bASIC iNFO ABT lmds
17
 LMDS LMDS (A NEW ADVANCEMENT IN (A NEW ADVANCEMENT IN WIRELESS COMMUNICATION) WIRELESS COMMUNICATION) GROUP MEMBERS GROUP MEMBERS 1) 1) Shrikant Sundaram Shrikant Sundaram 2) 2) Arnab Dey Arnab Dey 3) 3) Rahul Kaul Rahul Kaul 4) 4) Shardul vaidya Shardul vaidya NAME OF ORGANISATION NAME OF ORGANISATION : RELIANCE INFOCOM : RELIANCE INFOCOM RESEARCH CENTRE RESEARCH CENTRE CHEMBUR,MUM-71 CHEMBUR,MUM-71 EXTERNAL GUIDE EXTERNAL GUIDE : MR.GOVIND CHOUDHARY : MR.GOVIND CHOUDHARY INTERNAL GUIDE INTERNAL GUIDE : PROF.G.R SREENIVASAN : PROF.G.R SREENIVASAN Roll nos Roll nos 1) 1) 4354 4354 2) 2) 4318 4318 3) 3) 4331 4331 4) 4) 4360 4360
Transcript

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 1/17

 

LMDSLMDS(A NEW ADVANCEMENT IN(A NEW ADVANCEMENT IN

WIRELESS COMMUNICATION)WIRELESS COMMUNICATION)GROUP MEMBERSGROUP MEMBERS

1)1) Shrikant SundaramShrikant Sundaram

2)2) Arnab DeyArnab Dey3)3) Rahul KaulRahul Kaul

4)4) Shardul vaidyaShardul vaidya

NAME OF ORGANISATIONNAME OF ORGANISATION: RELIANCE INFOCOM: RELIANCE INFOCOM

RESEARCH CENTRERESEARCH CENTRE

CHEMBUR,MUM-71CHEMBUR,MUM-71

EXTERNAL GUIDEEXTERNAL GUIDE: MR.GOVIND CHOUDHARY: MR.GOVIND CHOUDHARY

INTERNAL GUIDEINTERNAL GUIDE: PROF.G.R SREENIVASAN: PROF.G.R SREENIVASAN

Roll nosRoll nos

1)1) 43544354

2)2) 431843183)3) 43314331

4)4) 43604360

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 2/17

 

CONTENTSCONTENTS

GENERAL OVERVIEWGENERAL OVERVIEW

  INSTALLATIONINSTALLATION

INSTALLATION FLOWINSTALLATION FLOW AIR LINK SETUP AT BASE STATIONAIR LINK SETUP AT BASE STATION

AIR LINK SETUP AT TERMINAL STATIONAIR LINK SETUP AT TERMINAL STATION

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 3/17

 

LMDS NetworkLMDS Network

Internet/ 

Data NW 

PSTN 

S a t e l l i t e d i s h

Video Feed 

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 4/17

 

 Radio To The Building(RTTB)

 Application 

3.5 GHz3.5 GHz

10.5 GHz10.5 GHz

26 GHz26 GHz

Business Customer 

 Application

Base Station

Terminal Station

Micro Cell Feeding 

 Application

How does LMDS

work?

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 5/17

 

 Air Link Setup Air Link Setup

Walker

Install Base StationSelect Frequency

Enable BU

Send Search MassagesAllocate EOC

Register Terminal StationsDefine Services

Install Terminal StationEnable BU

Frequency Scan Power EqualizationSynchronizationAuthentication

DistanceMeasurement

Equalizer TrainingSend TS ParametersOperational Service

 Automatic

Process

 AutomaticProcess

BaseBase

StatioStatio

nn

TerminaTermina

l Stationl Station

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 6/17

 

 Air Link Setup – Base Air Link Setup – Base

  Installing base station and frequency selection

As the BS BU enabled and frequency is selected, a PRBSAs the BS BU enabled and frequency is selected, a PRBS

is transmitted on the desired channel, resulting ais transmitted on the desired channel, resulting a

continues 1.75 MHz of bandwidth radio signal, as if trafficcontinues 1.75 MHz of bandwidth radio signal, as if traffic

is transmitted.is transmitted.

Configuration:

• List of associated terminal stationsList of associated terminal stations

• Services (Not mandatory for link establishing)Services (Not mandatory for link establishing)

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 7/17

 

 Air Link Setup - Base Air Link Setup - Base

Send Search Message Allocate EOCSend Search Message Allocate EOC

 Search messages are sent to the associated terminalSearch messages are sent to the associated terminal

stations, allocated over the EOC channel.stations, allocated over the EOC channel.

