~-- 3"~/l)till(ifi11/106/01/2016/1!:1.3!- CJ~':I! Ril1 jq;_ 20.10.2016
~ '#: l)till(ifil1 \('tlfirq'll 3q't'tf'JI\?I ~ 't't&'f'll
To Members of Operation Co-ordination Sub-Committee.
~: l)till(>fil1 't'tlfirq'll 3q't'tf'JI\?I cfi'r 128 eft ~ '# 't'"cftifrl 3fl31~"1 4il<45fllf'f cfi'J' ~ Subject: Outage programme approved in 128th OCC Meeting.
l)till(ifil1 't'tlfirq'll 3q't'tf'JI\?I cfi'J' 128 eft ~14.10.2016 q;)' 10.30 ~
3.~.a:rr.v.~. iff ~ '# 3t14U~rl cfi'r 'llf 1 3C"ql&il1 ~ 01rr q1~61o1 crc=cn ~ fi;nr
l)till(ifil1 't'tlfirq'll 3q't'tf'JI\?I cfi'J' ~ '# 't'"cft'frl 3fl31~"1 4il<45fllf't cfi'J' ~{<t'i(>fdil11$-l,
<ti(>fdil14i-2(A, B&C) <ti(>fdil14i-3[3A(1-2)&38(1-8)]} cl4R CfR' 3".~.fct't't". cfi'r h"-~ tR
5l'(if eft 'llf ~ ~ http://nrpc.gov.in. ~ sl3il1tofts ~ "'T \('t'Cfi"(1T ~ 1 ~ CfiT i'a'fCtC1
q; I :4 C£C1 ~fnr tfi ~ '(f;'{ ~ a I Q d II I
128th meeting of the Operation Co-ordination Sub-Committee was held on 14.10.2016 from 10.30 hrs at NRLDC, New Delhi. Outage programme for generating units, transmission lines and transmission elements {Annexure-!,
Annexure-2(A, B&C), Annexure-3 [3A(1-2)&38(1-8)] as approved in the Operation Co-ordination Sub-Committee meeting has been up-loaded on the NRPC web-site and can be down-loaded from http://nrpc.gov.in. Detailed minutes of the meeting shall be issued shortly.
( 3fa"4" (1 Jl d ll q q; •<)
(Ajay Talegaonkar)
.mft~ ~(l)till(>fil1)
vet <ti'll,"'i$ 't't&'f'll. ~
Annexure – 1
APPROVED OUTAGE OF GENERATION STATIONS FOR THE MONTH OF NOVEMBER, 2016 THDC India Limited S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 Koteshwar HEP 4 100 08.11.2016 23.12.2016 45 Annual Maintenance
* Remarks: For Unit # 3 maintenance schedule has already been approved in last OCC meeting from 22.09.2016 to 10.11.2016 RRVUNL S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 SSTPS, Suratgarh 5 250 01.11.2016 15.12.2016 45 Annual Capital
Overhaul NTPC – NCR S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 Badarpur 5 - 14.11.2016 08.12.2016 - Annual Capital
Overhaul
NTPC – NR S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 Singrauli 1 - 10.11.2016 15.12.2016 45 Annual Capital
Overhaul
2. Tanda 2 1.11.2016 20.12.2016 50 Annual Capital
Overhaul Indraprastha Power Generation Co. Ltd. & PPCL S.No. Station Unit
No. Capacity Date of
Start Date of
Completion No. of Days Remarks
1 PPS-III Bawana PPCL STG1 - 01.11.2016 30.11.2016 30 Overhauling of Steam Turbine &
Inspection of Generator
Remarks: GT#2 of Module-1 will be available in open cycle operation during proposed period. Module-II (i.e. GT#3, GT#4 & STG#2) will be available in combined cycle. NHPC All the approved shutdowns are subject to availability of water. S.No. Station Unit No. Capacity Date of Start Date of
Completion No. of Days Remarks
1. Bairasuil 1 60 10-11-2016 29-11-2016 20 Annual Maintenance
2. Salal 1 115 10-10-2016 18-11-2016 40 Annual Maintenance
3. Salal 5 115 12-11-2016 21-12-2016 40 Annual Maintenance
4. Salal 2 115 01-10-2016 28-01-2017 120 Capital Maintenance
5. Tanakpur 2 31.4 15-11-2016 14-12-2016 30 Annual Maintenance
6. Uri 1 120 08-11-2016 22-11-2016 15 Annual Maintenance
7. Uri 2 120 25-11-2016 09-12-2016 15 Annual Maintenance
8. Chamera-II 1 100 14-11-2016 28-11-2016 15 Annual Maintenance
9. Dhauliganga 4 70 15-11-2016 06-12-2016 22 Annual Maintenance
10. Sewa-II 1 40 16-11-2016 03-12-2016 18 Annual Maintenance
11. Uri-II 1 60 01-11-2016 20-11-2016 20 Annual Maintenance
12. Uri-II 2 60 24-11-2016 13.12.2016 20 Annual Maintenance
13. Parbati-III 3 130 01-11-2016 15.12.2016 45 Capital Maintenance
DATE TIME DATE TIME
1 PGCIL 800 AGRA BNC PGCIL I INTER ContFor Integration of Pole-3 with Pole-1 and neutral busbar installation work at both end.
15-11-16 08:00 19-11-16 18:00
2 PGCIL 800 AGRA BNC PGCIL II INTER ContFor Integration work of Pole-4 with Pole-1 and extension of HV side Busbar at both end.
21-11-16 08:00 25-11-16 18:00
3 PGCIL 500 BALIA BHIWADI PGCIL I INTRA DAILY HVDC line and Terminal eqpt AMP/ prewinter maint works. 21-11-16 08:00 24-11-16 18:00
4 PGCIL 500 BALIA BHIWADI PGCIL II INTRA DAILY HVDC line and Terminal eqpt AMP/ prewinter maint works. 25-11-16 08:00 30-11-16 18:00
5 PGCIL 500 BALIA BHIWADI PGCIL I&II INTRA DAILY HVDC line and Terminal eqpt AMP/ prewinter maint works. 29-11-16 08:00 30-11-16 18:00
6 PGCIL 500 RIHAND DADRI PGCIL I INTRA CONT HVDC line and Terminal eqpt AMP/ prewinter maint works. 07-11-16 08:00 13-11-16 18:00
OCC approved subject to the observation that during outages other works like insulator replacement will be also done and backing of generation may have to be carried out
FROM S/S REASONDAILY/
CONTINUOUS
INTER/ INTRA
REGIONAL
APPROVED OUTAGE OF NLDC TRANSMISSION LINES FOR THE MONTH OF NOVEMBER, 2016ANNEXURE 2(A)
VOLT LEVEL
(KV)
FROMS.N. CKT IDTO REMARKSNAME OF
REQUESTING AGENCY
LINE DETAILS APPROVED DATE AND TIME
TO S/S OWNER
7 PGCIL 500 RIHAND DADRI PGCIL II INTRA CONT HVDC line and Terminal eqpt AMP/ prewinter maint works. 14-11-16 08:00 19-11-16 18:00
OCC approved subject to the observation that during outages other works like insulator replacement will be also done and backing of generation may have to be carried out
8 PGCIL 765 BHIWANI PHAGI PGCIL I INTRA DAILY Pre winter maintenance work 26-11-16 08:00 26-11-16 18:00
9 PGCIL 765 BHIWANI PHAGI PGCIL II INTRA DAILY
RTV Coating on HV-Bushing of L/ Reactor one unit each day/ swaping with Spare unit AT Bhiwani end
02-11-16 08:00 05-11-16 18:00
10 PGCIL 765 BHIWANI MOGA PGCIL I INTRA DAILY Installation of Polymer insulator in jack Bus-I. 24-11-16 08:00 26-11-16 18:00
11 PGCIL 765 KANPUR JHATIKRA PGCIL S/C INTRA DAILY Jumper tightening/ Prewinter maintenance work. 18-11-16 11:00 21-11-16 18:00
12 PGCIL 765 GWALIOR PHAGI PGCIL I INTRA DAILY Pre winter maintenance work 23-11-16 08:00 23-11-16 18:00
13 PGCIL 765 GWALIOR PHAGI PGCIL II INTRA DAILY Pre winter maintenance work 24-11-16 08:00 24-11-16 18:00
14 PGCIL 765 AGRA FATEHPUR PGCIL II INTRA DAILYStringing of 400KV Agra(UP) Agra(S) D/C lines under Lalitpur-Agra Transmission
23-10-16 08:00 24-10-16 18:00
15 PGCIL 800 AGRA BNC PGCIL I INTRA DAILY
S/D of 132KV Earth Electrode line at Agra HVDC for stringing of 400KV Agra(UP) - Agra(S) D/C lines under Lalitpur-Agra transmission project. Other pole will run in metallic return mode
18-10-16 08:00 19-10-16 18:00
16 PGCIL 800 AGRA BNC PGCIL I INTRA DAILY
S/D of 132KV Earth Electrode line at Agra HVDC for stringing of 400KV Agra(UP) - Agra(S) D/C lines under Lalitpur-Agra transmission project. Other pole will run in metallic return mode
20-10-16 08:00 21-10-16 18:00
17 PGCIL 765 AGRA GWALIOR PGCIL I INTRA DAILY For Insulator Cleaning 05-11-16 08:00 07-11-16 18:00
OCC approved subject to outage being clubbed with the Outage approved in WRPC of this line
18 PGCIL 765 AGRA GWALIOR PGCIL II INTRA DAILY For Insulator Cleaning 08-11-16 08:00 10-11-16 18:0019 PGCIL 765 BALIA LUCK PGCIL INTRA DAILY For Insulator Cleaning 28.11.2016 09:30 1.12.2016 17:30
19 SLDC RAJASTHAN 765 ANTA PHAGI RAJASTHAN II INTRA DAILY
Replacement of defective NGR of line reactor bank of 765KV Anta Phagi II Outage is for Anta end
03-11-16 08:00 03-11-16 20:00
OCC approved to subject to it being clubbed with Generation Outage
20 SLDC RAJASTHAN 220 KOTA BADOD RAJASTHAN - INTRA Cont
For Replacement of deteriorated twin zebra bus conductor or 220KV Bus B which is crossing over line conductor of 220KV Badod and RAPP (A) feeder at 220KV GSS Sakatpura Kota
10-11-16 07:00 11-11-16 18:00
21 SLDC UP 765 ANPARA UNNAO UP - INTRA DAILY For Insulator Cleaning 22-11-16 08:00 25-11-16 18:00
OCC approved subject to outage being clubbed with the Outage of generator unit otherwise backing of generation may have to be carried out
ALL OUTAGES APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONS AND SPECIFIC REMARKSOUTAGES FOR THE MONTH OF OCTOBER APPROVED TENTATIVELY AS A SPECIAL CASE ON ACCOUNT OF PRE-WINTER WORKS
From Date From Time To Date To
TimeRequest Detail
1 NTPC [ DELHI ] Anta(NTPC)-Swaimadhopur(RVPNL)(220 kV) Powergrid Continuous Annual Bay Maintenance 04-11-2016 09:00 06-11-2016
Sno Request By Element Name Owner Name Mode Reasons
18:00
3 NTPC [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 1(220 kV) Powergrid Continuous Annual Bay Maintenance 14-11-2016 09:00 15-11-2016
18:00
2 NTPC [ DELHI ] Anta(NTPC)-Lalsot(RVPNL) 2(220 kV) Powergrid Continuous Annual Bay Maintenance 01-11-2016 09:00 03-11-2016
18:00
5 NTPC [ DELHI ] Faridabad(NTPC)-Palla(HVPNL) 2(220 kV) Powergrid Daily Annual Bay Maintenance 11-11-2016 09:00 12-11-2016
18:00
4 NTPC [ DELHI ] Faridabad(NTPC)-Palla(HVPNL) 1(220 kV) Powergrid Daily Annual Bay Maintenance 09-11-2016 09:00 10-11-2016
18:00
18:00
7 NTPC [ DELHI ] Faridabad(NTPC)-Samaypur(BBMB) 2(220 kV) Powergrid Daily Annual Bay Maintenance 17-11-2016 09:00 18-11-2016
18:00
6 NTPC [ DELHI ] Faridabad(NTPC)-Samaypur(BBMB) 1(220 kV) Powergrid Daily Annual Bay Maintenance 15-11-2016 09:00 16-11-2016
18:00
12 NTPC [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(220 kV)
18:008 NTPC [ DELHI ] Rihand HVDC(PG)-Rihand(NTPC) 1(400 kV) NTPC Continuous
Replacement of 20 years old CTs and maintenance of bay equipments
and testing 08-11-2016 08:00 09-11-2016
18:00
10 NTPC [ DELHI ] Auraiya(NTPC)-Kanpur(PG) 2(400 kV) Powergrid DailyMaintenance of bay equipments and
testing 15-11-2016 08:00 15-11-2016
9 NTPC [ DELHI ] Allahabad(PG)-Rihand(NTPC) 2(400 kV) Powergrid Daily
Maintenance of bay equipments and testing OCC deliberated to approve
the outage subject to it being clubbed with Generator Outage
and availability of pole 11-11-2016 08:00 12-11-2016
Powergrid Continuous
Complete replacement of Protection Relay panel and Maintenance of bay
equipments and testingOCC deliberated to approve thye outage subject to it being clubbed with the
work at SR NO 42 03-11-2016 08:00 11-11-2016
18:00
11 NTPC [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid DailyMaintenance of bay equipments and
testing 18-11-2016 08:00 18-11-2016
18:00
18:00
13 NTPC [ DELHI ] Basti(UP)-Tanda(NTPC)(400 kV)Uttar
Pradesh DailyMaintenance of bay equipments and
testing 18-11-2016 08:00 19-11-2016
PROPOSED OUTAGE OF TRANSMISSION LINES FOR THE MONTH OF NOVEMBER, 2016 ANNEXURE 2B
17:00
15SLDC_UTTARAKHAND [
UTTARAKHAND ] Kashipur(UTT)-Moradabad(UP)(400kV) Uttrakhand Daily
For tightening of jumpers, vibration dampers, spacers and lopping
chopping of line & other maintenance work of line. 17-11-2016 09:00 17-11-2016
POWERGRID [ DELHI ] Agra-Bassi 1(400 kV) Powergrid Daily For Insulator Cleaning work 17-11-2016 08:00 20-11-2016
18:00
17 POWERGRID [ DELHI ] Agra-Jaipur South-2(400 kV) Powergrid Daily For insulator Cleaning work 14-11-2016 08:00 16-11-2016
25
16 POWERGRID [ DELHI ] Agra-Jaipur South-1(400 kV) Powergrid Daily For Insulator Cleaning work 11-11-2016 08:00 13-11-2016
21 POWERGRID [ DELHI ] Ballabgarh-Kanpur 1(400 kV) Powergrid Daily For Insulator Cleaning work 27-11-2016 08:00 28-11-2016
18:0022 POWERGRID [ DELHI ] Fatehpur-Kanpur 2(400 kV) Powergrid Daily For AMP work 22-11-2016 09:30 22-11-2016
18:00
18:00
20
Powergrid Daily
For Polymer insulator replacement and cleaning OCC approve the outage but deliberated that the
detail of the work already done be submitted 21-11-2016 08:00 25-11-2016
18:00
18
17:30
14
DailyFor polymer insulator replacement
and cleaning 26-11-2016 08:00 30-11-2016
18:00
19 POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 1(400 kV)
18:00POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid
17:00
POWERGRID [ DELHI ] Kishenpur-Moga 1(400 kV) Powergrid Daily For AMP Works. 04-11-2016 09:00 04-11-2016
17:30
24 POWERGRID [ DELHI ] Hisar-Moga(400 kV) Powergrid DailyFor AMP Works. (400KV Hisar-Moga-
1) 17-11-2016 09:00 17-11-2016
23 POWERGRID [ DELHI ] Jalandhar - Kurukshetra(400 kV) Powergrid Daily
To facilitate construction activities of 400 KV Kurukshetra-Malerkotla-II line Equipment erection (i.e. CVT/LA/BPI)
