BARODA HEAT-UP CONTROLS PVT. LTD LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES Sr. No CLIENT YEAR TYPE OF JOB TYPE OF PLANT INSPECTED BY 1 M/s. Bharat Heavy Plates and Vessels Ltd, VIZAG, Through EME FEB.'02 Refractory Dryout Super Heater for IOCL Barauni EIL, BHPV, EME 2 Indian Oil Corporation Ltd, Panipat Through Industrial Associates MAY'02 Refractory Dryout Main Combustion chamber of Sulpher Recovery Unit IOCL, INDUSTRIAL ASSOCIATES 3 Indian Oil Corporation Ltd, Barauni Through ACC JUL' 02 To AUG' 02 Refractory Dryout MCC, Thermal Incinerator, Waste Heat Boiler, Reactor, Sulpher Condensor EIL, IOCL, BHPV, ACC 4 Larsen & Toubro Ltd, Powai Thru. Ciria India Ltd. APR'03 TO JUNE’03 Refractory Dryout Cold Collector, R. G. Boiler, Reaction Furnace AIR LIQUIDE, ITT, L & T, CIL 5 Oil and Natural Gas Commission, HAZIRA Thru Shahani Associates. JULY’03 Refractory Dryout Vertical Incinerator ONGC, SHAHANI 6 Godrej, Mumbai Thru Ciria India AUG.’03 TO SEPT’03 Refractory Dryout Cold Collector AIR LIQUIDE, ITT, GODREJ, CIRIA 7 BPCL, Chembur, Mumbai thru Ciria India Ltd SEP.’03 Refractory Dryout Stack L&T, EIL, CIRIA 8 LNG Petronet, Dahej thru L & T ECC, Ahmedabad Dec.’03 Refractory Dryout Heat Exchanger EIL/ FOSTER WHEELER-UK, LNG Petronet, TOYO ENGG. INDIA LTD, L&T ECC, 9 Godrej, Mumbai Thru Ciria India Ltd. Feb’04 To Mar’04 Refractory Dryout Cold Collector Phase I & II AIR LIQUIDE, ITT, GODREJ, CIRIA 11 Larsen & Toubro Ltd, Powai, Mumbai Thru Ciria India Mar’04 Refractory Dryout Waste Heat Boiler (3 Nos) L & T, CIRIA 12 Hindustan Petro Chemical Ltd, Vizag Thru BHPV / Sesha Chooda Thermotech Pvt. Ltd., Hyderabad Apr’04 Refractory Dryout 43 Mtrs. Height STACK EIL, HPCL, BHPV, SCTPL
Transcript
Page 1: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTEDREFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTED BY

1 M/s. Bharat Heavy Plates and Vessels Ltd, VIZAG,Through EME

FEB.'02 Refractory Dryout

Super Heater for IOCL Barauni

EIL, BHPV, EME

2 Indian Oil Corporation Ltd, Panipat Through Industrial Associates

MAY'02 Refractory Dryout

Main Combustion chamber of Sulpher Recovery Unit

IOCL, INDUSTRIAL ASSOCIATES

3 Indian Oil Corporation Ltd, BarauniThrough ACC

JUL' 02To

AUG' 02

Refractory Dryout

MCC, Thermal Incinerator, Waste Heat Boiler,Reactor, Sulpher Condensor

EIL, IOCL, BHPV, ACC

4 Larsen & Toubro Ltd,Powai Thru. Ciria India Ltd.

APR'03 TO

JUNE’03

Refractory Dryout

Cold Collector, R. G. Boiler, Reaction Furnace

AIR LIQUIDE, ITT, L & T, CIL

5 Oil and Natural Gas Commission, HAZIRAThru Shahani Associates.

JULY’03 Refractory Dryout

Vertical Incinerator ONGC, SHAHANI

6 Godrej, MumbaiThru Ciria India

AUG.’03 TO

SEPT’03

Refractory Dryout

Cold Collector AIR LIQUIDE, ITT, GODREJ,CIRIA

7 BPCL, Chembur, Mumbai thru Ciria India Ltd

SEP.’03 Refractory Dryout

Stack L&T, EIL, CIRIA

8 LNG Petronet, Dahej thru L & T ECC, Ahmedabad

Dec.’03 Refractory Dryout

Heat Exchanger EIL/FOSTER WHEELER-UK,LNG Petronet,TOYO ENGG. INDIA LTD, L&T ECC,

9 Godrej, MumbaiThru Ciria India Ltd.

Feb’04To

Mar’04

Refractory Dryout

Cold CollectorPhase I & II

AIR LIQUIDE, ITT, GODREJ,CIRIA

11 Larsen & Toubro Ltd, Powai, Mumbai Thru Ciria India

Mar’04 Refractory Dryout

Waste Heat Boiler (3 Nos)

L & T,CIRIA

12 Hindustan Petro Chemical Ltd, VizagThru BHPV / Sesha Chooda Thermotech Pvt. Ltd., Hyderabad

Apr’04 Refractory Dryout

43 Mtrs. Height STACK

EIL, HPCL,BHPV,SCTPL

Page 2: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTEDREFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB TYPE OF PLANT INSPECTED BY

13 Bharat Petro Chemicals Ltd, Chembur, Mumbai Thru L & T HARP, Baroda Thru Ciria India Ltd.

May’04 Refractory Dryout

MCC, LBMC & TOMC for SRU Project

EIL, BPCL,L&T,CIRIA

14 Larsen & Toubro Ltd., Mumbai Thru. Ciria India

Jan’05Nov’05Dec’05

Refractory Dryout

R. G. BoilerTotal 3 Nos

L & T,CIL

15 Godrej & Boyce, Vikhroli, Mumbai thru Ciria India Ltd.,

Jan’05 Refractory Dryout

Cold Collector AIR LIQUIDE, ITT, GODREJ,CIL

16 Technip K T, Okhla, New Delhi Thru. Ciria India

Feb.’05Oct.’05

Refractory Dryout

2 Nos Cold Collector

TECHNIP,CIL

17 Indian Oil Corporation Ltd, Vadodara, Thru. L &T- ECC Ahmedabad

April’05 Refractory Dryout

CO Duct EIL, IOCL, L&T-ECC.

18 Reliance Industries Ltd., Jamnagar (Guj.)

May’05,To

June’07

Refractory Dryout

Flare Stack Tip-06 Nos

RIL

19 Indian Oil Corporation Ltd, Mathura Thru. L& T Powai Thru. Ciria India Ltd., Noida

June’05 Refractory Dryout

Reactor IOCL,L&T,CIL

20 Indian Oil Corporation Ltd, Panipat Thru. L&T, Baroda Thru. CIL, Noida

Oct. ‘05 Nov.’05

Supervision for Refractory Dryout

2 Nos Cold Collector

L&T,CIL

21 Larsen & Toubro Ltd., Hazira, Surat Thru. CIL, Noida

Nov’05 Dec’05

Refractory Dryout

Cold Collector2 Nos

L&T,CIL

22 Indian Oil Corporation Ltd, Baroda Thru. L& T , Ciria India Ltd., Noida

Dec’05To

Feb’06

Refractory Dryout

Stack for DHTU Heater:2 Nos

EIL,IOCL, L& T, CIL

23 Larsen & Toubro Ltd., Mumbai Thru CIL, Noida

Mar.’06 June’06

Refractory Dryout

R. G. Boiler3 Nos

L&T,CIL

24 Indian Oil Corporation Ltd, Baroda Thru. Ciria India, Noida

Mar.’06 Refractory Dryout

Flue Duct (3 Nos)

EIL,IOCL,CIL.

Page 3: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB TYPE OF PLANT INSPECTEDBY

25 Indian Oil Corporation Ltd, Panipat Refinery Thru. L&T, Mumbai

Mar’06 Apr.’06

Supervision for Refractory Dryout

Hot Oil Heater IOCL, L&T.

26 Indian Oil Corporation Ltd, Panipat Thru Nu-Calcutta Constn. Co. Kolkata

April’06To

June’06

Refractory Dryout

2 Nos Reaction Furnace &1 No. Hydro Generation Reactor &2 Nos Converter

IOCL Panipat,EIL,NCCC

27 Rastriya Chemical Fertilizer Ltd., Chembur Thru. Ciria India Ltd.,Noida

June’06 Refractory Dryout

Cold Collector RCF,CIL

28 Indian Oil Corporation Ltd, GuwahatiThru. Ciria India Ltd., Noida

June’06 Refractory Dryout

P. G. Boiler IOCL Guwahati,CIL

29 Indian Oil Corporation Ltd, Mathura Refinery, Mathura Thru. Ciria India Ltd

July’06 Refractory Dryout

R.G. Cooler IOCL,CIL

30 Co-en Bharat Ltd., Dist. Baroda

Aug.’06 Refractory Dryout

Heater with Stack

CBL

31 Indian Petrochemicals Ltd, Baroda Thru. Neo-Structo Constn. Co. Thru. Ciria India, Noida.

Nov.’06 to

Jan.’07

Refractory Dryout

Hot Flue Gas Duct

EIL,IPCL’NSCC,CIL

32 Indian Petrochemicals Ltd, Baroda Thru. Chaney & Co. Thru. Thermax, Pune

Dec.’06 Refractory Dryout

By-Pass Duct, Cold Flue Duct & Damper

EIL,IPCL’C&C,Thermax

33 Larsen & Toubro Ltd., Powai, Mumbai Thru. Ciria India Ltd., Noida

Jan ‘07May’07

Refractory Dryout

Waste Heat Boiler2 Nos RG Boiler3 Nos Riser Duct

L & TCiria

34 Reliance Industries Ltd., Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd., Mumbai

Aug ’07To

Dec’07

Refractory Dryout

Stack -9 Nos RIL,TECLPRL

35 Indian Oil Corporation Ltd, Mathura Refinery ThruCiria India Ltd., Noida

July’07 Refractory Dryout

Stack 4 Nos & MCC 1 No

EIL,IOCL,CIL

36 Indian Oil Corporation Ltd, Haldia Refinery, Thru Ciria India Ltd

Oct. ’07 Refractory Dryout

P G Boiler IOCL,CIL

Page 4: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTEDREFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB TYPE OF PLANT INSPECTEDBY

