+ All Categories
Home > Documents > LMSHarmonisationPhase2Study MEA

LMSHarmonisationPhase2Study MEA

Date post: 21-Nov-2015
Category:
Upload: asawinraja
View: 223 times
Download: 0 times
Share this document with a friend
Popular Tags:
38
LMS Harmonisation Phase 2 Study 7 th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam
Transcript
  • LMS Harmonisation Phase 2 Study

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 1

    AGENDA

    LMS Harmonisation Background

    Power Distribution System Thriving & Progress

    LMS Harmonisation Phase 2 Road Map

    Conclusion

  • History

    Year 2005 - Founding Partners:Electricit Du Cambodge, Cambodia

    Electricit Du Laos, Lao PDR

    Hanoi Power Company, Vietnam

    Ho Chi Minh Power Company, Vietnam

    Metropolitan Electricity Authority, Thailand

    International Copper Association Southeast Asia

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 2

  • Year 2009Danang Power Company, Vietnam

    (subsidiary of CPC)

    Hai Phong Power Company, Vietnam (subsidiary of NPC)

    Year 2010Provincial Electricity Authority, ThailandCentral Power Corporation, Vietnam

    Year 2012Northern Power Corporation, VietnamSouthern Power Corporation, Vietnam

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 3

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 4

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 5

    Report Content

    Power Distribution System

    High Voltage Sub-transmission System

    Medium Voltage Distribution System

    Reliability Improvement

    Customers Service and IT Support

    Telecommunication Network and Application

    Future Environment Countermeasure

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 6

    Focus Areas

    Loss Reduction

    Power Quality

    Undergrounding

    Customer Service

    Functional Training

    External Funding

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 7

    Stakeholders Commitment

    Loss Reduction

    Undergrounding Power Quality

    Functional Training Customer

    Service Delivery

    Funding From Intl Agencies

  • Strategic Roadmap At A Glance

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 8

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 9

    Loss Reduction: A Priority of LMS Utilities

    Losses in Power Distribution System

    Distribution System System Equipment

    Underground Cables Distribution Transformers

    Conversion

    from overhead cabling

    Adoption of

    low loss transformers

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 10

    Capacity Building

    UG Cable

    Training

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 11

    Capacity Building

    UG Cable

    Seminar

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 12

    Consultation Cooperation

    Feasibility Study on OH to UG Conversion

    Luang Prabang, Lao PDR

    in 2009

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 13

    Consultation Cooperation

    Master Plan for OH to UG Conversion

    Danang, Vietnam

    in 2011

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 14

    Handbook and Specifications Development

    Cable TWG Meeting in 2009

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 15

    Handbook and Specifications Development

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 16

    Harmonisation Program Phase 2

    Enhancing Harmonisation of Power Distribution Systems in the LMS:

    The Technical Study for AEC 2015

    and Beyond

  • PARTICIPATING UTILITIES

    MEA

    EVN HANOI

    EVN NPC

    EVN CPC

    EVN SPC

    EVN HCMC

    EDL

    EDC

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 17

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 18

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 19

  • Demand in MW

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 20

  • No. of Customers

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 21

  • No. of Employees

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 22

  • Consumption in GWh

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 23

  • Power Distribution System Reliability in LMS

    SAIFI

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 24

  • SAIDI

    Power Distribution System Reliability in LMS

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 25

  • Power Distribution System Loss in LMS

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 26

  • Smart Grid Implementation in LMS

    SG Technology EDC EDL HANOI HCMC NPC CPC SPC MEA

    SCADA mini SCADA

    EMS x start

    DMS x start start

    CSCS

    SA (IEC61850) IED supported

    start

    FA x study study

    AMI x pilot start

    GIS x start

    OMS Start in 2012

    start x

    AMS x start study

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 27

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 28

    POWER QUALITY

    RELIABILITY

    SMART GRIDLOSS

    REDUCTION

    UNDERGROUND CABLING Utilities

    Consensus

    STAFF CAPACITY BUILDING

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 29

    1. Reliability

    Stage 3Reliability Indices Calculation Methodology

    Stage 4Reliability

    Improvement

    Stage 1Basic Knowledge Reinforcement

    Stage 2Interruption Statistic Collection

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 30

    2. Loss Reduction

    Stage 3Implementation

    Stage 4Self

    Improvement

    Stage 5 Benchmarking

    Stage 1Basic Knowledge Reinforcement of

    Related Equipment

    Stage 2Analysis of Break-Even Point

    for Investment

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 31

    3. Power Quality

    Stage 3Finding Solution

    Stage 4 Standardisation

    Stage 1Basic Knowledge Reinforcement

    Stage 2Analysis and Identifying

    Cause of Problem

  • 4. Undergrounding

    Stage 3Funding

    Stage 4 Implementation

    Stage 1Basic Knowledge Reinforcement

    Stage 2Master Plan Development

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 32

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 33

    5. Smart Grid

    Stage 3Master Plan

    Stage 4Funding

    Pilot Project

    Stage 5 Full Scheme

    Stage 1Basic Knowledge Reinforcement

    Stage 2Identifying Technology and

    Practice

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 34

    6. Staff Capacity Building

    Stage 3Develop training material & resources by

    Lead utilities

    Stage 4Implement

    training

    Stage 1Identify training need

    Stage 2Develop training module

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 35

    UTILITYS GOAL

    High quality

    Superb performance & safety

    Excellence efficiency

    PQ RELIABILITYLOSS

    REDUCTION

    SMART GRID

    UNDERGROUND CABLE

    Staff Capacity Building

    POWER DISTRIBUTION SYSTEM

  • 7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam 36

    HARMONISATION

    Interconnected

    Interchangeability

    Integrated market

  • Thank You

    7th LMS Harmonisation Forum. 11-12 September 2013, Meeting Hall EVNHANOI, Hanoi, Vietnam


Recommended