along with TPP Tower and Beam (Falling besides the induction area of
Jalandhar Line in AIS).OCC deliberated and approved the ge but requested for completing the
work in 2 days 01-11-2016 09:30 03-11-2016
17:30
16-11-201609:0016-11-2016
For tightening of jumpers, vibration dampers, spacers and lopping
chopping of line & other maintenance work of line.DailyUttrakhandKashipur-Rishikesh(400 kV)
SLDC_UTTARAKHAND [ UTTARAKHAND ]
17:3026 POWERGRID [ DELHI ] Kishenpur-Moga 2(400 kV) Powergrid Daily For AMP Works. 09-11-2016 09:00 09-11-2016
18:00
29 POWERGRID [ DELHI ] Lucknow(UP)-Singrauli(NTPC)(400 kV) Powergrid Daily
For insulator cleaning workOCC approved outage but proposed
that it should be clubbed with the machine outage 12-11-2016 08:00 13-11-2016
18:00
28 POWERGRID [ DELHI ] Allahabad(PG)-Singrauli(NTPC) 2(400 kV) Powergrid Daily
For insulator cleaning workOCC approved outage but stressed that
it should be clubbed with the machine outage 10-11-2016 08:00 11-11-2016
27 POWERGRID [ DELHI ] Allahabad(PG)-Singrauli(NTPC) 1(400 kV) Powergrid Daily For insulator cleaning work 08-11-2016 08:00 09-11-2016
18:00
31 POWERGRID [ DELHI ] Allahabad(PG)-Rihand(NTPC) 2(400 kV) Powergrid Daily For insulator cleaning work 15-11-2016 08:00 16-11-2016
18:00
30 POWERGRID [ DELHI ] Allahabad(PG)-Rihand(NTPC) 1(400 kV) Powergrid Daily For insulator cleaning work 15-11-2016 08:00 16-11-2016
18:00
33 POWERGRID [ DELHI ] Allahabad-Fatehpur 2(400 kV) Powergrid DailyFor insulator cleaning work & AMP
work 17-11-2016 08:00 18-11-2016
18:00
32 POWERGRID [ DELHI ] Allahabad-Fatehpur 1(400 kV) Powergrid DailyFor insulator cleaning work & AMP
work 17-11-2016 08:00 18-11-2016
18:00
18:00
34 POWERGRID [ DELHI ] Fatehpur-Singrauli(400kV) Powergrid Daily For insulator cleaning work 21-11-2016 08:00 22-11-2016
35 POWERGRID [ DELHI ] Fatehpur-Mainpuri 1(400 kV) Powergrid Daily For insulator cleaning work 05-11-2016 08:00 07-11-2016
18:00
37 POWERGRID [ DELHI ] Lucknow-Rosa(400 kV) Powergrid Daily Insulator cleaning 21-11-2016 09:30 21-11-2016
18:00
36 POWERGRID [ DELHI ] Fatehpur-Mainpuri 2(400 kV) Powergrid Daily For insulator cleaning work 08-11-2016 08:00 10-11-2016
17:30
39 POWERGRID [ DELHI ] Agra(PG)-Auraiya(NTPC) 2(400 kV) Powergrid Daily
For 02 Nos. bushing replacement work on DGA violation OCC
deliberated to approve the outage subject to it being clubbed with
work at Sr no 20 26-11-2016 09:00 30-11-2016
17:30
38 POWERGRID [ DELHI ] 400KV LUCKNOW-SHAHJHNPR-II(400 kV) Powergrid Daily Insulator cleaning 22-11-2016 09:30 22-11-2016
18:00
18:00
40 POWERGRID [ DELHI ] Agra-Jaipur South-1(400 kV) Powergrid Daily
For 02 Nos. bushing replacement work on DGA violation OCC
deliberated to approve the outage subject to it being clubbed with
work at Sr no 16 11-11-2016 09:00 11-11-2016
17:30
42 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(220 kV) Powergrid Daily
Insulator replacement workOCC deliberated to approve the outage
subject to it being clubbed with work at Sr no 12 and the work to
be completed in three days 03-11-2016 09:30 06-11-2016
41 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 1(220 kV) Powergrid Daily
Insulator replacement workOCC deliberated to approve the outage
for completion in three days 01-11-2016 09:30 04-11-2016
17:30
17:30
44 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 4(220 kV) Powergrid Daily Insulator replacement work 19-11-2016 09:30 22-11-2016
17:30
43 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 3(220 kV) Powergrid Daily
Insulator replacement workOCC deliberated to approve the outage
for completion in three days 13-11-2016 09:30 16-11-2016
45 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid Daily
Erection works of Dead end Tower and Beam for new FSC.Bus
extension work also 01-11-2016 08:00 01-11-2016
18:00
47 POWERGRID [ DELHI ] Agra-Sikar 1(400 kV) Powergrid DailyJumper tightening/ Prewinter AMP
works. 11-11-2016 08:00 12-11-2016
18:00
46 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid Daily
Erection works of Dead end Tower and Beam for new FSC.Bus
extension work also 08-11-2016 08:00 08-11-2016
18:00
49 POWERGRID [ DELHI ] Neemrana-Sikar 1(400 kV) Powergrid DailyJumper tightening/ Prewinter AMP
works. 09-11-2016 08:00 09-11-2016
19:00
48 POWERGRID [ DELHI ] Agra-Sikar 2(400 kV) Powergrid DailyJumper tightening/ Prewinter AMP
works. 13-11-2016 08:00 14-11-2016
18:00
51 POWERGRID [ DELHI ] Bhiwadi-Gurgaon(400 kV) Powergrid DailyDiversion due to DFCC Rail project.It
involves erection of 01 No tower. 07-11-2016 08:00 11-11-2016
18:00
50 POWERGRID [ DELHI ] Neemrana-Sikar 2(400 kV) Powergrid DailyJumper tightening/ Prewinter AMP
works. 10-11-2016 08:00 10-11-2016
18:00
53 POWERGRID [ DELHI ] Ballabgarh-Mainpuri 2(400 kV) Powergrid DailyDiversion due to DFCC Rail project. Erection/dismantalling of 2 towers. 14-11-2016 08:00 23-11-2016
18:00
52 POWERGRID [ DELHI ] Ballabgarh-Mainpuri 1(400 kV) Powergrid DailyDiversion due to DFCC Rail project.It
involves erection of 01 No tower. 14-11-2016 08:00 23-11-2016
18:00
18:00
55 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Koteshwar(THDC) 2(400 kV) Powergrid Daily
Replacement of Isolator contacts at Koteshwar-GIS. With Bus-I S/D.OCC
approve the outage on the deliberation that work would be
targeted to be completed within 2 days 08-11-2016 08:00 10-11-2016
54 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Koteshwar(THDC) 1(400 kV) Powergrid Daily
Replacement of Isolator contacts at Koteshwar-GIS. With Bus-I S/D.OCC
approve the outage on the deliberation that work would be
targeted to be completed within 2 days 05-11-2016 08:00 07-11-2016
18:00
57 POWERGRID [ DELHI ] Koteshwar Pool (PG)-Tehri(THDC) 2(220 kV) Powergrid DailyReplacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 15-11-2016 08:00 17-11-2016
18:00
56 POWERGRID [ DELHI ] Koteshwar Pool(PG)-Tehri(THDC) 1(220 kV) Powergrid DailyReplacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 12-11-2016 08:00 14-11-2016
18:00
18:00
59 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 2(220 kV) Powergrid DailyReplacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 22-11-2016 08:00 24-11-2016
18:00
58 POWERGRID [ DELHI ] Meerut-Koteshwar Pool 1(400 kV) Powergrid DailyReplacement of Isolator contacts at
Koteshwar-GIS. With Bus-I S/D 19-11-2016 08:00 21-11-2016
18:00
61 POWERGRID [ DELHI ] Bassi-Jaipur South2(400 kV) Powergrid Daily Insulator cleaning/ Prewinter maint. 16-11-2016 08:00 16-11-2016
60 POWERGRID [ DELHI ] Bassi-Jaipur South1(400 kV) Powergrid Daily Insulator cleaning/ Prewinter maint. 15-11-2016 08:00 15-11-2016
18:00
63 POWERGRID [ DELHI ] Kota(PG)-Merta(RVPNL) 1(400 kV) Powergrid DailyReplacement of bottom Expandable
below of Line Reactor. 23-11-2016 08:00 26-11-2016
18:00
62 POWERGRID [ DELHI ] Bassi(PG)-Heerapura(RVPNL) 2(400 kV) Powergrid Daily Insulator cleaning/ Prewinter maint. 17-11-2016 08:00 17-11-2016
18:00
18:00
64 POWERGRID [ DELHI ] Agra(PG)-Agra(UP) 1(400 kV) Powergrid Daily
Stringing/termination and jumpering for charging of LILO at
Fatehabad.OCC deliberated to approve the outage as a special
case on account of lowload conditions and the work of
cleaning of insulators to be done alongwith 15-10-2016 08:00 17-10-2016
65 POWERGRID [ DELHI ] Ballabgarh-Maharanibagh(400 kV)I Powergrid Daily
Shifting of towers and line diversion for DFCC track at Loc.78-80. OCC
deliberated and approve the outage ,the dates shifted from
already agreed dates by DTL on account of Trade Fair in Delhi 29-11-2016 08:00 01-12-2016
18:00
67 POWERGRID [ DELHI ] Dadri(NTPC)-Maharanibagh(PG)(400 kV)II Powergrid Daily
Shifting of towers and line diversion for DFCC track at Loc.78-80. OCC
deliberated and approve the outage ,the dates shifted from
already agreed dates by DTL on account of Trade Fair in Delhi 02-12-2016 08:00 04-12-2016
18:00
66 POWERGRID [ DELHI ] Dadri(NTPC)-Maharanibagh(PG)(400 kV) I Powergrid Daily
Shifting of towers and line diversion for DFCC track at Loc.78-80. OCC
deliberated and approve the outage ,the dates shifted from
already agreed dates by DTL on account of Trade Fair in Delhi 29-11-2016 08:00 01-12-2016
18:00
69 POWERGRID [ DELHI ] Kanpur(PG)-Kanpur GIS 1(400 kV) Powergrid DailyJumper tightening/ Prewinter
maintenance work. 07-11-2016 08:00 09-11-2016
18:00
68 POWERGRID [ DELHI ] Ballabgarh-Maharanibagh(400 kV)II Powergrid Daily
Shifting of towers and line diversion for DFCC track at Loc.78-80. OCC
deliberated and approve the outage ,the dates shifted from
already agreed dates by DTL on account of Trade Fair in Delhi 02-12-2016 08:00 04-12-2016
18:00
71 POWERGRID [ DELHI ] Bassi(PG)-Dausa(RVPNL) 1(400 kV) Powergrid Daily Insulator cleaning/ Prewinter maint. 04-11-2016 08:00 04-11-2016
18:00
70 POWERGRID [ DELHI ] Kanpur(PG)-Kanpur GIS 2(400 kV) Powergrid DailyJumper tightening/ Prewinter
maintenance work. 10-11-2016 08:00 12-11-2016
18:00
73 POWERGRID [ DELHI ] Heerapura(RVPNL)-I.G.Nagar(RVPNL)(400 kV) Powergrid Daily Insulator cleaning/ Prewinter maint. 06-11-2016 08:00 06-11-2016
18:00
72 POWERGRID [ DELHI ] Bassi(PG)-Dausa(RVPNL) 2(400kV) Powergrid Daily Insulator cleaning/ Prewinter maint. 05-11-2016 08:00 05-11-2016
18:00
75 POWERGRID [ DELHI ] Dausa(RVPNL)-Sawai madopur(RVPNL)(400 Kv) Powergrid DailyDisc insulator replacemnt with
polymer string 07-11-2016 08:00 08-11-2016
18:00
74 POWERGRID [ DELHI ] Heerapura(RVPNL)-Sanganer(RVPNL)(400 kV) Powergrid Daily Insulator cleaning/ Prewinter maint. 07-11-2016 08:00 08-11-2016
18:00
77 POWERGRID [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 2(400 kV) Powergrid DailyDisc insulator replacemnt with
polymer string 21-11-2016 09:00 26-11-2016
18:00
76 POWERGRID [ DELHI ] Anta(NTPC)-Bhilwara(RVPNL) 1(400 kV) Powergrid DailyDisc insulator replacemnt with
polymer string 14-11-2016 08:00 19-11-2016
19:00
18:00
79 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 2(400 kV) Powergrid DailyOPGW stringing work. Earth peak
strengthening in 14 towers. 03-11-2016 08:00 11-11-2016
78 POWERGRID [ DELHI ] Kanpur(PG)-Unchahar(NTPC) 1(400 kV) Powergrid DailyOPGW stringing work. Earth peak
strengthening in 14 towers. 03-11-2016 08:00 11-11-2016
18:00
81 POWERGRID [ DELHI ] Cbganj(UP)-Tanakpur(NHPC) (400 kV) Powergrid ContinuousShifting on ERS for diversion work
due to construction of Highway 18-11-2016 08:00 20-11-2016
18:00
80 POWERGRID [ DELHI ] Cbganj(UP)-Sitarganj(PG)(400 kV) Powergrid ContinuousShifting on ERS for diversion work
due to construction of Highway 15-11-2016 08:00 17-11-2016
18:00
83 POWERGRID [ DELHI ] Cbganj(UP)-Tanakpur(NHPC) (400kV) Powergrid Daily Re-Stringing for final diversion. 26-11-2016 08:00 27-11-2016
18:00
82 POWERGRID [ DELHI ] Cbganj(UP)-Sitarganj(PG)(400 kV) Powergrid Daily Re-Stringing for final diversion. 23-11-2016 08:00 24-11-2016
18:00
18:0084 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 2(400 kV) Rajasthan DailyJumper tightening/ Prewinter AMP
works. 07-11-2016 08:00 07-11-2016
18:00
87 POWERGRID [ DELHI ] Anta(NTPC)-Swaimadhopur(RVPNL)(400 kV) Powergrid DailyDisc insulator replacement with
polymer string. 04-11-2016 08:00 06-11-2016
18:00
86 POWERGRID [ DELHI ] Anta(NTPC)-Lalsot(RVPNL) 2(400kV) Powergrid DailyDisc insulator replacement with
polymer string. 01-11-2016 08:00 03-11-2016
85 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 4(400 kV) Rajasthan DailyJumper tightening/ Prewinter AMP
works. 08-11-2016 08:00 08-11-2016
18:00
89 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 2(400 kV) Rajasthan DailyJumper tightening/ Prewinter AMP
works. 17-11-2016 08:00 17-11-2016
18:00
88 POWERGRID [ DELHI ] Ratangarh(RVPNL)-Sikar(PG) 1(400kV) Rajasthan DailyJumper tightening/ Prewinter AMP
works. 16-11-2016 08:00 16-11-2016
18:00
91 POWERGRID [ DELHI ] Sikar(PG)-Sikar(RVPNL) 2(220 kV) Rajasthan DailyJumper tightening/ Prewinter AMP
works. 19-11-2016 08:00 19-11-2016
18:00