37 Indian Oil Corporation Ltd, Panipat Thru. Technip KTI India Ltd., Noida

Oct ‘07 Nov.’07

Refractory Dryout

Stack- 2 Nos EIL,IOCL,TKTI

38 Larsen & Toubro Ltd., Mumbai Thru CIL, Noida

Nov’07 Refractory Dryout

R. G. Boiler L&T,CIL

39 Larsen & Toubro Ltd., Powai, Mumbai Thru Ciria India Ltd

Jan.’08 &

Mar.’08

Refractory Dryout

2 Nos R G Boiler L&T,CIL

40 Bharat Oman Refinery Ltd, Bina, Thru. Technip KTI India Ltd., Noida

Mar.’08To

Aug’08

Refractory Dryout

Duct/Stack for CDU/VDU Heater Package -2 Nos

EIL,BORL,TKTI

41 LNG Petronet, Dahej Thru Neo Chemoflon Pvt Ltd

June’08 Refractory Dryout

Heat Exchanger EIL,LNG,NCPL

42 Hindustan Petro Chemicals Limited, Vizag Thru Pacific Refractories Ltd., Mumbai

June’08July’08

Refractory Dryout

5 Nos Duct & Stack for SRU

EIL, HPCL, PCL

43 Larsen & Toubro Ltd, Hazira Thru M/s. Ciria India Ltd., Noida

Oct.’08 Refractory Dryout

Convection Module

L&T/CIL

44 LNG Petronet, Dahej, Thru Neo Structo Construction Ltd., Surat

Dec.’08 Refractory Dryout

Cogen Heat Exchanger - 2 Nos

EIL/TOYO/LNG/NSCL

45 Bharat Oman Refinery Ltd, Bina, thru Pacific Refractories Ltd., Mumbai

Dec.’08To

Mar’09

Refractory dryout

Stack/DUCT EIL/BORL/PCL

46 Bharat Oman Refinery Ltd, Bina, thru Rockwool Insulation, Mumbai

Dec.’08To

Mar’09

RefractoryDryout

Stack Module/ Duct Module

EIL/BORL/RI

47 Larsen & Toubro Ltd., Powai, Mumbai Thru Ciria India Ltd., Noida

Jan.’09 To

May’09

Refractory Dryout

3 Nos R G Boiler L&T/CIL

48 Bharat Petro Chemicals Ltd, Mahul, Chembur, Thru Pacific Refractories Ltd., Mumbai

Feb.’09Mar’09

Refractory Dryout

Duct & Stack for CDU & VDU Heaters – 5 stages

BPCL/PCL

49 Bharat Oman Refinery Ltd, Bina, thruNu Calcutta Contn. Co. Kolkata

Mar.’09To

July’09

Refractory dryout

Stack/Duct EIL/BORL/NCCC

50 Larsen & Toubro Ltd., Powai, Mumbai Thru Ciria India Ltd., Noida

Mar.’09To

May’09

Refractory Dryout

Cold Collector-4 stage

L&T/CIL

Page 5: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB TYPE OF PLANT INSPECTEDBY

51 Mangalore Refinery, Mangalore thru Ciria India Ltd., Noida

May’09 Refractory Dryout

P G Boiler MRPL/CIL

52 Indian Oil Corporation Ltd, Baroda, thru. L & T Ltd Baroda thru. Ciria India Ltd., Noida

May’09To

July’09

Refractory Dryout

Reaction Furnace – 2 Nos, Thermal Incinerator

IOCL/EIL/L&T/CIL

53 Indian Oil Corporation Ltd, Mathura Refinery thru Ciria India Ltd., Noida

July’09 Refractory Dryout

Incinerator, MCC & Sulphur Condenser

EIL/IOCL/CIL/

54 Larsen & Toubro Ltd., Powai Mumbai thru M/s. Ciria India Ltd., Noida

July.’09 To

Dec’09

Refractory Dryout

1 No. R.G. Boiler4 Nos P G Boiler

L&T/CIL

55 Bharat Oman Refinery Ltd, Bina Refinery thru. Ciria India Ltd., Noida

Aug’09 Refractory Dryout

Process Gas Outlet Header

EIL/BORL/CIL

56 Reliance Industries Ltd., Baroda thru Shiv Engineering

Aug’09 Refractory Dryout

Flue Gas Duct RIL/SE

58 Indian Oil Corporation Ltd, Panipat thru M/s. Larsen & Toubro Ltd., Powai, Mumbai

Aug’09 Refractory Dryout

Fired Heater (Charge Heater-301 H 101)

IOCL/JACOBS/L&T

59 Indian Oil Corporation Ltd, Panipat thru M/s. Toyo Engineering Pvt Ltd., Mumbai

Aug’09 Refractory Dryout

HSD Heater (-303 H 201)

IOCL/JACOBS/TOYO

60 Chennai Petrochemicals Limited, Chennai Thru. M/s. Nu Calcutta Contn Co. Kolkata

Sept’09Dec’09

Refractory Dryout

HDS Stack, Off Take Duct & HFG Duct

CPCL/BRIDGE & ROOF/NCCC

61 Bharat Petro Chemicals Ltd, Kochi Refinery Thru. Technip K T India Ltd., Noida

Sept’09 To

Jan’10

RefractoryDryout

Duct/ Stack of NHT& CCR Heater

EIL/BPCL/TKTI

62 Bharat Petro Chemicals Ltd, Kochi Thru. Technocrats, Kochi

Oct’09 Refractory Dryout

Duct-4 Stages(1500Dia x 80 Mtrs Long)

BPCL/TC

63 Bharat Petro Chemicals Ltd, Kochi Thru. Malayil Builders Pvt Ltd., Kochi

Oct.’09To

Feb’10

Refractory Dryout

Stack for Heater EIL/IJT/BPCL/MBPL

Page 6: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

64 Indian Oil Corporation Ltd, Mathura thru. Thermax Ltd., Pune

Nov.’09 To

Dec’09

Refractory Dryout

HDS Heater IOCL/JACOB/THERMAX

65 Hindustan Petro Chemicals Ltd, Vizag, thru. Sri Raja Corporation, Vizag.

Nov.’09 RefractoryDryout

Stack- 2 Stage HPCL/ Bridge &Roof/COSMOS/SRC

66 HPCL Mittal Energy Ltd, Guru Govind Singh Refinery, Bhatinda, PunjabThru. Rockwool Insulation, Mumbai

Nov.’09To

Jun’10

RefractoryDryout

Stack Module for CDU/VDU Heater

GGSR/EIL/RI

67 Bharat Petro Chemicals Ltd, Kochi refinery, Through Technip KT India Ltd, Noida.

Jan’10 Refractory Dryout

5 Stage-CCR Duct of NHT Heater

BPCL/EIL/TKTI

68 HPCL Mittal Energy Ltd, Guru Gobind Singh Refinery, Bhatinda Refinery, Punjab Thru. Rockwool Insulation, Mumbai

Jan’10To

Aug’10

RefractoryDryout

25 Stage- HFG & CFG Duct/Stack for CDU/VDUHeater,3 Stage-Stack of NHT CCR Heater, 2 Stage-Stack of DHDT Heater

GGSR/EIL/RI

69 Bharat Petro Chemicals Ltd, Kochi refinery, Through Malayil Builders, Kochi

Feb’10 Refractory Dryout

4 Stage-Stack for CFBC Boiler

BPCL/MB

70 Indian Oil Corporation Ltd, Gujarat Refinery Thru Thermax Engg. Constn. Ltd., Pune

Feb’10 Refractory Dryout

Reactor Feed Heater

JACOBS/IOCL/TECL/

71 Thermax Ltd.,Savli, Thru Pacific Refractories Ltd., Mumbai

Feb’10To

July’10

Refractory Dryout

8 Nos convection Module of Reactor Feed Heater and Fractionator feed Heater,2 Nos Economiser of FGC Proj, 1 No Convection Header

EIL/TL/PRL

Page 7: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

72 HPCL Mittal Energy Ltd, Guru Gobind Singh Refinery, Bhatinda Refinery Thru M/s. Thermax Engg Constn. Ltd thru M/s. Pacific Refractories Ltd., Mumbai

