Date post: | 04-Jun-2018 |
Category: |
Documents |
Upload: | rehan-yakob |
View: | 215 times |
Download: | 0 times |
of 102
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
1/102
A ab d a LNG a ac ad cda
Da:A ab d a LNG a ac ad cda
20110706
R:Ic R
Pc Maa:J Sad /Mca Gb
Rc:Da Ma AM Scd Bc
SSPA Sd AB F Id AB
J Sad Mca Gb
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
2/102
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
3/102
F & SSPA c a 3 (102) R: Ic R
1 1 ............................................................................................................ 3
1.1 L F.................................................................................................................... 5
1.2 L ab ..................................................................................................................... 5
2 ..................................................................................................... 6
3 ....................................................................................................... 8
4 ............................................................................. 12
5 .......................................................................................... 13
6 ................................................................................................................... 156.1 R c ad a ................................................................................. 15
6.2 C a d ............................................................................ 15
6.3 Sc d .......................................................................................................... 17
6.4 Eab ad aca .......................................................................................... 17
7 ....................................................................... 227.1 W aca 1, Ic............................................................................................. 23
7.2 W aca 2, Ba .............................................................................................. 25
7.3 W aca 3, Faca ad Ecc ac ......................................................... 29
7.4 W aca 4, Tcca ad aa ac LNG a ................ 36
7.5 W aca 5, Sa ac ..................................................................................... 42
7.6 W aca 6, Da ab d cd cda. ......... 49
7.7 W aca 7, T cda .............................................................. .... 51
7.8 W aca 8, Fa cda ................................................................ ...... 55
8 .................................................................................................................. 568.1 Oaa ................................................................................................................... 56
8.2 S G ............................................................................................................... 56
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
4/102
F & SSPA c a 4 (102) R: Ic R
8.3 Rc G ............................................................................................................ 58
8.4 Caca ad ada b ............................................................ 59
8.5 Pc b ................................................................................................... 59
8.6 I d cb .............................................................................. 60
8.7 Dca .............................................................................................................. 61
8.8 Cc ad aa dcd dc ........................................................... 63
8.9 Ia .............................................................................................................. 64
8.10 W a ....................................................................................................................... 65
8.11 R ca a ad d a ad aa ... 69
8.12 Sd cd ......................................................................................... 70
8.13 Dab .................................................................................................................... 71
8.14 P ............................................................................................................. 71
8.15 Faca C............................................................................................................. 72
8.16 Cca a ................................................................................................ 72
8.17 Cac A ................................................................................................ 72
8.18 Cda a a ................................................................ 72
9 ................................................................................................................... 76
10 1 ; , ..................................................................................................................................... 77
10.1 Ma ada N E .............................................................. 77
10.2 Caca c .................................................................................................... 84
10.3 Ta S Oa..................................................................................... 85
10.4 Sa S O ................................................................................................. 86
10.5 Ta Oa ........................................................................................................ 87
11 2 / ...... 89
12 3 ................ ................. 95
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
5/102
F & SSPA c a 5 (102) R: Ic R
13 4 ............... ................. ............ 99
F 1: O ad aca ad a a ad c
Dc W. ....................................................................................................................... 9
F 2: Ma SECA cd Bac Sa, N Sa ad E Ca...... 14
F 3: T a a a d Ma Sa cc Ea
U. ............................................................................................................................................ 16
F 4: D a LNG a LNG a a a
. ............................................................................................................................................... 20
F 5: O ad W Paca ad a a ad c
Dc W. ..................................................................................................................... 22
F 6: Gac Sc, a a Rda ad Ada. .... 32
F 7: Bac FSA (Fa Sa A) c. ........................................ 43
F 8: Ta a aa ad ca FSA . ......................... 48
F 9: Oaa ca c aa c F&SSPA a,
Pc Scaa, S G ad Rc G.............................................. 57
Tab 1: Caa ad ad b, a a
P Rda. .................................................................................................................. 34
Tab 2: O aca ad aca ad. ................................................ 60
Tab 3: Sc acc c dc. ..................................................................... 62
Tab 4: M cd c. .................................................................................. 70
Tab 5: O c dab. ................................................................................... 71
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
6/102
F & SSPA c a 6 (102) R: Ic R
2 AIS Aac Idca S
CEN T Ea C Sadada
DAMSA Da Ma Sa Ada
DMA Da Ma A
DS Dc S
EIA Ea Iac A
EMSA Ea Ma Sa Ac
ERS Ec Ra S
ESD Ec S DFSA Fa Sa A
GSO Ga Sa O
IGC Iaa Cd Cc adE S Ca Ld Ga B
IGF Iaa Cd Sa Naa GaFd S
IKC I Kd Cb
IMO Iaa Ma Oaa
ISO Iaa Oaa Sadada
LFA Lca Fa A
LNG Ld Naa Ga
MaP Iaa C P P F S
OEM Oa E Maac
OSPAR T C Pc aE NEa Aac
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
7/102
F & SSPA c a 7 (102) R: Ic R
SECA S E C Aa
SIGTTO Sc Iaa Ga Ta ad TaOa
SMTF Sd Ma Tc FTO Ta O
TSO Ta S Oa
VTS V Tac c
WP W Paca
WS WS
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
8/102
F & SSPA c a 8 (102) R: Ic R
3 T c a
d b c b d a c ad
SECA (S E C Aa) a c Bac Sa, E Ca ad
N Sa. T c a b c b Jaa 2015, ad acad aa . O b d
, Ld Naa Ga (LNG). H,
LNG a LNG a ac b dd ad
abd.
T c a a a ab d ad cda ca
ad ad d ac ab a LNG ac. I
Da Ma A a a a c
Ea U TENT a Ma Sa.
T c a a a b d aca, F 1.
Aa, dc, daa ad a ba d cca,
cca ad a ac ad cda ad cda.
T a b a cda ad a ab .
T c dcb a da c a a a d
Dc S cd a dad a ad c aca.
M, c a b ac d
dad cd, c. T c a d cb
ac, b a ad aba c aca
c.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
9/102
F & SSPA c a 9 (102) R: Ic R
F 1: D .
* 1 1( )
** 1
T ba, aca 2, b cad d J ad A 2011 ad
c aa a b aa bad LNG ca cda.
T a cd, a, aa a , ad ad LNG
. I a c a d aa d
c a, .. cbb a d.
B d aca , a ba d cd a dc
a a b aad a cca ad aa c,
a a aca, cc ad a ac.
AfeasibilitystudyforanLNG
filling
stationinfrastructure
Testof
recommendations
1. Identify andstudy enablers ofan LNG
infrastructure
2. Set uprecommendations
3. Testrecommendations
4. Finalrecommendations
WP 2 Baseline study
WP 3Economicandfinancialaspects
WP 4Technicalandoperationalaspects
WP 5Safetyaspects
WP 6
Setting up recommendations
WP 7
Test of recommendations
WP 8
Final recommendations
WP 1 Inception phase
TEN-Tapplication*
Description ofWork**
Work packages
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
10/102
F & SSPA c a 10 (102) R: Ic R
I Sb, Ocb ad Nb, a d aa d
a b ad. T aa a d a a
a , a a ad a LNG :
1. Caa aa b b LNG d
ca d . R ac a a cdd;2. Cc LNG a. O a cd a, d, a ad a.
Ec ca b ad;
3. LNG db a caa b . Eca, aac ad
aca c b ad. S c a ba cc ca
b a a a cdd ;
4. A caa aa b d a b, ac
.
Aa aa cd:
a. T aca ad cc ac aca 3;
b. T cca ad aa ac aca 4;
c. T a ac aca 5.
Bad cca, aa, cc ad aca a a a ad aa
d, a Da Fab d cda b ad ( aca 6)
ad dd d Nb 2011.
T cda b dcd ad ca ad c a ,
aac, a, LNG d, a, EU, IMO, c.
aab a cd a LNG ac.
T Da Fab d b ad aaab a bc .
W a b d d ada d ad ca
dad cca ad cc ac a LNG
a ad ad ac. T b aad
a, , LNG d ad ad d Dcb 2011 ad
Jaa 2012.
T c d a b bd
aca 8 Fa Fab d cd Rcda, b dd d
Mac 2012.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
11/102
F & SSPA c a 11 (102) R: Ic R
A c aa ad a a a b dd d c d. I
c c a , a c, dca ad aca c.
Da S G ad Rc G a b d, a a da
dab.
T c a a b ad ad cc a a d ac aca d ad. F, ca d
ca c d ad d b acc a a d d ac
ca bc aa.
