15
PERMIT APPLICATIONS RECEIVED Construction Operating Permits Permits Total January 27 25 52 February 39 14 53 March 54 15 69 April 50 6 56 May 43 9 52 June 48 8 56 July 42 6 48 August 67 17 84 September 45 9 54 Total 415 109 524 101 ... m MISSOURI ll m DEPARTMENT OF NATURAL RESOURCES Air Pollution Control Program
Transcript
Page 1: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

PERMIT APPLICATIONS

RECEIVED

Construction Operating Permits Permits Total

January 27 25 52

February 39 14 53

March 54 15 69

April 50 6 56

May 43 9 52

June 48 8 56

July 42 6 48

August 67 17 84

September 45 9 54

Total 415 109 524

101

... m MISSOURI llm DEPARTMENT OF NATURAL RESOURCES

Air Pollution Control Program

Page 2: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

Air Pollution Control Program

Department of Natural Resources

Division of Environmental Quality

Permits Management System

County: Barton

Company: Midwest Minerals Quarry

City: Jasper

Received: 9/17/2019

Description: Equipment replacement

Location: 350 SE 100TH RD

Status: AP: Receive, Log, Assign

Permit Type: AP: IR Applicability Determination Request

Project#: AP201909030

County: Boone

Company: City of Columbia Energy Center

City: Columbia

Received: 9/25/2019

Description: Peaking Turbines

Location: 4902 Peabody Rd

Status: AP: Awaiting Completeness Check

Permit Type: AOP: Part 70 Operating Permit Renewal

Project#: AP201909044

County: Boone

Company: Hubbell Power Systems - East Street

City: Centralia

Received: 9/20/2019

Description: Move equipment

Location: 1100 E Switzler

Status: AP: Applicant responding to technical request

Permit Type: AP: Applicability Determination Request

Project#: AP201909041

County: Boone

Company: Hubbell Power Systems-Allen St Complex

City: Centralia

Received: 9/20/2019

Description: Move equipment

Location: 210 N ALLEN ST

Status: AP: Technical Review

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Project#: AP201909040

County: Boone

Company: Hubbell Power Systems-Plastics Plant

City: Centralia

Received: 9/11/2019

Description: Update for NSR

Location: 1190 E Switzler

Status: AP: Receipt and Log In

Permit Type: AOP: Intermediate Operating Permit Amendm

Project#: AP201909022

County: Buchanan

Company: Johnson Controls Battery Group

City: St. Joseph

Received: 9/9/2019

Description:

Location: 4722 Pear Street

Status: AP: Temporary Permit Issued

Permit Type: AP: Temporary or Pilot Plant Permit

Project#: AP201909013

County: Buchanan

Company: Lifeline Foods

City: St. Joseph

Received: 9/10/2019

Description: Update to reflect actual processes

Location: 2811 S 11th St

Status: AP: Awaiting Completeness Check

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Project#: AP201909019

County: Buchanan

Company: Lifeline Foods

City: St. Joseph

Received: 9/10/2019

Description: Confidentiality for 2019-09-019

Location: 2811 S 11th St

Status: AP: Technical Review

Permit Type: AP: Confidentiality Request

Project#: AP201909020

County: Buchanan

Company: Seaboard Energy LLC

City: St. Joseph

Received: 9/30/2019

Description: Anaerobic Digestor

Location: 5701 Stockards Expwy

Status: AP: Receipt and Log In

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Project#: AP201909052

County: Butler

Company: The Gates Rubber Company

City: Poplar Bluff

Received: 9/30/2019

Description: Radiator Hoses

Location: 1650 ROWE PKWY

Status: AP: Awaiting Completeness Check

Permit Type: AOP: Intermediate Operating Permit Renewal

Project#: AP201909054

10/7/2019 Page 1 of 5DEQ/APCP - PAMS

102

Page 3: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: Camden

Company: Magruder Limestone-Shawnee Bend

City: Sunrise Beach

Received: 9/18/2019

Description: Rock Crushing

Location: Hwy 5 & Eddie Ave

Status: AP: Unit Chief Review

Permit Type: AP: Sec 4: Relocate to New Site

Project#: AP201909035

County: Carter

Company: Royal Oak Enterprises

City: Ellsinore

Received: 9/5/2019

Description: Preheater change

Location: CR 60-330

Status: AP: Awaiting Fees

Permit Type: AP: Corrections & Amendments

Project#: AP201909009

County: Cass

Company: QuickTrip Kitch & Dist. Ctr

City: Belton

Received: 9/5/2019

Description: Bakery

Location: 822 Quicktrip Way

Status: AP: Receive, Log, Assign

Permit Type: AP: Applicability Determination Request

Project#: AP201909010

County: Clay

Company: Capital Sand Co - Missouri City

City: Missouri City

Received: 9/26/2019

Description: Sand and Gravel

Location: 22225 210 Hwy

Status: AP: Unit Chief Review

Permit Type: AP: Applicability Determination Request

Project#: AP201909047

County: Clay

Company: Ideker Inc - Mosby North

City: Mosby

Received: 9/20/2019

Description: Rock Crushing

Location: US 69 & Cameron Rd

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Project#: AP201909036

County: Clay

Company: Ideker Inc - Mosby North

City: Mosby

Received: 9/20/2019

Description: Replace crusher

Location: US 69 & Cameron Rd

Status: AP: Unit Chief Review

Permit Type: AP: IR Applicability Determination Request

Project#: AP201909037

County: Clay

Company: Martin Marietta Materials - Randolph

City: Randolph

Received: 9/4/2019

Description: Conveyor

Location: 410 Randolph

Status: AP: No Permit Required

Permit Type: AP: IR Applicability Determination Request

Project#: AP201909004

County: Clay

Company: St Luke's Northland Hospital - Smithvill

City: Smithville

Received: 9/17/2019

Description: Boilers

Location: 601 S 169 HWY

Status: AP: Receipt and Log In

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Project#: AP201909031

County: Clinton

Company: Norris Quarries - Everett Quarry #1

City: Lathrop

Received: 9/18/2019

Description: Rock Crushing

Location: 510 SE 248th St

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Project#: AP201909032

County: Dunklin

Company: Farmers Union Gin Company

City: Senath

Received: 9/3/2019

Description: Change Operational Limitation to Emission Li

Location: 203 Highway C West

Status: AP: Receipt and Log In

Permit Type: AP: Corrections & Amendments

Project#: AP201909002

County: Dunklin

Company: Stokes - Mayberry Gin Company

City: Malden

Received: 9/10/2019

Description: Emission factors and BMPs

Location: 400 W Laclede

Status: AP: Receipt and Log In

Permit Type: AP: Corrections & Amendments

Project#: AP201909018

10/7/2019 Page 2 of 5DEQ/APCP - PAMS

103

Page 4: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: Dunklin

Company: Stokes - Mayberry Gin Company

City: Malden

Received: 9/23/2019

Description: Increase ginning capacity

Location: 400 W Laclede

Status: AP: Receipt and Log In

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Project#: AP201909038

County: Gentry

Company: Norris Quarries - Stanberry

City: Stanberry

Received: 9/12/2019

Description: Rock Crushing

Location: 4656 397th St

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Project#: AP201909025

County: Gentry

Company: Roeslein Alternative Energy - Ruckmann

City: Albany

Received: 9/4/2019

Description: Remove Part 70 Requirement

Location: Hwy N & 250th St

Status: AP: Awaiting Completeness Check

Permit Type: AP: Corrections & Amendments

Project#: AP201909006

County: Jackson

Company: Aspen Pet Cremations