Feb’10 To

June’10

Refractory Dryout

2 Stage-Convection Module ,1 Stage-Stack for DHDT Heater,1 Stage for HFG Duct of reactor Feed heater

EIL/TECL/PRL

73 Numaligarh Refinery Ltd., Assam Thru Ciria India Ltd., Noida

Mar’10To

May’10

Refractory Dryout

Transfer Line -10 Stages

EIL/NRL/CIL

74 Larsen & Toubro Ltd., Mumbai, Through STG Refractory Services Pvt Ltd., Mumbai

Apr’10 To

Dec’10

Refractory Dryout

1 No-P G Boiler, 7-Stage Cold Collector, 1 No Waste Heat Boiler

SRSPL/L&T

75 Bharat Petro Chemicals Ltd, Kochi thru Nu Calcutta Constn. Co. Kolkata

May’10 Refractory Dryout

SRU – 3 Stages EIL/BPCL/NCC

76 Bharat Petro Chemicals Ltd, Kochi thru Refrac Consultancy, Noida

May’10To

July’10

Refractory Dryout

Stack for SRU-4 Stage, Catalytic Converter, Incinerator, Reduction Furnace

EIL/BPCL/RC

77 Bharat Petro Chemicals Ltd, Kochi thru S K Boiler Pvt Ltd., Kochi

Jun’10To

Aug’10

Refractory Dryout

Stack and Duct-3 stage

EIL/BPCL/SKB

78 HPCL Mittal Energy Ltd, Guru Govind Singh Refinery, Bhatinda Refinery, Punjab, Thru. Ciria India Ltd, Noida

Jun’10To

Dec’10

RefractoryDryout

6 Stage-Stack for Naptha Super Heaters,10 Stage-Reactor/Stack for SRU,3 Stage Stack for Incinerator

GGSR/EIL/L&T/CIL

79 Indian Oil Corporation Ltd, Gujarat Refinery, thru Ciria India Ltd., Noida

June’10 To

July’10

RefractoryDryout

VGO DHT Heater IOCL/Heurty/UDAY/CIL

80 Bongaigaon Refinery & Petrochemicals Ltd, Assam Thru. M/s. Nu Calcutta Contn Co. Kolkata

June’10 To

July’10

RefractoryDryout

Waste Heat Boiler & Main Combustion Chamber

BRPL/EIL/IJT/NCC

81 Larsen & Toubro Ltd., Mumbai, Thru. Ciria India

July’10 To

Dec’10

Refractory Dryout

3 Nos R. G. Boiler L & T, CIL

Page 8: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTEDREFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

82 HPCL Mittal Energy Ltd, Guru Govind Singh Refinery, Bhatinda Refinery, PunjabThru Thermax Ltd., Pune Thru Pacific Refractories Ltd., Mumbai

July’10 To

Dec’10

RefractoryDryout

Stack/Duct-7 Stage

GGSR/EIL/TEIL/PRL

83 Larsen & Toubro Ltd., Mumbai, Thru. M/s. Kaefer Punj Lloyd

July’10 To

Nov’10

RefractoryDryout

1 No Catalic Cooler- Tube Sheet & Shell side

L&T/KPLL

84 Bongaigaon Refinery & Petrochemicals Ltd, Assam, Thru. M/s. Kaefer Punj Lloyd

Aug’10 To

Oct’10

RefractoryDryout

Thermal Incinerator package, Catalytic Converter & Hydrogen Reactor

BRPL/EIL/KPLL

85 Petrofab Ltd-Dabhasa, Gujarat, Thru. Ciria India Ltd,

Aug’10 To

Dec’10

RefractoryDryout

1 stage- Convection Section, 2 stage -HFG Duct for DHDT Heater, 6 Stage-Duct for DHDT heater.

EIL/CIL

86 Thermax Ltd, Kandla, Gujarat, through pacific Refractories, Mumbai

Aug’10 RefractoryDryout

Sulpher Combustion Chamber

Thermax/PRL

87 Thermax Ltd.,Pune, Thru Pacific Refractories Ltd., Mumbai

Sept’10 Refractory Dryout

3 Nos Economiser EIL/TL/PRL

88 HPCL Mittal Energy Ltd, Guru Govind Singh Refinery, Bhatinda Refinery, Punjab Thru. Chaney & Co, Pune

Oct’10 To

Dec’10

Refractory Dryout

10 Stage- Hot Air Duct for DCU Heater

GGSR/EIL/ACE/CHANEY

89 Bharat Petro Chemicals Ltd, Mehul, Mumbai, Through Pacific Refractories Ltd, Mumbai

Nov’10 Refractory Dryout

2 Stage – Stack BPCL/PRL

90 Reliance Industries Ltd, Jamnagar, Gujarat

Nov’10 To

Dec’10

Refractory Dryout

1 No Flare Stack & 1 No Mock-up Spool

RIL

91 Mangalore Refinery & petrochemicals Ltd, Mangalore, Through Technip KT India Ltd, Noida.

Nov’10 To

Dec’10

Refractory Dryout

26 Stages-Stack Module for PFCC Heater/DCU Heater

EIL/MRPL/TKTI

92 Indian Oil Corporation Ltd,Panipat, Through Nu Calcutta Constn. Co. Ltd, Kolkata

Nov’10 Refractory Dryout

Waste Heat Boiler and Reaction Furnace

EIL/OICL/NCCC

Page 9: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTEDREFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

93 Oil & Natural Gas Commission Ltd, Dahej Thru M/s. Toyo Engg. India Ltd., Mumbai

Dec’10 Refractory Dryout

Hot Oil Heater ONGC/Foster Wheeler/CIL/TOYO

94 HPCL Mittal Energy Ltd, Guru Govind Singh Refinery, Bhatinda Refinery, Punjab Thru. Chaney & Co, Pune

Jan’11 To

April’11

Refractory Dryout

Hot Flue Gas Duct& Cold Flue Gas Duct for DCU Heater

GGSR/EIL/ACE/CHANEY

95 Hindustan Petroleum Corporation Ltd, Mehul, Mumbai, Through Kaefer Punj Lloyds ltd, Mumbai

Jan’11 to

April’11

Refractory Dryout

Miter Bend for Cooler

HPCL/KPLL

96 HPCL Mittal Energy Ltd,Guru Gobind Singh Refinery, Bhatinda Refinery, Punjab Thru. Pacific Refractories Ltd, Mumbai

Jan’11 To

April’11

Refractory Dryout

Outlet/Inlet Duct & Mediate Duct

GGSR/EIL/TEIL/PRL

97 HPCL Mittal Energy Ltd,Guru Gobind Singh Refinery, Bhatinda Refinery, Punjab Thru. Ciria India Ltd, Noida

Jan’11 To

June’11

Refractory Dryout

1 Stage: Incinerator5 Stage: Duct for

Waste Heat Boiler

GGSR/EIL/KSS/CIL

98 Larsen & Toubro Ltd., Mumbai, Thru. Ciria India Ltd, Noida

Feb’11 To

Dec’11

RefractoryDryout

16 Stage: Cold Collector, 1 No: PG Boiler,2Nos:Waste Heat Boiler, 1No:R.GCooler,2Nos:Methantor Boiler, 1 No: Steam Superheater

L&T/CIL

99 Technip KT India Ltd, Okhla, Thru. Ciria India Ltd, Noida

Feb’11 To

June’11

RefractoryDryout

3 Stage: Stack, 2 Stage: outlet PG header

TKTI/CIL

100 ME Energy Pvt, Ltd, Pune, Thru. Ciria India Ltd, Noida

Mar’11 RefractoryDryout

Convection Module Heurty Petrochem-Mumbai/CIL/MEPL

Page 10: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTEDREFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

101 Mangalore Refinery and Petrochemicals Ltd, Mangalore, Karnataka, Through Technip KT India Ltd, Noida

Mar’11 To

Nov’11

RefractoryDryout

15 Stage: Hot Air Duct for DCU heater,2 Stage :Stack Module,7 Stage: CFG/HFG Duct for DCU heater.

EIL/MRPL/TKTI

102 Mangalore Refinery and Petrochemicals Ltd, Mangalore, Karnataka, Thru. Ciria India Ltd, Noida

Mar’11 To

May’11

RefractoryDryout

5 Stage-Stack EIL/MRPL/L&T/CIL

103 HPCL Mittal Energy Ltd,Guru Gobind Singh Refinery, Bhatinda Refinery, Punjab

Mar’11 To

April’11

Refractory Dryout

1 Stage: VDU Heater, 2 Stage: CDU Heater

HMEL/EIL

104 Indian Oil Corporation Ltd, Digboi, AssamThru. Ciria India Ltd., Noida

April’11 Refractory Dryout

1 No: P. G. Boiler of HGU

IOCL/EIL/CIL

105 Petron Engineering Const. Ltd, Dabhasa, Baroda, Gujarat

April’11 To

Oct’11

Refractory Dryout

Hot Air Generator, 2 Stage: Duct for DCU Heater,2 Stage: Duct for Radiant Section,1 Stage: Stack,2 Stage: Convection Section of DCU Heater for IOCL Paradeep Site