Ca bc aa ad c a
ac a b ad. I a d a a
a LNG a ac ad d b
a.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
12/102
F & SSPA c a 12 (102) R: Ic R
4 T c d ad a c d ad
a ad ad a Dc S add
cac. T cd a dad c a da ad dab c.
T a a acd c a a a d
aca ad a ca ca bc d. A aa ad
c b c b ad d ac a d b
a. T ca a a d cb c.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
13/102
F & SSPA c a 13 (102) R: Ic R
5 T a ad c c dd Dc W a :
o T d ad d ab ab a LNG (Ld Naa Ga)
ac a cc a a a cca ;
o T cda a a d a cd
LNG;
o T cda cca a a c a
b ca ;
o T da cca ad cc cda a ca ad
a a d a cd LNG.
T aca c c SECA (S E C Aa)
d c ad a LNG ca c. T a F 2 b,
SECA aa.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
14/102
F & SSPA c a 14 (102) R: Ic R
F 2: ECA B , E C.
, .
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
15/102
F & SSPA c a 15 (102) R: Ic R
6
T a ba c dc caa ad d, a a ca cb GHG a a
ad .
Rc IMO (Iaa Ma Oaa) a1 c
b dcd 0.1% b Jaa 2015, ad d (NO)
b dcd b 1 Jaa 2016 .
T IMO a cad Iaa C P
P S, a MARPOL 73/78. O 27 Sb 1997, MARPOL
C a add b 1997 Pc, c cd A VI d Ra P A P S. MARPOL A VI NOad
d (SO) a ad b dba
d bac.
T caac cb d d a a b a
c aab b cc, c d Ea a c.
T da a, c ab aa a b ad, d ad d EU a a.
TaEa (TENT), ac c c ,
a a da a. Scca, a a a
d c a ad a c a
C ad ca a d d a. A a TENT
Ma Sa (MS). T Ma Sa cc a a dc
da abad c ca E, c d b ab a ca
ca a aa a c. T a
cdd a a a a ad F 3 b.
1MARPOL 73/78, A 6, a 13 ad 14
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
16/102
F & SSPA c a 16 (102) R: Ic R
T abad c ca b aab, ad d b cca
c, a adbad a. T MS a acc a
E, ad b d ac Ea ad . F
, ad a a a ad a ca, a caac ad a a
a c, b a a a ad ad aa, dd. T C addda Ma Sa.
F 3: E .
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
17/102
F & SSPA c a 17 (102) R: Ic R
T c a a Ma Sa cc ad b Da Ma
Ada (DMA).
T a dad a c a, aa a
LNG (Ld Naa Ga) b a b aa. B abc a LNG
ac LNG a d b a, d adad,
c. d a aa ab. A LNG ac b a
ca ; c LNG ad/ ac aa a
aa a d, a a ad db LNG, LNG .
T c a ab d ad cda
a cda ca a a ab a a
LNG ac SECA . T aca c c d Bac Sa, N Sa ad E Ca, d c ad a
LNG ca c. T d a a b cdd:
ad a LNG a ( ad d) ad ad
a, caca , da adad ad ca, c. ( d).
T cda a a ca ad (, , LNG d,
d aa c.) ab ad a LNG ac
ca cca a a cc . A a a a , a
a ad adad ad d a ad adad ab d ad a LNG ca c.
T Dc W a dd ab d a LNG a
ac: a; ca ca ad bc aa; cca b
LNG; a d a a LNG
a; LNG a; c a , a ad a LNG d ;
LNG a; ad a a.
T ca aa ab c a. B a
a ab ad a ab b dd d
aca.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
18/102
F & SSPA c a 18 (102) R: Ic R
6.4.1 T a a ad a a LNG c ad caacd b
b ad a b ad/ ad a/. Pa a, a
cadc cd a aa a
d. F, cca a ad LNG ac , a d b ad bad a b aad, ad ad a c
b dd. T a b dd aca 5.
6.4.2 T a LNG ac c cd ad aa ad
a , a a a add a ca baa
. T bc d aa c ad cd a
, c ad a . F, d ad
, b a d a c, dca LNG d add ca a ad b c c ad a. B
dca ca ad bc aa LNG ac a a
add LNG c. Ac bc aa ad ca b
dd aca 2, 4 ad 5.
Sc ac a d a b a a a bc aa.
6.4.3 F ab d b a cd aca cca b LNG. T a a d aaab a a a
da . P ad c b d aca 2,
ad c d aca 3. I a ca aa
LNG da . T aac b a ad a
c ad b c d.
6.4.4 T b d a , a c, acac ad
ac , a c, b aad aca 2 ad 3.W ad a, LNG c ad d ad,
, a DME ad bd. F a d a
a LNG a ca b dd a LNG ca c
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
19/102
F & SSPA c a 19 (102) R: Ic R
ca, a da . T aa a c a ac
a a LNG ac .
6.4.5 A a , ac a, a a ad ad LNG b cd aca 2 ad d a ba aa
ab LNG a.
Tcca ad aa ac LNG a b aad,
aca 4, b aba a cac db a LNG c
d , F 4 b. D b b dcbd ad aad
ab d ca dca ac .
Sca c ad ac b aad ad aca ad cc ac
a a a ac b aad ( aca 3 ad 5). F, da LNG a b ad aca 4. Ra cc
ca aa a b cdd. A, ac a a acc
c b addd.
.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
20/102
F & SSPA c a 20 (102) R: Ic R
F 4: D G G .
6.4.6 I ad aa c LNG ad LNGa d b
aad a , a a ad a LNG . Ec
ca a ad b ba b ad. T aa cd ac
, da ad ad ca LNG
ad a . T ac b addd aca 3.
F a cc ac cd ad aca d
adc ad cca a.
6.4.7 A c d LNG ad
. Pc d LNG ca b dd
cac, ad a a dd b a c. T LNG a
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
21/102
F & SSPA c a 21 (102) R: Ic R
a b cd b c d ad c d
c aa c a 0.1 % a a /a d , cbb
c d ad HFO (Ha F O). A d
d ad dad ad c d b d ad a
d ca b aad.
6.4.8 T a a LNG a dd c LNG a
a a a , c a a d a
. T a SECA a ba aa b
acd d LNG .
T d d aa bad Sac c a AIS
daa a d a a c c . W c daa b
b a b b ad c a
a a a LNG . A a aa a b d
b Ga Ld Bac Sa.
F ac a ad a b c ca b
cacad a cad a SSPA. Ld ad b
b , ca c a aa a LNG. W
aca 6 (aca ad cc ac) ad cda,
aca 7, a ca b acd ad cabad c aa ad
. T aaca a ca a b d a a d.
T c c abd ab. F, ca
b addd a:
P c, cac c ad EIA ad ac;
Ra, d ad adad: ca a ;
Lac adad ad d;
Sa ca a ca LNG aa;
B;
Ia.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
22/102
F & SSPA c a 22 (102) R: Ic R
7 T c bad a b aca, a d ad dd. T
c a a b d aca, F 5. Aa, dc,
daa ad a ba d cca, cca ad a
ac ad cda ad cda. T a ba cda ad a ab .
F 5: D .
* 1 1
( )
** 1
AfeasibilitystudyforanLN
G
filling
stationinfrastructure
Testof
recommendations
1. Identify andstudy enablers ofan LNGinfrastructure
2. Set uprecommendations
3. Testrecommendations
4. Finalrecommendations
WP 2 Baseline study
WP 3Economicandfinancialaspects
WP 4Technicalandoperationalaspects
WP 5Safetyaspects
WP 6
Setting up recommendations
WP 7
Test of recommendations
WP 8
Final recommendations
WP 1 Inception phase
TEN-Tapplication*
Description ofWork**
F & SSPA work packages
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
23/102
F & SSPA c a 23 (102) R: Ic R
B, d aca a d da. T aaa a
cd ca 7.
1,
T c a c aaa, caca ad ada , a
bd, dad c a, ad a aa ad c b c
d ac a d b a. Ab , cc a
d.
o Ia a ad ad ab;
o R ca a ad d a ad aa ;
o R dad a;
o Ia cda a a, c ad a.
T a ad b.
7.1.1 1.1 A a a ad ad ab a b ad bad aa
d d aa.T ad cd ad 1. T a
a ab a d 6.4 .
7.1.2 1.2
I DW, a ac d a a A 1A DW
(c 2.9). O a a a, c a dd a ca a a
bc cd da bc, ac, cd , ,
dca ad a ca ac aca ad a. A da ca a
cd cac ad 2, DS.
T ca a a a b d aa ad dd da . Rad
ab aa ca. T L a b cdd a a a c
dc. T ad aa dca dd a a
ad c a ad a c c
ad dab ad ac a d c .