90 POWERGRID [ DELHI ] Sikar(PG)-Sikar(RVPNL) 1(220 kV) Rajasthan DailyJumper tightening/ Prewinter AMP
works. 18-11-2016 08:00 18-11-2016
18:00
18:00
92 POWERGRID [ DELHI ] Fatehpur(PG)-Naubasta(UP)(220 kV)Uttar
Pradesh Daily
AMP work of the Line Eqipments & Hot spot Attending Work in Y phase
line conductor 03-11-2016 09:00 03-11-2016
Stringing of 400KV Agra (UP)-Agra(S) D/C lines under Lalitpur Agra
Transmission Project 05-11-2016 08:00 06-11-2016 18:00
Stringing of 400KV Agra (UP)-Agra(S) D/C lines under Lalitpur Agra
Transmission Project 02-11-2016 08:00 03-11-2016 18:00
94 POWERGRID [ DELHI ] Agra-Bassi (400kV) Power Grid Daily
93 POWERGRID [ DELHI ] Agra-Ballabhgarh (400kV) Power Grid Daily
97 POWERGRID [ DELHI ] Amritsar-Hamirpur (400KV) Powergrid DailyFor polymer insulator replacement on
alternate day basis 19-10-2016 09:00 10-11-2016 17:30
98 POWERGRID [ DELHI ] Amritsar-Barnala(Pabati Pooling) (400KV) Powergrid DailyFor polymer insulator replacement on
alternate day basis 20-10-2016 09:00 12-11-2016 17:30
99 POWERGRID [ DELHI ] ChameraPooling-Jalandhar (400KV) I Powergrid DailyFor polymer insulator replacement on
alternate day basis 13-11-2016 09:00 23-11-2016 17:30
100 POWERGRID [ DELHI ] ChameraPooling-Jalandhar (400KV) II Powergrid DailyFor polymer insulator replacement on
alternate day basis 14-11-2016 09:00 24-11-2016 17:30
101 POWERGRID [ DELHI ] Chamera NHPC-Jalandhar (400KV) I Powergrid DailyFor polymer insulator replacement on
alternate day basis 25-11-2016 09:00 05-12-2016 17:30
102 POWERGRID [ DELHI ] Chamera NHPC-Jalandhar (400KV) II Powergrid DailyFor polymer insulator replacement on
alternate day basis 26-11-2016 09:00 06-12-2016 17:30
17:00105 BBMB [ CHANDIGARGH ] Dasuya(PSEB)-Pong(BBMB)-1(220 kV) BBMB Daily
Half yearly mtc.OCC deliberated and approved the outage subject
to consent of Punjab 08-11-2016 08:00 08-11-2016
107 BBMB [ CHANDIGARGH ] Baira suil(NHPC)-Pong(BBMB)(220 kV) BBMB Daily
Half yearly mtc.OCC deliberated and approved the outage subject
to the same being clubbed with the outage of NHPC 09-11-2016 08:00 11-11-2016
106 BBMB [ CHANDIGARGH ] Dasuya(PSEB)-Pong(BBMB)-2(220 kV) BBMB Daily
Half yearly mtc.OCC deliberated and approved the outage subject
to consent of Punjab 09-11-2016 08:00 09-11-2016
17:00
95 POWERGRID [ DELHI ] Agra-Bhiwadi I (400kV) Power Grid Continuous
Diversion due to construction of DFCC Track New Tower Erection
OCC deliberated and approved the outage but proposed that the period of outage be curtailed 05-11-2016 08:00 19-11-2016 18:00
103 POWERGRID [ DELHI ] Bhiwadi-Hissar I (400kV) Power Grid Continuous
Diversion due to construction of DFCC Track New Tower Erection
OCC deliberated and approved the outage but proposed that the period of outage be curtailed 05-11-2016 08:00 19-11-2016 18:00
96 POWERGRID [ DELHI ] Agra-Bhiwadi II (400kV) Power Grid Continuous
Diversion due to construction of DFCC Track New Tower Erection 20-11-2016 08:00 10-12-2016 18:00
Diversion due to construction of DFCC Track New Tower Erection 20-11-2016 08:00 10-12-2016 18:00
104 POWERGRID [ DELHI ] Bhiwadi-Kotputli (400kV) Power Grid Daily
17:00
120 Badarpur (NTPC)-Balbagarh(BBMB)1 BBMB Daily Replacement of CT and yearly MTC 10-11-2016 10-11-2016
121 Badarpur (NTPC)-Balbagarh(BBMB)2 BBMB Daily
of line and equipment of line equipment OCC deliberated and approved the outage subject to
consent of Delhi 11.11.2016 11.11.2016BBMB [ CHANDIGARGH ] 08:00 17:00
17:00
17:00
110 BBMB [ CHANDIGARGH ] Hisar(BBMB)-Hisar-IA(HVPNL) 2(220 kV) Haryana Daily
Half yearly mtc.OCC deliberated and approved the outage subject
to consent of Haryana 18-10-2016 08:00 18-10-2016
17:00
109 BBMB [ CHANDIGARGH ] Hisar(BBMB)-Hisar-IA(HVPNL) 1(220 kV) Haryana Daily
Half yearly mtc.OCC deliberated and approved the outage subject
to consent of Haryana 17-10-2016 08:00 17-10-2016
108 BBMB [ CHANDIGARGH ]
12-11-2016 09:00 13-11-2016 18:00
Jassor(HP)-Pong(BBMB)(220 kV) BBMB DailyHalf yearly mtc of substation
equipment at Pong 14-11-2016 08:00 16-11-2016
Pre-winter mtc. of line & yearly mtc. of S/S equipment. 05-11-2016 08:00 05-11-2016 17:00
113 BBMB [ CHANDIGARGH ] Panipat-Narela 1(220 kV) BBMB Daily
Pre-winter mtc. of line & yearly mtc. of S/S equipment. 04-11-2016 08:00 04-11-2016 17:00
112 BBMB [ CHANDIGARGH ] Bhiwani-Dehar(400 kV)(Rajpura-Dehar section) BBMB Daily
111 BBMB [ CHANDIGARGH ] Bhiwani-Dehar(400 kV)(Rajpura-Bhiwani section) BBMB Daily
Pre-winter 18-10-2016 08:00 18-10-2016 17:00
115 BBMB [ CHANDIGARGH ] Narela(DTL)-Rohtakroad(BBMB) 1(220 kV) BBMB Daily
Pre-winter 17-10-2016 08:00 17-10-2016 17:00
114 BBMB [ CHANDIGARGH ] Panipat-Narela 2(220 kV) BBMB Daily
Pre-winter mtc. of line & yearly mtc. of S/S equipment. 09-11-2016 08:00 09-11-2016 17:00
117 BBMB [ CHANDIGARGH ] Ballabhgarh(BBMB)-Samaypur(BBMB) - 3(220 kV) BBMB Daily
Pre-winter mtc. of line & yearly mtc. of S/S equipment. 02-11-2016 08:00 02-11-2016 17:00
116 BBMB [ CHANDIGARGH ] Narela(DTL)-Rohtakroad(BBMB) 2(220 kV) BBMB Daily
Pre-winter mtc. of line & yearly mtc. of S/S equipments. 22-11-2016 08:00 22-11-2016 17:00
119 BBMB [ CHANDIGARGH ] Dadri(NTPC)-Panipat(BBMB) 2(400 kV) Powergrid Daily
Pre-winter mtc. of line & yearly mtc. of S/S equipment. 23-10-2016 08:00 23-10-2016 17:00
118 BBMB [ CHANDIGARGH ] Dadri(NTPC)-Panipat(BBMB) 1(400 kV) Powergrid Daily
Pre-winter mtc. of line & yearly mtc. of S/S equipments. 23-11-2016 08:00 23-11-2016 17:00
122 NHPC [ DELHI ] Bairasiul(NHPC)-Jassure(HPSEB)(220 kV) Powergrid Daily Maintenance of SF-6 circuit breaker
124 SLDC_DELHI [ DELHI ] Bawana(DTL)-Mandola(PG) 1(400 kV) Delhi Daily
S/D AT BAWANA FOR ANNUAL MAINTENANCE AND TAN DELTA
TEST.OCC deliberated and approved the outage but proposed that Pre winter work on line should
also be done in the outage 29-11-2016 09:30 29-11-2016
17:00
17:00
125 SLDC_DELHI [ DELHI ] Bawana(DTL)-Mandola(PG) 2(400 kV) Delhi Daily
S/D AT BAWANA FOR ANNUAL MAINTENANCE AND TAN DELTA
TEST.OCC deliberated and approved the outage but proposed that Pre winter work on line should
also be done in the outage 30-11-2016 09:30 30-11-2016
123 NHPC [ DELHI ] Bairasuil(NHPC)-Pong(BBMB)(220 kV) Powergrid Daily
15-11-2016 08:00 16-11-2016 17:00
127 SJVNL [ HIMANCHAL PRADESH ] Jhakri(SJVNL)-Karchamwangtoo(JP) 2(220 kV) JP Trans Daily APM for GIS Line Bay
126 SJVNL [ HIMANCHAL PRADESH ] Jhakri(SJVNL)-Karchamwangtoo(JP) 1(220 kV) JP Trans Daily APM for GIS Line Bay
Maintenance of SF-6 circuit breaker OCC deliberated and approved the outage to be clubbed with that of
BBMB 09-11-2016 09:00 11-11-2016 18:00
21-11-2016 08:00 22-11-2016 17:00
129 SJVNL [ HIMANCHAL PRADESH ] Jhakri-Panchkula 2(400 kV) Powergrid Daily APM for GIS Line Bay
17-11-2016 08:00 18-11-2016 17:00
128 SJVNL [ HIMANCHAL PRADESH ] Jhakri-Panchkula 1(400 kV) Powergrid Daily APM for GIS Line Bay
28-11-2016 08:00 30-11-2016 16:30
131 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 2(400 kV) Powergrid Daily APM for GIS Line Bay
23-11-2016 08:00 24-11-2016 17:00
130 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 1(400 kV) Powergrid Daily APM for GIS Line Bay
28-11-2016 08:00 30-11-2016 16:30
28-11-2016 08:00 30-11-2016 16:30
132 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 1(400 kV) Powergrid Daily
Stringing of Shielding / Earth wire from Western PHY to OG tower of
PGCIL OCC deliberated and approved the shutdown but
proposed it to be completed in 2 days
19:00
143 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily
setting of panto graph isolators related to Bus-2 and replacement of
TB's 25-11-2016 08:00 25-11-2016
19:00
142 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily
setting of panto graph isolators related to Bus-2 and replacement of
TB's 24-11-2016 08:00 24-11-2016
141 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily
setting of panto graph isolators related to Bus-2 and replacement of
TB's 23-11-2016 08:00 23-11-2016
19:00
145 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Kabulpur 2(400 kV) Haryana Daily General Mtc work 08-11-2016 07:00 08-11-2016
19:00
144 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Kabulpur 1(400 kV) Haryana Daily General Mtc work 07-11-2016 07:00 07-11-2016
19:00
19:00
146 SLDC_HARYANA [ HARYANA ] Jhajjar CLP-Dhanonda -1(400 kV) Haryana Daily General Mtc work 09-11-2016 07:00 09-11-2016
133 SJVNL [ HIMANCHAL PRADESH ] Jhakri - Rampur 2(400 kV) Powergrid Daily
Stringing of Shielding / Earth wire from Western PHY to OG tower of
PGCIL OCC deliberated and approved the shutdown but
proposed it to be completed in 2 days
28-11-2016 08:00 30-11-2016 16:30
135 SJVNL [ HIMANCHAL PRADESH ] Rampur - Nallagarh 2(400 kV) Powergrid Daily
Stringing of Shielding / Earth wire from Western PHY to OG tower of
PGCIL
28-11-2016 08:00 30-11-2016 16:30
134 SJVNL [ HIMANCHAL PRADESH ] Rampur - Nallagarh 1(400 kV) Powergrid Daily
Stringing of Shielding / Earth wire from Western PHY to OG tower of
PGCIL
02-11-2016 08:00 02-11-2016 19:00
137 SLDC_HARYANA [ HARYANA ] Fatehabad(PG)-Khedar(HVPNL) 1(400 kV) Haryana Daily
setting of panto graph isolators related to Bus-1 and replacement of
TB's
28-11-2016 09:00 30-11-2016 16:30
136 SLDC_HARYANA [ HARYANA ] Khedar-Nuhiyawali 2(400 kV) Haryana Daily
setting of panto graph isolators related to Bus-1 and replacement of
TB's
04-11-2016 08:00 04-11-2016 19:00
139 SLDC_HARYANA [ HARYANA ] Khedar-Kirori 1(400 kV) Haryana Daily
setting of panto graph isolators related to Bus-1 and replacement of
TB's
03-11-2016 08:00 03-11-2016 19:00
138 SLDC_HARYANA [ HARYANA ] Khedar-Kirori 2(400 kV) Haryana Daily
setting of panto graph isolators related to Bus-1 and replacement of
TB's
22-11-2016 08:00 22-11-2016 19:00
05-11-2016 08:00 05-11-2016 19:00
140 SLDC_HARYANA [ HARYANA ] Khedar-Nuhiyawali 2(400 kV) Haryana Daily
setting of panto graph isolators related to Bus-2 and replacement of
TB's
Haryana DailyFor checking and cleaning of
porcelain insulators 18-11-2016 09:00 18-11-2016
147 SLDC_HARYANA [ HARYANA ] Dhanonda-Jhajjar CLP-2(765 kV) Haryana Daily General Mtc work 10-11-2016 07:00 10-11-2016
15:00
17:00
151 SLDC_HARYANA [ HARYANA ] 400kV G.Noida(UP)-Nawada(HVPNL)(400 kV) Powergrid Daily
To replace the unhealthy and critical 400 kV isolators blades of bus -II and TIE-II ICT - II with new spares.OCC
deliberated and approved the outage to be clubbed with Dadri-MAHRANI Bagh OUTAGE WITH
THE CONSENT OF UP 09-11-2016 08:00 09-11-2016
17:00
150
Haryana DailyFor checking and cleaning of
porcelain insulators 19-11-2016 09:00 19-11-2016
19:00
148 SLDC_HARYANA [ HARYANA ] Dipalpur-Kabulpur 1(400 kV)
16:00
153 SLDC_HARYANA [ HARYANA ] Daultabad(HVPNL)-Gurgaon(PG) -2(400 kV) Haryana Daily For tree cutting 04-11-2016 09:00 04-11-2016
152 SLDC_HARYANA [ HARYANA ] Daultabad(HVPNL)-Gurgaon(PG) -1(400 kV) Haryana Daily For tree cutting 02-11-2016 09:00 02-11-2016
SLDC_HARYANA [ HARYANA ] Hisar(PG)-Hisar-IA(HVPNL) 2(220 kV) Powergrid Continuous For replacement of C&R panel 02-11-2016 09:00 04-11-2016
17:00
149 SLDC_HARYANA [ HARYANA ] Dipalpur-Kabulpur 2(400 kV)
17-11-2016 10:00 17-11-2016
15:00
155 SLDC_RAJASTHAN [ RAJASTHAN ] BASSI(PG)-PHAGI-1(400 kV) Powergrid Daily
Tightening of clamps & connectors of droppers from high / jack bus to
equipments. 22-11-2016 10:00 23-11-2016
16:00
154 SLDC_HARYANA [ HARYANA ] Daultabad-Dhanonda ckt-1(400 kV) Haryana Daily To attend hot line observation 05-11-2016 11:00 05-11-2016
17:00
17:00
159 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Bhilwara-2(220 kV) Rajasthan Daily
Maintenance Work OCC deliberated and approved the outage & it to be
clubbed with Power Grid work 16-11-2016 08:00 16-11-2016
158 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Bhilwara-1(220 kV) Rajasthan Daily
Maintenance Work OCC deliberated and approved the outage & it to be
clubbed with Power Grid work 15-11-2016 08:00 15-11-2016
