23
Name Chainage Grade Score Category Grade
Current
Status of
Road
DLP Perioud Tourits/Pilgrim Centers/Ports&Harbours Interstate
Connectivity Total
scoreScore Grade Score
24
OTHER MDRs
SL.
NoName of Road
Details of Link
Length of
Road
Criteria of selection of Road (As per Methodology)
Remar
ksConstituen
cyName Chainage
Starting Node Ending Node Traffic Density of Connecting
Corridors
Tribal
or
Under
11.09.2022
Proposed NH Currently not in DLP
Total length
Good condition
03.07.2020
11.09.2022
Overlapping SH 10
from Pallikal upto
Chengannur
NA
NA
Leads to Kollam NA
06.12.2021
NA
RITES LIST 2001
12.07.2021
4360290/2020/OS-PWD120
1Thattarambalam -
Thrikkunnapuzha RoadKarippuzha jn: 1/800
Thrikkunnapu
zha13/070 11.270 A 60 a a 15 No
Intermediate
tourist/pilgrim
centre
y 10 No 0 85 HaripadGood
Condition
2Erumakkuzhy - Edappon
RoadPara Junction 0/000 Edappon 06/380 6.380 A 60 a a 15
Intermediate
tourist/pilgrim
centre
Y 10 No 0 85Mavelikar
agood
3Puthiyakavu - Pallickal
RoadPuthiyakavu 0/000 Kattanam 9/400 9.400 A 60 a a 15
Intermediate
tourist/pilgrim
centre
Y 10 No 0 85
Kayamkul
am/
mavelikara
work on
going under
KIIFB
4
Bharanikkavu- Komallor -
Thervumukk- Padanilam -
Kudassanadu -
Athikkattukulngara Road
Bharanikkavu 0/000Athikkatukul
nagara17/200 17.200 A 60 a b 12.5
Intermediate
tourist/pilgrim
centre
Y 10 No 0 82.5
Kayamkul
am/
mavelikara
work on
going under
CRF
44.250
5Haripad - Veeyapuram
road
Haripad Town
hall Jn:0/000
Thrippakkuda
m1/650 1.650 B 50 b b 10 Yes
Major
tourist/pilgrim
centre
x 15 No 0 75 Haripad Good
6Thrikkunnapuzha -
Valiyazheekkal road
Thrikkunnapuz
ha0/000
Valiyazheekk
al 15/700 15.700 B 50 b b 10 Yes
Major
tourist/pilgrim
centre
x 15 No 0 75 Haripad
Good
Condition
(0/000 to
5/400 - Patch
Work
Arranged)
7 Sabarimala village RoadPottamelkadav
u2/400
puliyoor
kizhakkenada
jn
7/800 5.4 B 50 b c 7.5 NA
Major
tourist/pilgrim
centre
x 15 No 0 72.5Chengann
ur
BM & BC
Road, Good
Condition
22.750
06.12.2020
NA
NA
Not in DLP
30.06.2019
16.08.2022
17.04.2021
4360290/2020/OS-PWD121
Name Chainage Name ChainageStarting
NodeEnd Node Category Grade
1Challimu
kku43/000 Arippa 52/000
BC overlay
in progressGood
Hillhighway work
ongoing
Arippa 52/000
Kulathup
uzha
Temple
61/400BM overlay
in progressGood
Hillhighway work
ongoing
Kulathup
uzha
Temple
61/400Thenmal
a73/296 4/22/2024 Good
2
Adoor -
Sasthamk
otta road
7thmile 11/200Sasthamc
otta18/250 7.050 S.H 37 Good
SF 18-19 Heavy
maintenance -
Providing BM
and BC - work in
progress - Ch
4/200 to 16/000
handed over to
NH.
3 Ayoor 0/000Agastyac
ode9/000 2012 Moderate
KIIFB work,
Awaiting T.S
Agastyac
ode9/000 Punalur 19/082 BM ongoing Good
Hillhighway work
ongoing
Parippally 0/00 kulamada 1/600 2019 Good
Elikkunna
m mugal11/200
Madathar
a33/100 11/20/2021 Good
5
Punalur
Moovattu
puzha
road
TB jn
Punalur0/00
Kallumka
davu13/800 13.800 S.H -8 May-20 Good
Anchal
RO Jn7/300
Alencher
ry9/200 2013 Moderate
Upgradation
work necessary
6Alencher
ry9/200
Kulathup
uzha 26/200 Good
Hillhighway work
ongoing
Old NH
Portions
Oachira
North
Puthiyaka
vu2.250 Old N.H
27/02/2023(
for bits on
LHS and
RHS near
Puthiyakavu
)
It is not a
continuous stretch
and is scattered in
small bits. Work
arraged by NH in
three bits near
Valiyakulangara.