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
24/102
F & SSPA c a 24 (102) R: Ic R
7.1.3 1.3 A a b ad, cd a aca ad ca d
cb. A a d ca aa
. T C dd a dad a.
7.1.4 1.4 ,
T cda a d a cac ad ad a
c ad a. T a a 8.18
, c a aa ca.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
25/102
F & SSPA c a 25 (102) R: Ic R
2,
T ba d c ba aa a LNG ac
ab Bac Sa, N Sa ad E Ca. T a bc
d a, daa ad a c. c a ac
d. F, bda aa a dd ba.
T a ba cd ac: A a d
cb aad J 29 2011. A da ba dd A 31,
2011, ad a ba Sb, 30, 2011.
T a b a WP 2 a d d ac a. Ta b
cd a:
o Hca a ad ca d;
o
Uda ca a ad d a ad aa
;
o I ca bca, d ad c ac c;
o R E Ra ad Sadad;
o R a c, ada, ad b;
o I ad ad LNG ac ad ;
o Naa a E ad a LNG a;
o Tcca b LNG;
o T a LNG a a cd a d a
a LNG a.
S c a a ad a a a a cb
d IKC ca b d c.
Rad d cb , aca ad aa a
aca 2 a ad bad cac .
7.2.1 2.1
A a ad cc a b ad ad ca cd a d cb. F a Ga a
d ad d.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
26/102
F & SSPA c a 26 (102) R: Ic R
7.2.2 2.2
T a a b d aca 2 aa. T da b ad
b Ta Lad D Ta Lad ad bad
d aca.
7.2.3 2.3 ,
T ccd ad a d F ONE a ad c.
Acc a ad 3 dc,
ca ab c aa.
O d d a bca, d ad c ac c
a ac cca d cb ad
c, ca ba ad ac.
7.2.4 2.4 A d aa, a ad a a aa
ba ba. H a IMO cd, SIGTTO, ad adad ad b
dd ad d. F, a ad ca adad a b ad ad
cdd. Sca c b a adad ad a ad b
ad a. Vaa ad a, d, b d . T b
a a ad b da ad.
T c aa SECA, b a add Ra c
a a ad LNG. T d b a bd
dca abd c a a c d cb. T
a cd a a aa d aa b cc, dc
ad a b a ad cd d cb, ca GL,
MAN, La Ka ad Ga.
7.2.5 2.5 , , A a ad b dd ba, ad cd ba, a, aa ad ca. T ada ad a c b
ad ad, dd , cac da b cdd. S d
cb a b a Ga, Ga ad E.d.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
27/102
F & SSPA c a 27 (102) R: Ic R
7.2.6 2.6 T a a b d aca 2 aa. T cda ad
b Ta Lad ad D Ta Lad. O a c a a
cad a ac a a. H, cda
b a Ta Lad. R a ca 8.18.
7.2.7 2.7 2.8
A aa a ad LNG ac a a c ad c
ad ac ac d b ad a daaba ad ad a
GIS a. B d a daaba aca a c
a a ba , a dd aca aa ab d LNG a ac.
Ca , SWOT aa b d a aa
LNG bad a c TSO (Ta S Oa),
ad a c.
T ba daaba ca a a ad ad ad
LNG ac ad aa a E:
o D aca bda d, cd SECA;
o E LNG ac ad c a
c cc;
o E ad (c) ad LNG ac;
o E ad c ad aa a E ad a
LNG a;
o LNG .
I d cb c a Ga, Ga ad Ga d a
ba .
7.2.8 2.9 T a a a ca a b a LNG. T a
a aaab da a b d ad dcbd . A c ad a
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
28/102
F & SSPA c a 28 (102) R: Ic R
c acad d d b ad. T a a
ba ad bac a d ad a a
b aad aca 35. T cd c
ad d . S ( LNG), Da F (LNG ad
HFO/MGO/MDO) c b d ad aad. T aac ad d cb MAN d .
7.2.9 2.10
T a ca cc a ac ad daa
bd a daaba , a ( ab a a
cc), b, ad b dad (bad ad , ad
, d d ad . T ab daa cc, dd
acc AIS daa DAMSA. T acc a b cd .T ccd daa d a WP4 a 4.1 cac db
LNG a a a b dd daa. F d aab daa
aca 3. T AIS daa, daa ad daa, b
ad daaba, ad ab ad a a.
Vaab MAN a ab c a a d c.
A b d a , a c, ac
ac ad ac , a c, a b cad
a. F a d a a LNG a ca
b dd a LNG ca c ca, a
da .
A a, a d a ba ca ad a c
a aa ad a a ba d d b
ad ab d.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
29/102
F & SSPA c a 29 (102) R: Ic R
3,
Aa ada a d a b MARPOL dc
ad dc. F , a a d
a a b ab. H aca ada a a
d . Aa cca b, a aac b aca ad cc ac. I ad d ,
aa ac a cdd a :
Ha F O (HFO) dc a ad a a cbb;
Rac HFO Ma Ga O (MGO)/ Ma D O (MDO) a
c 0.1% ;
R ad a/DME (a cd bad a a,
ac ad DME c d a );
S LNG, ad;
o R ,
o I .
W aca 3, a ad cca ad c c b cd
aca 2 ad aca 4 b aad aca ad cc
.
T ca aa ab d LNG aa, c
ab a LNG a ac. Faca ad cc ac a
a ad a b aad.
Ta b cd a;
o A LNG c d ca .. MGO/MDO
o A b LNG a d (ba ad Ea )
o Faca aa d
o Oaa d d LNG ca
O , cdd DS, a b d
aca 4 (a 4.5) DS.
7.3.1 3.1 T a a b ad a 3.2.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
30/102
F & SSPA c a 30 (102) R: Ic R
7.3.2 3.2 T c LNG b daa a ab LNG. T LNG c d d b cd.
Pc ad a a a bc cdab ca. Ma
a d a a ca. I cc ca,
a Ea U Naa Ga Idca c. A
d ca, dd b aa cd c, c a Pa,
IEA, c., b d d d a aad ca ab
d.
Bad ca c cc ab b b, c a d
c ca b da b a . A a caca b d LNG
c.
A a b cad c cd cac ad c. Va
ac a c cbd a a ad b ca a
b ad aa a.
7.3.3 3.3. W aca 2 ad 4 b d aa c b
addd b a d aa.
o T b a a ca d , a d cd a ac;
o Aa d aa d ac a
ac a a c ca ;
o L MGO/MDO;
o HFO ad a cbb;
o Ma ad b c DME;
o U LNG.
C a d b ad aac d
cb ad b ad aca aa.
A b cca ca b dd db ca. I ad a
ad c ad a ca a a/d dc
a b d a ba LNG.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
31/102
F & SSPA c a 31 (102) R: Ic R
Ta ad c a LNG da LNG a ad/ a
a. T da a a LNG dc , ad a
a ad LNG .
I db cd:
o E ac a a ca a;
o Md da a (a Na a);
o Sa ca a dc db ;
o LNG d , ad db LNG a a d/a
a ad b a ;
o LNG b , ad b ad db LNG a LNG
a;
o LNG c c d LNG, , a 100 3;
o LNG ad a a ca LNG a d b a ;o LNG ba.
T b ad b aca .. NPV, IRR, ad/ Pabac d. A
a aa b ad.
I add, a b a b a /a c a b
d d a aa. T a ca a c
a a LNG a . Sc ac d
b ccd. T a ca a bc b db .
T adda a a /a b ad ad ad
Ma Ecc I:
F ad ad a ad LNG ac a cd
aca 2, a ad a a (cad ad c ) a a
cad cc b ad. Eac c d ad d
ca ad a cc ac. I d cb a
ad d a a ac cc c. T
cb a ba a d ab a d
c / d.
7.3.4 3.4 I d a aa dad ac c , a
a c ad aca ca c, cdd
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
32/102
F & SSPA c a
da a d a
P Scc & Sc a
aa d b c
.
T aa a
o U Sa Db:
a?;
o Oa: W
o D Sa Db
a?;
o Tad: W
Ca a a
a c a.
F 6: G ,
32 (102) R: I
a d ; P
P Zb ad c a
d b a a
c a:
d ad LNG a, d
a ad a?;
: W d LNG d
LNG d ?
d F 1 b b d d
A.
, , 2006
c R
Ha,
.H,
c
ad a
da
a ad
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
33/102
F & SSPA c a 33 (102) R: Ic R
F, a a a dad ac ad
c, a a a a d c dd. Tab 1
b d a cac a ca ad ad
b P Rda.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
34/102
F & SSPA c a 34 (102) R: Ic R
1: C , .