3rd Quaterly maintenance of 400 KV side bay EquipmentsDailyRajasthanHeerapura-Hindaun II(400 kV)SLDC_RAJASTHAN [ RAJASTHAN ]157 18-11-201610:0018-11-2016 17:00
17:00
18:00
156 SLDC_RAJASTHAN [ RAJASTHAN ] Heerapura-Merta(220 kV) Rajasthan Daily3rd Quaterly maintenance of 400 KV
side bay Equipments
160 SLDC_RAJASTHAN [ RAJASTHAN ] Bikaner-Didwana 1(400 kV) Rajasthan DailyCT Eerection in Deedwana Bay (Dia-
6) replacing existing BPI to CT 09-11-2016 10:00 13-11-2016
18:00
162 SLDC_RAJASTHAN [ RAJASTHAN ] Anta-Kota(220 kV) Rajasthan Daily
FOR REPLACEMENT OF SEVERELY DETORIATED D
JUMPER OF R PHASE TOWARDS THE LINE SIDE AND TO DO THE QUATERLY MAINTENANCE OF
THE BREAKER AND CT. 17-11-2016 07:00 17-11-2016
17:00
161 SLDC_RAJASTHAN [ RAJASTHAN ] RAPP (A )-KOTA-1 D/C(220 kV) Rajasthan Continuous
FOR REPLACEMENT OF SEVERELY DETORIATED WHOLE TWIN ZEBRA BUS CONDUCTOR
OF 220 KV BUS D WHICH IS CROSSING OVER THE LINE
CONDUCTOR OF 220 KV BAROD & RAPP (A) FEEDERS AT 220 KV
GSS SAKATPURA KOTA. 10-11-2016 07:00 11-11-2016
18:00
164 SLDC_RAJASTHAN [ RAJASTHAN ] Chabra-Hindaun II(400 kV) Rajasthan DailyBALANCE JUMPERING WORK AT
CTPS END . 15-11-2016 08:00 16-11-2016
18:00
163 SLDC_RAJASTHAN [ RAJASTHAN ] RAPP (A )-KOTA-3 D/C(220 kV) Rajasthan Daily
FOR REPLACEMENT OF D JUMPER TOWARDS LINE SIDE OF
R PHASE AND TO DO THE QUATERLY MAINTENANCE OF
THE BREAKER AND CT. 25-11-2016 07:00 25-11-2016
18:00
166 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Rajwest 1(400 kV) Rajasthan Daily Planned maintenance 15-11-2016 08:00 15-11-2016
18:00
165 SLDC_RAJASTHAN [ RAJASTHAN ] Bhilwara-Chhabra 1(400 kV) Rajasthan Continuous
For Erection of 400 KV D/C B Type Tower B/w Loc No. 243 to 244 &
Dismentalling of 400 KV D/C A Type tower Loc No. 244 (For Construction of LILO of IInd CKT of 400 KV D/C Chhabra- Dahara- Bhilwara Line 08-11-2016 08:00 11-11-2016
168 SLDC_RAJASTHAN [ RAJASTHAN ] Barmer-Rajwest 1(400 kV) Rajasthan Daily Planned maintenance 17-11-2016 08:00 17-11-2016
18:00
167 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Rajwest 2(220 kV) Rajasthan Daily Planned maintenance 16-11-2016 08:00 16-11-2016
18:00
18:00
173 SLDC-RAJASTHAN Merta-Bikaner (400KV) PowerGrid DailyIII rd QUARTERLY MAINT.WORK
OF BAY & EQUIPMENTS 25-11-2016 09:00 25-11-2016 17:00
174 SLDC_PUNJAB Kangra - Shanan Ckt-I (132kV) Punjab Daily Mtc. of line 1.11.16 10.00 5.11.16 16.00
175 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 2.11.2016 10.00 2.11.2016 16.00
176 SLDC_PUNJAB Makhu - Nakodar Ckt-I (400kV) Punjab Daily Periodical testing and routine mainteanance 02.11.2016 9.00 02.11.2016 17.00
177 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers , suspension clamps and cleaning of Disc insulators of Tower
No 1 to 20
3.11.16 10.00 3.11.16 16.00
178 SLDC_PUNJAB Makhu - Nakodar Ckt-II (400kV) Punjab Daily Periodical testing and routine mainteanance 04.11.2016 9.00 04.11.2016 17.00
179 SLDC_PUNJAB Moga-Nakodar (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 4.11.2016 10.00 4.11.2016 16.00
180 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers , suspension clamps and cleaning of Disc insulators of Tower
No 1 to 20
5.11.16 10.00 5.11.16 17.00
17:00
17:00
170 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Merta 2(400 kV) Rajasthan DailyIII rd QUARTERLY MAINT.WORK
OF BAY & EQUIPMENTS 11-11-2016 09:00 11-11-2016
169 SLDC_RAJASTHAN [ RAJASTHAN ] Jodhpur II-Merta 1(400 kV) Rajasthan DailyIII rd QUARTERLY MAINT.WORK
OF BAY & EQUIPMENTS 10-11-2016 09:00 10-11-2016
17:00
17:00
172 SLDC_RAJASTHAN [ RAJASTHAN ] Bassi(PG)-Heerapura(RVPNL) 2(400 kV) Powergrid Daily
3rd Quaterly maintenance of 400 KV side bay EquipmentsOCC
deliberated and approve the shutdown to be clubbed with
Powergrid work 16-11-2016 10:00 16-11-2016
Bassi(PG)-Heerapura(RVPNL) 1(400 kV)SLDC_RAJASTHAN [ RAJASTHAN ]171 15-11-201610:0015-11-2016
3rd Quaterly maintenance of 400 KV side bay EquipmentsOCC
deliberated and approve the shutdown to be clubbed with
Powergrid workDailyPowergrid
181 SLDC_PUNJAB Makhu (PSEB)- Amritsar (PG) Ckt-1 (400kV) Punjab Daily Periodical testing and routine mainteanance 07.11.2016 9.00 07.11.2016 17.00
182 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 7.11.16 10.00 7.11.16 16.00
183 SLDC_PUNJAB Kangra - Shanan Ckt-II (132kV) Punjab Daily Mtc. of line 8.11.16 10.00 12.11.16 16.00
184 SLDC_PUNJAB Makhu (PSEB)- Amritsar (PG) Ckt-II (400kV) Punjab Daily Periodical testing and routine mainteanance 07.11.2016 9.00 07.11.2016 17.00
185 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers , suspension clamps and cleaning of Disc insulators of Tower
No 1 to 20
10.11.16 10.00 10.11.16 17.00
186 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 10.11.16 10.00 10.11.16 16.00
187 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 11.11.16 10.00 11.11.16 16.00
188 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers , suspension clamps and cleaning of Disc insulators of Tower
No 21 to 40
12.11.16 10.00 12.11.16 17.00
189 SLDC_PUNJAB Kangra - Phathankot Ckt-I (132kV) Punjab Daily Mtc. of line 14.11.16 10.00 18.11.16 16.00
190 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 14.11.16 10.00 14.11.16 16.00
191 SLDC_PUNJAB Moga-Nakodar (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 15.11.16 10.00 15.11.16 16.00
192 SLDC_PUNJAB Hamirpur - Chohal (132kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 16.11.16 9.00 16.11.16 17.00
193 SLDC_PUNJAB Rajpura - Nakodar Ckt-II (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 16.11.16 10.00 16.11.16 16.00
194 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-I (220kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers , suspension clamps and cleaning of Disc insulators of Tower
No 41 to 60
17.11.16 10.00 17.11.16 17.00
195 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 18.11.16 10.00 18.11.16 16.00
196 SLDC_PUNJAB Nalagarh (PG) - Mohali (PSEB) Ckt-II (220kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers , suspension clamps and cleaning of Disc insulators of Tower
No 41 to 60
19.11.16 10.00 19.11.16 17.00
197 SLDC_PUNJAB Talwandi Sabo - Nakodar (400kV) Punjab Daily General maintenance ,Jumper tightening and Tree Cutting 19.11.16 09:00 19.11.16 16:00
198 SLDC_PUNJAB Rajpura - Dhuri Ckt-II (400kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers , suspension clamps and cleaning of Disc insulators of Tower
No 81 to 96
20.11.16 11.00 21.11.16 17.00
199 SLDC_PUNJAB Kangra - Phathankot Ckt-II (132kV) Punjab Daily Mtc. of line 21.11.16 10.00 25.11.16 16.00
200 SLDC_PUNJAB Rajpura - Nakodar Ckt-I (400kV) Punjab Daily Tightening of Jumpers of Deadend Towers & Tree Cutting 22.11.16 10.00 22.11.16 16.00
201 SLDC_PUNJAB Rajpura - Dhuri Ckt-I (400kV) Punjab Daily
Tightening of nut bolts of jumpers, dampers , suspension clamps and cleaning of Disc insulators of Tower
No 81 to 96
23.11.16 11.00 13.12.16 17.00
202 NRSS XXX1(B) TRANSMISSION LTD. Rajpura-Bhiwani I(400KV) BBMB Daily
Stringing of new 400kV D/C Kurukshetra Malerkotla Transmission
Line. Part of Dehar Bhiwani Transmission Line Shutdown was
approved in OCC 126 but could not be taken because of load issues.
OCC approved the shutdown but deliberated that the same is subject to consent of BBMB
25-10-2016 08:00 26-10-2016 18:00
203 NRSS XXX1(B) TRANSMISSION LTD. Patiala - Patran (400kV) Powergrid Daily
Stringing of new 400kV D/C Kurukshetra Malerkotla Transmission
Line. Part of koldam Hisar Line30-10-2016 08:00 31-10-2016 18:00
204 NRSS XXX1(B) TRANSMISSION LTD. Rajpura - Dhuri both circuits (400kV) PSTCL Daily
Stringing of new 400kV D/C Kurukshetra Malerkotla Transmission
Line. Part of Dehar Bhiwani Transmission Line Shutdown was
approved in OCC 126 but could not be taken because of load issues.
OCC approved the shutdown but deliberated that the same is subject to consent of Punjab
20-11-2016 08:00 21-11-2016 18:00
205 NRSS XXIX TRANSMISSION LTD. Jalandhar (PG) - Samba (PG) 1 (Line Charged as
Jalandhar - Kishanpur Line with contingency arrangement)
- Continuous
For removal of contingency arrangement and restoration as it is
(as Jalandhar-Moga CKT1 and Kishanpur Samba CKT-1) - Samba-Kishanpur line will be charged within
48 hrs from the time of shutdown. The shutdown in real time shall be
availed subject to confirmation of bay readiness from Samba PG and Jalandhar PG for termination of
400kV DC Samba Jalandhar NRSSXXIX lines
28-11-2016 07:00 01-12-2016 07:00
206 NRSS XXIX TRANSMISSION LTD. Jalandhar (PG) - Samba (PG) 2 (Line Charged as
Jalandhar - Kishanpur Line with contingency arrangement)
- Continuous
For removal of contingency arrangement and restoration as it is
(as Jalandhar-Moga CKT1 and Kishanpur Samba CKT-1) - Samba-Kishanpur line will be charged within
96 hrs from the time of shutdown. The shutdown in real time shall be
availed subject to confirmation of bay readiness from Samba PG and Jalandhar PG for termination of
400kV DC Samba Jalandhar NRSSXXIX lines
28-11-2016 07:00 01-12-2016 07:00
207 NRSS XXIX TRANSMISSION LTD. Kishenpur-Samba II Continuous Carrier outage for restoration of inner ckt coupling 28-11-2016 07:00 28-11-2016 13:00
214 SLDC_UP [ UTTAR PRADESH ]400 KV Unnao-Bareilly line( ckt I ) Bareilly
UP Daily
Lopping Chopping of trees and replacement of disc Insulater with
Polymer InsulaterOCC approved the outage but it was desired that the
details of the progress of replacement of polymer insulators on the line be intimated along with
manpower deployed for work 07-11-2016 08:00 12-11-2016 18:00
213 SLDC_UP [ UTTAR PRADESH ]400 KV Unnao-Lucknow Line along with 400 KV
Main Bus-A UP Daily Complete overhauling of 29A & 29C
Isolator along with Main Bus-A 18-11-2016 08:00 17-11-2016 18:00
SLDC_UP [ UTTAR PRADESH ] Dadri(NTPC)-Muradnagar(UP)(400 kV) Powergrid Continuous
Shifting of 400KV Dadri-Muradnagar line from Muradnagar-I (Old) to Muradnagar-II S/S (New) OCC deliberated and decided to
postpone the outage to next OCC after the Hapur Substation is comissioned in line with the
decision of the standing committe 15-11-2016 09:00 21-11-2016
16:00
209 SLDC_UP [ UTTAR PRADESH ] Allahabad-Fatehpur 2(400 kV) Powergrid DailyFor stringing of conductor on
Allahabad-Banda line 13-11-2016 10:00 14-11-2016
208 SLDC_UP [ UTTAR PRADESH ] Allahabad-Fatehpur 1(400 kV) Powergrid DailyFor stringing of conductor on
Allahabad-Banda line 13-11-2016 10:00 14-11-2016
Routine T&C Testing Checking & tightening of Jumpers and Tree cutting & Bay maintance work 16-11-2016 08:00 17-11-2016 18:00212 SLDC_UP [ UTTAR PRADESH ]
400KV Sarojininagar-PGCIL, Kursi Road line(Up to LILO Point) UP Daily
17:00
18:00
211 SLDC_UP [ UTTAR PRADESH ] Moradabad(UP)-Muradnagar(UP)(400 kV) Powergrid DailyTightening of Bay/General
Maintenance 22-11-2016 08:00 22-11-2016
16:00
210
220 SLDC_UP [ UTTAR PRADESH ] 220 KV Fatehpur - Unchahar - I & II UP Daily
Restringing between tower no. 04 & 05 to maintain the ground clearance of bottom conductor as required by
DFCCIL. OCC approved the outage but proposed that no other outage
of lines connected with BE CLUBBED 18-11-2016 08:00 20-11-2016 18:00
221 SLDC_UP [ UTTAR PRADESH ] 400 KV SC Shaktinagar-Kanpur Line (PGCIL) UP Daily
Overhead quad conductor crossing between T.No. 501 (B+0) & 502
(A+0) of under construction LILO of 400 KV Rewa Road-Meja line at 400
KV Masauli. 21-11-2016 08:00 21-11-2016 18:00
218 SLDC_UP [ UTTAR PRADESH ] 400 KV Sultanpur- PGCIL Lucknow Line UP Daily
Replacement of Disc Insulator by Polymer Insulator, Lopping &
Chopping of tree branches. and Other M&R Works 16-11-2016 08:00 22-11-2016 18:00
219 SLDC_UP [ UTTAR PRADESH ] 400KV Gorakhpur-Azamgarh Line UP DailyFor replacement of existing porcelein
insulator with polymer insulator 07-11-2016 08:00 16-11-2016 18:00
216 SLDC_UP [ UTTAR PRADESH ] 400KV Sultanpur-Obra line UP Daily
1. For dismantling of 54 Mtr. Span of 400KV Transfer Bus 2.
Replacement of Disc Insulator by Polymer Insulator, Lopping &
Chopping of tree branches. 3. For stringing of R,Y,B Phase 54 Mtr.