City: Grain Valley

Received: 9/27/2019

Description: Incinerator

Location: 1251 NW Pamela Blvd

Status: AP: Permit Issued

Permit Type: AP: Permit-by-Rule

Project#: AP201909048

County: Jackson

Company: Sequest

City: Kansas City

Received: 9/26/2019

Description: Mobile Carbonator

Location: 1221 W 103rd St

Status: AP: Receive, Log, Assign

Permit Type: AP: Applicability Determination Request

Project#: AP201909046

County: Jackson

Company: Thomas Crushing - Quarry Park

City: Lee's Summit

Received: 9/6/2019

Description: Rock Crushing

Location: 2001 NW Quarry Park Rd

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Project#: AP201909012

County: Jackson

Company: Verizon Wireless

City: Kansas City

Received: 9/24/2019

Description: Cel Equipment

Location: 5171 NE Chouteau Tfwy

Status: AP: Technical Review

Permit Type: AP: Applicability Determination Request

Project#: AP201909043

County: Lincoln

Company: Magruder Limestone Inc

City: Silex

Received: 9/18/2019

Description: Make Port-0726 Stationary

Location: 330 County Hwy E

Status: AP: Awaiting Completeness Check

Permit Type: AP: IR Sec 5 & 6: Deminimis and Minor

Project#: AP201909039

County: Macon

Company: POET Biorefining-Macon, LLC

City: Macon

Received: 9/17/2019

Description: DDGS Pelleting System

Location: 30211 MAJOR AVE

Status: AP: Applicant responding to technical request

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Project#: AP201909028

County: Marion

Company: BASF Corporation - Hannibal Plant

City: Palmyra

Received: 9/10/2019

Description: Confidentiality for 2019-09-016

Location: 3150 HIGHWAY JJ

Status: AP: Unit Chief Review

Permit Type: AP: Confidentiality Request

Project#: AP201909017

County: Marion

Company: BASF Corporation - Hannibal Plant

City: Palmyra

Received: 9/10/2019

Description: New formulation

Location: 3150 HIGHWAY JJ

Status: AP: Unit Chief Review

Permit Type: AP: Applicability Determination Request

Project#: AP201909016

10/7/2019 Page 3 of 5DEQ/APCP - PAMS

104

Page 5: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: Marion

Company: C.B. Asphalt - Hwy 36

City: Monroe City

Received: 9/11/2019

Description: Asphalt

Location: US 36 & Hwy U

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Project#: AP201909023

County: Mercer

Company: Norris Asphalt Paving

City: Princeton

Received: 9/12/2019

Description: Rock Crushing

Location: Harmonica Rd

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Project#: AP201909024

County: Nodaway

Company: Kawasaki Motors Manufacturing Corp

City: Maryville

Received: 9/19/2019

Description: Crankcase Line

Location: 28147 BUSINESS HIGHWAY 71

Status: AP: Awaiting Completeness Check

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Project#: AP201909033

County: Osage

Company: Capital Materials - Loose Creek

City: Loose Creek

Received: 9/20/2019

Description: Asphalt

Location: US Hwy 50 E

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Project#: AP201909034

County: Pemiscot

Company: Cooter Cotton Gin

City: Holland

Received: 9/4/2019

Description: Cotton Gin

Location: US Hwy 61 S

Status: AP: Awaiting Completeness Check

Permit Type: AOP: Intermediate Operating Permit Renewal

Project#: AP201909007

County: Pemiscot

Company: Peach Orchard Gin Company

City: Gideon

Received: 9/3/2019

Description: Compliance Emission Factors and Addition of

Location: RR2 Box 169

Status: AP: Receipt and Log In

Permit Type: AP: Corrections & Amendments

Project#: AP201909003

County: Pemiscot

Company: Peach Orchard Gin Company

City: Gideon

Received: 9/6/2019

Description: Compliance emission factors and addition of B

Location: RR2 Box 169

Status: AP: Receipt and Log In

Permit Type: AOP: Intermediate Operating Permit Amendm

Project#: AP201909011

County: Pettis

Company: Rea Funeral Chapel & Cremation Services

City: Sedalia

Received: 9/25/2019

Description: Human Cremation

Location: 3510 W 16th St

Status: AP: Permit Issued

Permit Type: AP: Permit-by-Rule

Project#: AP201909045

County: Schuyler

Company: SEMO Operating Company

City: Lancaster

Received: 9/27/2019

Description: Concrete

Location: Hwy V & Tippecanoe

Status: AP: Executive Review

Permit Type: AP: Sec 4: Relocate to New Site

Project#: AP201909053

County: Scott

Company: Delta Asphalt - Miner

City: Miner

Received: 9/3/2019

Description: Asphalt

Location: Woods Rd & Hwy AA

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Project#: AP201909001

County: Scott

Company: MTL Missouri, Inc

City: Scott City

Received: 9/10/2019

Description: Clay Transloading

Location: 10200 Hwy N

Status: AP: Unit Chief Review

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Project#: AP201909021

10/7/2019 Page 4 of 5DEQ/APCP - PAMS

105

Page 6: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: St. Charles

Company: Broder Funeral Services

City: St. Charles

Received: 9/24/2019