Category Element ResponsibilityLand development Development of new port areas Port Authority
GovernmentMaritime infrastructure Capital dredging Government
Port Authority
Sea locks, dams & exteriorbreakwaters
Government 66%Port Authority 33%
VTS/Radar Government 66%Port Authority 33%
Light buoys and navigational aids Government
Port infrastructure Land reclamation Port AuthorityGovernment
Internal locks, docks, quays, lightboys and navigational aids, river berthand harbor basin dredging
Port Authority
Port superstructure Pavements, warehouses, sheds,cranes and gantries, link spans,pontoons, terminal and officebuildings, leasing/renting
Private
Public utilities Fire fighting, police, pollution control Municipality, port Authority,government
Infrastructure links Railways & metro links in area State railway company,Municipality
Port maintenance Maritime infrastructure maintenance Government
Maintenance of port infrastructure andsuperstructure
Port Authority
Port services Cargo handling Private
Technical-nautical servicesSource: EU Public Financing and Charging practices of Seaports in the EU, Final, June 2006
T a b ccd a b . F, a
b a ca, d ac , ad ad
aa d ca LNG ac .
P add
o
A ca c b dd, a a cc (c), cd bd, a, c. D cc
ab ac c c LNG a,
d ad b , c.;
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
35/102
F & SSPA c a 35 (102) R: Ic R
o D ad b ad ad LNG a
d, .. ca, a, ad a c;
o Add c c LNG a ad a b
ad d ad b acc;
o
E ba c d. A a c c LNG d cad ca
ad dca b a aca ab.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
36/102
F & SSPA c a 36 (102) R: Ic R
4,
A ab a LNG ac E a a a, a
a a LNG . I d a a aa, cca
ad aa ac LNG a ca ad b d a cca aa. T aa LNG a a aa
ab a cca ad aa a b aad a aca
ad cc c a a a c.
T a aca dcb cca a aa ac LNG
b ad a. T aca cd :
o T d a ca ad dcd bd a LNG db
a b a ca;
o T dc a LNG b a;o T dc aa cd LNG b;
o T dc a d ab dca ac LNG a.
7.4.1 : 4.1: I a, d cac db LNG a c
d b abad. T ca b dd, ad b d,
dc a a LNG db , cd a c a ,
dac c, LNG db/db , b b, b
a a c, c. A LNG b dbd aac d a c a LNG a, ca LNG a (a,
d ad a) a a a ac a acc a.
F a a aca c, b ad bad ba
cd aca 2 ad cd dac b LNG a, aa
ab dac LNG b , c.
I add, ac a cca aa c a , aad, d,
bc, a a cca, aa ad a cd b dcbd
ad aad bad ca. T b bcad ad b ac ca b dd. T aaab
b a: a a , a a a a, ad
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
37/102
F & SSPA c a 37 (102) R: Ic R
a c . T LNG a d aca 2 Ba a b a
acc.
T a a a c aac db LNG a aa. LNG
dc LNG a a ad ad aad a. T
c d aca 3 cc ac b cdd. Taca ad dc d ac ad LNG b
d a 3.3 ( c d ) ad 3.4 (
ad b ad a d ).
T aca daa dcd aca 2 b a a
dc d ca, a a d da a c
a . F, aca 2 Ba d Ta 4.1
, .. cc a ac daa ad
a ad adad a ac d a LNG a.
Dc cca ad c ac a c a b
Ta 4.4 Sac ca LNG b. T aa ad cca ad
c ac Ta 4.4 b cd a.
P add:
o T a dcb db a c c. T d
ca b dd d ad aa d ab db
a LNG c d cd cca ad c
ac;
o I b a a a , b ac, LNG d , LNG
b bad d a a ad dac
a ad c a d ca;
o I b ca a ac a LNG. T
a b bad accb a c a cc
b a , c ac bad aca daa
ad a d ( aca 3 a 3.2).
7.4.2 4.2: T a a a d adadd a d cc LNG b ad
ad ccd a a Ec Sd S (ESD) ad Ec Ra
S (ERS). T a b cad aa a a
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
38/102
F & SSPA c a 38 (102) R: Ic R
a c a ISO TC67WG LNG a F c ( LNG
c ad /cc cca), IGF ( a d
IMO adad a d , c ad a a da cd (IGF CODE)) a a
a a d d c.
T a a acc ac c a:
Vaa ;
T ;
T aaab b;
B a;
A LNG b bd.
Ia ac ac cd (b a d ):
LNG ESD b; LNG ERS b;
LNG B ad aa.
T a/ dcd b aad aca 5 ad aca 3 ad b
ad aca 6.
A a a, a acc a a a ab
adad.
P add:
O a d a adad a dcb LNG d
ad aa I b a acc:
LNG d ca b bd a;
o S / B ;
o Tc;
o P / Fd a;
Vaa ,
T aaab b, a LNG b bd; LNG ESD b, LNG ERS b;
Va ;
LNG B ad aa;
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
39/102
F & SSPA c a 39 (102) R: Ic R
C IGF, IGC, SIGTTO, ISO d / cda.
H ca a b a, , a ad a cc a a ? T
a ca b add a d ba ac d
cb, aac , d SSPA/F/DV ad a.
7.4.3 4.3: Bad d d LNG b ad Ta 4.2, aa
cd, a , , ad c b LNG b
aad. T ISO adad LNG a dad Dcb 2010, a SIGTTO
d LNG a ad cca ad aa d c
d d b a acc.
T a a ba cda dcd aca 6
ad. T a a a cda ca a ba aaa adad LNG b.
Sa ac b d aca 5 ad a da Fab R
ad Rcda b dcd aca 6.
I a acc a a a ab adad. T
ac b cdd a.
Cac a d cb, d a, a
b ad.
P add:
o H dcb a LNG b, c d c
ad a LNG d ad a dc?
7.4.4 4.4: T b d ab LNG b a b a
c, a LNG d c ad c. T a
ca a ca a dcb a a a ab LNG b .T ca a a a d LNG b
, ad ac ca a, .. a a
d ca c a d ad ab b dda
. F aa aa, a dca ab .
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
40/102
F & SSPA c a 40 (102) R: Ic R
T ca a d ad dda ac a, b ca b ad :
o a ac (.. dac c , aaab LNG , d
a LNG, c.);
o cca ac (.. b ca, d LNG a, d
a ad ba, c.)
o c ac (.. aa LNG a, ca ac
db LNG , aaab adbad LNG ac, c.)
o a ac (.. aa da d ad/ aad ac ad
LNG, c.); ad
o aca / cc ac (.. c, ba ab, c
LNG ad aa , c.)
o a ac(.. a aa);
o a ac(.. ca a a ad a).
P add:
o Paa d ac b dd ad ad b ad
ca ac b ad.
o I d d ad a ca, a b c
d aca 3, aca 5 ad a 4.1.
7.4.5 4.6 Ac ada a ca LNG adad ad b acc ad
aa a ca LNG b addd a. T a a
d a ac a cc ab a LNG a a ad/
a LNG b aa.
T ac b aad:
o LNG a / a a,
o LNG b a ,
o LNG b ac a c (b ad a aca)ad a/LNG a c.
T a c LNG ac b a c ac
ad ad a.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
41/102
F & SSPA c a 41 (102) R: Ic R
Sadad ad d b acc c a ca LNG db b
cdd. T a LNG adad, d ad d b
acc ad dc a ca LNG a a da.
A a a 4.3, a acc a a a
ab adad. T ac b cdd a.
P add:
o T ca a adad ad b acc a ca LNGa , a a d adad;
o Nca a b d aca 5.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
42/102
F & SSPA c a 42 (102) R: Ic R
5,
T a aca d a , c c ad
a a ada a a dd ad ad
d LNG ac LNG a .
T acad ad LNG d ca
ccd a ad. I ac a a b
cca ad a a c dd ad dd
W Paca b bc a cda ad a a a
aa abd.
Bd a, aca c c c a
a a b d a a bc aa . D
a aca 5 c dcd. I a
c a a c a c aca. Vc a aa a c a a. H, c b a HAZID c
FSA. Ld b ad a aa aac, a c ac b
b a aa ad dc a.
7.5.1 F a a d ad a a a c
aca, Fa Sa A (FSA) aac abd. I dd
ad cdd b IMO ad d add a c
E.
T FSA aac ad cc aaab a c a
a c d ba c a acad
ad LNG a a a . T FSA c a ad b
Ma Sa C ad Ma Ea Pc C 2001 ad
2002 ad dcbd : Gd Fa Sa A (FSA) IMO
a c. Ld: MSC/Cc.1023, Iaa Ma Oaa. (IMO, 2002).