Span of 400KV Transfer Bus 10-11-2016 08:00 16-11-2016 18:00
217 SLDC_UP [ UTTAR PRADESH ] 400 KV Sultanpur- Azamgarh Line UP Daily
Replacement of Disc Insulator by Polymer Insulator, Lopping &
Chopping of tree branches. and Other M&R Works 17-11-2016 08:00 23-11-2016 18:00
215 SLDC_UP [ UTTAR PRADESH ]400 KV Unnao-Bareilly line( ckt II ) Bareilly
UP Daily
Lopping Chopping of trees and replacement of disc Insulater with
Polymer InsulaterOCC approved the outage but it was desired that the
details of the progress of replacement of polymer insulators on the line be intimated along with
manpower deployed for work 14-11-2016 08:00 19-11-2016 18:00
232 SLDC_UP [ UTTAR PRADESH ] 400KV Muradnagar-Muzaffarnagar Line UP Daily
Tightening of Bay/General MaintenanceOCC approved the
outage and deliberated that line work should also be completed 20-11-2016 08:00 20-11-2016 17:00
233 SLDC_UP [ UTTAR PRADESH ] 400KV Muzaffarnagar-Vishnuprayag Line UP DailyFor replacement of Disc Insulator
with polymer insulator 20-11-2016 09:00 29-11-2016 18:00
230 SLDC_UP [ UTTAR PRADESH ] 400KV Greater Noida-Nawada line & its bay UP DailyFor stringing (crossing) of 400KV
Jahangirpur Cr. Noida line. 11-11-2016 08:00 12-11-2016 18:00
231 SLDC_UP [ UTTAR PRADESH ] 400KV Dadri-Maharani Bagh Line UP DailyFor stringing (crossing) of 400KV
Jahangirpur Cr. Noida line. 11-11-2016 08:00 13-11-2016 18:00
228 SLDC_UP [ UTTAR PRADESH ] 220KV Nara-Roorkee Line UP Daily
For tree cutting, inspection of insulators & other maintenance works.OCC deliberated and
approved the outage subject to consent of Uttrakhand 08-11-2016 09:00 09-11-2016 18:00
229 SLDC_UP [ UTTAR PRADESH ] 220KV Debai-NAPP Line UP Daily
p y Polymer OCC deliberated and
approved the outage subject to onsent of NAPP 10-11-2016 08:00 12-11-2016 18:00
226 SLDC_UP [ UTTAR PRADESH ] 400KV Panki-Unnao line UP Dailyfor routing testing & maintenance
work. 24-11-2016 08:00 24-11-2016 18:00
227 SLDC_UP [ UTTAR PRADESH ] 400KV Muzaffarnagar-Matore Line PowerGrid Daily
For routine testing of protection and other maintenance works.OCC delibertaed and proposed to
postpone the outage on account of grid conditions 04-11-2016 11:00 04-11-2016 16:00
224 SLDC_UP [ UTTAR PRADESH ] 400KV S/C Singrauli-Fatehpur-II line UP Daily For stringing of conductor. 16-11-2016 10:00 17-11-2016 16:00
225 SLDC_UP [ UTTAR PRADESH ] 400KV Unnao-Agra line UP Daily
Replacement of old porcelein strings by new polymer insulator & jumper
checking & tightening. 17-11-2016 08:00 25-11-2016 18:00
222 SLDC_UP [ UTTAR PRADESH ] 400KV Sarnath-Anpara (L5) line UP Daily
DFCC work OCC approved the outage but proposed that this
outage not tobe clubbed with any connected line outage Work should be completed in the
minimum time 27-11-2016 08:00 02-12-2016 18:00
223 SLDC_UP [ UTTAR PRADESH ] 400KV Anpara-Mau (L6) line UP Daily
DFCC work OCC approved the outage but proposed that this
outage not tobe clubbed with any connected line outage Work should be completed in the
minimum time 27-11-2016 08:00 02-12-2016 18:00
242 SLDC_UP [ UTTAR PRADESH ] Lucknow-Lucknow (UP) Powergrid Daily
Routine T&C Testing Checking & tightening of Jumpers and Tree cutting & Bay maintance work 16.11.2016 08:00 17.11.2016 18:00
243 SLDC_UP [ UTTAR PRADESH ] Singrauli-Fatehpur Power Grid Daily
Overhead QUAD Conductor crossing between TL 445 AND 446 of under construction LILO of 400KV Rewa
ROAD Meja LINE 1.11.2016 08:00 1.11.2016 18:00
234 SLDC_UP [ UTTAR PRADESH ] 400KVObra-Rewa Roadline UP Continuous
For diversion work of 400kV Obra-Rewa Roadline at Bahadraumarganj Loc. Due to DFCC & Jumpering work
of 220 KV saranpur - Phulpur line 02-11-2016 08:00 16-11-2016 18:00
235 SLDC_UP [ UTTAR PRADESH ] 400KV Meja Allahabad-2 Line PowerGrid Continuous
Overhead quad conductor crossing between T.No. 2/2 & 2/3 of under
construction LILO of 400 KV Rewa Road-Meja line at 400 KV Masauli. 26-11-2016 09:00 26-11-2016 18:00
236 SLDC_UP [ UTTAR PRADESH ] 400KV Fatehabad Muradnagar Line UP Daily
For stringing of missing earthwire and tightening of jumpers of tension tower
and maintenance work 01-11-2016 08:00 04-11-2016 18:00
237 SLDC_UP [ UTTAR PRADESH ] 400KV Agra Fatehabad UP Daily
For stringing of missing earthwire and tightening of jumpers of tension tower
and maintenance work 05-11-2016 08:00 09-11-2016 18:00
238 SLDC_UP [ UTTAR PRADESH ] 400KV Panki-Rewa Road Line UP Daily For stringing of conductor 19-11-2016 10:00 20-11-2016 16:00
239 SLDC_UP [ UTTAR PRADESH ] 400KV Dadri-Dankaur Earth Electrode Line UP Daily
For stringing (crossing) of 400KV Jahangirpur Cr. Noida line.OCC
approved the outage but deliberated that details of work be
given 04-11-2016 08:00 06-11-2016 18:00
240 SLDC_UP [ UTTAR PRADESH ] 400KV Muzzafarnagar - Srinagar Line UP Daily
For replacement of Disc Insulator with polymer insulator (during
shutdown 400kv MZN-Line VPN line) 10-11-2016 09:00 19-11-2016 18:00
241 SLDC_UP [ UTTAR PRADESH ]400KV Dhampur-Kalagarh line (D/C) UK Interstate
Line alongwith 132KV Afzalgarh-Kalagarh Line UP Daily
For maintenance work OCC approved the outage subject to
consent of Uttrakhand 16-11-2016 08:00 17-11-2016 18:00
246 Allahabad(PG)-Rihand 2 Power GRID DAILY 30.11.2016 08:00 30.11.2016 18:00
247 Allahabad(PG)-Rihand 1 Power GRID DAILY 30.11.2016 08:00 30.11.2016 18:00
248 SLDC-UP(UTTAR PRADEWSH) Allahabd -Kanpur 2 Power GRID DAILY For stringing of conductor 10.11.2016 10:00 11.11.2016 16:00
SLDC_UP [ UTTAR PRADESH ]
249 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 03-11-2016 09:00 03-11-2016 17:00
244 SLDC_UP [ UTTAR PRADESH ] Lucknow(UP)-Singrauli(NTPC)(400 kV) Powergrid Daily
Overhead quad conductor crossing between T.No. 445 (B+0) & 446
(A+25) of under construction LILO of 400 KV Rewa Road-Meja line at 400 KV Masauli.OCC deliberated and
approved the outage but submitted that the details of work to be done
be given 17-11-2016 09:00 17-11-2016 18:00
245 SLDC_UP [ UTTAR PRADESH ]
250 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 04-11-2016 09:00 04-11-2016 17:00
251 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 05-11-2016 09:00 05-11-2016 17:00
252 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 07-11-2016 09:00 07-11-2016 17:00
253 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 08-11-2016 09:00 08-11-2016 17:00
Annual Overhaul 09-11-2016 09:00 09-11-2016 17:00-
Overhead quad conductor CROSSING BETWEEN tl 717&718
of under construction LILO of 400KV rewa road-meja line at 400KV
masuali OCC approve the outage subject to the Rihand mmachine being out but Rihand bipole no
outage be there
Kanpur(PG)-Singrauli(NTPC)(400 kV) Powergrid Daily
Overhead quad conductor crossing between T.No. 501 (B+0) & 502
(A+0) of under construction LILO of 400 KV Rewa Road-Meja line at 400 KV Masauli.OCC deliberated and
approved the outage but the details of work to be done be
submiitted 21-11-2016 08:00 21-11-2016 18:00
254 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 -
ALL OUTAGES APPROVED TENTATATIVELY SUBJECT TO GRID CONDITIONS AND SPECIFIC REMARKSOUTAGES APPROVED TENTATIVELY FOR THE MONTH OF OCTOBER ON ACCOUNT OF PRE WINTER WORKS
11:00 06-11-2016 16:30
255 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 01 - - Annual Overhaul 10-11-2016 09:00 10-11-2016 17:00
256 ARAVALI POWER CO. PVT. LTD. Jhajjar-Mundka # 02 - - Annual Overhaul 11-11-2016 09:00 11-11-2016
29-11-2016 11:00 30-11-2016 16:30
Pre-winter preventive maintenance work of the 220kV trans. Line which includes tightening of tower jumpers, checking and rectification of vibration dampers, arcing horns, tightening of tower body bolt/nuts, inspection and
cleaning of insulator strings, clearance of tower beds, lopping of trees etc. in the line corridors and rectification of loose sags if anyDailyADHPL220kV Prini Nalagarh Line CKT 1ADHPL
17:00
259 ADHPL 220kV Prini Nalagarh Line CKT 1 ADHPL Daily
260 ADHPL 220kV Prini Phozal Line CKT 2A ADHPL Daily
Half yearly maintenance of 220kV Prini switchyard which includes
overhauling of 245kV SF6 circuit breaker's poles of line-1 (B-phase)
and bus coupler (R,B-phase) at Prini end AND Rectification of 245kV
SF6 circuit breaker's operating mechanism problems for Line-1 (R-
Phase) and Line-2 (Y-phase) at Nalagarh end. 07-11-2016 09:00 16-11-2016 18:00
257 HPLDS 66KV S/C Transmission Line from Shanan to Bijnee - -Replacement of partially damaged
disc insulator of T.No. 8 22-11-2016
01-11-2016
261 17-11-2016 11:00 20-11-2016 16:30
22-11-2016 11:00 27-11-2016 16:30
10:00 22-11-2016 16:00
258 ADHPL 220kV Prini Nalagarh Line CKT 1 ADHPL Daily
Pre-winter preventive maintenance work of the 220kV trans. Line which includes tightening of tower jumpers, checking and rectification of vibration dampers, arcing horns, tightening of tower body bolt/nuts, inspection and
cleaning of insulator strings, clearance of tower beds, lopping of trees etc. in the line corridors and rectification of loose sags if any
Date Time Date Time
1 WRPC PGCIL765KV Gwalior-Jaipur#2 Line ( Main and Tie bay
should kept open) 21-10-2016 09:00 21-10-2016 18:00 Daily
Spare reactor integration balance work (in last shut down spare
reactor integration with R-ph only completed) and to attain the
isolator alignment problem of 03 Nos of isolator of main and Tie Bay of Jaipur#2.Line shut down naure
defect in line left by KPTL
2 WRPC PGCIL765 KV Gwalior-Agra-1
line 25-10-2016 10:00 25-10-2016 17:00 Daily
For attending IPS tube to LA connectors & droppers (line to IPS
tube) in R , Y and B phases.
3 WRPC MPPTCL220 KV MALANPUR -
AURAIYA CKT 8-11-2016 09:00 8-11-2016 17:00 daily
FOR SCHEDULED MAINTENANCE & TESTING WORK
4 WRPC MPPTCL220 KV MEHGAON -
AURAIYA CKT 9-11-2016 09:00 9-11-2016 17:00 daily
FOR SCHEDULED MAINTENANCE & TESTING WORK
5 WRPC AdaniHVCD Mundra-
Mahendragarh Pole-127.11.2016 07:00 30.11.2016 18:00 Continuous
Annual Maintenance in Terminal stations and Insulator replacement
from porcelain to polymer / cleaning of porcelain insulators in
HVDC Line
6 WRPC AdaniHVCD Mundra-
Mahendragarh Pole-201.12.2016 07:00 04.12.2016 18:00 Continuous
Annual Maintenance in Terminal stations and Insulator replacement
from porcelain to polymer / cleaning of porcelain insulators in
HVDC Line
7 ERPC PGCIL 765KV S/C GAYA-BALIA TL 11.11.16 08:00 11.11.16 18:00 ODBFOR REPLACEMENT OF
INSULATORS DAMAGED BY MISCREANT BY PGCIL-GAYA
8 ERPC PGCIL765KV S/C GAYA-VARANASI-1 TL
12.11.16 08:00 12.11.16 18:00 ODBFOR REPLACEMENT OF
INSULATORS DAMAGED BY MISCREANT BY PGCIL-GAYA
9 ERPC PGCIL765KV S/C GAYA-VARANASI-2 TL
15.11.16 08:00 15.11.16 18:00 ODBFOR REPLACEMENT OF
INSULATORS DAMAGED BY MISCREANT BY PGCIL-GAYA
Outages proposed in other RPCs APPROVED IN OCC 128 ALL OTAGES APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONS AND SPECIFIC REMARKS ANNEXURE 2C
Sl Nooutages
proposed in
Name of Requesting
AgencyName of Elements
From To
Basis Reason Remarks
10 ERPC PGCIL 400 KV BARH - GKP -1 18.11.16 08:00 20.11.16 18:00 ODBFOR MAINTENANCE WORK AT
BARH
OCC approved the outage but
deliberated that line work should also be
done
11 ERPC PGCIL 400 KV BARH - GKP -2 22.11.16 08:00 24.11.16 18:00 ODBFOR MAINTENANCE WORK AT
BARH
OCC approved the outage but
deliberated that line work should also be
done
12 ERPC PGCIL400 KV BIHARSHARIF-
VARANASI -1 &209.11.16 08:00 12.11.16 17:30 ODB
BUS SPLIT WORK ARRANGEMENT AT BIHARSHARIFF
13 ERPC PGCIL400 KV BIHARSHARIF-
BALIA-116.11.16 08:00 16.11.16 17:30 ODB
TL MAINTENANCEWORK AT BIHARSHARIFF
14 ERPC PGCIL400 KV BIHARSHARIF-
BALIA-217.11.16 08:00 17.11.16 17:30 ODB
TL MAINTENANCEWORK AT BIHARSHARIFF
DATE TIME DATE TIME
1 PGCIL 765 ICT-I at BHIWANI PGCIL INTRA DAILY Installation of Polymer insulator. With Bus-II. 09-11-16 08:00 09-11-16 16:00
2 PGCIL 765 ICT-II at BHIWANI PGCIL INTRA DAILY Installation of Polymer insulator. With Bus-I. 15-11-16 08:00 16-11-16 16:00
3 PGCIL 765 BUS-I at BHIWANI PGCIL INTRA DAILY AMP work /Polymer insulators replacement. 25-11-16 08:00 25-11-16 16:00
4 PGCIL 765 BUS-II at BHIWANI PGCIL INTRA DAILY AMP /Polymer insulators replacement. 07-11-16 08:00 10-11-16 16:00
5 PGCIL 765 Bus Reactor-I at BHIWANI PGCIL INTRA DAILY Installation of Polymer insulator. With Bus-II. 10-11-16 08:00 10-11-16 16:00
6 PGCIL 765 BUS-I at MEERUT PGCIL INTRA DAILYInstallation of Polymer insulators at S/S and Bus extension work.
10-01-00 08:00 25-10-16 16:00
7 PGCIL 765 BUS-II at MEERUT PGCIL INTRA DAILYInstallation of Polymer insulators at S/S and Bus extension work.
10-11-16 08:00 15-11-16 16:00
8 PGCIL 400 BUS-1B at HVDC Agra PGCIL INTRA DAILY Integration of 400kV Sikar-1 Bays with 400kV Bus 20-11-16 08:00 20-11-16 16:00
9 PGCIL 400 BUS-2B at HVDC Agra PGCIL INTRA DAILY Integration of 400kV Sikar-2 Bays with 400kV Bus 21-11-16 08:00 21-11-16 16:00
PGCIL 400 BUS-1A at HVDC Agra PGCIL INTRA DAILY Integration work for 400kVPole-3 dia 26-11-16 08:00 26-11-16 16:00
PGCIL 400 BUS-2A at HVDC Agra PGCIL INTRA DAILY Integration work for 400kVPole-3 dia 28-11-16 08:00 28-11-16 16:00
10 PGCIL 765 702 Tie bay of ICT-I at Meerut PGCIL INTRA DAILY Installation of Polymer insulators at S/S. 24-11-16 08:00 24-11-16 16:00
11 PGCIL 765 714 Tie bay of Gr.Noida at Meerut PGCIL INTRA DAILY Installation of Polymer insulators at S/S. 26-11-16 08:00 26-11-16 16:00
12 PGCIL 765 708 Tie bay of ICT-I/Merut at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 18-11-16 08:00 19-11-16 16:0013 PGCIL 765 713 Main bay of Moga at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 21-11-16 08:00 22-11-16 16:0014 PGCIL 765 7714 Tie bay of Moga/BR-I at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 23-11-16 08:00 24-11-16 16:00
PROPOSED OUTAGE OF NLDC TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016 ALL OUTAGES APPROVED TENTATIVELYSUBJECT TO GRID CONDITIONS AND SPECIFIC REMARKS ANNEXURE 3A (1)
REMARKSS.N.