Description: Human Crematory

Location: 3421 Ehlmann Rd

Status: AP: Permit Issued

Permit Type: AP: Permit-by-Rule

Project#: AP201909042

County: St. Francois

Company: Iron Mountain Trap Rock

City: Iron Mountain

Received: 9/30/2019

Description: Emergency Crusher

Location: 1325 Highway N

Status: AP: Unit Chief Review

Permit Type: AP: IR Applicability Determination Request

Project#: AP201909050

County: St. Louis

Company: FOL Tape, LLC

City: Fenton

Received: 9/26/2019

Description: Flexible Traffic Tape

Location: 2025 Hitzert Ct

Status: AP: Receipt and Log In

Permit Type: AOP: Intermediate Operating Permit

Project#: AP201909049

County: St. Louis City

Company: Elementis Specialties, Inc

City: St. Louis

Received: 9/30/2019

Description: Dust collection

Location: 5548 MANCHESTER AVE

Status: AP: Unit Chief Review

Permit Type: AP: Applicability Determination Request

Project#: AP201909051

County: St. Louis City

Company: Huvepharma Inc.

City: St. Louis

Received: 9/4/2019

Description: Current Operations applicability

Location: 4545 Oleatha

Status: AP: Technical Review

Permit Type: AP: Applicability Determination Request

Project#: AP201909008

County: St. Louis City

Company: P Q Corporation

City: St. Louis

Received: 9/3/2019

Description: Responsible Official

Location: 4238 GERALDINE AVE

Status: AP: Receipt and Log In

Permit Type: AOP: Part 70 Operating Permit Admin. Amend

Project#: AP201909005

County: St. Louis City

Company: St Louis Zoo

City: St. Louis

Received: 9/13/2019

Description: Generators

Location: Concourse Drive

Status: AP: Technical Review

Permit Type: AP: Applicability Determination Request

Project#: AP201909027

County: St. Louis City

Company: U.S. Ringbinder

City: St. Louis

Received: 9/9/2019

Description: Notebooks

Location: 6800 Arsenal

Status: AP: Awaiting Technical Review

Permit Type: AOP: Intermediate Operating Permit Renewal

Project#: AP201909015

County: Taney

Company: APAC - Roark Creek Quarry

City: Branson West

Received: 9/6/2019

Description: Asphalt

Location: 1312 Shepherd of the Hill

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Project#: AP201909014

County: Texas

Company: Pace Construction - Indian Creek

City: Houston

Received: 9/17/2019

Description: Asphalt

Location: Hwy 17

Status: AP: Unit Chief Review

Permit Type: AP: Sec 4: Relocate to New Site

Project#: AP201909029

County: Wright

Company: Black Oak Power Producers

City: Hartville

Received: 9/13/2019

Description: Responsible official change

Location: 5054 Hwy HH

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Admin. Amend

Project#: AP201909026

10/7/2019 Page 5 of 5DEQ/APCP - PAMS

106

Page 7: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

PERMIT PROJECTS

COMPLETED

Construction Operating Permits Permits Total

January 25 6 31

February 22 14 36

March 42 7 49

April 59 36 95

May 32 25 57

June 43 5 48

July 40 4 44

August 44 19 63

September 42 13 55

Total 349 129 478

107

Clil MISSOURI llm DEPARTMENT OF NATURAL RESOURCES

Air Pollution Control Program

Page 8: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

Department of Natural Resources

Division of Environmental Quality

Permits Management System

Air Pollution Control Program

County: Atchison

Company: Site Ready mix - Westboro

City: Westboro

Received

8/22/2019

Completed

9/13/2019

Permit #

082019-004A

Description: Concrete

Location: 30158 Hwy C

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

22

Project#: AP201908064

County: Barton

Company: Capital Materials - Nashville

City: Liberal

Received

8/30/2019

Completed

9/10/2019

Permit #

012016-003F

Description: Concrete

Location: Hwy 126

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

11

Project#: AP201908081

County: Barton

Company: Redneck Outdoor Products

City: Lamar

Received

6/17/2019

Completed

9/24/2019

Permit #

092019-010

Description: Gel Coat Booth

Location: 153 SE 1st Lane

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

99

Project#: AP201906038

County: Bates

Company: Scoular Company

City: Adrian

Received

4/19/2019

Completed

9/12/2019

Permit #

092019-002

Description: Remove the mineral oil application requireme

Location: NW 1001 Rd

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

146

Project#: AP201905007

County: Benton

Company: Capital Materials - Warsaw

City: Warsaw

Received

8/21/2019

Completed

9/4/2019

Permit #

072019-007A

Description: Recycled Asphalt

Location: SW County Rd 301

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

14

Project#: AP201908046

County: Boone

Company: University of Missouri Power Plant

City: Columbia

Received

6/17/2019

Completed

9/9/2019

Permit #

112016-004A

Description: Boiler Reclassification

Location: 417 S 5th St

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

84

Project#: AP201906037

County: Buchanan

Company: Altec Industries, Inc.