IMO dcb FSA a a aa ad ac c a ad
a a ad c a ad aa c
ad b IMO dc . T FSA c cd bac
a ad F 7 b.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
43/102
F & SSPA c a 43 (102) R: Ic R
F 7: B FA (F A) .
I ac , a b d c ad aaca a b b
ad. T c a a abd c ad c a cd
ac aad dca, cb d aa
dd ca ad a ca a c .
T FSA c a dd a aca ad a b c
d a add a . T FSA aac b d
acab a b ad d ad a abd
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
44/102
F & SSPA c a 44 (102) R: Ic R
adad aa da a a, c a:
R aa Pc ad d (ISO 31000:2009, IDT) ad
R aa R a c (IEC/ISO 1010:2009).
T d a a a aaca ad c ad, b
dcbd da aac ad aa accac.
Oc aca:
T aca d c:
o Sa a cda cca ad aa ac d
aca 4;
o Idca cca a ad aad acad db LNG
ad aa;
o Idca cca a ad aad acad a d
b LNG;
o Idca cca a ad aad acad LNG
aca;
o Fa ad d a a aa c ad a
a abd, d ad ad d aa
cd LNG ad;
o Idca aa a d b dd ad
d ad d acab a;
o Idca aa ad a c cc a
d b addd;
o Sac a a cda ad acab dc
aac a a ad LNG d c.
T aca 5 d b ddd a cca add ,
b a ad d a c. T a a
dad a 5.1 5.3 ad dcbd b.
7.5.2 5.1: T b LNG ac ad db ad d
aca4 b aad ad cca a . Acab d
d aad, a ad d a c a d
ba abd acc ad c ad LNG da. Eabd
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
45/102
F & SSPA c a 45 (102) R: Ic R
a dcb a cc accd b ca d ad
aca a /aa, a daa ad aa
b dcbd ad adad aca d a LNG ac.
Sca cda b dcd a ad ca a accd
cc c a LNG add ad a aab aad bac add. Sa cda b addd
ac a c ad ac , ca ,
dac da aa ad a d a a b dcd
a. Cca a ad aad acad a LNG
aca , c, a, b ad c a b
addd a .
P add:
o I a d aca/aa c a
aa d, a ac, ad ad ;
o Sa a cc ca accd a d
aca 4 ab cc cc a a a
a LNG a a;
o Sd a 1 ad 2 b ad a aa FSA d a d a
ac cc FSA d?;
o Ta 3 c FSA 5 b a 1 ad 2.
7.5.3 5.2 A b a cc ad a b b dcbd
aca 4 ad a add cca a ad aad acad
a d b LNG. Va a ca b c
a b ddcad LNG b , ad ad bad a
a a a d b d b bc ca a a b
ab ad aa d a a caa aa ad c .
A a aac a aad dca c d b b d cd a ca aa a, cd ad accda
ad c cc. Accd ac LNG b cac ad
cc ad a a dad cd ad accd
a abd d aca dca ac a a.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
46/102
F & SSPA c a 46 (102) R: Ic R
P add:
o I a d aca/aa c b c
ad LNG ad bad ca a a a cd ad
addd;
o I a d ac b ad/ ad a/ac d b a d ab a a
a a c;
o Sa a cc b cc accd a d
aca 4, cd a ca cc ddcad b , a
ca c bad b ad cc b a d ad ad
aa da a a .
7.5.4 5.3 ,
I W Paca, a b aa ad aa a c ad
adad LNG ad ad LNG a a ad ad a
a d. T a a ad a a LNG ad
ad b c ad caacd b b ad a
b ad/ ad a/.
D a a a a LNG b ad a ad bad b a
ad a a LNG a a ca. T a d aa a a, a cadc cd a a c.
Aa a a d b dd ad d b
dcbd ad d b ad a c b
ada a ad a bad c b cda.
Md Ga ad a a a a caca c
ad d aa d d dad cca c adad ad
cda. T d a ada d c c adad
add a a aa ad ad ad b LNG b dcd ad
ab a b d.
I d a a b c a a a b aa
cd d b dd, d ad ad. A b aa LNG
d , b ca, aa a a LNG d
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
47/102
F & SSPA c a 47 (102) R: Ic R
ab a aa cd aa cd a dd ad
d aca 4. T a cca add abd a a
aa ad d d ad aa
cd ad c d cd d aca 4 a d
a c.P add:
o Ga a a a b dd aa a
a ad ad b a cc;
o Scc a bad cb cda aa a
a d. Pa a c d, , b
a ad acab a ad LNG b a cc;
o Ra d cb aa a b
ad aad dca , cca ca ad a bab ad cc a accd ca.
7.5.5 Sa b 7 J 2011 a aca F&SSPA c a,
cd DNV d d cb (a: P Ha, P
Zb, Sc, Ga, Ga, Ga, E.d, F, GL, MAN ad
La Ka)
A Haad dca (HAZID) b aad Sb 20 (a).
T HAZID b aad a ad b SSPA Gb, Sd.
W aca 5 ad HAZID a bac
aca 4 aaab.
I add c a, d a b SSPA ad DNV, cd
a d cb b d.
Adda a a ad ad a a b d.
I a, ab 1520 aca a cdd .
A cd cca add ad b adda c (RCO) a b aad Ocb (Ocb 25) cd HAZID
.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
48/102
F & SSPA c a 48 (102) R: Ic R
Cc ad d aca 5 b d ad bd aca
6.
W aca a ad FSA a F 8 b. T a 5.1 ad 5.2 acdcd aa FSA c. T Ta 5.3 baca
add FSA 4 ad 5.
Ta
FSA
Ta 5.1Sa ad LNG
Ta 5.2Sa ad bad bada LNG
Ta 5.3Nd add a,aacd & aadad
1 HaadIdca2 R Aa3 R CO4 CBCda5 RcdaF 8: FA .
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
49/102
F & SSPA c a 49 (102) R: Ic R
6, .
I a, d b cd ad d a da ab d ad cda.
T cda ca cca, a a cc ad acda ad b d accd ca cd d a a cac:
T ad d add cca cca ad cc acd d d. F, a a a aad add a ad/ c a,LNG d, c. b dd d ad.
T d cad d ca cda cadd a ad a a, da adad, a a ad bc ca c, cda ad caba ac I Kd
Cb, ab, ad ac.
I add, a cda a ad c ad/ ab c d d d ad addad. T cda b d ca a cd LNG c.
D Sb, Ocb ad Nb da adcc c b ad, ad ad ad a . Tac a ad.
7.6.1 6.1 A DS, ad II Cac.
T aca a b a cc a aca ad ad c
aa a a a a dad d ad . T
bd a bad d ad dad cca, aa ad cca
ac LNG a. T C b d ad b
d. O F&SSPA ad dd d c a b
d. T b dcd cc; a d b cdd
a a d a b cca, aa ad cca . T b
a a cda.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
50/102
F & SSPA c a 50 (102) R: Ic R
W Paca Lad ad b ac ad cda b
d d a cca, aa ad cca cc a a
.
P add:
o T a a a cc aca ad ad ca
da a cc d. T cc da a d
b Ocb 2425;
o N dcd dab a, a .
7.6.2 6.2 A DS, ad II Cac.
A a a aa d add ca ad b
dd d a. T ca ad dd b C a:
o S ;
o E aac;
o P;
o LNG d;
o Id aa;
o Lca ca;
o Sa;
o EU;o IMO.
M ad b addd d c a dd.
Rcda a ca cca a a cc cda b
ad. T cda b b a ad ad .
T b a c ca bc a, caca , da
d ad adad. Ea c c cd b cda IMO IGF
cd, caca cda ad d a ad LNG b .
A da ab b dd Nb 25.
P add:
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
51/102
F & SSPA c a 51 (102) R: Ic R
o W aca 6 a c d ad aa aca c
35 aca ad a ad cc ad da cda
a d a ccdd. W ad, a a a aca d
c aca ad a Ta 6.1 a a d b
a c a add c .
7,
7.7.1 T aca7 ad cca ad cc
cda a ca ad a a d a cd
LNG. T cda a dd ad cd aca 2 6.
F, a ada ab ab a LNG
ac a a b dd ad dcbd aca. T
cda b cca c.
T a cda b d a ca ad c
a a LNG d, LNG a, , c.
T b bad b cdcd P Zb, P
Ha, ad P Sc (, d, P Scc), c.
Eac a a dc ad d
a d a a cda W
Paca 8.
A cdc a ab c. R
ad d b d ad a d dc a d.
7.7.2 T cd W Paca 7 a b dd, a d acca a. S a
ac a a. W a a ad Dcb,
a Dcb, b ad aa a ad b
cad Dcb Jaa. T a ad a a
aca a ad ad a cda a ad ada. T a
a S G ad d da ,
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
52/102
F & SSPA c a 52 (102) R: Ic R
cd. T a a d ad b
cdd a cda.