NAME OF REQUESTING
AGENCY
EQUIPEMENT DETAILS
TOVOLT LEVEL
(KV)NAME OF THE ELEMENT
POWERGRID NORTHERN REGION-I
OWNER
DAILY/ CONTINUOUS
REASONAPPROVED DATE AND TIME
INTER/ INTRA
REGIONA
FROM
15 PGCIL 765 715 Main bay of B/R-1 at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 26-11-16 08:00 27-11-16 16:0016 PGCIL 765 718 Main bay of B/R-2 at Bhiwani PGCIL INTRA DAILY AMP/ CVT C&tan delta. 28-11-16 08:00 29-11-16 16:00
1 PGCIL 765 ICT-I at Bareilly PGCIL Intra Daily AMP work of ICT-I 14-11-2016 10:00 14-11-2016 18:00
2 PGCIL 765 765/400kv ICT-I Agra PGCIL INTRA cont.
For Variable FrequiancyTan Delta Mesurementand AMP
work
22.11.16 09:00 22.11.16 18:00
3 PGCIL 765 765/400kv ICT-II Agra PGCIL INTRA cont.
For Variable FrequiancyTan Delta Mesurementand AMP
work
23.11.16 09:00 23.11.16 18:00
4 PGCIL 765 ICT-I Main bay at Bareilly (Bay No. 709)
PGCIL INTRA DAILY AMP of CT & CB 15-11-2016 10:00 15-11-2016 18:00
5 PGCIL 765 ICT-I & Line Tie bay at Bareilly (Bay No. 708)
PGCIL INTRA DAILY AMP of CT & CB 16-11-2016 10:00 16-11-2016 18:00
6 PGCIL 765 765 kv Bareilly-Lucknow Line Main Bay (Bay No. 707) Bareilly PGCIL INTRA DAILY AMP of CT & CB 17-11-2016 10:00 17-11-2016 18:00
7 PGCIL 765 701 Bay (Main Bay of Fatehpur-Varanasi Line) Fatehpr PGCIL INTRA DAILY AMP Work 02.11.2016
09:3002.11.2016
18:00
8 PGCIL 765 702 Bay (Tie Bay of Fatehpur-Varanasi Line) Fatehpr PGCIL INTRA DAILY AMP Work 04.11.2016
09:3004.11.2016
18:00
9 PGCIL 765 703 Bay (Main Bay of 765 KV ICT-1) Fatehpr PGCIL INTRA DAILY AMP Work 07.11.2016 09:30 07.11.2016 18:00
10 PGCIL 765 704 Bay (Tie bay of Fatehpur-Sasaram Line) Fatehpr PGCIL INTRA DAILY AMP Work 09.11.2016 09:30 09.11.2016 18:00
11 PGCIL 765 707 Bay (Main Bay of Fatehpur-Agra-1 Line) PGCIL INTRA DAILY AMP Work 14.11.2016 09:30 14.11.2016 18:00
12 PGCIL 765 Bus Reactor-II VARANASI PGCIL INTRA DAILY
For Jumpering and connection & testing of 110 MVAR, Spare unit towards commissioning
06.11.16 11:00 09.11.16 18:00
13 PGCIL 765 701-Balia Line Main Bay Lucknow PGCIL INTRA DAILY For AMP work on daily basis 01.11.16 09:00 02.11.16 18:00
14 PGCIL 765 702- ICT-I & Balia line Tie Bay Lucknow PGCIL INTRA DAILY For AMP work on daily
basis 04.11.16 09:00 05.11.16 18:00
15 PGCIL 765 707R-765Bareilly line Reactor Bay Lucknow PGCIL INTRA DAILY For AMP work on daily
basis 10.11.16 09:00 11.11.16 18:00
16 PGCIL 765 765kV Agra-Fatehpur ckt-2 Line Reactor at Agra PGCIL INTRA cont. For replacement of faulty
PRD relays. 04.11.16 09:00 04.11.16 18:00
OCC deliberated and decide to approve the
outage alongwith that of
line work
POWERGRID NR-3
17 PGCIL 765 765kV Agra-Bus Reactor-2 PGCIL INTRA cont. For replacement of faulty PRD relays. 05.11.16 09:00 05.11.16 18:00
DATE TIME DATE TIMEX-3
1765 kV A 14.11.16
09:0015.11.16
17:00 Daily For Annual Maintenance Works.
2765 kV A 16.11.16
09:00 17.11.1617:00 Daily For Annual
Maintenance Works.
3765 kV A 18.11.16
09:00 19.11.1617:00 Daily For Annual
Maintenance Works.
4765 kV A 21.11.16
09:00 22.11.1617:00 Daily For Annual
Maintenance Works.
OCC DELIBERATED THAT OUTAGES OF REACTOR BE GENERALLY NOT TAKEN UP IN THE PERIOD FROM 1.11.2016 TO END MARCH 2017ON ACCOUNT OF HIGH VOLTAGE EXPECTED IN THE PERIOD
POWERGRID NORTHERN REGION-IIS.N.
Details of Transmission Element Category of
eleme
DURATION Daily/ Continu
ous
ReasonVoltage level
(KV)NAME OF THE ELEMENT AND
SUBSTATION
Bus Reactor-1 Tie Bay at Moga.
Bus Reactor-2 Main Bay at Moga.
Bus Reactor-2 Tie Bay at Moga.
FROM TO
For O&M activity
Bus Reactor-1 Main Bay at Moga.
\\PRIYANKA\Users\Public\occ 128 app\ANNEXURE 3A(2).xlsx Page 1
ALL OUTAGES APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONS
Type of Shutdown
Voltage Level
Name From To From To Daily/Continous Basis
1 765 KV3X500MVA, ICT-II at 765KV GSS Phagi
A 10.11.2016 11.11.2016 09.00Hrs 18.00Hrs Daily1. For the tightening of loose clamps & connectors of equipments. 2. Measurement of di-electric loss angle of Bushings.
2 765 KV800KV CB(706-52B) of 765KV Phagi -Anta Line-1. at 765KV GSS Phagi
A 15.11.2016 16.11.2016 10.00Hrs 18.00Hrs Daily1.Maintenance of CB & CTs . 2. Measurement of Tan-delta of CTs 3. Tightening of clamps & connectors.
3 765 KV800KV Tie CB ( 705-52T) of 3X80 MVAr Bus Reactor Bank. at 765KV GSS Phagi
A 17.11.2016 18.11.2016 10.00Hrs 18.00Hrs DailyMeasurement of Tan delta of Current transformers, & maintenance of CB.
4 765 KV765 KV Main Bus-B at 765KV GSS Phagi
A 24.11.2016 25.11.2016 10.00 Hrs 18.00Hrs DailyFor tightening of clamps & connectors of droppers from main bus to isolators of different 765 KV Bays.
5 765 KV3X80 MVAr Bus Reactor Bank at 765KV GSS Phagi
A 29.11.2016 29.11.2016 10.00Hrs 18.00Hrs Daily For the maintenance of Reactors
6 765 KV
765 KV ,3X80 MVAr Reactor Bank II installed on 765 KV Anta-Phagi ckt-II at 765KV GSS Anta
A 03.11.2016 04.11.201608.00 Hrs.
20.00 Hrs. Continous BasisCommissioning of RPH2 Relay on Reactor Bank-II Breakeri.e. 7-5-52ALR
During Shut down of 765 KV Anta-Phagi Ckt-I and its line Reactor will be available in circuit.
7 765 KV
765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - I at 765KV GSS Anta
A 07.11.2016 09.11.201609.00 Hrs.
20.00 Hrs. Continous Basis
For synchrinisation of 765 KV Anta-Phagi ckt-I Line Reactor Bank with spare Reactor and commissioning of RPH2 Relay on Reactor Bank C.B. No. 7-4-52 ALR
During Shut down of 765 KV Anta-Phagi Ckt-I &II will be available in circuit.
8 765 KV400/765 KV ,3X500 MVA ICT Bank -I at 765KV GSS Anta
A 10.11.2016 13.11.201609.00 Hrs.
20.00 Hrs. Continous BasisSynchronisation of 400/765 KV ICT Bank-I with spare ICT and commissioning of RPH2 relay on C B (7-4-52B,7-4-52T,4-6-52C,4-6-52T)
During Shut down 400/ 765 KV ICT Bank II & III will be available in circuit. ICT-I is expected by 15.01.16
9 765 KV400/765 KV ,3X500 MVA ICT Bank -II at 765KV GSS Anta
A 15.11.2016 18.11.201609.00 Hrs.
20.00 Hrs. Continous BasisSynchronisation of 400/765 KV ICT Bank-II with spare ICT and commissioning of RPH2 relay on C B (7-5-52B,7-5-52T,4-9-52C,4-9-52T)
During Shut down 400/ 765 KV ICT Bank I & III will be available in circuit. ICT-I is expected by 15.01.16
RemarksPurpose
APPROVED OUTAGE OF NLDC TRANSMISSION ELEMTS FOR THE MONTH OF NOVEMEBER 2016 ANNEXURE3A(2)
S.No. Details of Transmission element
Category to which transmission
element belong (A/B/C/D)
Date Timings
\\PRIYANKA\Users\Public\occ 128 app\ANNEXURE 3A(2).xlsx Page 2
Type of Shutdown
Voltage Level
Name From To From To Daily/Continous Basis
RemarksPurposeS.No. Details of Transmission element
Category to which transmission
element belong (A/B/C/D)
Date Timings
10 765 KV400/765 KV ,3X500 MVA ICT Bank -III at 765KV GSS Anta
A 21.11.2016 24.11.201609.00 Hrs.
20.00 Hrs. Continous Basis
Synchronisation of 400/765 KV ICT Bank-III with spare ICT, commissioning of RPH2 relay on C B (7-6-52B,7-6-52T) and Replacement of Damaged/Broken Disc Insulator String at 765 KV side between ICT Bank-III & 765 KV Main Bus -II
During Shut down 400/ 765 KV ICT Bank I & II will be available in circuit. ICT-I is expected by 15.01.16
11 765 KV765 KV Main Bus-II at 765KV GSS Anta
A 21.11.2016 22.11.201609.00 Hrs.
20.00 Hrs. Continous BasisReplacement of Damaged/Broken Disc Insulator String at 765 KV side between ICT Bank-III & 765 KV Main Bus -II
During Shut down 765 KV Main Bus-I will be available in circuit.
OCC DELIBERATED THAT OUTAGES FOR REACTOR BE GENERALLY NOT TAKEN UP IN THE PERIOD FROM NOV-MARCH ON ACCOUNT OF HIGH VOLTAGE
\\PRIYANKA\Users\Public\occ 128 app\ANNEXURE 3B(1).xlsx Page 1
RVPNL ALL OUTAGES APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONS AND SPECIFIC REMARKS
Type of Shutdown
Voltage Level
Name From To From ToDaily/Continous
Basis
1 400 KV400/220/33 KV, 315 MVA,
TR.NO.-01 , (TELk) at 400KV GSS Hindaun
11.11.2016 11.11.2016 10:00HRS 15:30Hrs Daily Quaterly Maintenance
2 400 KV400/220/33 KV, 315 MVA, TR.NO.-02 , (CGL) at 400KV
GSS Hindaun18.11.2016 18.11.2016 10:00HRS 15:30Hrs Daily Quaterly Maintenance
3 400 KV
400/220/33 KV,250 MVA, ILT-1 (400 KV Side Bay
Equipment of Transformers) at 400KV GSS Heerapura
21.11.2016 21.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay
Equipments
4 400 KV
400/220/33 KV,250MVA, ILT-2 (400 KV Side Bay
Equipment of Transformers) at 400KV GSS Heerapura
22.11.2016 22.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay
Equipments
5 400 KV
400/220/33 KV,250 MVA, ILT-3 (400 KV Side Bay
Equipment of Transformers) at 400KV GSS Heerapura
23.11.2016 23.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay
Equipments
APPROVED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure-3B (1)
S.No. Details of Transmission element Date Timings
Purpose
\\PRIYANKA\Users\Public\occ 128 app\ANNEXURE 3B(1).xlsx Page 2
Type of Shutdown
Voltage Level
Name From To From ToDaily/Continous
Basis
S.No. Details of Transmission element Date Timings
Purpose
6 400 KV
400/220/33 KV,315MVA, ILT-4 (400 KV Side Bay
Equipment of Transformers) at 400KV GSS Heerapura
24.11.2016 24.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 400 KV side bay
Equipments
7 400 KV
400/220/33 KV, 250MVA,ILT-1 (220 KV Side Bay
Equipment of Transformers) at 400KV GSS Heerapura
25.11.2016 25.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay
Equipments
8 400 KV
400/220/33 KV,250MVA, ILT-2 (220 KV Side Bay
Equipment of Transformers) at 400KV GSS Heerapura
28.11.2016 28.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay
Equipments
9 400 KV
400/220/33 KV,250MVA, ILT-3 (220 KV Side Bay
Equipment of Transformers) at 400KV GSS Heerapura
29.11.2016 29.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay
Equipments
10 400 KV
400/220/33 KV,315MVA, ILT-4 (220 KV Side Bay
Equipment of Transformers) at 400KV GSS Heerapura
30.11.2016 30.11.2016 10:00 Hrs 17:00 Hrs Daily3rd Quaterly maintenance of 220 KV side bay
Equipments
11 400 KV400 KV/220KV 500MVA ICT-
IV at 400KV GSS Jaisalmer(Akal)
03.11.2016 03.11.2016 10:00 Hrs 16:00 Hrs DailyII QUARTERLY MAINTANANCE OF BAY EQUIPMENT
\\PRIYANKA\Users\Public\occ 128 app\ANNEXURE 3B(1).xlsx Page 3
Type of Shutdown
Voltage Level
Name From To From ToDaily/Continous
Basis
S.No. Details of Transmission element Date Timings
Purpose
12 400 KV400 KV BUS REACTOR at
400KV GSS Jaisalmer(Akal)04.11.2016 04.11.2016 10:00 Hrs 16:00 Hrs Daily
II QUARTERLY MAINTANANCE OF BAY EQUIPMENT OCC deliberated not to approve the outage as high voltage expected in the period from 1.11.2016 to end March 2016
13 400 KV400 KV ICT II at 400KV GSS
Jaisalmer(Akal)16.11.2016 16.11.2016 10:00 Hrs 16:00 Hrs Daily
II QUARTERLY MAINTANANCE OF BAY EQUIPMENT
14 400 KV400 KV Main Bus-I at 400KV
GSS Bikaner01.11.2016 04.11.2016 10:00 Hrs 17:00 Hrs Continous Basis
Testing/operation of Isolator and Final alignment of IPS tube below Main Bus-I
15 400 KV400 KV Main Bus-II at 400KV
GSS Bikaner05.11.2016 08.11.2016 10:00 Hrs 17:00 Hrs Continous Basis
Testing/operation of Isolator and Final alignment of IPS tube below Main Bus-II
16 400 KV400 KV Main Bus-I at 400KV
GSS Bikaner15.11.2016 20.11.2016 10:00 Hrs 17:00 Hrs Continous Basis Jumpering and Misc. Work
17 400 KV400 KV Main Bus-II at 400KV
GSS Bikaner21.11.2016 26.11.2016 10:00 Hrs 17:00 Hrs Continous Basis Jumpering and Misc. Work
\\PRIYANKA\Users\Public\occ 128 app\ANNEXURE 3B(1).xlsx Page 4
Type of Shutdown
Voltage Level
Name From To From ToDaily/Continous
Basis
S.No. Details of Transmission element Date Timings
Purpose
18 400 KV400 KV 252 A CB OF
BIKANER LINE at 400KV GSS Merta
07.11.16 07.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
19 400 KV400 KV 252 B CB OF
BIKANER LINE at 400KV GSS Merta
08.11.16 08.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
20 400 KV400 KV 352 A CB OF
JODHPUR-I LINE at 400KV GSS Merta
09.11.16 09.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
21 400 KV400 KV 352 B CB OF
JODHPUR-I LINE at 400KV GSS Merta
15.11.16 15.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
22 400 KV400 KV 452 ACB OF 315MVA
ILT-I at 400KV GSS Merta16.11.16 16.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
23 400 KV400 KV 452 B CB OF
JODHPUR-II LINE at 400KV GSS Merta
17.11.16 17.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
\\PRIYANKA\Users\Public\occ 128 app\ANNEXURE 3B(1).xlsx Page 5
Type of Shutdown
Voltage Level
Name From To From ToDaily/Continous
Basis
S.No. Details of Transmission element Date Timings
Purpose
24 400 KV400 KV 452 T CB OF
JODHPUR-II LINE & ILT-I at 400KV GSS Merta
22.11.16 22.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
25 400 KV400 KV 552 ACB OF 315MVA
ILT-II at 400KV GSS Merta23.11.16 23.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
26 400 KV400 KV 552 B CB OF
RATANGARH LINE at 400KV GSS Merta
24.11.16 24.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
27 400 KV400 KV TIE BAY OF BIKANER DEEDWANA LINE at 400KV
GSS BIKANER09.11.2016 13.11.2016 10:00 Hrs 17:00 Hrs Daily
CT Eerection in Deedwana Bay (Dia-6) replacing existing BPI to CT
28 400 KV315MVA 400/220KV ILT 1st ALSTOM Make Trf. at 400KV
GSS Jodhpur12.11.16 12.11.16 09:00 Hrs 17:00 Hrs Daily III rd QUARTERLY MAINT.WORK
OCC DELIBERATED THAT REACTOR OUTAGE SHOULD NOT BE GENERALLY PLANNED IN THE PERIOD FRON NOV-MARCH ON ACCOUNT OF HIGH VOLTAGE
S No.