PECL-Dabhasa

106 Reliance Industries Ltd, Jamnagar, Gujarat

May’11 to

Aug’11

Refractory Dryout

Flare Tip of Flare Stack

RIL

107 Mangalore Refinery and Petrochemicals Ltd, Mangalore, Karnataka, Thru. Pacific Refractories Ltd, Mumbai

May’11 to

Dec’11

RefractoryDryout

1 Stage-Stack Module,7 Stage:HFG Duct& Outlet Duct with Circular Duct,2 Stage: Intermediate Duct

EIL/MRPL/TL/PRL

108 Thermax Ltd, Savli, Baroda, Thru. Pacific Refractories Ltd, Mumbai

May’11 To

June’11

RefractoryDryout

1St and 2nd Layer of Inlet Chanel

Lloyds/TL/PRL

Page 11: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

109 Petron Engineering Const. Ltd, Dabhasa, Baroda, Gujarat, Thru. Ciria India Ltd., Noida

June’11 To

Dec’11

Refractory Dryout

2 Stage: Hot Air Duct, 2 Stage: Flue Gas Duct,3 Stage:FCCU Stack section

PECL-Dabhasa, CIL

110 Indian Oil Corporation Ltd,Barauni Refinery, Barauni, Bihar, Thru. Ciria India Ltd., Noida

July’11 RefractoryDryout

1 No: Inlet Chamber of P.G.Boiler

IOCL/EIL/CIL

111 Mangalore Refinery and Petrochemicals Ltd, Mangalore, Karnataka, Thru. Castwel Industries, Nagpur

Aug’11 to

Nov’11

RefractoryDryout

8 Stage : Stack EIL/MRPL/TL/CI

112 Indian Oil Corporation Ltd,Mathura, UP, Through NK Enterprise, Mathura

Oct’11 to

Nov’11

RefractoryDryout

RG Cooler of Hydrogen Reformer, Incinerator for SRU

EIL/IOCL/NK

113 Indian Oil Corporation Ltd,Mathura, UP, Through Refratec Consultancy & Services, Noida

Oct’11 RefractoryDryout

Riger pipe of FCCU Heater

EIL/IOCL/RCS

114 Indian Oil Corporation Ltd,Paradeep Refinery, Paradeep, Orissa, Through Petron Engineering Constn. Ltd, Mumbai

Oct’11To

Nov’11

RefractoryDryout

8 Stages Stack for VGO Heater

Uday India-Mumbai, IOCL/PECL

115 Oil and Natural Gas Corporation, Mangalore Petrochemicals Ltd, Mangalore, Karnataka, Thru. Ciria India Ltd., Noida

Nov’11 to

Dec’11

RefractoryDryout

6 Stage: Convection Section of Heater

Heurtey/ONGC/CIL

116 Hindustan Petroleum Corporation Ltd, Visakh Refinery, Visakhapatnam, Through Swaran Singh & Co, Visakhapatnam (AP)

Dec’11 RefractoryDryout

Hot & Cold Flue Gas Duct

EIL/HPCL/SSC

117 Indian Oil Corporation Ltd,Paradeep Refinery, Paradeep, Orissa, Through Petron Engineering Constn. Ltd, Mumbai

Jan’12 To

Dec’12

RefractoryDryout

29 Stage of HFG of CDU, CFG Duct of VDU & VDU take off Duct, Flue By Pass Duct, Stackfor AVU heater

Foster Wheeler, IOCL/PECL

Page 12: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

118 Mangalore Refinery and Petrochemicals Ltd, Mangalore, Karnataka, Thru. Castwel Industries, Nagpur

Jan’12 Feb’12

RefractoryDryout

9 Stage : Stack, 1 Stage: Outlet Duct, 1 Stage: Outlet Hood,1 Stage: Inlet Duct,2 Stage: Incinerator

EIL/MRPL/TL/CI

119 R D Dynamech Infra Pvt. Ltd, Bobbili, Vizianagaram (AP), Thru. Ciria India Ltd., Noida

Jan’12 RefractoryDryout

6 Stage: Piping spool for FCC Unit

TUV/RDDL/L&T/CIL

120 Petron Engineering Const. Ltd, Dabhasa, Baroda, Gujarat, Thru. Ciria India Ltd., Noida

Jan’12 Refractory Dryout

1 Stage: FCCU Stack section

PECL-Dabhasa, CIL

121 Hindustan Petroleum Corporation Ltd, Visakh Refinery, Visakhapatnam, Through Swaran Singh & Co, Visakhapatnam (AP)

Jan’12 RefractoryDryout

4 Stage: Hot & Cold Flue Gas Duct

EIL/HPCL/SSC

122 Indian Oil Corporation Ltd,Mathura, UP, Through NK Enterprise, Mathura

Jan’12 RefractoryDryout

2 Stage Incinerator and Main Combustion Chamber for SRU

EIL/IOCL/NK

123 Reliance Industries Ltd, Jamnagar, Gujarat

Jan’12 RefractoryDryout

2 Stage: Cold Header

RIL

124 Mangalore Refinery and Petrochemicals Ltd, Mangalore, Karnataka, Thru. Saarc Engineers, Baroda

Feb’12 RefractoryDryout

Water seal Drum EIL/MRPL/SE

125 R D Dynamech Infra Pvt. Ltd, Bobbili, Vizianagaram (AP), Thru. Ciria India Ltd., Noida

Feb’12To

May’12

RefractoryDryout

29 Stage: Piping spool for FCC Unit

TUV/RDDL/L&T/CIL

126 Mangalore Refinery and Petrochemicals Ltd, Mangalore, Karnataka, Thru. Castwel Industries, Nagpur

Feb-Mar’12

RefractoryDryout

5 Stage : Stack 3 Stage:,1 Stage-Incinerator & 1Stage –Convection Section

EIL/MRPL/TL/CI

127 Essar Oil Ltd., Jamnagar, Gujarat

Feb.’12 RefractoryDryout

Riser at Main FractionatorColumn

EOL

Page 13: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

128 Oil and Natural Gas Corporation, Mangalore Petrochemicals Ltd, Mangalore, Karnataka, Thru. Ciria India Ltd., Noida

Feb-April’12

RefractoryDryout

7 Stage: Convection Section of Heater

Heurtey/ONGC/CIL

129 Thermax Ltd, Savli, Baroda, Thru. Pacific Refractories Ltd, Mumbai

Jan’12To

Nov’12

RefractoryDryout

8 Nos Convection Section, 8 Nos Stack, 8 Nos Transition Duct

TL/PRL

130 Cape Industrial Service Pvt Ltd.,Mumbai

Mar.’12 Refractory Dryout

Transfer Line – 3 stages

CISPL

131 IOCL, Digboi Refinery, Assam Thru M/s. Refrac Consultancy Services

April’12 RefractoryDryout

P G Boiler IOCL/ RCS

132 Esteem Projects Pvt Ltd., Buddy, Himachal Pradesh thru M/s. Ciria India Ltd., Noida

April’12 Refractory Dryout

Stack & Convection Section

EPPL/CIL

133 Indian Oil Corpn. Ltd., Digboi, Assam thru M/s. Refrac Consultancy Services, Noida

April’12 Refractory Dryout

P G Boiler EIL/IOCL/RCS

134 Petron Engineering Constn. Ltd., Petrofab, Dabhasa, Baroda

April’12 RefractoryDryout

Convection Section

PECL

135 L&T Ltd, R&C, Mulund thru Ciria India Ltd., Noida

April’12 RefractoryDryout

Secondary Reformed Waste Heat Boiler

L&T/CIL

136 L&T Ltd, R&C, Mulund thru Ciria India Ltd., Noida

April’12 RefractoryDryout

Waste Heat Boiler L&T/CIL

137 Indian Oil Corporation Ltd,Paradeep Refinery thru M/s. Ciria India Ltd.

May’12 RefractoryDryout

2 Stages of DCU Heater

FOSTER WHEEL/IOCL/ JACOB/HERUTEY/CIL

138 Indian Oil Corporation Ltd,Paradeep Refinery Thru M/s. Ciria India Ltd., Noida

May-Jun’12

RefractoryDryout

DHDT Heater IOCL /UDAY/CIL

Page 14: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

139 L&T R&C Mulund, Mumbai thru M/s. Ciria India Ltd., Noida

Mar.’12 Refractory Dryout

Waste Heat Boiler L&T/CIL

140 Thermax Ltd, Savli, Baroda, Thru. Pacific Refractories Ltd, Mumbai

Jan’12To

Nov’12

RefractoryDryout

8 Nos Convection Section, 8 Nos Stack, 8 Nos Transition Duct

TL/PRL

141 Mangalore Refinery & Petrochemical Ltd, Mangalore thru M/s. Kaefer Punj Lloyds Ltd., Gurgaon

April’12 To

May’12

Refractory Dryout

8 stage of Catalytic Convertor Reducing Reactor,

MPRL/KPLL

142 L&T Ltd, R&C Mulund, Mumbai thru M/s. Ciria India Ltd., Noida

June’12 Refractory Dryout

Secondary Reformer Waste Heat Boiler

L&T/CIL

143 Indian Oil Corporation Ltd,Paradeep Refinery thru M/s. Ciria India Ltd., Noida

June’12 RefractoryDryout

2 Stage of DHDT Heater

IOCL/CIL

144 L&T Ltd., R&C Mulund, Mumbai thru Ciria India Ltd., Noida

July’12 RefractoryDryout

2 Stage of Steam Super Heater

L&T/CIL

145 Technip K T India Ltd., Okhla thru M/s. Ciria India Ltd., Noida