City: St. Joseph

Received

4/10/2019

Completed

9/6/2019

Permit #

092019-001

Description: Paint booth and ovens

Location: 2106 S RIVERSIDE RD

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

149

Project#: AP201904023

County: Buchanan

Company: Johnson Controls Battery Group

City: St. Joseph

Received

9/9/2019

Completed

9/13/2019

Permit #

Description:

Location: 4722 Pear Street

Status: AP: Temporary Permit Issued

Permit Type: AP: Temporary or Pilot Plant Permit

Days Used

4

Project#: AP201909013

County: Caldwell

Company: The Meadows -Pet Crematory

City: Hamilton

Received

5/2/2019

Completed

9/30/2019

Permit #

092019-016

Description: Animal Crematory

Location: 5285 NE Sandstone Dr

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

151

Project#: AP201905005

10/7/2019 Page 1 of 6DEQ/APCP - PAMS

108

Page 9: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: Callaway

Company: Harbison-Walker Refractories - Fulton Pl

City: Fulton

Received

8/26/2019

Completed

9/17/2019

Permit #

Description: Inlet and Exhaust additions

Location: 1301 WESTMINSTER AVE

Status: AP: No Permit Required

Permit Type: AP: Applicability Determination Request

Days Used

22

Project#: AP201908071

County: Cape Girardeau

Company: Southeast Missouri State University

City: Cape Girardeau

Received

5/30/2019

Completed

9/12/2019

Permit #

Description: Boilers

Location: 900 Normal

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Sign. Modific

Days Used

105

Project#: AP201905045

County: Cass

Company: Capital Materials - Beyer

City: Cleveland

Received

8/13/2019

Completed

9/5/2019

Permit #

042005-020

Description: Asphalt

Location: 4600 E Hwy Y

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

23

Project#: AP201908014

County: Clay

Company: Ideker Inc - Mosby North

City: Mosby

Received

9/20/2019

Completed

9/20/2019

Permit #

062011-006A

Description: Rock Crushing

Location: US 69 & Cameron Rd

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Days Used

0

Project#: AP201909036

County: Clay

Company: Martin Marietta Materials - Randolph

City: Randolph

Received

9/4/2019

Completed

9/17/2019

Permit #

Description: Conveyor

Location: 410 Randolph

Status: AP: No Permit Required

Permit Type: AP: IR Applicability Determination Request

Days Used

13

Project#: AP201909004

County: Clinton

Company: Norris Quarries - Everett Quarry #1

City: Lathrop

Received

9/18/2019

Completed

9/19/2019

Permit #

052014-006

Description: Rock Crushing

Location: 510 SE 248th St

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Days Used

1

Project#: AP201909032

County: Dade

Company: Limestone Creek Quarry - Lockwood

City: Lockwood

Received

6/7/2019

Completed

9/17/2019

Permit #

092019-007

Description: Rock Crushing

Location: Hwy Z & CR 95

Status: AP: Section 5 Permit Issued

Permit Type: AP: IR Sec 5 & 6: Deminimis and Minor

Days Used

102

Project#: AP201906012

County: Gentry

Company: Norris Quarries - Stanberry

City: Stanberry

Received

9/12/2019

Completed

9/13/2019

Permit #

012007-004

Description: Rock Crushing

Location: 4656 397th St

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Days Used

1

Project#: AP201909025

County: Greene

Company: City Utilities of Springfield (James Riv

City: Springfield

Received

2/22/2019

Completed

9/26/2019

Permit #

OP2016-003A

Description: Update coal requirements

Location: 5701 South Kissick

Status: AP: Closed out, per policy

Permit Type: AOP: Part 70 Operating Permit Sign. Modific

Days Used

216

Project#: AP201902042

County: Harrison

Company: Swan Land Improvement of Missouri

City: Ridgeway

Received

5/3/2019

Completed

9/6/2019

Permit #

072018-007A

Description: Generator Changes

Location: 28542 E 230th Place

Status: AP: Amendment Approved

Permit Type: AP: IR Corrections & Amendments

Days Used

126

Project#: AP201905008

10/7/2019 Page 2 of 6DEQ/APCP - PAMS

109

Page 10: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: Henry

Company: Kansas City Power & Light Co.(Montrose)