 

Embedded Operation Channel (EOC) is used forEmbedded Operation Channel (EOC) is used for

signaling,Management & Maintenance EOC/Signaling.signaling,Management & Maintenance EOC/Signaling.

 

The Base Station will provide the Terminal Station all theThe Base Station will provide the Terminal Station all the

necessary service configuration parameters over the EOCnecessary service configuration parameters over the EOC

channel (in the end of the process).channel (in the end of the process).

The Terminal Station sets EOC signaling bit until it receivesThe Terminal Station sets EOC signaling bit until it receives

an access from the Base Station.an access from the Base Station.

The search message will continued to be sent to eachThe search message will continued to be sent to each

terminal the haven’t completed initialization with the base yet.terminal the haven’t completed initialization with the base yet.

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 8/17

 

INSTALLING THE

TERMINALSTATION

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 9/17

 

MappingMapping

C o m p a s sBinocular 

  L i n e  o

 f 

 S i g   h t

GPS

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 10/17

 

 Air Link Setup - Terminal Air Link Setup - Terminal

Configuration:Configuration:

• Radio parametersRadio parameters

• ID #ID #

Scanning FrequenciesScanning Frequencies

TS scans frequencies continuouslyTS scans frequencies continuously

scans from the first frequency index to the last onescans from the first frequency index to the last one

continues to scan until power is detectedcontinues to scan until power is detected

MODEM synchronizes on the received signal.MODEM synchronizes on the received signal.

Walker

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 11/17

 

• Through the LCI following information can be viewed on the Hyper Terminal

• the “Scanning Frequencies” in the form of index no.

for example:

  “Attempt sync on RF Band Index 18” 

•  The RF frequency the TS BU is currently tuned on and waiting

for power detect.

 

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 12/17

 

EVENT scenarios:

Long no power 

Pwr detect

Sync fail

Rx ready

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 13/17

 

• Synchronization:

“Sync on RF Band Index 18, Freq [Up3431000,Dn3531000]” – Synchronization on WALKair air protocol frame succeeded, this

message will appear right after the message “rx ready”

• Authentication:

 • “wait for SEARCH”

• EOC channel contains an ID number 

• If it does match the following will be displayed:

”DLC search”• If the ID’s do not match the following message will be

displayed:

”Time Out:Wait_Search”

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 14/17

 

Power EqualizationPower Equalization

Transmits a initial low power signal.Transmits a initial low power signal.

TS increases or decreases the transmitted power.TS increases or decreases the transmitted power.

RTPC process – Remote Transmit Power Control.RTPC process – Remote Transmit Power Control.

Distance measurementDistance measurement

The BS BU is measuring the distance to the TS BU.The BS BU is measuring the distance to the TS BU.

This process happens only during the initializationThis process happens only during the initialization

phase.phase. In the end of the measurement the following will beIn the end of the measurement the following will be

displayed:displayed: “Estimated dist: 0 Adjustment: 0 “Estimated dist: 0 Adjustment: 0

symbols. (Debug Init Dist: 0)”; “DLC distance “;symbols. (Debug Init Dist: 0)”; “DLC distance “;

 “DISTANCE –8”. “DISTANCE –8”.

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 15/17

 

 Air Link Setup – Terminal Air Link Setup – Terminal Equalizer TrainingEqualizer Training

• Reads path characteristicsReads path characteristics

• Automatic and continues as long as the link is up.Automatic and continues as long as the link is up.

TS Sends ParametersTS Sends Parameters

  Operational ServiceOperational Service

• All the required services are enabled.All the required services are enabled.

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 16/17

 

Frame Relay Frame structureFrame Relay Frame structure

7/16/2019 Lmds Introduction

http://slidepdf.com/reader/full/lmds-introduction 17/17

 

GROUP MEMBERSGROUP MEMBERS

Shrikant SundaramShrikant Sundaram

Arnab DeyArnab Dey

Rahul KaulRahul Kaul

Shardul vaidyaShardul vaidya

NAME OFNAME OF

ORGANISATIONORGANISATION::

RELIANCE INFOCOMRELIANCE INFOCOM

RESEARCH CENTRERESEARCH CENTRE

 

CHEMBUR,MUM-71CHEMBUR,MUM-71EXTERNAL GUIDEEXTERNAL GUIDE::

MR.GOVIND CHOUDHARYMR.GOVIND CHOUDHARY

INTERNAL GUIDEINTERNAL GUIDE::

PROF.G.R SREENIVASANPROF.G.R SREENIVASAN