Office of Energy Projects Terry L. Turpin, P.E. LNG Engineering Branch Federal Energy Regulatory Commission October 18, 2006 LNG IMPORT PROJECTS: FERC REVIEW PROCESS
Transcript
Page 1: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

Office of Energy Projects

Terry L. Turpin, P.E.LNG Engineering Branch

Federal Energy Regulatory Commission

October 18, 2006

LNG IMPORT PROJECTS:FERC REVIEW PROCESS

Page 2: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects2

• FERC Organizational Structure• LNG Project Review Process• Engineering Design Review• Exclusion Zones• Emergency Response Plan• Cost-Sharing Plan• Safety & Security Coordination with States

Overview

Page 3: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects

ChairmanKelliher (R)

ExternalAffairs

GeneralCounsel

EnergyMarkets &Reliability

ExecutiveDirector

AdministrativeLitigation

AdministrativeLaw Judges

EnergyProjects

Secretary

CommissionerKelly (D)

CommissionerSpitzer (R)

CommissionerMoeller (R)

CommissionerWellinghoff (D)

Enforcement

3

Page 4: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

4

DirectorJ. Mark Robinson

Deputy DirectorRobert J. Cupina

Division of Pipeline Certificates

Director - Berne L. MosleyDeputy Dir. - Vacant

Division of Gas-Environment & EngineeringDirector - Richard R. Hoffmann

Deputy Dir. – Lauren H. O’Donnell

Division of Hydropower Licensing

Director - Ann F. MilesDeputy Dir.- Edward A. Abrams

Division of HydropowerAdministration & Compliance

Director - Joseph D. MorganDeputy Dir. - Hossein Ildari

Division of Dam Safety& Inspections

Director – Constantine G. TjoumasDeputy Dir. – Daniel J. Mahoney

Energy InfrastructurePolicy GroupJeff C. Wright

Assistant DirectorManagement & Operations

Thomas E. DeWitt

Certificates Branch 1Michael J. McGehee

Certificates Branch 2William L. Zoller

Gas Branch 1Michael J. Boyle

Gas Branch 2Alisa M. Lykens

Gas Branch 3Lonnie A. Lister

Hydro East Branch 1Vince E. Yearick

Hydro East Branch 2Mark A. Pawlowski

Hydro West Branch 1Jennifer Hill

Hydro West Branch 2Timothy J. Welch

Land ResourceBranch

John E. Estep

Engineering &Jurisdiction BranchWilliam Y. Guey-Lee

Biological ResourcesBranch

George H. Taylor

Washington OfficeWilliam H. Allerton

Atlanta RegionalOffice

Jerrold W. Gotzmer

Chicago RegionalOffice

Peggy A. Harding

New York RegionalOffice

Charles Goggins

Portland RegionalOffice

Harry T. Hall

San FranciscoRegional Office

Takeshi Yamashita

LNG EngineeringBranch

Terry L. Turpin

LNG ComplianceBranch

Chris M. Zerby

OEP Organizational Structure

Page 5: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

Timeline for LNG Project Review Process

StartPF

Review

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Review DraftResource Reports

& Prepare Prelim. DEIS

IssueDraftEIS

FileAt

FERC

IssueOrder

Prepare Draft ResourceReports

IssueFinalEIS

Applicant’s Activities

FERC’s Activities

DetermineApplicationComplete

(months)

SubmitPF

letter

FERC

Office of Energy Projects5

Page 6: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

Office of Energy Projects

FERC

Start of Pre-Filing Process

Scoping Meeting / Site Visit

Data Requests, Analysis & Agency Coordination

Notice of Application

Interventions & Protests

Issue DEIS

Public Meeting / Comments

Issue FEIS

Authorization / Denial

Safety & Engineering

Cryogenic Design &Safety Review

Technical Conference

Waterway SuitabilityAssessment Review

Waterway Suitability Report

USCG Letter of Recommendation(issued independently)