July’12 RefractoryDryout

Stack TKTI/CIL

146 Heurtey Petrochem India Pvt Ltd., Kolkata thru M/s. Ciria India Ltd., Noida

July’12 RefractoryDryout

8 stages of Convection Module

HEURTEY/CIL

147 Indian Oil Corporation Ltd,Paradeep Refinery thru M/s. Ciria India Ltd., Noida

July’12 RefractoryDryout

Fresh Feed Heater IOCL/CIL

148 Indian Oil Corporation Ltd,Paradeep Refinery thru M/s. Ciria India Ltd., Noida

July’12 RefractoryDryout

Hot Air Duct of Fresh Feed Heater

IOCL/CIL

149 Indian Oil Corporation Ltd,Paradeep Refinery thru M/s. Ciria India Ltd., Noida

July’12 RefractoryDryout

Stack Module of Fresh Feed Heater

IOCL/CIL

150 Indian Oil Corporation Ltd,Paradeep Refinery thru M/s. Ciria India Ltd., Noida

July’12 RefractoryDryout

VGO Heater IOCL/CIL

151 Indian Oil Corporation Ltd., Guwahati Thru M/s. Ciria India Ltd., Noida

Aug’12 RefractoryDryout

P G Boiler IOCL/CIL

Page 15: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

152 Indian Oil Corporation Ltd,Paradeep thru M/s. Five Combustion System Pvt Ltd., Dabhasa, Gujarat

Sept’12 RefractoryDryout

Process Air Heater Stack

IOCL/FCSPL

153 Technip K T (I) Ltd., Okhla, Delhi thru M/s. Ciria India Ltd., Noida

Sept’12 RefractoryDryout

Convection Module TKTI/CIL

154 HPCL Mittal Energy Ltd., Bathinda thru M/s. Ciria India Ltd., Noida

Sept’12 RefractoryDryout

Incinerator and Reaction Furnace

HPCL/CIL

155 L&T, Mulund, Mumbai thru M/s. Ciria India Ltd., Noida

Sept’12 Refractory Dryout

Transition Duct, SAIPEN Waste Heat Boiler & Waste Heat Boiler

L&T/CIL

156 Bharat Oman Refinery Ltd., Bina thru M/s. Refrac Consultancy Ltd., Noida

Sept’12 Refractory Dryout

P G Boiler EIL/BORL/RCS

157 Reliance Industries Ltd., Jamnagar

Oct.’12 Refractory Dryout

Cold Header RIL

158 HPCL Mittal Energy Ltd., Bathinda thru M/s. Ciria India Ltd., Noida

Oct’12 RefractoryDryout

Reaction Furnace of SRU-B

HPCL/CIL

159 L&T Powai, Mumbai thru M/s. Ciria India Ltd., Noida

Nov’12 Refractory Dryout

2 stages of R G Boiler

L&T/CIL

160 Raj Engineering, Murbad thru M/s. Ciria India Ltd., Noida

Nov’12 Refractory Dryout

Incinerator RE/CIL

161 HPCL, Mumbai thru M/s. Toyo Engg. India Ltd, Mumbai

Nov’12 RefractoryDryout

DHT Heater HPCL/CIL/TOYO

162 Indian Synthetics Rubber Ltd, Panipat, thru M/s. Pacific Refractories Ltd., Mumbai

Nov-Dec’12

Refractory Dryout

2 stages of Primary CombustionChamber & 2 Nos Duct of Primary CombustionChamber

ISRL/PRL

163 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Jan’13 RefractoryDryout

Duct of AVU Heater

FosterWheeler/IOCL/PECL

Page 16: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

164 Thermax Ltd., Savli, Vadodara thru M/s. Pacific Refractories Ltd., Mumbai

Jan’13To

Mar’13

Refractory Dryout

Convection Section, Stack, Header Box

TL/PRL

165 Hindustan Petroleum Corporation Ltd., Visakhapatnam thru M/s. Refrac Consultancy & Services, Noida

Mar’13 Refractory dryout

Stack - 4 stages and Inlet & Outlet Channel - 1 stage

EIL/HPCL/FABTECH/RCS

166 M/s. Ciria India Ltd., Noida, Dryout job at POR, Vadodara

Mar-April’13

Refractory Dryout

3 Stages of Convection Section and 3 Stages of Stack/ Ducts

HeurteyPetrochem/CIL

167 Thermax Ltd., Savli, Vadodara thru M/s. Pacific Refractories Ltd., Mumbai

April’13 Refractory Dryout

Stack and Header Box

TL/PRL

168 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

April’13 Stress Relieving

4 stages of Manifold

FosterWheeler/IOCL/PECL

169 GAIL (I) Ltd., Dibiyapur, Dist. Auraiya thru M/s. Petron Engineering Contn Ltd., Mumbai

April’13 RefractoryDryout

Convection Module EIL/GAIL/PECL

170 Hindustan Petroleum Corporation Ltd., Visakhapatnam thru M/s. Refrac Consultancy & Services, Noida

May’13 Refractory Dryout

Incinerator EIL/HPCL/FABTECH/RCS

171 GAIL (I) Ltd., Dibiyapur, Dist. Auraiya thru M/s. Petron Engineering Contn Ltd., Mumbai

May’13 RefractoryDryout

2 Stages of Convection Module

GAIL/EIL/PECL

172 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

May’13 Stress Relieving

6 stages of Manifold

FosterWheeler/IOCL/PECL

173 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

June’13July’13

Refractory dryout

2 Stages NHT Stack Module

FosterWheeler/IOCL/PECL

Page 17: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

174 OMPL Mangalore thru M/s. L&T Ltd., Baroda

June’13, July’13Aug’13

Refractory Dryout

7 stages – Stack & Duct for Heater

TOYO/OMPL/L&T

175 Reliance Industries Ltd., Jamnagar

July’13& Sept’13

Refractory Dryout

2 Nos Cold Header RIL

176 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Aug.13 Refractory dryout

2 Nos HTD Reactor Feed Heater for VGO HDT Unit

FosterWheeler/IOCL/PECL

177 IOCL Refinery, Mathura thru M/s. N Kay Refractory Works Pvt Ltd., Mathura

Aug’13 Refractory Dryout

R G Cooler and Cold Collector

IOCL/NKRPL

178 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Aug.13 Refractory dryout

Hot Flue Gas Duct FosterWheeler/IOCL/PECL

179 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Sept.13 Refractory dryout

Boxed-up Heater for VDU Heater

FosterWheeler/IOCL/PECL

180 Hindustan Petroleum Corporation Ltd., Visakhapatnam thru M/s. Refrac Consultancy & Services, Noida

Sept’13 Refractory Dryout

Reaction Furnace EIL/HPCL/FABTECH/RCS

181 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Oct’13 Refractory dryout

CDU Heater(F-101)

FosterWheeler/IOCL/PECL

182 BPCL, Mahul, Mumbai thru M/s. Jaco Erector (P) Ltd., Mumbai

Nov-Dec’13

Refractory Dryout

2 layers of MCC of SRU

BPCL/JEPL

183 HPCL, Visakhapatnam thru M/s. Refrac Consultancy & Services, Noida

Nov’13-Jan’14

Refractory Dryout

2 Stages of Spool Pieces, 3 stages of Condensor & 3 Stage of Hydrogen Reactor

EIL/HPCL/FABTECH/RCS

184 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Dec’13 Refractory dryout

2 Stages of Cold Flue Gas Duct,2 stage of Stack of CDU Heater & 2 Stage of NHT/CCR Duct

FosterWheeler/IOCL/PECL

Page 18: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

185 IOCL Mathura Refinery thru M/s. N Kay Refractory Works Pvt Ltd., Mathura

Dec’13 Refractory Dryout

Riser Pipe of FCCU Unit

IOCL/NKE

186 Mangalore Refinery & Petrochemicals Ltd, Mangalore thru M/s. Pacific Refractories Ltd.,Mumbai

Dec.’13 Refractory Dryout

Chimney Tray MRPL/PRL

187 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Jan’14 Refractory dryout

CDU Heater(F-201)

FosterWheeler/IOCL/PECL

188 Reliance Industries Ltd.,Jamnagar

Jan.’14 Refractory dryout

LLP Flare Stack RIL

189 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Jan’14-Feb’14

Refractory dryout

Stack Module, HFG & CFG Duct of CCR Heater

FosterWheeler/IOCL/PECL

190 IOCL, Paradeep Refinery thru M/s. Windsor Refractories Pvt Ltd., Mumbai

Feb.’14to Sept’14

Refractory dryout

6 Nos Convertor,Reaction Furnace-1Stage, Waste Heat Boiler 3 Stage, Thermal Oxidiser-1 Stage& Decomposition Furnace-1 Stage.