7.7.3 W , , LNG d ad ad b cad ad ca dad cca ad cc ac
a LNG a ad ad ac. T a cda
a b dd aca 2 5 ad cd ad abad W Paca 6
b ad ac , d ad cca dcd ad aad d
.
Eac a da ada ad b d b F&SSPA c a
b c ca a a, ac a ca . T
aca b d b aca ad. T
dc aa cdd W Paca 6. F, a a
ad ac d dcb a ad ca cc cd
ad d ad caacc a a cd ac dc. T
a d, a a a cd b ca , Zb
ad Ha, c. S d Sc cd.
o 1 Zb: 8 9 Dcb, 2011. Cd;
o 2d Ha: 16 17 Jaa, 2012. Cd;
o 3d Sc: 23 24 Jaa, 2012. T b cd, .
T aca d c a d cb a a a
ac ad ad ad c a. T a b
abd b F ad SSPA accda . T a
ca a ca, b a a a .
B b d cb ad a a a d, a d
adc b addd cdab a d. T a d dc a d ad cb ab a
cda.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
53/102
F & SSPA c a 53 (102) R: Ic R
A a dca ada ad a b
aca ad a a. H, b a c ac cc cd
ad d, ad d caacc ca a cd ac
dc ad c. T caacc a a aca dc,
cd caac, a d, aa ac, cca ad aa cd,ca ad ad.
T c aca aa ad d cb a ddd
bad ca. A d cb a a bd aca
, b a c c a a a adda . H,
bd c a c ac ca, a ca,
ca d a a b .
T d aca a c b d:
o : P Zb, Ga, F, d a ca ad
ad;
o H: P Ha, Ga, Ga, E.d, d a
ca ad ad;
o : Scc & Sc a A SA, GL, MAN, Ga,
d a ca ad ad.
E ada a c aca
adaa ca b d cb ad a
ca a da c ad aab dbac d ac, ad ad d a.
7.7.4 A a ab c a ad ab ca
ca a d d a a c a ac b LNG, b dd,
d acca a. Iad, a b cad a a ca
ab c, .. a c aa ad cca
cda b d b ba ad a ca b
dcd da. T dc a aca ad a ad d b . T a aa ad aa ad cca
cda d a ca.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
54/102
F & SSPA c a 54 (102) R: Ic R
7.7.5 F ad SSPA dc dc ad d , c
b a a aa W Paca 8. A aca a
acc a aa, d ad cc. Pa
a b dbd ad ad bc abd b ad .
7.7.6 A aca ad aca , a a
F&SSPA c a, aa. A d cb a a .
T cd c b a:
(): Zb, Ha ad Scc & Sc
(): Ga, Ga, Ga, E.d, F, GL, MANad La Ka.
A dcbd a dc, F ad SSPA a . F
b ada a, c cd acca aaa , d
a, b c d cb, c. Idca a aca
b cad b F ad SSPA ca d cb. T,
a b ca ad a ad. SSPA b
ca a, cda ad aa, ad a b cad
ca F.
T F&SSPA a a a , a a
ad a.
Eac d ac a aca ad. T b dcd
a a a a c d c ad acca
aa. Ra d cb b d aca
a cad .
Cac d cb
I W Paca 7, a cacd d c a. T a
cd a ad ad da d b dcdd. A a
d cb a aca b a.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
55/102
F & SSPA c a 55 (102) R: Ic R
8,
R Cac Ad II, Dc S, a a Ad I,
Dc W, aca ad a cd A ad c.
T a a c cc a ad d aca 2 6 ad a
cb b ca ad cad aca 7. A
dcad , a cda a bad a d a
cda ad ad ada cd. T cda a cd
a a a LNG a . T dd a a
ac a ad ac a EU.
T a a b a dc c, aaab ad ad
bc. I a b c a, a ad a b d,
accdac cac a.
A ad, b d 250 c ad aaab cca a . T
bc aaab b.
Fa ad a bad adad c.
T F&SSPA c a a aca a cc b
aad ab b d Mac 2012.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
56/102
F & SSPA c a 56 (102) R: Ic R
8
T a c aa ad F 9 b. T ca d c ad a F a ad, aca ad ad a
aa. T ca c, DMA ( Da Ma A), ad
Pc Scaa. T c aa ad ad Pc Scaa
M M Scd Bc. T c a ca a S G ad
a Rc G.
T S G c bc ad a cb acad c. A
b/cac S G aacd ad 2. T S
G a a b c ac d c.
T S G a ad ( cd) ad aa
b dbd aad.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
57/102
F & SSPA c a 57 (102) R: Ic R
Danish Maritime Authority
Project ManagerMogens Schrder Bech
Flemish Ministry ofMobility and Public
WorksMr. Pim Bonne
Steering GroupPublic and private partners to theproject
Reference Group
Project SecretariatProjectManager/Administrator,
Mogens Scd Bech,DMA withBengt Sangberg Bureau
Veritasand administrative staff
Team LeaderMonica Gullberg, F
Deputy Team LeaderJohan Gahnstrm, SSPA
Work Package 1Inception
Jim Sandkvist
Work Package 2Baseline
Gunilla Gransson
Work Package 3Financial and economic
aspectsGa Ga
Work Package 4Technical and
operational aspectsJohan Gahnstrm
Quality ManagementISO 9000and internal audit:Kristina Haraldsson, F andJim Sandkvist, SSPA
Test of recommendations:Port of HirtshalsPort of Szczecin & SwinoujsciePort of Zeebrugge
Central Stakeholders:shipowners, port authorities, LNG providers, industry organizations, states, the EU and the IMO, etc.
Work Package 8Final recommendations(and Feasibility Study)
Ja Ga ad Ga
Ga
Work Package 5Safety
aspectsB Fa
Work Package 6Setting Up
Recommendations (andDraft Feasibility Study)Johan Gahnstrm and
Gunilla Gransson
Work Package 7Test of
recommendations
F 9: F&A , , G G.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
58/102
F & SSPA c a 58 (102) R: Ic R
A b Rc G cdd ad 3. I d
c , a a ad cac b
d, ca a a dc c b aa. Cac
ca b ac aca ad aa. Scc bb aa ad a ad cac.
I a Rc G ca:
o Pd ca cc;
o Pd ac a ca, c a ad aca c d
ca;
o Pd c ad ac LNG ac ac
a;
o Pd c a c; ado G dbac d aa ad cda
T a Rc G ad ( d cd).
F, b Rc G b d cb c
ad cc a aca 6. T a a d d
c dd b ca. T Rc G b d ab
dd DMA ad add DMAb a. T Rc G
a acc ONEc ( Tab 3 ), ad b ad a
add .
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
59/102
F & SSPA c a 59 (102) R: Ic R
8.4.1 F Id AB (abbad F) cac . Rb, ad a
ca. T ca, F&SSPA a, d b F ada d ad c a c.
8.4.2 SSPA ad DNV a cacd a bca F. T a ad
d F ad a b ba accac
a.
8.4.3 I d cb a bcacd F bad b ad Ad4 cac. T a add ad d b F accd
acc c b DMA.
T aaa c F&SSPA a a b add c
d. T aa a c :
Mca Gb, F, Ta LadJa Ga, SSPA, D Ta Lad
Mca Gb, F, Ta Lad c ad b
d cd a, c aca.
Mca Gb b c ada, caca , ad
c C. A F cac , Mca Gb a cac
C. H, cca C dcd b Ja
Ga ad Mca Gb.
T ddd aca, ac a b aca ad. T
aca ad a c aa ad ad a cc
bc aa. T aca ad a a b dab c
aca.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
60/102
F & SSPA c a 60 (102) R: Ic R
I Tab 2 b, aca ad a d.
2: .
# Dc W Paca
1 Ic J Sad SSPA
2 Ba Ga Ga F
3 Faca ad Ecc Ac Ga Ga, F
4 Tcca ad Oaa Ac Ja Ga, SSPA
5 Sa Ac B Fa, SSPA
6 S Rcda Ga Ga, F/
Ja Ga, SSPA
7 T Rcda Lda S, SSPA
8 Fa Rcda Ga Ga, F/Ja Ga, SSPA
T c a ac d cb a a a a 3 700
, ddd b 12 d cb . T a: E.d, F, Ga,
Ga, Ga, Ga, GL, P Ha, La Ka, MAN, P Sc ad
P Zb.