It is not a
continuous stretch
and is scattered in
small bits.
KOLLAM DISTRICT
Core Road Network
Sl. No.Name of
Road
Details of link
Length of
roadCategory
Criteria of Selection of Road ( As per Methodology)
DLP STATUS RemarksStarting Node Ending Note
Traffic
Density of Tribal or
under
developed
Tourits/Pilgrim Interstate
Connectiv
ity
MarksRemarks
STATE HIGHWAYS
Thiruvana
nthapura
m -
Tschenkot
ta road
30.300 S.H-2
Ayoor -
Punalur
road
19.090 S.H 48
4
Varkala -
paripally -
Madathar
a road
23.500 S.H 64
Hill High
way Ayoor
Kulathupp
uzha
18.900 S.H -59
4360290/2020/OS-PWD122
2/18/2020 Good
Chipping carpet
provided on bit
near Pulliman
Junction.
1/22/2019 Good
Chipping carpet
provided on bit
near Lalaji
Junction.
Moderate
Chipping carpet
existing on bit near
Vettamukku. DLP
not Known.
Old NH
Portions
Sakthikula
ngaraKavanad 1.600 Old N.H
Old NH
Portions
Vellayitta
mbalam
Chinnakk
ada3.700 Old N.H May-21 Good
8 MC road Vazhodu 43/100 Enathu 83/500 40.4 SH 1
BC overlay
completed
Through
SCDP
safe corridor
Demonstration
Project
Total 164.190
1
Kollam-
Ayoor
Road
Kollam 0/000 Ayoor 30/750 30.750 MDR
Connectivi
ty to NH
66 , NH
744 &
MC road.
Presently
the road is
under
KSTP and
not yet
handed
over.
28.02.2015 Trafficable
2
Chavara -
Pattakkad
avu Road
KMML,
CHAVA
RA
0/000Karalimu
kku9/000 9.000 MDR 7/4/2019
work
progressing
from ch 0/00
to 5/000.
Balance in
trafficable
condition
BC Overlay
work proposed
from ch 5/000 to
9/000. It is in
Tender stage
3
Karalimuk
ku -
Kadapuzh
a Road
Karalimuk
ku0/000
Kadapuzh
a5/100 5.100 MDR
Good
Condition
Entire stretch is
under KIIFB
project and work
is in progress.
BM completed.
3.600 Old N.H
RITES LIST 2001
7
Old NH
Portions
Pulliman
Jn
Neendaka
ra
4360290/2020/OS-PWD123
4
Kundara
Pallimukk
u -
Chittumal
a
(RANDUR
OAD)
Randu
road0/000
Pallimukk
u5/500 5.500 MDR Trafficable
work started on
02/06/2018 and is
in progress
5
Chathann
oor -
Paravoor
Thirumuk
ku0/000
Pozhikkar
a9/660 9.660 MDR
Connectivi
ty to NH
66.
2018 Nov Good
6
Paravoor -
Thoppil
Landing
Paravoor 0/000 Kappil 2/810 2.810 MDR
Tourist
destinatio
n to
Kappil
Beach.
2020
MarchGood
7Paravoor-
Paripally Paravoor 0/000 Paripally 10/250 10.250 MDR
Tourist
destinatio
n to
Kappil
Beach.
2016 Nov Good
8 Ayoor 0/000 Roadvila 8/000 MDR
Connectivi
ty to NH
66.
11/29/2020 Good
Roaduvil
a8/000
Kummall
oor17/500 MDR 2/10/2023 Good
Kattachal
Junction17/600
Ithikkara
Junction24/043 MDR 2019 Good
9
Kottarakk
ara -
Sasthamc
otta Road
Kottarakk
ara0/000
Sasthamc
otta17/300 17.300 MDR
KIIFB 16-
17 work
ongoing.