LNG Project Review Process

6

Page 7: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects7

Multi-Agency Jurisdiction

FERC – Section 3 of the Natural Gas Act

USCG – 33 CFR Part 105 Facility Security

FERC – Lead Agency for Environmental Impact Statement

DOT – 49 CFR Part 193 Safety StandardsUSCG – 33 CFR Part 127

Interagency Agreement of February 2004 ensures integrated and concurrent review

shipfirst

valve

tank

pipeline

Page 8: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects8

FERC Staff’sEngineering Review

Onshore Facility Review• Cryogenic Design and

Technical Review – Report 13• Safety systems – detection and

control• Exclusion Zones – Thermal

Radiation and Flammable Vapor

• Compliance with 49 CFR Part 193 and NFPA 59A

Marine Safety Review• Coordination w/ Coast Guard• Cargo spill hazard analysis

Page 9: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects9

Cryogenic Design Review

• Fuel Gas System

• Storage Tanks

• Electrical Systems

• Seismic design review

• Operational reliability

• Training, Operation & Emergency Procedures

• Compliance with DOT & NFPA safety requirements

Marine Facilities LNG Pumps LNG VaporizersCompressors & BlowersProcess VesselsProcess Piping SystemsInstrument Pneumatic System Instrumentation & Controls

Page 10: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects10

Exclusion Zones

• Title 49, CFR, Part 193: Federal Safety Standards for LNG Facilities establish siting criteria in terms of exclusion zones.

– Sec. 193.2057 Thermal radiation protection

– Sec. 193.2059 Flammable vapor-gas dispersion protection.

• Require that each LNG container and LNG transfer system must have a thermal and flammable vapor dispersion exclusion zone.

• Zones are calculated for design spills established by NFPA 59A: Standard for the Production, Storage, and Handling of LNG.

Page 11: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects11

LNG Storage TankIncident Flux (Btu/ft2 hr) Exclusion Area

1,600 Outdoor assembly area occupied by 50 or more people.

3,000 Offsite structures used foroccupancies or residences.

10,000 Property line that can be built upon.

Vaporization, Process, or LNG transfer areasIncident Flux (Btu/ft2 hr) Exclusion Area

1,600 Property line that can be built upon.

Thermal Radiation Exclusion Zones

Page 12: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects12

Vapor DispersionExclusion Zones

• Part 193.2059 requires that provisions be made to minimize the possibility of flammable vapors from a design spill from reaching a property line that can be built upon.

• Calculations are done to 2.5 percent average gas concentration (one half the lower flammability limit of LNG vapor).

Page 13: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects13

Marine Traffic and Vessel Safety

• Compliance with 33 CFR Part 127

• Letter of Intent to initiate U.S. Coast Guard Letter of Recommendation

• June 2005 NVIC / WSA

• Marine Safety Analysis –Thermal Radiation and Flammable Vapor Hazards

• Vessel Traffic Congestion

Page 14: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects14

• To be developed in coordination with the Coast Guard, state, county, and local emergency planning groups, fire departments, state and local law enforcement, and appropriate Federal agencies.

• Must include– designated contacts with state and local emergency response agencies; – procedures for notification of local officials and emergency response

agencies; – procedures for notifying residents and recreational users within areas of

potential hazard; – evacuation routes for residents and other public use areas that are within

any transient hazard areas along the route of the LNG vessel transit; – locations of permanent sirens and other warning devices; and– an “emergency coordinator” on each LNG vessel to activate sirens and other

warning devices.

• Must include a Cost-Sharing Plan

• The ERP must be approved by FERC prior to any final approval to begin construction

Emergency Response Plan

Page 15: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects15

Cost-Sharing Plan

• Identifies mechanisms for funding all project-specific security/emergency management costs that may be imposed on state and local agencies

• The Cost-Sharing Plan (as part of the ERP) must be approved by FERC prior to any final approval to begin construction

Page 16: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects16

• Governor designates an agency to consult with FERC about state and local safety considerations

• The designated agency may file an advisory

report within 30 days of filing of application

• Project Sponsor’s Emergency Response Plan

must involve state and local agencies

Safety & SecurityCoordination with States

Page 17: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

FERC

Office of Energy Projects17

Please send an original and two copies of your comment letter to:

Magalie R. Salas, SecretaryFederal Energy Regulatory Commission888 First St., N.E., Room 1AWashington, DC 20426

Reference Docket No. PF06-22-000 on the original and both copies, and label one copy of your comments for the attention of the Gas Branch 2, DG2E.

Comments may also be submitted electronically to the FERC via the Internet on the FERC’s website. See the instructions at http://www.ferc.gov under the “e-Filing” link.

How to Comment

Page 18: LNG IMPORT PROJECTS: FERC REVIEW PROCESSmde.state.md.us/programs/ResearchCenter/FactSheets...Oct 18, 2006  · USCG Letter of Recommendation (issued independently) LNG Project Review

Office of Energy Projects

LNG IMPORT PROJECTS:FERC REVIEW PROCESS


Recommended