City: Clinton

Received

1/28/2019

Completed

9/27/2019

Permit #

Description: Equipment removal and termination

Location: 400 SW Hwy P

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Admin. Amen

Days Used

242

Project#: AP201901032

County: Howell

Company: MFA Inc.

City: West Plains

Received

3/4/2019

Completed

9/16/2019

Permit #

092019-004

Description: Fertilizer mixer

Location: 1205 BRATTON AVENUE

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

196

Project#: AP201903004

County: Jackson

Company: Cargill, Inc.

City: Kansas City

Received

10/2/2018

Completed

9/4/2019

Permit #

1140C

Description: Update emission limits

Location: 2306 ROCHESTER ST

Status: AP: Amendment Approved

Permit Type: AP: Corrections & Amendments

Days Used

337

Project#: AP201810008

County: Jackson

Company: Thomas Crushing - Quarry Park

City: Lee's Summit

Received

9/6/2019

Completed

9/27/2019

Permit #

032017-007C

Description: Rock Crushing

Location: 2001 NW Quarry Park Rd

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

21

Project#: AP201909012

County: Jackson

Company: Unilever Bestfoods North America

City: Independence

Received

7/29/2019

Completed

9/23/2019

Permit #

122015-009A

Description: Updating recordkeeping

Location: 13000 E 35TH ST S

Status: AP: Amendment Approved

Permit Type: AP: IR Corrections & Amendments

Days Used

56

Project#: AP201907040

County: Jasper

Company: Empire District Electric Co (Asbury)

City: Asbury

Received

5/9/2019

Completed

9/4/2019

Permit #

OP2018-001A

Description: Responsible Official

Location: Redbud Rd

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Admin. Amen

Days Used

118

Project#: AP201905053

County: Jasper

Company: Owens Corning

City: Joplin

Received

3/29/2019

Completed

9/18/2019

Permit #

Description: Burner changes

Location: 1983 Stateline Rd

Status: AP: Section 5 Permit Issued

Permit Type: AP: IR Corrections & Amendments

Days Used

173

Project#: AP201903062

County: Jasper

Company: Owens Corning

City: Joplin

Received

5/8/2019

Completed

9/18/2019

Permit #

Description: Confidentiality for 2019-03-062

Location: 1983 Stateline Rd

Status: AP: Amendment Approved

Permit Type: AP: Confidentiality Request

Days Used

133

Project#: AP201905012

County: Jasper

Company: Tamko Building Products, Inc.

City: Joplin

Received

5/2/2019

Completed

9/6/2019

Permit #

OP

Description: HAP emissions

Location: 3000 Newman Rd

Status: AP: Permit Required

Permit Type: AOP: Applicability Determination Requests

Days Used

127

Project#: AP201905001

County: Jasper

Company: Tamko Building Products, Inc.