Good
KIIFB work in
progress under
the control of
PWD roads
Section,
Kottarakara
NH-
Padanaya
rkulangar
a temple
0/000
kallukada
vu
Bridge
4/200 4/15/2019
Road
developed
potholes.
KIIFB work
progressing.
10Kallukad
av bridge4/200
Anjilimo
odu9/600
KIIFB work in
progress under
the control of
PWD roads
Section,
Karunagappally
Kottarak
kara
chandam
ukku
0/000nellikkun
nam5/000 25-11-2020 average
11nellikkun
nam5/000
kurisinm
ood15/000
Connectivi
ty to MC
road.
5/28/2021 Good
Kottarakk
ara -
Velinalloo
r Road
15.000 MDR
Ayoor -
Ithikkara
road
24.043
Sasthamc
otta -
Kochanjili
moodu -
Karunaga
ppally
Road
9.6 MDR
4360290/2020/OS-PWD124
12
Vavvakka
vu -
Thazhava
Road
Road
Vavvakka
vu0/000
Manappal
ly 5/650 5.650 Good
Budget work
ongoing.BM &
BC completed
13
Manappal
ly -
Anayadi
Road
Manappal
ly 0/000 Anayadi 8/426 8.426 11/30/2022
good upto
0/800
BM & BC upto
Ch 0/800.Balance
CC
14
Pazhakula
m -
Anayadi
Pazhakul
am0/000
vellachira
Junction1/200 2.000
Only 2km
is under
Kollam
Division
balance
Portion is
under
Pathanamt
hitta
district
May-23 Good
KIIFB work
ongoing- GSB
provided- WMM
laying ongoing
15
Oachira -
Thamarak
ulam
Oachira 0/000Erickal
bridge3/287 3.287
Connectivi
ty to NH
66,
Oachira
temple.
BAD
CC at present.To
be upgraded to
BM & BC -
Ongoing KIIFB
work
158.376
4360290/2020/OS-PWD125
Grade ScoreStarting
Node
End
NodeScore Grade Score Category Grade Score
1 2 3 4 5 6 7 8 9 10 11 12 13 15 16
1 M C Road Nalanchira
10/00Thattathumala
43/200 33.2 SH -1
0/000 to 14/650-
Cantonment
section,Good in
condition
Km 14/650 to 25/000
was with KSTP. Now
handed over after DLP
on January 2020.
Remaining with KSTP,
Road safety corridoor
project in progress
Km 0 to 16.6 - BM & BC
surface.
Km 16.6 to 19.7Chipping
carpet
0 to 11. SLTF works just
completed.
Km 11 to 19.7, Hill
Highway work in
progress
For 0/000 to
11/000 DLP
up to
09/2020
DLP Expired
on 09/2019
from Km
0/000 to
4/200
For 4/200 to
10/500 DLP
up to
06/2021
DLP Expired
on 01/2020
from Km 16
to 25
Balance
portion now
in DLP
Starting Node Ending NodeTraffic
Density of Connecting
Corridors
Tribal or Under
Developed Regions
Tourits/Pilgrim
Centers/Ports&Harbours
14 17
STATE HIGHWAYS
THIRUVANANTHAPURAM DISTRICT
CORE ROAD NETWORK
SL.
NoName of Road
Details of Link
Length of
Road
Criteria of selection of Road (As per Methodology)
Road Code
NoPresent Status
Remarks(DL
P Period)Pavement
width in Lane
Base Year
Traffic (in
PCU) 2001
Name Chainage Name Chainage
4360290/2020/OS-PWD126
(From 19/700)Kallikadu
to Vazhichal-
Hill Highway work in
progress
Vazhichal to
Kudappanamoodu-
Hill Highway work to be
tendered
Kudappanamoodu to
Anappara-
Hill Highway work in
progress
Anappara to
Kadukkara- SLTF work
arranged
Vellayambalam-Kowdiar
road=1.200
Kowdiar-Peroorkada
road=2.040
Peroorkada-Vazhayila
road=0.640( first stretch)
Peroorkada-Vazhayila
road=0.790( second
stretch) Good in
condition,BM&BC work
arranged in Kowadiar-
Peroorkada road
Ch.0/000 to 3/000-
SLTF work ongoing,
Road selected for doing
White topping project
Km 10 to 35,-
Sabarimala Project in
progress. Km 35
to 43.200,-Hill Highway
Project in progress
4
Thiruvananthapu
ram Ponmudi
Road
Chulliman
oor
0/0037/200
Ponmudi 37/200 37.200 SH - 45
BM & BC surfacing
Selected under Rebuild
Kerala.