T ca b dcd c a a cda
b d cb. I acad a d cb b
cb bad , aa, ad aa. Tcc ad c d cb a acad d
aca ad accd d cb ad c.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
61/102
F & SSPA c a 61 (102) R: Ic R
A d cb a b dcd a ad a cd a
a cd cb . W aca a a b aad ad
d cb a b d ( cd).
T d cb a acc ONE a cd Tab 3.
T c a b aa a bc. T c a cb
a d c. I F c c ONE, c a a
aa , a c cad a.
T c c adad cc c, ad a a
a cad, aad ad d. T aa dcd ad
adad ONE, c a SaP aca aaab b aa c a a ad a ad. T C ca c ad a
dca a c ca acc ONE ba (.da.d).
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
62/102
F & SSPA c a 62 (102) R: Ic R
3: .
.. E
E
E
A T a bc DMAS G &Rc G
I dcbF & SSPA
Ia F adSSPA
Ia ab c
Cac adadccd bd
Da, dd
Waa
E Da dab Da dab Ia
Dab;Ic Ba Da ab dFa ab d
Dab;Da IcIc Da ba Ba Da abdFa ab
d
Dab;Da IcIc Da ba Ba Da abd
Fa ab
Ic
Pa T a adda
M a ac
M RG Pa Rc ba
Rc ba M RGad SG
M RGad SG
Rc ba Rc ba
8.7.1 T dc aa a F, B b, b c
bca ad d cb. Ta Lad Mca Gb b
ada a d cb.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
63/102
F & SSPA c a 63 (102) R: Ic R
T ONE aa c, Haa Paad b aa
b acc ad da a a aca ad dc a
.
8.7.2
Ea c ad ad, ad a
b dcd ONE. A, a cdc ad a b
acd ONE. T acc d a dcbd Tab 3.
8.7.3 A c da ad b Ta Lad Mca Gb ad acd ONEa.
T Ta Lad Mca Gb ad Ja Ga a d ad
a a b a . Eac aca ad
b cc ac ad d a .
Pad ad a b dd b a b
dd c. T Qa Maa a Ka Haad, F ad J
Sad, SSPA a b a.
8.8.1
IT c cd a dd ONE aa .
8.8.2 Sa a ad daa ad a cc a a a c. H,
c a a b cda b a. T Ca ad
a b ab cc a ad a cc C,
d cb ad a c a a d cc
ac A. T Ca c ba a bcac
ad a Ca Pc.
M cca, a b ad a ac d cb a a a
ad c dc a ca b aa. T Ca a a
aa cd C ad d cb C ad/ d
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
64/102
F & SSPA c a 64 (102) R: Ic R
cb ac A c Pc c
a d b acc C' ,
cd a c. Sc aa a b dcd b Ca
c Pc.
8.9.1 Ra bacd a ad dc dcd b a a d ONE.
T dc aa b c bca
ad d cb. Mca Gb b ada a
d cb.
T a c a d b Ta Lad. T a dd b
a ad dcd ONE.
W aca ad a aca. H, cda d
cb a ad c ca dd. Dd bc,
cb d cb cd b b a d bad, b a c
a ad / d a cc.
8.9.2 W aca ad a b ca , ada cd da,
, ca ad d cc d.
Ia a F&SSPA a b ad d cb a bd.
Sa d a b a a a c
ab a ad. F aca cc, a ad
d cc a b.
Eac aca ad d aca, ca c,
cb b d cb ( a), a dab, acd ad .
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
65/102
F & SSPA c a 65 (102) R: Ic R
8.9.3 Ia c cd b , d cc ad a .
T Ta Lad a b ca , ada cd
da, , ca ad d cc . Ia a F&SSPA a
b ad d cb a bd.
M aca d cb a a ab a d
a ad dad ( a) a a c, ad ca, a
ac ad a.
8.9.4 F Gd R cd a S G a c a
c. I ca, B Aa Maa ad Ma Aa Maa,
a Ta Lad, a b cdd c a S G. T a
ca c a a d c cd a bd
c, ad a c.
A d a F 10 b, cd c aca
ad aca. T d cb c a a cdd
accad a d F 10. Dab a ad a
aca a b. T ab dab d Tab 5.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
66/102
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
67/102
F & SSPA c a 67 (102) R: Ic
Months
WeekScheduleWork Packages
Project deliverables are mentioned in the relevant task bars.
Work package 1: Inception Jim S 2% 8
Work package 2: Baseline Gunilla G 18% 18
Work package 3: Financial and economic aspects Gunilla G 16% 16
Work package 4: Technical and operational aspects Johan G 18% 16
Work package 5: Safety aspects Bjrn F 9% 19
Work package 6: Setting up of recommendations Johan & Gunilla 7% 11
Work package 7: Test of recommendations Linda Styhre 12% 11
Work package 8: Final recommendations Johan & Gunilla 4% 5
Management Monica G 7% 48
Project management 48
Quality assuranceSteering Group and Reference Group meetings 7%Project steering group meeting 1Project Steering Group meeting 2Project Steering Group meeting 3Reference Group meeting 1Reference Group meeting 2
Deliverable
Timetable for deliverables: refer to Table 5Hours per week, consultant teamConsultant's relative timeresources per week
Including in kind contributors time Accumulated hours, ikc
F 10:
May2011
Jun2011
Jul2011
Aug2011
Sep2011
Responsible
Per-centageof time
resources
Duration
(weeks)
1 3 5 7 9 11 13 15 17 19 21
1 3 5 7 9 11 13 15 17 19 21 2
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
68/102
F & SSPA c a 68 (102) R: Ic
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
69/102
F & SSPA c a 69 (102) R: Ic R
T Lca Fa c a bd a a b dad d
ca dad a c cad c . T
d bc ad a a a. M cca, ca
a a ac aac ac aca, cc
ac, dad a c a b c a.
T ca a a d a a a c
ad dab.
I d ca a c ac a, b ad
d cb a a d ba.
Bad dd ca a a, ad aa dca
(M&E dca) ca b dd a a c, b
c ad a a b aa LNG a
ab.
F c, dca ca ad dab ad a
d .
Rad ad aa dca, a CO2 b
ad. T a ba d aab aca
d c a NO. SO ad CO2, ad, S G d a,
a b cdd a a c ca .
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
70/102
F & SSPA c a 70 (102) R: Ic R
M a ad d c d a d Tab 4 b.
4: .
; D
1 G & G ; G G
J 17, 2011 B
2 ;
J 29, 2011 Sc/d
3 ;
J 29, 2011 Sc/d
4 ;
J 29, 2011 Sc/d
5 ; J 7, 2011 Gb/d
25;
Sb 23,2011
Sc a IKC
C 6; ,
Ocb 2425,2011
H /(V L) bdcd
2 G ; G Dcb 2,2011
Sc a c, aGa bdcd
1 ; G,F, *
Dcb 8 9,2011
P Zb
2 ;E.,
Jaa 16 17,2012
P Ha
3 ; & A A, G, A, G,
Jaa 23 24,2012
P Sc
3 G & G Jaa 31, 2012 Ca
F ,a a ad a d cb
Fba 10, 2012 Gb
F Mac 2012 Ca
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
71/102
F & SSPA c a 71 (102) R: Ic R
A b a dd c cd dab da ad a. I Tab 5 b dab a d da.
5: .
D D DA B
D J 10, 2011
F J 30, 2011
D B A 29, 2011
F B Sb 26, 2011
D F Nb 21, 2011
D F F Fba 27, 2012
F a ad ac, a a b dd c caa da:
A 15, a c Ma 10 J 31, 2011
Nb 15, a c A 1 Ocb 30, 2011
Fba 15, a c Nb 1, 2011, Jaa 31, 2012
P a a A 15, 2012.
T a ad . T a b cd a ad cd
a:
P R Sa
Ta aa d
P a d
W a d
Tab 1: Udad bd dab c a da
Tab 2: Udad dca a adac c a da a ad
aca
Tab 3: Udad dca a adac c a da a ad aca
Tab 4: Udad a ca ac
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
72/102
F & SSPA c a 72 (102) R: Ic R
T ca a da c d, ad cad ad
a. T ca b cad a ad a ad
ad accad a d cd Gaca. T c a a
dad ca c.
A
Ia ad a b cd c 6 b F a ad. Ia Ad
ca a b cdd cc dab.
T F&SSPA a a cca a cd:
A ; DMA b
A F: aa (ONE) Scaa ad S
G ad d cb.
cd S G ad Rc G
cda
R Fa Cc
T ca d ad da bac ac ad dc a db c a c a.
T ca a a d , d , a ad
aa, c. c. I a aca a d c c,
b ad b ca da c. T c d
aca.
T c a b cdad a, c a adad
c, ab d ad c.