City: Joplin

Received

6/5/2019

Completed

9/6/2019

Permit #

OP

Description: Facility Name change

Location: 3000 Newman Rd

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Admin. Amen

Days Used

93

Project#: AP201906014

10/7/2019 Page 3 of 6DEQ/APCP - PAMS

110

Page 11: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: Johnson

Company: Enersys Energy Products Inc

City: Warrensburg

Received

10/11/2018

Completed

9/4/2019

Permit #

OP2017-057A

Description: Move Emission Point

Location: 617 N RIDGEVIEW DR

Status: AP: Amendment Approved

Permit Type: AOP: Intermediate Operating Permit Amendm

Days Used

328

Project#: AP201810020

County: Johnson

Company: Enersys Energy Products Inc

City: Warrensburg

Received

4/26/2019

Completed

9/24/2019

Permit #

092019-011

Description: Raw Material Changes

Location: 617 N RIDGEVIEW DR

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

151

Project#: AP201904055

County: Laclede

Company: Brunswick Freshwater Group

City: Lebanon

Received

8/20/2019

Completed

9/4/2019

Permit #

OP2018-026A

Description: Responsible official change

Location: 2900 Industrial Drive

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Admin. Amen

Days Used

15

Project#: AP201908048

County: Lincoln

Company: Toyota Motor Corp - Bodine Aluminum

City: Troy

Received

6/13/2019

Completed

9/24/2019

Permit #

092019-009

Description: Generators

Location: 100 Cherry Blossom Way

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

103

Project#: AP201906028

County: Marion

Company: C.B. Asphalt - Hwy 36

City: Monroe City

Received

9/11/2019

Completed

9/11/2019

Permit #

062001-002I

Description: Asphalt

Location: US 36 & Hwy U

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Days Used

0

Project#: AP201909023

County: Mercer

Company: Norris Asphalt Paving

City: Princeton

Received

9/12/2019

Completed

9/13/2019

Permit #

012007-003E

Description: Rock Crushing

Location: Harmonica Rd

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Days Used

1

Project#: AP201909024

County: Morgan

Company: Capital Materials - Prestage

City: Laurie

Received

8/8/2019

Completed

9/4/2019

Permit #

102000-030M

Description: Rock Crushing

Location: Hwy O

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

27

Project#: AP201908010

County: New Madrid

Company: National Steel

City: New Madrid

Received

4/1/2019

Completed

9/26/2019

Permit #

092019-013

Description: Confidentiality for 2019-04-030

Location: 545 W HWY U

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

178

Project#: AP201904031

County: New Madrid

Company: National Steel

City: New Madrid

Received

4/1/2019

Completed

9/26/2019

Permit #

092019-013

Description: Steel Mill

Location: 545 W HWY U

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

178

Project#: AP201904030

County: New Madrid

Company: Pioneer Hi-Bred Intl. Inc.