5Venjaramoodu
Attingal
Venjaram
oodu 0/00
10/460
Attingal 10/460 10.460 SH - 47 SLTF Work -On going
6Kilimanoor
Alamcode Kilimanoor 0/00
10/800
Alamcode 10/800 10.800 SH - 46
(Budget Work 2017-
18) BC Overlay work
in progress
DLP not yet
started
37.5 SH - 3
DLP Expired
DLP up to
04.07.2022
22.02.2027
22.02.2027
30.05.2031
DLP not yet
started
2Nedumangad -
Shorlacode roadNeduman
gad
0/0037/500
Kadukkara37/500
DLP of
patchwork
will be over
by August
2020
DLP not yet
started
3
Thiruvanathapur
am - Shencotta
Road
Thiruvana
nthapuram
0/0043/200
Elavupalam43/200 43.2 SH - 2
4360290/2020/OS-PWD127
7Vembayam -
NedumangadVembaya
m
0/008/00
Nedumangad8/000 8.000 SH - 47 BM & BC surfacing,
Land acquisition for
KIIFB project in progress
8Varkala-
ParippallyVarkala 0/000 Parippally 11/600 11.600 SH - 64
KIIFB work submitted for
tender
9Parippalli-
MadatharaKulamada 1/600
Elikkunnam
mugal11/200 9.600 SH - 64
Work arranged for BC
Overlay
201.560
Attakulangara to
Thiruvallam-
BM & BC Work
arranged
Thiruvallam to Poovar -
BCoverlay required. Now
road not in good
condition but trafficable
Poovar to Sankurutty
road up to Oorambu
junction- 6/200 km,
Oorambu to
Cheruvarakonam-
TamilNadu reach
(4/200),
Cheruvarakonam to
Kaliyikkavila-2/700
{Road from Poovar to
Kaliyikkavila already
done by KSTP during
2010-2011}
Now Road in good
condition except
isolated potholes
vizhinjam
toPanayarakunnu- Road
in good condition
DLP Expired
Total
RITES LIST 2001
1
Thiruvananthap
uram-
Vizhinjam-
Poovar-
Sankurutty-
Cheruvarakona
m Road
Manacadu 0/000 Poovar 40/900 40.9 3271 ST201
DLP of
SLTF Work
(live)
DLP Expired
DLP Expired
on 2015
IL(5.5m)
DLP of
patchwork
will be over
by August
2020
DLP of SLTF
Work ended
on 11/2019
Not in DLP
4360290/2020/OS-PWD128
Panayarakunnu to
Balaramapuram - Road
in good condition
Balaramapuram to
Kattakada-
Road transferred to NH
Division TVPM for CRF
work
Kattakada to Kuttichal
3
Parassala
Panachamood
road
Parassala 0/000Panachamoo
du12/950 12.95 5479 ST205
Hill Highway work
(KIIFB) in progress
4Vamanapuram-
Chittar Road
Vamanpu
ram0/000 Palodu 20/900 20.9 2875 ST208
KIIFB Project in
Progress.Work not
completed
5
Vembayam-
pallipuram
Road
Pallipura
m0/000 Vembayam 11/300 11.3 4360 ST210
KM 0 to 1.2 Chipping
carpet surfacing.
Remaining BM &
BC.Land acquisition
for KIIFB project in
progress.
IL Not in DLP
SL(3.75m)DLP not yet
started
ILDLP not yet
started
IL 8718 ST204
DLP Expired
on 2021
Not in DLP
2
Vizhinjam-
Balaramapuram-
Kattakkada-
kuttichal road
Vizhinjam 0/000 Kuttichal 25/100 25.1
4360290/2020/OS-PWD129
6
Thiruvananthap
uram-
Malayinkil-
Kattakada-
Neyyardam
Road
Thiruvan
anthapura
m
0/000 Neyyar Dam 29/900 29.9 7246 ST213
Karamana to
Poojapura-BM&BC
work completed
Poojapura to
Pallimukku-
SLTFwork completed
Pallimukku-
Valiyavila-BM&BC
work in progress
Valiyavila to
Kundamankadavu-
BC overlay arranged
Kundamankadavu -
Malayinkeezhu-
Kattakada- Road in
good condition
Kattakada to
Neyyardam-
Surface damages are
there so SLTF work
arranged,KIIFB
project sanctioned
Kallambalam to
Puthusserymukku ch.