FosterWheeler/IOCL/WRPL

191 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Mar.’14 Refractory Dryout

VGO Heater & APH of VGO Heater

FosterWheeler/IOCL/PECL

192 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Mar.’14 Refractory Dryout

NHT Heater FosterWheeler/IOCL/PECL

193 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Mar.’14 toMay’14

Refractory Dryout

5 Nos Stack Module of CCR Heater

FosterWheeler/IOCL/PECL

194 HPCL, Visakhapatnam thru M/s. Refrac Consultancy & Services Pvt Ltd., Noida

April’14 ToMay’14

Refractory Dryout

Reaction Furnace, Waste Heat Boiler, Incinerator

EIL/HPCL/FABTECH/RCS

Page 19: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

195 Technip KT India Ltd., Okhla, DelhiFOR BPCL, MUMBAI

May’14ToJuly’14

Refractory Dryout

3 stages of Convection Section of VDU Heater

EIL/TKTI

196 M/s. Technip KT (I) Ltd., Noida At-Bilfinger Plant Equipment Pvt Ltd., Surat FOR BPCL, MUMBAI

May ’14ToOct’14

RefractoryDryout

4 Stages -Convection Section,4 Stages-Off-take Duct & 3 Stages- Stack Module of CDU Heater

EIL/TKTI

197 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

June.’14 Refractory Dryout

APH &CFG Duct of NHT Heater

FosterWheeler/IOCL/PECL

198 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

May ’14 to

June’14

RefractoryDryout

6 Stage Convection Section& 1 Stage Duct of CDU Heater

EIL/TKTI

199 Bilfinger Plant Equipment Pvt Ltd., Surat

June’14 RefractoryDryout

JNK heater BPEPL

200 L&T Ltd.,Hazira Works, Surat For Reliance Industries Ltd., Jamnagar

June’14 to

Sept’14

Refractory Dryout

36 Stages of Convection Modules

RIL/L&T

201 Reliance Industries Ltd., Jamnagar

July’14 Refractory Dryout

Main Flare Stack RIL

202 Godrej & Boyce Mfg. Co. Ltd., Vikhroli, Mumbai thru M/s. Ciria India Ltd., Noida

July’14 Refractory Dryout

Manway Plug & Nozzle for Secondary reformer

KBR/CIL

203 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

July’14 ToAug’14

RefractoryDryout

3 Stage convection Section, 2 stages of Cold Flue Gas Duct of CDU Heater

EIL/TKTI

204 Heurtey Petrochem, Pali, Raigarh thru M/s. Ciria India Ltd

July’14 ToSept’14

Refractory Dryout

2 stage of Convection Section, 11 stages for Flue Gas Duct,1 Stage for Stack, 2Stage Crude Heater & 3 Stage Charged Heater

Heurtey Petrochem/CIL

Page 20: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

205 L&T Ltd., Powai, Mumbai thru M/s. Totale Global Pvt Ltd., Chennai

Aug’14 Refractory Dryout

2 stages of Transfer Line

KBR/L&T

206 Petron Engineering Ltd., (Petrofab Division),Vadodara- Jambusar Works) Ta. Padra, Vadodara

Aug’14To Oct’14

Refractory Dryout

1 stage of Convection Water Module & 1 stage of Convection Oil Module, 2 Stage Convection Blank Module, HFG-3 Stage,1 stage CFG &2 Stage of Header Box

PECL

207 Heurtey Petrochem, Jamnagar thru M/s. Ciria India Ltd., Noida

Aug’14 Refractory Dryout

3 Nos APH Support Structure and FG Duct & Convection Section

Heurtey Petrochem /CIL

208 ISGEC Hitech Zosen Ltd., Dahej, Dist Bharuch thru M/s. Ciria India Ltd.,Noida

Sept’14 Refractory Dryout

Transfer Line and Manway Cover

KBR/CIL

209 Technip KT (I) Ltd., Okhla shop, New DelhiFOR BPCL, MUMBAI

Sept’14 Refractory Dryout

Convection Module of VDU Heater

EIL/TKTI

210 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

Sept’14To

Dec’14

RefractoryDryout

3 Stage CFG Duct of VDU Heater, 1 Stage CFG for CDU & VDU Heater, 3 Stage Convection Module for CDU/VDU Heater& Breaching Section for CDU & VDU

EIL/TKTI

211 BPCL, Mumbai thru M/s. Technip K T (I)Ltd., Noida

Oct’14 RefractoryDryout

Stack SM-1 EIL/BPCL/TKTI

212 M/s. Technip KT (I) Ltd., Noida at M/s Jord Engineers India Ltd., Asoj, Vadodara FOR BPCL, MUMBAI

Oct’14 ToNov’14

RefractoryDryout

4 stages of CFG Duct& 2 Stage HFG Duct for each CDU &VDU Heater i.e. Total 12 Stage

EIL/TKTI

213 Daynite Engineers & Contractors Pvt Ltd., Mahul, Mumbai thru M/s. Ciria India Ltd., Noida

Oct’14 RefractoryDryout

2 stages of Convection Section

CIL/DECPL

Page 21: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

214 Technip K I India Ltd., Okhla, New Delhi thru M/s. Ciria India Ltd., Noida

Nov’14 RefractoryDryout

35 Nos Cone in Temporary Furnace

TKTI/CIL

215 Heurtey Petrochem, Jamnagar, thru. M/s. Ciria India Ltd

Nov’14 Refractory Dryout

Convection Module of Zone A & Zone B, Stabilizer 2 Stages, Isomer -2 stages and Damper Aeromatic – 2 stages

Heurtey Petrochem/CIL/RIL

216 Heurtey Petrochem, Jamnagar, thru. M/s. Ciria India Ltd

Dec’14 Refractory Dryout

Isom FGD, Tolune, Tolune Damper, Isom CM, Xylene Damper, Toulene FGD, 2 stage of Xylene FGD and 2 stage of Tolune FGD

Heurtey Petrochem/CIL/RIL

217 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Dec’14 To Jan’15

RefractoryDryout

2 Stage Convection Modulefor DCU Heater

EIL/ Heurtey/ CIL

218 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

Jan’15 RefractoryDryout

Hot Flue Gas Duct& Cold Flue Gas Duct for CDU/VDU Heater

EIL/TKTI

219 Heurtey Petrochem, Jamnagar, thru. M/s. Ciria India Ltd

Jan’15 Refractory Dryout

Isom SM-1, Tolune SM-1, Tolune CFGD-17, Stabilizer CFGD

Heurtey Petrochem/CIL/RIL

220 Daynite Engineers & Contractors Pvt Ltd., Mahul Mumbai thru M/s. Ciria India Ltd., Noida

Jan-Feb’15

Refractory Dryout

2 stages of Radiant Section

DECPL/CIL

221 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Jan-Feb’15

Refractory Dryout

Off Take Duct Module of CCR Heater

FosterWheeler/IOCL/PECL

222 L&T Ltd, Hazira, Surat thru M/s. Ciria India Ltd., Noida

Feb’15 Refractory Dryout

2 stages of Convection Module

L&T/TECHNIP/CIL

Page 22: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

223 Essar Heavy Engineering Ltd., Hazira thru M/s. Lizmontagens India Pvt Ltd., Mumbai

Feb’15 Refractory Dryout

Cross Header of Steam Reformer Outlet

EHEL/LIPL

224 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Feb’15 RefractoryDryout

Convection Module of DCU Heater

EIL/ Heurtey/ CIL

225 IOCL, Paradeep Refinery thru M/s. Petron Engineering Constn Ltd., Mumbai

Feb’15 Refractory Dryout

Off Take Duct Module of CCR Heater

FosterWheeler/IOCL/PECL

226 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Feb’15 RefractoryDryout

2 stages of Off take Duct and 1 stage of Cold Flue Gas Duct

EIL/ Heurtey/ CIL

227 L&T Ltd, Hazira, Surat thru M/s. Ciria India Ltd., Noida

Feb’15 Refractory Dryout

4 stages of Convection Module

L&T/CIL

228 Heurtey Petrochem, Jamnagar, thru. M/s. Ciria India Ltd

Feb’15 Refractory Dryout

- 2 Stages of HFGD of Stabilizer Heater, HFGD and CFGD of ISOM Heater, HFGD & CFGD of Toulene Heater, 3 stages -Stack support of Xylene Heater & Damper of ISOM heater.