City: New Madrid

Received

6/25/2019

Completed

9/23/2019

Permit #

092019-008

Description: Sorters

Location: 11426 US Hwy 61 N

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

90

Project#: AP201906055

10/7/2019 Page 4 of 6DEQ/APCP - PAMS

111

Page 12: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: Newton

Company: FAG Bearings

City: Joplin

Received

5/3/2019

Completed

9/5/2019

Permit #

OP2016-028A

Description: Responsible official

Location: 3900 S RANGE LINE RD

Status: AP: Amendment Approved

Permit Type: AOP: Intermediate Operating Permit Amendm

Days Used

125

Project#: AP201905054

County: Osage

Company: Capital Materials - Loose Creek

City: Loose Creek

Received

9/20/2019

Completed

9/20/2019

Permit #

042007-011

Description: Asphalt

Location: US Hwy 50 E

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate Approved Site

Days Used

0

Project#: AP201909034

County: Perry

Company: TG Missouri Corporation

City: Perryville

Received

10/1/2012

Completed

9/10/2019

Permit #

OP2019-030

Description: Auto Parts

Location: 2200 Plattin Rd

Status: AP: Operating Permit Issued

Permit Type: AOP: Part 70 Operating Permit Renewal

Days Used

2535

Project#: AP201210002

County: Pettis

Company: Rea Funeral Chapel & Cremation Services

City: Sedalia

Received

9/25/2019

Completed

9/30/2019

Permit #

092019-015

Description: Human Cremation

Location: 3510 W 16th St

Status: AP: Permit Issued

Permit Type: AP: Permit-by-Rule

Days Used

5

Project#: AP201909045

County: Platte

Company: J.A. Lillig Excavating Inc

City: Kansas City

Received

6/11/2019

Completed

9/17/2019

Permit #

092019-006

Description: Temporary Crushing

Location: 1179 Mexico City Ave

Status: AP: Section 5 Permit Issued

Permit Type: AP: Temporary or Pilot Plant Permit

Days Used

98

Project#: AP201906022

County: Platte

Company: Renascent Inc - KCI Airport

City: Kansas City

Received

8/29/2019

Completed

9/5/2019

Permit #

Description: Add crusher

Location: 2 Amsterdam Cr

Status: AP: No Permit Required

Permit Type: AP: IR Applicability Determination Request

Days Used

7

Project#: AP201908079

County: Saline

Company: Monsanto Company

City: Marshall

Received

12/26/2018

Completed

9/17/2019

Permit #

092019-005

Description: Modular Facility update

Location: 830 N Miami

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

265

Project#: AP201812030

County: Scott

Company: Delta Asphalt - Miner

City: Miner

Received

9/3/2019

Completed

9/19/2019

Permit #

072018-004B

Description: Asphalt

Location: Woods Rd & Hwy AA

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

16

Project#: AP201909001

County: St. Charles

Company: Boeing Company-Electronic

City: St. Charles

Received

7/26/2019

Completed

9/25/2019

Permit #

092019-012

Description: Spray Booth

Location: 2600 N 3RD ST

Status: AP: Section 5 Permit Issued

Permit Type: AP: Sec 5 & 6: Deminimis and Minor

Days Used

61

Project#: AP201907041

County: St. Charles

Company: Broder Funeral Services

City: St. Charles

Received

9/24/2019

Completed

9/30/2019

Permit #

092019-014

Description: Human Crematory

Location: 3421 Ehlmann Rd

Status: AP: Permit Issued

Permit Type: AP: Permit-by-Rule

Days Used

6

Project#: AP201909042

10/7/2019 Page 5 of 6DEQ/APCP - PAMS

112

Page 13: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

County: St. Charles

Company: Nike-IHM

City: St. Charles

Received

2/6/2019

Completed

9/9/2019

Permit #

Description: Line 20 and generator

Location: 8 Research Park Drive

Status: AP: Amendment Approved

Permit Type: AP: IR Corrections & Amendments

Days Used

215

Project#: AP201902010

County: St. Louis

Company: Metro Sewer St Louis Sewer District-Lemay

City: St. Louis

Received

7/25/2019

Completed

9/5/2019

Permit #

OP2018-007B

Description: Responsible Official

Location: 201 Hoffmeister

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Admin. Amen

Days Used

42

Project#: AP201908049

County: Ste. Genevieve

Company: Pace Construction - Fischer-St. Mary

City: St. Mary

Received

8/12/2019

Completed

9/4/2019

Permit #

092018-003C

Description: Asphalt

Location: 25501 Hwy Z

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

23

Project#: AP201908017

County: Taney

Company: APAC - Roark Creek Quarry

City: Branson West

Received

9/6/2019

Completed

9/16/2019

Permit #

042005-021H

Description: Asphalt

Location: 1312 Shepherd of the Hill

Status: AP: Section 4 Permit Issued

Permit Type: AP: Sec 4: Relocate to New Site

Days Used

10

Project#: AP201909014

County: Vernon

Company: 3M Company - Commercial Graphics

City: Nevada

Received

8/30/2019

Completed

9/5/2019

Permit #

OP2017-040C

Description: Responsible Official change

Location: 2120 E AUSTIN BLVD

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Admin. Amen

Days Used

6

Project#: AP201908084

County: Wright

Company: Black Oak Power Producers

City: Hartville

Received

9/13/2019

Completed

9/18/2019

Permit #

OP2018-030A

Description: Responsible official change

Location: 5054 Hwy HH

Status: AP: Amendment Approved

Permit Type: AOP: Part 70 Operating Permit Admin. Amen

Days Used

5

Project#: AP201909026

10/7/2019 Page 6 of 6DEQ/APCP - PAMS

113

Page 14: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

114

Page 15: llm m MISSOURI - dnr.mo.govdnr.mo.gov/env/apcp/docs/macc-permitsreport-october312019.pdf · City: Albany Received: 9/4/2019 Description: Remove Part 70 Requirement Location: Hwy N

Construction PermitsDe Minimus/Minor 83Major 1Amendments 49Permit-By Rule 0Temporary Permits 1Relocate to New Site 4Relocate to Approved Site 0Applicability Determinations 30Local Construction Permit 5Banking Requests 0Confidentiality Requests 6New Source Review/Construction Permit Summary 179

Operating PermitsInitial Basic 0Basic Renewal 2Basic Amendment 0Initial Intermediate 11Intermediate Renewal 24Intermediate Amendment 20Initial Part 70 4Part 70 Renewal 55Part 70 Amendment 11Part 70 CAM 0Part 70 Administrative/Off Permit 4112 J MACT Applications 0NOx Banking and Allowance Requests 0CAIR Applications 0Acid Rain Permits 0Applicability Determinations 0Operating Permit Summary 131

Total Open Projects 310

Monthly Status of Open APCP Permit Section Projects

115


Recommended