0/000 to2/000
Puthusserymukku-
Nagaroor-Poyyakara ch.
2/000- 10/200---- CRF
completed by NH Wing
in 2019
Poikakada to Karete ch.
10/200 to 16/200
152.45
Details of Link Criteria of selection of Road (As per Methodology)
Other MDRs
IL 5368 ST276
IL
Karamana
to
Kudamanka
davu-
DLP not yet
started
Kundamank
adavu -
Malayinkeez
hu-
Kattakada-
DLP up to
05/2020
Kattakada
to
Neyyardam-
DLP not yet
started
7
Kallambalam-
Nagaroor-
Karette road
Leading to
varkala
Kallambal
am0/000 Varkala 11/400 11.4
DLP
EXPIRED
DLP
DLP up
to 04/2021
4360290/2020/OS-PWD130
Grade ScoreStarting
Node
End
NodeScore Grade Score Category Grade Score Grade
Scor
e
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1
Perumkadavila
Kunnathukal
Road
Perumka
davila0/000 Kunnathukal 11/000 11 B 50 b b 10
Under
Develpoed 25 Nil Nil 0 Yes 10 95 Parassala Good in Condition
0/000 to 7/200-SLTF
Work Arranged
7/200 to 11/700- BM&
BC
11/700 to 14/965- BM
& BC work arranged
3Amaravila
Karakkonam
road
Thannimo
od0/000 Karakonam 7/050 7.05 C 40 a b 12.5
Under
developed
regions
25Pilgrim
centerx 15 No 0 92.5 Parassala
Obtained Financial
Sanction of 90crores
from KIIFB to the road
improvement
33.015
4Kovalam Ist
approach roadKovalam 0/000 Beach 1.6 1.6 A 60 a a 15 Nil 0 Kovalam X 15 No 0 90 Kovalam Deposit Work arranged
5Kovalam II
approach roadKovalam 0/000
udaya
samudhra0.78 0.78 A 60 a a 15 Nil 0 Kovalam X 15 No 0 90 Kovalam Good in condition
6
Nedumangad –
Town Branch
road
Neduman
gad
(Pazhakut
ty)
0/000
Nedumangad
(Market)
1.800 1.800 B 50 a a 15Under
developed25 Nil Nil 0 No 0 90 Nedumangad
BM & BC Surfacing.
BC Overlay work
arranged.
Part of the road is
included in 4 laning
project of KIIFB
DLP
Expired
DLP
Expired
DLP not yet
started
Parassala
DLP not yet
started
DLP up to
12/2021
DLP not yet
started
DLP
Expired
before
2010/not in
DLP
17
DLP up to
12/2021
2
Arattukuzhi
amboori
Neyyardam
Road
Choondik
kal0/000 Devapara 14/695 14.965 B Tourist Y 10 No 0 9550 b b 10
Under
Develpoed 25
Present StatusRemarks(DL
P Period)
Starting Node Ending NodeTraffic
Density of Connecting
Corridors
Tribal or Under
Developed Regions
Tourits/Pilgrim
Centers/Ports&Harbours
Interstate
Connectivity
Total Score
SL.
NoName of Road
Length of
RoadRemarks
Name Chainage Name Chainage
4360290/2020/OS-PWD131
7
Amaravila
ottasekharaman
galam Road
Perumka
davila7/000
ottasekharam
angalam12/200 5.2 B 50 b b 10
Under
Develpoed 25 Nil Nil 0 No 0 85 Parassala
BM&BC,KIIFB work
in Progress
8Parassala
Kollemcode road
Parassala 0/000
Kaduvakuzhi
1/448 1.448 D 30 a c 10
Under
developed
regions
25Pilgrim
centery 10 Yes 10 85 Parassala
Last improvement done
on 2015,now the road is
in good condition
10.828
397.853
DLP not yet
started
DLP
Expired on
2018