Heurtey Petrochem/CIL/RIL

229 L&T Ltd., Powai Mumbai thru M/s. Totale Global Pvt Ltd, Chennai

Feb’15 Refractory Dryout

P G Boiler L&T/TGPL

230 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

Feb’15 RefractoryDryout

Cold Flue Gas Duct for CDU/VDU Heater

EIL/TKTI

231 Reliance Industries Ltd., Jamnagar thru M/s. Castwel Industries, Nagpur

Feb-Mar’15

RefractoryDryout

Stack RIL/THERMAX/CI

232 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Feb’15 RefractoryDryout

2 stages of Off take Duct of DCUHeater

EIL/ Heurtey/ CIL

233 L&T Ltd, Hazira, Surat thru M/s. Ciria India Ltd., Noida

Feb’15 Refractory Dryout

2 stages of Convection Module

L&T/TECHNIP/CIL

Page 23: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

234 Reliance Industries Ltd., Jamnagar A/c. Lizmontagens India Pvt Ltd., Mumbai

Feb’15 RefractoryDryout

First Stage Reactor of Gasifier

RIL/LIPL

235 Furnace Fabrica (I) Ltd., Kandla,Gandhidham

Feb’15 RefractoryDryout

4 stages of Stack Pieces

RIL/FFIL

236 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

Feb’15 RefractoryDryout

Cold Flue Gas Duct for CDU/VDU Heater

EIL/TKTI

237 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Feb’15 RefractoryDryout

Convection Module of DCU Heater

EIL/ Heurtey/ CIL

238 Reliance Industries Ltd., Jamnagar thruM/s. Castwel Industries, Nagpur

Mar’15 RefractoryDryout

Stack RIL/THERMAX/CI

239 Heurtey Petrochem, POR, Dist. Vadodara thru. M/s. Phisem Consultancy Services (P) Ltd., Noida

Mar’15 Refractory Dryout

Convection Moduleand Stack

HP/RIL/CIL

240 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

Mar’15 RefractoryDryout

Hot Flue Gas Duct for CDU/VDU Heater

EIL/TKTI

241 L&T Ltd., Powai Mumbai thru M/s. Totale Global Pvt Ltd, Chennai

Mar’15 Refractory Dryout

P G Boiler L&T/TGPL

242 L&T Ltd, Hazira, Surat thru M/s. Ciria India Ltd., Noida

Mar’15 Refractory Dryout

4 stages of Convection Module

L&T/CIL

243 Reliance Industries Ltd., Jamnagar A/c. Lizmontagens India Pvt Ltd., Mumbai

Mar’15 RefractoryDryout

First Stage Reactor of Gasifier

RIL/LIPL

244 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Mar’15 RefractoryDryout

Convection Module ofDCU Heater

EIL/ Heurtey/ CIL

245 Heurtey Petrochem, POR, Dist. Vadodara thru. M/s. Phisem Consultancy Services (P) Ltd., Noida

Mar’15 Refractory Dryout

2 Stages of Flue Gas Duct

HP/RIL/CIL

Page 24: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

246 Reliance Industries Ltd., Jamnagar thruM/s. Castwel Industries, Nagpur

Mar’15 RefractoryDryout

Stack RIL/THERMAX/CI

247 L&T Ltd., Powai, Mumbai thru M/s. STG Refractories Service Pvt Ltd., Mumbai

Mar’15 Refractory Dryout

R G Boiler L&T/SRSPL

248 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

Mar’15 RefractoryDryout

Hot Flue Gas Duct & Cold Flue Gas Duct for CDU/VDU Heater

EIL/TKTI

249 Heurtey Petrochem, Jamnagar, thru. M/s. Ciria India Ltd

Mar’15 Refractory Dryout

HFGD, Stack, FGD, OFD, Damper & 2 Stages of CFGD for Xylene Heater, Stack, Stack Support, Damper & STB for ISOM Heater

Heurtey Petrochem/CIL/RIL

250 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Mar’15 RefractoryDryout

Convection Module of DCU Heater

EIL/ Heurtey/ CIL

251 Reliance Industries Ltd., Jamnagar A/c. Lizmontagens India Pvt Ltd., Mumbai

Apr’15 RefractoryDryout

First Stage Reactor of Gasifier

RIL/LIPL

252 Reliance Industries Ltd., Jamnagar thruM/s. Castwel Industries, Nagpur

Apr’15 RefractoryDryout

Stack RIL/THERMAX/CI

253 Heurtey Petrochem, POR, Dist. Vadodara thru. M/s. Phisem Consultancy Services (P) Ltd., Noida

Apr’15 Refractory Dryout

3 stages of Flue Gas Duct

HP/RILCIL

254 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Apr’15 RefractoryDryout

Convection Module & Cold Flue Gas Duct of DCU Heater

EIL/ Heurtey/ CIL

255 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

Apr’15 RefractoryDryout

2 stages of Cold Flue Gas Duct for CDU/VDU Heater

EIL/TKTI

Page 25: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTD

LIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

256 Heurtey Petrochem, Jamnagar, thru. M/s. Ciria India Ltd., Noida

Apr’15To May’15

Refractory Dryout

HFGD, FGD & 2 stages of CFGD of Stabilizer Heater & 3 stages of CFGD, HFGD & FGD of Toulene Heater

Heurtey Petrochem/CIL/RIL

257 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Apr’15 RefractoryDryout

Convection Module & Cold Flue Gas Duct of DCU Heater

EIL/ Heurtey/ CIL

258 Reliance Industries Ltd., Jamnagar A/c. Lizmontagens India Pvt Ltd., Mumbai

May’15 RefractoryDryout

First Stage Reactor of Gasifier

RIL/LIPL

259 BORL,Bina Refinery ThruM/s. Ciria India Ltd., Noida

May’15 Refractory Dryout

Train ‘A’ Convertor & Annular portion of Waste Heat Boiler Train ‘A’

EIL/BORL/CIL

260 Reliance Industries Ltd., Jamnagar thruM/s. Castwel Industries, Nagpur

May’15 RefractoryDryout

Stack RIL/THERMAX/CI

261 Technip KT (I) Ltd., CoimbatoreFOR BPCL, KOCHI

May’15 RefractoryDryout

Hot Flue Gas Duct for CDU/VDU Heater

EIL/TKTI

262 Petron Engineering Constn Ltd., CoimbatoreFOR BPCL KOCHI

May’15 To Aug’15

Refractory Dryout

Stack Module for FCCU Heater, CFG Duct for VGO HDT Heater, Total10 Stage

EIL/BPCLPECL

263 Bharat Petroleum Corpn Ltd., Kochi thru M/s. TechnipIndia Ltd., Noida

May-Aug’15

RefractoryDryout

4 stages of Stack for CDU/VDU Heater

EIL/BPCL/TKTI

264 Heurtey Petrochem, POR, Baroda, thru. M/s. Ciria India Ltd., Noida

June’15 To Sept’15

RefractoryDryout

FGC Duct, ECS Module 1 & 2, Stack, Convection Module, Breaching & HFG Duct of CCR Heater; Total18 Stage

Heurtey/RIL/CIL

Page 26: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTDLIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

265 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

Sept’15 RefractoryDryout

Stack Module of DCU Heater; Total3 Stage

EIL/ Heurtey/ CIL

266 L&T Ltd., Mumbai thru M/s. STG Refractories Ltd., Mumbai

Sept’15 RefractoryDryout

Double Chamber Waste Heat Boiler

L&T/STGRL

267 Ciria India Ltd., Coimbatore siteFOR BPCL, KOCHI

May-Oct’15

RefractoryDryout

HFG Duct, CFG Duct, Off Take Duct, Stack & Convection Module of DCU Heater & FCCU Heater; Total15 Stage

EIL/ Heurtey/ CIL

268 L&T Ranoli, Baroda thru M/s. Refrac Consultancy & Service Pvt Ltd., Noida

Aug’15 to Oct.15

RefractoryDryout

34 Stages of Cyclones and 5stages of Cross Over Duct and 22stages of Dipleg

L&T/RCS

269 IOCL, Haldia Refinery thru M/s. Dominion Uniseven Industrial Services Pvt Ltd., Kolkata

Sept’15 to Oct’15

RefractoryDryout

7 Stages of Duct IOCL/DUISPL

270 Bilfinger Plant Equipment Pvt Ltd., Sachin, Surat

Oct’15ToNov’15

Refractory Dryout

6 Stages of Convection Module

BFEPL

271 Essar Oil Ltd., Vadinar, Jamnagar thru M/s. Ciria India Ltd., Noida

Oct’15 Refractory Dryout

Cold Flue Gas Duct and Hot Flue Gas Duct

EOL/CIL

272 Bharat Petroleum Corpn Ltd., Kochi thru M/s. TechnipIndia Ltd., Noida

Oct’15 RefractoryDryout

Stack for CDU/VDU Heater

EIL/BPCL/TKTI

273 Petron Engineering Constn Ltd., CoimbatoreFOR BPCL KOCHI

Oct’15To Nov’15

RefractoryDryout

HFG Duct, CFG, Stack & Convection Module

EIL/BPCLPECL

274 Bharat Petroleum Corpn Ltd., Kochi thru Pacific Refractories Ltd., Mumbai

Oct-Nov’15

Refractory Dryout

4 Stages of Stack EIL/BPCLPRL

275 Totale Global Pvt Ltd., Coimbatore siteFOR BPCL, KOCHI

Nov’15 RefractoryDryout

3 stages of Stack of DCU Heater

EIL/ Heurtey/ TGPL

276 Panametrics Engineering Pvt Ltd., Pali, Maharashtra thru M/s. Castwel Industries, Nagpur

Nov’15 Refractory Dryout

Convection Module PEPL/CI

Page 27: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTDLIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

277 Petron Engineering Constn Ltd., CoimbatoreFOR BPCL KOCHI

Nov’15 Refractory Dryout

CFG Duct & Stack of VGO HDT Heater

EIL/BPCLPECL

278 L&T Ltd., Ranoli, Baroda thru M/s. Refrac Consultancy Services, Noida

Nov’15 To Dec’15

Refractory Dryout

23 Stages of dust Hopper, Diplegs, Hot strokes & Plenum

L&T/RCS

279 Deepak Nitrite Ltd., Dahej,Dist. Bharuch

Dec’15 Refractory Dryout

Boiler of Furnace DNL

280 Petron Engineering Constn Ltd., CoimbatoreFOR BPCL KOCHI

Dec’15 Refractory Dryout

CFG Duct & Radiant Header Box of VGO HDT Heater

EIL/BPCLPECL

281 Bharat Petroleum Corpn Ltd., Kochi thru M/s. Pacific Refractories Ltd., Navi Mumbai

Dec’15 Refractory Dryout

Stack Module for CDU/VDU Heater

EIL/BPCL

282 L&T Ltd., Powai,Mumbai thru M/s. STG Refractories Pvt Ltd., Mumbai

Dec’15 RefractoryDryout

Steam Super Heater and Spool Piece

L&T/SRPL

283 Heurtey Petrochem Pvt Ltd. POR through M/s. Ciria India Ltd.,Noida

Dec’15 Refractory Dryout

Convection Module and Stack Module

Heurtey/CIL

284 JNK Pvt Ltd.,MIDC, Ambernath (E) Thane thru M/s. Castwel Industries, Nagpur

Jan’16 RefractoryDryout

2 stages of Stack JPL/CI

285 Bharat Petroleum Corpn Ltd., Kochi thru M/s. Pacific Refractories Ltd., Navi Mumbai

Jan’16 RefractoryDryout

3 Stages of Stack Module for CDU/VDU Heater

EIL/BPCL

286 Bilfinger Plant Equipments Pvt Ltd., Sachin, Surat

Jan’16 Refractory Dryout

2 stages of Convection Modules

BPEPL

Page 28: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTDLIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