Name of the Requesting agency
Voltage Level (KV)
Name of the Element Owner
Inter Regional/Intra Regional
Daily /Continous
Reason From Date From Time
To Date To time Remarks
1 TS Org 400400/220KV, 500 MVA
ICT No. 2 at 400KV Dhuri
PSTCL Inter regional Daily
Sagging work of Interconnection of ICT-3
Bays with 220 KV Bus Bar at 400 KV Dhuri
1.11.2016 8.00 2.11.2016 19.00
2 POWERGRID 400400/220KV, 315 MVA
ICT No. 1 at 400KV Makhu
PSTCL Inter regional DailyCompletion, Testing &
Commissioning of HVWSS System
03.11.16 9.00 04.11.16 17.30
3 POWERGRID 400400/220KV, 315 MVA
ICT No. 2 at 400KV Makhu
PSTCL Inter regional DailyCompletion, Testing &
Commissioning of HVWSS System
05.11.16 9.00 06.11.16 17.30
4 POWERGRID 400400/220KV, 80MVAR
Reactor at 400KV Makhu
PSTCL Inter regional Daily
Completion, Testing & Commissioning of
HVWSS System OCC deliberated not to
approve the outage on account of high voltage expected in the period
from 1.11.2016 onwards till end March
2017
07.11.16 9.00 08.11.16 17.30
5 POWERGRID 400400/220KV, 315 MVA
ICT No. 1 at 400KV Muktsar
PSTCL Inter regional DailyCompletion, Testing &
Commissioning of HVWSS System
10.11.16 9.00 11.11.16 17.30
6 POWERGRID 400400/220KV, 315 MVA
ICT No. 2 at 400KV Muktsar
PSTCL Inter regional DailyCompletion, Testing &
Commissioning of HVWSS System
12.11.16 9.00 13.11.16 17.30
PSTCL
APPROVED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure 3B (2)
ALL OUTAGES APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONS AND SPECIFIC REMARKS
7 POWERGRID 400400/220KV, 80MVAR
Reactor at 400KV Muktsar
PSTCL Inter regional Daily
Completion, Testing & Commissioning of
HVWSS System OCC deliberated not to
approve the outage aon account ogf high
voltage expected in the period from 1.11.2016 onwards till end March
2017
14.11.16 9.00 15.11.16 17.30
8 POWERGRID 400400/220KV, 315 MVA
ICT No. 1 at 400KV Nakodar
PSTCL Inter regional ContinousCompletion, Testing &
Commissioning of HVWSS System
17.11.16 9.00 18.11.16 17.30
9 POWERGRID 400400/220KV, 315 MVA
ICT No. 2 at 400KV Nakodar
PSTCL Inter regional ContinousCompletion, Testing &
Commissioning of HVWSS System
19.11.16 9.00 20.11.16 17.30
10 POWERGRID 400400/220KV, 80MVAR
Reactor at 400KV Nakodar
PSTCL Inter regional Daily
Completion, Testing & Commissioning of
HVWSS System OCC deliberated not to
approve the outage on account of high voltage expected in the period
from 1.11.2016 onwards till end March
2017
21.11.16 9.00 22.11.16 17.30
11 P&M Org 400400/220KV, 315 MVA
ICT No. 1 at 400KV Makhu
PSTCL Inter regional DailyPeriodical testing and routine mainteanance
23.11.16 9.00 23.11.16 17.00
12 P&M Org 400400/220KV, 315 MVA
ICT No. 2 at 400KV Makhu
PSTCL Inter regional DailyPeriodical testing and routine mainteanance
24.11.16 9.00 24.11.16 17.00
13 P&M Org 400400/220KV, 80MVAR
Reactor at 400KV Makhu
PSTCL Inter regional Daily
Completion, Testing & Commissioning of
HVWSS System OCC deliberated not to
approve the outage on account of high voltage expected in the period
from 1.11.2016 onwards till end March
2017
27.11.16 10.00 27.11.16 16.00
DELHI TRANSCO LIMITED (SLDC)S.N Shutdown
TypeWork to be Carrried Reason
Voltage Level
Name Date Time Date Time
1 400 kV 315MVA ICT-5 400kV Bus-2 of PPCL at Bawana
Daily Basis 02.11.2016 07:00 hrs 03.10.2016 17:30 hrs Annual Maintenance and tan delta testing as per OS mannual
Load will be run through -400kV Bus-1
2 400KV 400kV CB No 652 Tie CB's of ICT-3 at Bawana
Daily Basis 29.11.2016 09:30 hrs 29.11.2016 13:00 Hrs Annual Maintenance and tan delta testing as per OS mannual
315MVA ICT-3 will remain charge through main CB752
3 400KV 400kV CB No 952 Tie CB's of ICT-2 at Bawana
Daily Basis 30.11.2016 13:30 Hrs 30.11.2016 17:30 hrs Annual Maintenance and tan delta testing as per OS mannual
315MVA ICT-2 will remain charge through main CB1052
4 400 kV 400kV Bus-1 at Bawana
Daily Basis 21.11.2016 07:00 hrs 21.11.2016 17:30 hrs Annual Maintenance as per OS mannual
Load will be run through-400kV Bus-2
5 400KV 400kV Bus-2 at Bawana
Daily Basis 24.11.2016 07:00 hrs 24.11.2016 17:30 hrs Annual Maintenance as per OS mannual
Load will be run through-400kV Bus-1
6400kV 315MVA ICT-1 at
BamnauliDaily Basis 18.11.2016 09:30 hrs 18.11.2016 17:00 hrs General Maintenance and tan
delta testing load will be met by the other 03 ICT's.
NTPC STATION - DADRI & RIHANDS.N Shutdown
TypeWork to be Carrried Reason
Voltage Level
Name Date Time Date Time
1 220KV ICT # 3 Dadri Continuous 21.11.2016 07:00 hrs 26.11.2016 18:00 Hrs Annual Maintenance2 220KV ICT # 4 Dadri Continuous 28.11.2016 07:00 hrs 03.12.2016 18:00 Hrs Annual Maintenance3 400KV 400/132KV IBT-1 of
Rihand STPSDaily 14.11.2016 9.00hrs 17.11.2016 15:00Hrs Maintenance of IBT and Bay
Equipment
ALL OUTAGES APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONS
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER., 2016Annexure 3B (3)
Details of Transmission Element From To
Details of Transmission Element From To
S.N.MODE
DATE TIME DATE TIME
1 500MVA ICT-I NIMRANA Daily 07-11-16 09:00 07-11-16 18:00 AMP work/Bushing C&tan delta
2 315MVA ICT-I NIMRANA Daily 10-11-16 09:00 10-11-16 18:00 AMP work/Bushing C&tan delta
3 315MVA ICT-I MAHRANIBAG Daily 10-11-16 09:00 10-11-16 18:00 AMP work/Bushing C&tan delta
4 315MVA ICT-II MAHRANIBAG Daily 11-11-16 09:00 11-11-16 18:00 AMP work/Bushing C&tan delta
5 315MVA ICT-II at SONIPAT Daily 17-11-16 08:00 17-11-16 18:00 AMP work/Bushing C&tan delta
6 315MVA ICT-I at ROORKI Daily 07-11-16 09:00 07-11-16 17:00 AMP work/Bushing C&tan delta
7 315MVA ICT-II at ROORKI Daily 10-11-16 09:00 10-11-16 17:00 AMP work/Bushing C&tan delta
8 100MVA ICT-I at PITHORAGRH Daily 17-11-16 08:00 17-11-16 18:00 AMP work/Bushing C&tan delta
9 400kv BUS-I at BHIWANI Daily 15-11-16 08:00 16-11-16 18:00 Installation of Polymer insulator in ICT-2 400kv jack bus & Bus1.
10 400kv BUS-II at BHIWANI Daily 17-11-16 08:00 17-11-16 18:00 AMP work/Bushing C&tan delta
11 400kv BUS-I at BHIWADI Daily 10-11-16 08:00 10-11-16 18:00 AMP work/CVT C&tan delta
12 400kv BUS-II at BHIWADI Daily 11-11-16 08:00 11-11-16 18:00 AMP work/CVT C&tan delta
13 400kv BUS-I at BHIWADI-HVDC DAILY 12-11-16 08:00 12-11-16 18:00 AMP work/CVT C&tan delta
14 400kv BUS-II at BHIWADI-HVDC DAILY 13-11-16 08:00 13-11-16 18:00 AMP work/CVT C&tan delta
15 FSC of Koteshwar-I line at Meerut DAILY 01-11-16 08:00 08-11-16 18:00Erection works of Dead end Tower and Beam for new FSC.
16 125MVAR Bus Reactor at Jaipur(S) DAILY 01-11-16 08:00 15-11-16 18:00 Erection works related to 125MVAR new Bus Reactor.
17 400kv Bus Coupler Bay at GIS Gurgaon daily 11-11-16 08:00 11-11-16 18:00 AMP work/CVT C&tan delta
18 Agra Line Main Bay at Ballabhgrh daily 07-11-16 08:00 28-11-16 18:00 New Civil foundation & Replacement of M&G CB. Line to remain charged.
19 400kv GIS Bus Coupler at Koteshwar Cont 19-10-16 10:00 19-10-16 18:00 Replacement of Isolator contacts at Koteshwar-GIS. With Bus-I S/D
20 400kv GIS Bus Coupler at Koteshwar Cont 03-10-16 09:00 03-10-16 18:00 Replacement of Isolator contacts at Koteshwar-GIS. With Bus-II S/D
21 Bus-I A at Agra DAILY 26-11-2016 08:00 26-11-2016 18:00 Integration for 400kVPole-4 dia with 400kV Bus
22 Bus-II A at Agra DAILY 28-11-2016 08:00 28-11-2016 18:00 Integration for 400kVPole-4 dia with 400kV Bus
23 Bus-I B at Agra Cont 20-11-2016 08:00 20-11-2016 18:00 Integration of 400kV Sikar-1 Bays with 400kV Bus
24 Bus-II B at Agra Cont 21-11-2016 08:00 21-11-2016 18:00 Integration of 400kV Sikar-2 Bays with 400kV Bus
25 ICT-I at Pithoragarh Daily 17.11.16 09:00 17.11.16 17:00 For AMP work26 Main Bay of ICT-2 Mainpuri Daily 09.11.16 09:00 09.11.16 18:00 AMP work27 Main Bay of ICT-1 Mainpuri Daily 10.11.16 09:00 10.11.16 18:00 AMP work28 Tie Bay of ICT-2 and 400KV Parichha-
1 Line(405) Daily 14.11.16 09:00 14.11.16 18:00 AMP work
29 Tie Bay of ICT-1 and 400KV Fatehpur-1 Line(408) Daily 15.11.16 09:00 15.11.16 18:00 AMP work
30 Main Bay of 400KV Fatehpur-1 Line(409) Daily 18.11.16 09:00 18.11.16 18:00 AMP work
31 Main Bay of 400KV Ballabhgarh-1 Line(410) Daily 19.11.16 09:00 19.11.16 18:00 AMP work
32 Tie Bay of 400KV Ballabhgarh-1 Line-1 and 400KV Fatehpur-2 Line(411) Daily 23.11.16 09:00 23.11.16 18:00 AMP work
33 405-400kv Lucknow Line-2 & 400kv Side ICT-1 Tie bay Daily 07.11.16 09:00 07.11.16 18:00 For AMP work
34 411-ICT-2 400kv Side Tie Bay Daily 08.11.16 09:00 08.11.16 18:00 For AMP work35 Lucknow-II Main Bay Daily 22.10.2016 09:30 hrs 22.10.2016 17:30 hrs For AMP work36 Bareilly -II Main Bay Daily 23.10.2016 09:30 hrs 23.10.2016 17:30 hrs For AMP work37 Bareilly -I Tie Bay Daily 24.10.2016 09:30 hrs 24.10.2016 17:30 hrs For AMP work38 400 KV Meerut Line-2 Main Bay at Bareilly Daily 08-11-2016 10:00 08-11-2016 18:00 Annual maintenance work
OUTAGES APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONSOCC DELIBERATED THAT OUTAGES FOR REACTOR SHOULD NOT BE GENERALLY PROPOSED
IN THE PERIOD FROM NOVEMBER-MARCH ON ACCOUNT OF HIGH VOLTAGE
APPROVED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016Annexure 3B (4)
POWERGRID NR-1 & 3
ICT , B/R, SVC
PURPOSE REMARKSLINE/EQUIPT
DURATION FROM TO
Voltage level Name From To From To
1 2 3 4 6 7 8 9 10 11
1 400 KV400 KV BUS COUPLER ALONG WITH 400 KV MAIN BUS-B Sarojaninagar
A 02.11.16 30.11.16 09:00 16:00FOR REPLACEMENT OF 400 KV ABCB OF BUS COUPLER BAY BY SF6 CIRCUIT BREAKER
Continuous Basis
2 400 KV400 KV Unnao-Lucknow Line Main Breaker Unnao end (line remain charge through TBC).
A 21.11.16 27.11.16 09:00 18:00 Major Overhauling of Circuit Breaker of 400 KV Unnao-Lucknow Line
Continuous Basis
3 400 KV 315 MVA ICT-(I) Bareilly A 15.11.16 14.12.16 08:00 18:00 For complete overhaulling of transformer by changing gasket and centrifuging.
Continuous Basis
4 400 KV 400KV Bus -(I) Bareilly A 21.11.16 21.11.16 08:00 18:00 For changing the contacts of bus side pantograph isolator Transfer bus 29-A Y-phase
Daily Basis
5 400KV 400KV Bus coupler alongwith 400KV A bus at 400 kV Sultanpur A 01.11.16 13.11.16 08:00 18:00
For erection and commissioning of New Bus Bar Protection Panel in place of old Bus Bar Protection Panel.
continuous basis
6 400KV 240MVA ICT-I at Sultanpur A 02.11.16 03.11.16 08:00 18:00 For dismantling of 36 Mtr Span of 220KV Transfer Bus and 220KV B bus.
continuous basis
7 400KV 240MVA ICT-I at Sultanpur A 06.11.16 06.11.16 08:00 18:00 Erection of 27+36 Mtr Span of 220KV Transfer Bus Daily Basis
8 400KV 240MVA ICT-I at Sultanpur A 07.11.16 08.11.16 08:00 18:00
1. Dismantling of 36 Mtr. Span of 220KV A Bus 2. Complete Erection of 220KV side columns & beams. 3. Erection of 27+36 Mtr Span of 220KV B Bus
Continuous Basis
9 400KV 240MVA ICT-I at Sultanpur A 09.11.16 09.11.16 08:00 18:00 1. For Erection of 220KV A Bus 2. For dismantling of 54 Mtr. Span of 400KV Transfer Bus
Daily Basis
APPROVED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016
Uttar Pradesh Power Transmission Corporation Limited
Sl. No.
Detail of Transmission element Category to which
transmission
element belong
(A/B/C/D)
Period Time
Reason Remark
ANNEXURE 3B (5)
10 400KV 400KV Transfer Bus Sultanpur A 09.11.16 18.11.16 08:00 18:00
For dismantling of 54 Mtr. Span, beam structure etc. of 400KV Transfer Bus For 400KV 315MVA New Transformer Bay erection
continuous basis
11 400KV 400KV 80MVAR Bus Reactor Sultanpur A 09.11.16 18.11.16 08:00 18:00
For dismantling of 54 Mtr. Span, beam structure etc. of 400KV Transfer Bus For 400KV 315MVA New Transformer Bay erection
continuous basis
12 400KV 400KV B bus Sultanpur A 13.11.16 13.11.16 08:00 18:00 For B bus pantograph isolator maintenance of 400KV obra Bay Daily Basis
13 400KV 400/220KV 240MVA ICT-I at Sultanpur A 17.11.16 18.11.16 08:00 18:00 For stringing of R,Y,B Phase 54 Mtr. Span
of 400KV Transfer Bus Daily Basis
14 400KV 400KV CB-91 (ABCB) at 400KV S/s Azamgarh A 02.11.16 17.11.16 8.00 18.00 Replacement of CB with new SF6 CB
Continous Basis. All T/F and lines at 400KV S/s Azamgarh will remain in service.
15 400KV 240MVA 400/220KV ICT-I PANKI A 07.11.16 07.11.16 08:00 18:00 for routing testing & maintenance work. Daily basis.
16 400KV 240MVA 400/220KV ICT-IIPANKI A 17.11.16 17.11.16 08:00 18:00 for routing testing & maintenance work. Daily basis.
17 400KV 315MVA ICT T/F-III & its bay at 400KV S/S Greater Noida A 04.11.16 06.11.16 08:00 18:00 Centrifuging of oil & General Maintenance
of Bay Daily basis
18 400KV 240MVA T/F-II at 400KV Sub-station, Muradnagar-II A 18.11.16 18.11.16 08:00 17:00 For tightening if Bay & Testing work. Daily basis.
19 400KV 400KV AligarhMuradnagar Line A 18.11.16 18.11.16 08:00 17:00 Tightening of Bay/General Maintenance Daily basis.
20 400KV 315MVA ICT-I at 400KV Sub-station, Muradnagar A 24.11.16 24.11.16 08:00 17:00 Tightening of Bay/General Maintenance Daily basis.
21 400KV 315MVA ICT-II at 400KV Sub-station, Muradnagar A 26.11.16 26.11.16 08:00 17:00 Tightening of Bay/General Maintenance Daily basis.
22 400KV 315MVA ICT-III at 400KV Sub-station, Muradnagar A 28.11.16 28.11.16 08:00 17:00 Tightening of Bay/General Maintenance Daily basis.
OUTAGES ARE APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONSOCC DELIBERATED THAT OUTAGES FOR REACTOR SHOULD NOT BE PLANNED IN THE MONTH OF NOV-MARCH ON ACCOUNT OF HIGH VOLTAGE
DATE TIME DATE TIME
X-2
1 400 KV A 15.11.16 0900 16.11.16 1700 Daily For Busbar stability for Dehradun-1 & 2 Bays. As it cannot be clubbed with annual maintenance.
2 400 KV A 10.11.16 0900 11.11.16 1700 Daily Replacement of Droppers from Bus from twin to Quad for Dehradun Bay Dia.
3 400 KV A 09.11.16 09:00 10.11.16 18:00 Daily
4 400 KV A 11.11.16 09:00 12.11.16 18:00 Daily
5 400 KV A 14.11.16 09:00 15.11.16 18:00 Daily For equipment replacement (Isolator etc.) for commissioning of Bus-Reacor at BBMB, Dehar.
6 400 KV A 16.11.16 09:00 17.11.16 18:00 Daily For equipment replacement (Isolator etc.) for commissioning of Bus-Reacor at BBMB, Dehar.
7 400 KV A 02.11.16 09:00 03.11.16 18:00 Daily
8 400 KV A 04.11.16 09:00 05.11.16 18:00 Daily
X-31 400 KV A 07.11.16 09:00 08.11.16 17:00 Daily For AMP works.2 400 KV A 10.11.16 09:00 11.11.16 17:00 Daily For AMP works.
3 400 KV A 09.11.16 10:00 09.11.16 12:00 Daily Repetition of C&Tan Delta if IV, R-Phase bushing on variable frequency.
4 400 KV A 17.11.16 09:00 17.11.16 17:00 Daily For replacement of 220 KV Side CT & AMP works.
5 400 KV A 11.11.16 09:00 11.11.16 18:00 Daily For AMP works.6 400 KV A 08.11.16 10:00 08.11.16 17:00 Daily For AMP works.7 400 KV A 14.11.16 10:00 14.11.16 17:00 Daily For MCU Testing works.8 400 KV A 15.11.16 10:00 15.11.16 17:00 Daily For MCU Testing works.9 400 KV 315 MVA ICT-2 at Nalagarh. A 21.11.16 09:00 21.11.16 17:00 Daily For AMP works.
10 400 KV A 22.11.16 09:00 22.11.16 17:00 Daily For AMP works.11 400 KV A 23.11.16 09:00 23.11.16 17:00 Daily For AMP works.12 400 KV 500 MVA ICT-1 at Moga. A 07.11.16 09:00 07.11.16 17:00 Daily For AMP works.
400 KV Bus-1 at Hamirpur.400 KV Bus-2 at Hamirpur.
400 KV Bus-1 at Nalagarh.400 KV Bus-2 at Nalagarh.
400 KV Bus-1 at Abdullapur.
400 KV Bus-2 at BBMB Dehar
For Jumper connection and Bus Bar Stability for Kishenpur - 3 & 4 Lines under construction.
Annexure 3B (6)
315 MVA ICT 1 at Hamirpur.
400 KV Bus-1 at Kaithal.
400 KV Bus-2 at at Kaithal.
APPROVED OUTAGE OF TRANSMISSION ELEMENTS FOR THE MONTH OF NOVEMBER, 2016
S.No.Details of Transmission Element Category
of element
DURATION Daily/ Continuous ReasonVoltage
level NAME OF THE ELEMENT AND
SUBSTATIONFROM TO
For Bay extension work of Dadri Malerkotla Line at Kaithal.
400 KV Bus-2 at Abdullapur.
POWERGRID NORTHERN REGION-II
For construction activity
400 KV Bus-1 at Abdullapur.400 KV Bus-2 at Abdullapur.
315MVA ICT-1 at Abdullapur.
315 MVA ICT-2 at Kaithal.
315 MVA ICT-1 at Jalandhar.
For O&M activity
400 KV Bus-1 at New Wanpoh
400 KV Bus-2 at New Wanpoh
400 KV Bus-1 at BBMB Dehar
13 400 KV 250 MVA ICT-2 at Moga. A 08.11.16 09:00 08.11.16 17:00 Daily For AMP works.14 400 KV 500 MVA ICT-3 at Moga. A 09.11.16 09:00 09.11.16 17:00 Daily For AMP works.15 400 KV 315 MVA ICT-4 at Moga. A 10.11.16 09:00 10.11.16 17:00 Daily For AMP works.16 400 KV A 02.11.16 09:00 02.11.16 17:00 Daily For AMP works.17 400 KV A 03.11.16 10:00 03.11.16 17:00 Daily For AMP works.
18 400 KV A 07.11.16 7:00 11.11.16 9:00 Continuous For replacement of 220 KV Bushing -02 No.'s due to DGA Voilation. Rescheduled from 126 OCC.
19 400 KV A 15.11.16 10:00 15.11.16 17:00 Daily For AMP works.20 400 KV A 16.11.16 10:00 16.11.16 17:00 Daily For AMP works.
21 400 KV A 14.11.16 09:00 19.11.16 18:00 Continuous For replacing DGA Violating 400 KV R-Phase Bushing.
OCC DELIBERATED THAT OUTAGE FOR REACTOR SHOULD NOT BE PROPOSED IN THE MONTH OF NO-MARCH ON ACCOUNT OF HIGH VOLTAGE
315 MVA ICT-1 at Ludhiana
315 MVA ICT-2 at Panchkula.315 MVA ICT-1 at Panchkula.
400/220KV ICT-2 at Patiala.
400 KV Bus-1 at Wagoora.400 KV Bus-2 at Wagoora.
OUTAGES ARE APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONS
APPROVED OUTAGE OF TRANSMISSION ELEMENTS / LINES FOR THE
MONTH OF NOVEMBER, 2016
Annexure 3B (7) PDD J&K
Name of Division Name of G/Stn./ Trans.Lines Approved date and time of shutdown.
1.
TLMD-II, Jammu. 220/132/33 KV Grid Station Gladni. 05-11-2016 0800 Hrs. to 1400 Hrs.
2.
G.C.D, Jammu. 320MVA,220/132/66KV G/Stn.Hiranagar including 220KV Sarna-Hiiranagar & Hiranagar-Gladni Tr. Lines alongwith 132KV Hiranagar-Sewa-II D/C Tr. Line .
12-11-2016 0800 Hrs. to 1400 Hrs.
3.
TLCD-I, Jammu 220/132 KV G/Station Bishnah and 220KV Hiranagar-Bishnah Trans. Line.
12-11-2016 0800 Hrs. to 1400 Hrs.
4. TLCD-II, Jammu a-220/132/33KV G/S Barn b-220 KV D/C Barn-Kishenpur Trans. Line(BKTL)
19-11-2016 0800 Hrs. to 1400 Hrs.
5. TLMD-III, Udhampur a- 220/132/33KV G/S Ramban
b- 220KV D/C KPTL Kishenpur-Ramban- (Ckt.-I & II)
c- 220/132/33KV Grid Station
Udhampur.
d- 220KV S/C Sarna-Udhampur Trans. Line.
19-11-2016 0800 to 1400 Hrs. 19-11-2016 0800Hrs. to 1400 Hrs. 26-11-2016 0800 Hrs. to 1400 Hrs. 26-11-2016 0800 Hrs. to 1400Hrs.
The shutdown shall be subject to fair weather conditions. THE ABOVE OUTAGES ARE APPROVED TENTATIVELY SUBJECT TO GRID CONDITIONS
Details of
Transmission
l tVoltage
level From To From (Hrs.) To (Hrs.)
1 400 KV 400 kV Dhanonda 400kV BUS -I A 01.11.16 01.11.16 Daily basis 09:00 17:00 To attend hot line observations
2 400 KV 400 kV Bhiwani 400 kV Bhiwani - Rajpura S/Ckt A 02.11.16 02.11.16 Daily basis 08:00 18:00 For Crossing of 400 kV Jind - kirori line
3 400 KV 400 kV Dhanonda 400kV BUS-II A 02.11.16 02.11.16 Daily basis 10:00 17:00 To attend hot line observations
4 400 KV 400 kV Dhanonda 315MVA, 400/220KV ICT T-3 A 03.11.16 03.11.16 Daily basis 09:00 13:00 To attend hot line observations
5 400 KV 400 kV Dhanonda 315MVA, 400/220KV ICT T-4 A 04.11.16 04.11.16 Daily basis 14:00 16;00 To attend hot line observations
6 400 KV 400 kV D/Bad 315 MVA, ICT-2 A 09.11.16 09.11.16 Daily basis 09:00 16:00 Gen mtc
7 400 KV 400 Kv Nawada400 KV Nawada-Samaypur (Loop Out) Ckt ,400 KV BUS-I, 400KV Bus-II, TIE-
II and ICT-IIA 09.11.2016 09.11.2016 Daily
basis 08:00 15;00To replace the unhealthy and critical 400KV Isolators Blades of Bus-II and TIE-II, ICT-II
with new spares.
8 400 KV 400 kV Dipalpur SS 400 kV Bus 1 A 14.11.16 14.11.16 Daily
basis 10:00 17:00 For annual maintenance and testing
9 400 KV 400 kV D/Bad 400 KV Bus-Bar I A 15.11.16 15.11.16 Daily basis 00:00 00:00 Gen mtc. And attending hot points bus bar
isolator mtc.
10 400 KV 400 Kv Nawada 315MVA 400/220/33KV ICT-I, TIE-I and BUS-II A 15.11.16 15.11.16 Daily
basis 09:00 15;00 To replace the unhealthy and critical 400KV Isolators Blades of ICT-I and TIE-I
11 400 KV 400 kV Dipalpur SS 400 kV Bus 2 A 15.11.16 15.11.16 Daily
basis 10:00 17:00 For annual maintenance and testing
12 400 KV 400 kV Kabulpur SS 400 kV Bus 1 A 16.11.16 16.11.16 Daily
basis 10:00 17:00 For annual maintenance and testing
13 400 KV 400 kV Kabulpur SS 400 kV Bus 2 A 17.11.16 17.11.16 Daily
basis 10:00 17:00 For annual maintenance and testing
14 400 KV 400 Kv Nawada 250 MVA 400/220/33KV ICT-II,TIE-II, Bus-II A 17.11.16 17.11.16 Daily
basis 09;00 15:00 For maintenance of 400KV CB and 400KV CT’s of ICT and BUS-II CT’s
15 400 KV 400 kV D/Bad 400 KV Bus-Bar II A 21.11.16 21.11.16 Daily basis 00:00 00:00 Gen mtc. And attending hot points bus bar
isolator mtc.
Approved outages of transmission elements for the month of November - 2016 HVPNL ANNEXURE3B(8)
Sr. No. Name of S/Stn Name of transmission
elements
Category to which
transmission
element belong
(A/B/C/D)
DateDaily basis
Timings
Purpose/ Reasons
16 400 KV 400 kV Kirori 400 kV TIE - 1 bay with 400 kv Khedar - Kirori Ckt - II A 24.11.16 24.11.16 Daily
basis 08:00 19:00 Mtc of Isolators
17 400 KV 400 kV Kirori 400 kV TIE - 2 bay with 400 kv Khedar - Kirori Ckt - I A 24.11.16 24.11.16 Daily
basis 08:00 19:00 Mtc of Isolators
18 400 KV 400 kV Kirori 400 kV TIE - 3 bay A 29.11.16 29.11.16 Daily basis 10:00 18:00 Mtc of Isolators
OCC DELIBERATED THAT OUTAGE OF REACTOR SHOULD NOT BE GENERALLY PLANNED IN PERIOD OF NOV-MARCH ON ACCOUNT OF HIGH VOLTAGE