287 Heurtey Petrochem, POR, Baroda, thru. M/s. Ciria India Ltd., Noida

Jan’16 Refractory Dryout

Header Box of CCR Heater

Heurtey/RIL/CIL

288 Petron Engineering Constn Ltd., CoimbatoreFOR BPCL KOCHI

Jan’16 Refractory Dryout

CFG Duct & HFG Duct of VGO HDT Heater

EIL/BPCLPECL

289 Bharat Petroleum Corpn Ltd., Kochi thru M/s. Pacific Refractories Ltd., Navi Mumbai

Feb’16 Refractory Dryout

3 stages of Stack Module for CDU/VDU Heater

EIL/BPCL

290 L&T Ltd., Powai,Mumbai thru M/s. STG Refractories Pvt Ltd., Mumbai

Feb’16 Refractory Dryout

3 Nos Manway Plug of Steam Super Heater

L&T/SRPL

291 L&T Ltd., Wada,Mumbai thruPhisem Consultancy Services (P) Ltd., Noida

Feb’16 Refractory Dryout

6 stages of Stack Section

EIL/L&T/PCSPL

292 Petron Engineering Constn Ltd., CoimbatoreFOR BPCL KOCHI

Feb’16 Refractory Dryout

CFG Duct & Convection Header Box of VGO HDT Heater

EIL/BPCLPECL

293 Reliance Industries Ltd., Jamnagar, Gujarat thru M/s. STG Refractories Pvt Ltd., Mumbai

Feb’16 Refractory Dryout

2 stages of First Stage of Reactor of Gasifier

RIL/SRPL

294 Heurtey Petrochem Pvt Ltd., POR, Vadodara thruM/s. Phisem Consultancy Pvt Ltd

Feb’16 Refractory Dryout

2 stages of Convection Section

HEURTEY/PCSPL

295 Zuari Agro Chemicals Ltd., Goa thru M/s. Ciria India Ltd., Noida

Feb-Mar’16

Refractory Dryout

Secondary Reformer

ZACL/CIL

296 L&T Ltd., Powai, Mumbai thru M/s. PhisemConsultancy Services Pvt Ltd., Noida

Feb-Mar’16

Refractory Dryout

R G Boiler and Spool Piece

L&T/PCSPL

297 Bharat Petroleum Corpn Ltd., Kochi thru M/s. Pacific Refractories Ltd., Navi Mumbai

Mar’16 Refractory Dryout

3 stages of Stack Module for CDU/VDU Heater

EIL/BPCL

Page 29: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTDLIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

298 JNK Pvt Ltd.,MIDC, Ambernath (E) Thane thru M/s. Castwel Industries, Nagpur

Mar’16 Refractory Dryout

2 stages of Stack & 1 Stage of Convection Module

JPL/CI

299 L&T Ltd., Wada,Mumbai thruPhisem Consultancy Services (P) Ltd.,Noida

Mar’16 Refractory Dryout

7 stages of Stack Section

EIL/L&T/PCSPL

300 L&T Ltd., Powai., Mumbai thru M/s. Ciria India Ltd., Noida

Mar’16 Refractory Dryout

Double Chamber R G Boiler

L&T/CIL

301 Esteem Projects Pvt. Ltd, Baddi, Himachal Pradesh

Mar’16 Refractory Dryout

HFG Duct & Convection Modules of OHFCU Furnace

EIL/EPPL

302 Heurtey Petrochem Pvt Ltd., POR, Vadodara thruM/s. Phisem Consultancy Pvt Ltd

Mar’16 Refractory Dryout

Convection Section

HEURTEY/PCSPL

303 L&T Ltd., Wada,Mumbai thruPhisem Consultancy Services (P) Ltd.,Noida

April’16 Refractory Dryout

Junction Box with HFG Duct

EIL/L&T/PCSPL

304 Indian Oil Corporation Ltd., Paradeep, Orissa thru M/s. Furnace Tech., Baroda

April’16 Refractory Dryout

Rotary Kiln, Secondary CombustionChamber & Duct

IOCL/FTE

305 Heurtey Petrochem Pvt Ltd., POR, Vadodara thruM/s. Phisem Consultancy Pvt Ltd

April’16 Refractory Dryout

3 Stages of Convection Module &2 Nos Breeching & 2 Stages of Stack for Heater

HEURTEY/PCSPL

Page 30: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTDLIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

306 Tata Chemicals Ltd., Babrala thru M/s. Ciria India Ltd., Noida

April’16 Refractory Dryout

Flare Stack, R G Boiler and Cold Collector

TCL/CIL

307 Deepak Fertilizer & Petrochemicals Ltd., Taloja, Raigarh thru M/s. Ciria India Ltd., Noida

April’16 Refractory Dryout

De-hydrogenation of Secondary Reformer

DFPL/CIL

308 L&T Ltd., Wada,Mumbai thruPhisem Consultancy Services (P) Ltd.,Noida

May’16 Refractory Dryout

2 Stages of HFG Duct with CFG Duct & Header Box

EIL/L&T/PCSPL

309 Gopinath Engg Co Pvt Ltd., Taloja, Mumbai thru M/s. Ciria India Ltd., Noida

May’16 Refractory Dryout

J- Bend GECPL/CIL

310 Deepak Fertilizer & Petrochemicals Ltd., Taloja, Raigarh thru M/s. Ciria India Ltd., Noida

May’16 Refractory Dryout

Secondary Reformer

DFPL/CIL

311 L&T Ltd., Ranoli, Vadodara thru M/s. Refrac Consultancy & Services Pvt Ltd., Noida

May’16 Refractory Dryout

5 stages of Riser Arm & 4 stages of Dipleg

L&T/RCSPL

312 Reliance Industries Ltd., Jamnagar thruM/s. Ciria India Ltd., Noida

May-June’16

Refractory Dryout

SRU Piping – 10 stages

RIL/CIL

313 L&T Ltd., Ranoli, Vadodara thru M/s. Refrac Consultancy & Services Pvt Ltd

June’16 Refractory Dryout

3 stages of Riser Outlet Tube

L&T/RCSPL

314 Bharat Petroleum Corporation Ltd., Mumbai thru M/s. Phisem Consultancy & Services, Noida

June’16 Refractory Dryout

Stack Bottom Portion

BPCL/PCSPL

315 Indian Oil Corporation Ltd., Barauni thru M/s. Ciria India Ltd., Noida

June’16 Refractory Dryout

Convection Module & Off Take Duct

EIL/HEURTEY PETROCHEMIOCL/CIL

Page 31: LIST OF JOBS EXECUTED REFINERY/HYDROCARBON INDUSTRIES CLIENT LIST.pdf · 2017. 1. 13. · Jamnagar (Guj.) Thru. Thermax Engg. Constn. Co. Ltd. Thru. M/s. Pacific Refractories Ltd.,

BARODA HEAT-UP CONTROLS PVT. LTDLIST OF JOBS EXECUTED

REFINERY/HYDROCARBON INDUSTRIES

Sr. No

CLIENT YEAR TYPE OF JOB

TYPE OF PLANT INSPECTEDBY

316 Mangalore Refinery & Petrochemicals Ltd., Mangalore thru M/s. Lizmontagens India Pvt Ltd., Mumbai

June-July’16

Refractory Dryout

3 Nos Spool/ Duct Pieces

EIL/MRPL/LIPL

317 Oriental Manufacturers Pvt Ltd., Ranoli, Baroda thru M/s. Windsor Refractories Ltd.,Mumbai

June-July’16

Refractory Dryout

Stack Section – 2 Stages

WRL

318 Bharat Petroleum Corporation Ltd., Kochi thru M/s. Windsor Refractories Ltd

July’16ToAug’16

Refractory Dryout

Incinerator & Metallic Bellow, Reduction Furnace, Duct, Outlet Duct and 2 Nos Expansion bellow

EIL/BPCL/WRL

319 Bharat Petroleum Corporation Ltd., Kochi thru. Refrac Consultancy & Services Pvt Ltd., Noida

July’16ToAug’16

Refractory Dryout

Convertor – 5 stages

EIL/Off Shore/BPCL/RCSPL

320 Indian Oil Corporation Ltd., Barauni thru M/s. Ciria India Ltd., Noida

July’16 Refractory Dryout

Convection Section

IOCL/CIL

321 Bharat Petroleum Corporation Ltd., Kochi thru M/s. Ciria India Ltd., Noida

Aug’16ToOct’16

Refractory Dryout

Pre-Reformer – 2 stages and Field Joint of Ducts

BPCL/CIL

322 Bharat Petroleum Corporation Ltd., Kochi thru M/s. Totale Global Pvt Ltd., Chennai

Aug-Oct’16

Refractory Dryout

Main CombustionChamber – 2 stages, Chimney Tray of Fractioner Column

BPCL/TGPL

323 Reliance Industries Ltd., Jamnagar site thru Ciria India Ltd., Noida

Sept’16ToOct’16

Refractory Dryout

2 Nos OA Shift Reactor

RIL/CIL

324 Chennai Petrochemical Corporation Ltd., Chennai thru M/s. Ciria India Ltd., Noida

Sept-Oct ’16

Refractory Dryout

Complete DCU Heater comprisingof Circuit I, Circuit –II & Circuit-III

HEURTEY/JACOBCPCL/CIL