T cac EU ad Ma ada E,
c ad a a. Cda cad
ba a cca ad aa ad cac
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
73/102
F & SSPA c a 73 (102) R: Ic R
c ad a c bd a. I ca a b
a d ad a ad b , ad ca bacd
a a b a a b bd.
T F & SSPA a a SMTF (Sd Ma Tc F) ad a
a EU dd c a LNG a a
. T cdd a Sb 2011 ad b d a
ba d. T a a a c ad
a a a b dcad.
A ba d ad a a aa Sb 23, a
aa c a b a cda d a d
aca 37.
S cac ad ca aad abd a d b.
F G Pd b SSPA Sd ca Sd Ma Tc F, FKAB
ad W S, 2010. A d ad cd
LNG b S Ka. Cac ad c c b d
LNG a c.
G
V L ad AGA a a LNG d F. SSPA cacd aa
ad c b.
F AGA a a aa b ad b a ad LNG b
ba ac Sc ab.T c ad d ad c ad b d
LNG a c.
C G/BG
T d cd, d d a Sd a b
. T ad d ad d c b d.
E
T ac c ES bad a aab ad cc a
a d c c ad a a a ac.
Cac, d ad c E c b LNG a c.
SSPA a b, Ma La c, ca a bad
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
74/102
F & SSPA c a 74 (102) R: Ic R
ca: c, d, ad aa, ad
ac . T , a c a a, cb a c
a , c d d c ac ad
.
Cac ad c Ma La b ab LNG a c.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
75/102
F & SSPA c a 75 (102) R: Ic R
C
Cac a b ad Ca S c, M. J Sa
d c . Ca ' a a a
Bac Sa cad b a d a ca ad ca
. T c b cad b a Bac Sa,
a Bac , ca, aac a ad ca
a a d c . T b , c b
dc ad c a a cca . P
Tb AB ca c, c a a ca 3 E ad a 3
a. Pa c a c d a ca b
ad.
:
Ma Sad E "Ca a a a aab ad
c ", a d B, 1 J 2011.
DG E & E, E C
A
Ea C
Dca Ga Mb ad Ta
U C2: Ma Ta Pc, P & Iad Waa
Postal address: DM 28 - 3/110 B-1049 Brussels Office address: Rue de Mot 28, B-1040 Brussels
Tel. +32 2 2953908 E-mail: mailto:[email protected]
http://ec.europa.eu/index_en.htm
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
76/102
F & SSPA c a 76 (102) R: Ic R
9 T c
d a c d a
b Jaa 2015.
O ad a ac ac ad d a LNG ac Bac Sa, N Sa ad E Ca a TSO ad a. T
ca c d a a cd a ab
a LNG a ac, ad a cda a
a a. Ca bc aa ad
c a ac a b ad.
T d d a c b aa
c ad da c. T ca d ca c
d ad d b acc a a d ac ca
bc aa.
T c a a b ad ad cc a a d
ac aca d ad. I a b ab a
cc cca a ad a a ad
ac ac. I b a a ca cda d
ad b d cb c.
Ac ad d c a:
o T a ca ad cd d cb a acd ad
dcd c ad c DW;
o T c a a b dad ad a cd, a ca
dad d a, cd d
cb;
o T ca a S G ad Rc G;
o Da a ad c a d;
o Da dab c a d;
o T ca a a d ca b a a
ad cd d cb ad ad
c.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
77/102
F & SSPA c a 77 (102) R: Ic R
10 1 ;,
Iad
Da Ta,Ta H,Kda S.Db 2Iad.
T: + 353 1 670 7444Wb: ://.a./a/.a
Fac
Scaa Ga d a M SGMER16 bad RaaF75007 PaFac
T: + 33 1 4275 6600Fac: + 33 1 4275 6678
EMa: [email protected]: ...
T Ud Kd
Ma ad Caad Ac
S Pac
105 Cca Rad
Sa
Ha
SO15 1EG
Wb: ://.d../ca
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
78/102
F & SSPA c a 78 (102) R: Ic R
B
M Cca ad Iac
Dcaaaa Ma V
Vaaa 56
1210 BRUSSELB
P : 02 277 31 11
a : 02 277 40 05
Wb: ://.b..b
T Nad
M Iac ad E
DcaGa Pbc W ad Wa Maa
Kad 4
2596 AA T Ha
Pb 20906
2500 EX T Ha
T Nad
T b: +31 (0)70 456 00 00
Fa b: +31 (0)70 456 11 11
T b: +31 (0)70 456 80 81
Fa b: +31 (0)70 456 83 35
://.aaa.//
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
79/102
F & SSPA c a 79 (102) R: Ic R
Naa P Cc
T Naa P Cc dd ca bd Dc a ,
aa ad bb aa b c c.
T Cc d cd ad cd cda ab bc a a
ac Dc a .
Naa Haaad
Kad 4
Pb 20906
2500 EX D Haa
T Nad
P: (070) 351 76 15
Fa: (070) 351 76 00
@aaad.
Wb: ://.aaad./
Ga
Bda Sca d Hda
BSH Hab
BadNcSa 78
20359 Hab
Ga
T. + 49 (0) 40 3190 0
Fa + 49 (0) 40 3190 5000BSH Rc
Na 5
18057 Rc
Ga
T. + 49 (0) 381 4563 5
Fa + 49 (0) 381 4563 948
Wb: ://.b.d//d.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
80/102
F & SSPA c a 80 (102) R: Ic R
Da
Da Ma A
Vdad 38 C
2100 Kba
Da
P: 3917 4400
Ea: @da.d
Wb: ://.da.d/Sd/H.a
Da Ma Sa Ada
Oad Vad 62 B
P.O.B 1919
DK1023 Ca
Da
T:(+45)3268 9500
Fa: (+45)3257 4341
Ea: @.d
Wb: ://.d//Pa/da.a
Na
Na Ma Dca
P.O B 2222
N5509 Had
Na
P +47 52 74 50 00
Fa +47 52 74 50 01
Ea: a@ad.
Wb: ://.ad./
T Na Caa Ada NCA
Pb 1502
6025 d
Na
P: +47 33 03 48 08
Fa: +47 70 23 10 08
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
81/102
F & SSPA c a 81 (102) R: Ic R
Ea: @.
Wb: ://..
Sd
Sd Ma Ada
SE601 78 N
Sd
: +46 771 63 00 00
a: +46 11 10 19 49
Ea: a@a.
Wb: ://.a.
Sd Ta Ac
Ma Da
P.O. B 653
SE601 15 N
Sd
T: +46 77150 35 03
a: +46 11 23 99 34
Ea: a@a.
Wb: ://.a.
Pad
M Iac
4/6 Cab S
00928 Waa
Pad
S Sa Da
. 0048 22 630 16 39
a 0048 22 630 14 97
Da Ma Ta ad Iad Naa. 0048 22 630 15 40
a 0048 22 630 15 49
Wb: ://....
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
82/102
F & SSPA c a 82 (102) R: Ic R
Laa
T Laa Ma Sa Ada
J. Ja . 24
92251, KadaLaa
P: ( 370 46) 469 602
Fa: ( 370 46) 469 600
Ea: a@a.
Wb: ://.a.//a.
Laa
Ma Ada Laa
P: +371 67062101
Fa: +371 67860082
://.aadaca.//d.
Ea
Ea Ma Ada
Va 4
11413 Ta
ESTONIA
P: +372 620 5500
Fa: +372 620 5506
Ea: a @ a.
Ma Sa D:
L 9
10416 Ta
Ea
P: +372 620 5700Fa: +372 620 5706
Ea: @a.
Wb: ://.a./a/?a=
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
83/102
F & SSPA c a 83 (102) R: Ic R
Ra
M a
Ra Ma Sc Sc
. Kaaad. 3
2
Mc
Ra
105064.
P: +7 (495) 2217130
+7 (495) 2217131
+7 (495) 2217132
+7 (495) 22171337 (495) 2217134
Fa: +7 (495) 6070195
Ea: b@c.
Wb: ://.c./
Fad
F Ta Ac
P.O. B 33,00521 HELSINKI
Fad
P +358 2063 7373
Fa +358 2063 73700
Ea: aa@a.
Wb: .a.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
84/102
F & SSPA c a 84 (102) R: Ic R
10.2.1 ://...Aca Ba S(ABS)
USA ://.a.
D N Va (DNV) Na ://.d.cCa Caca Sc(CCS)
Ca ://.cc..c
Ba Va (BV) Fac ://.a.cLd R (LR) Ead ://..Gac Ld (GL) Ga ://..cN Ka Ka (NK) Jaa ://.ca..Ka R S )KR) Ka ://..c.//d.
P R S(PRS)*
Pad ://..
RINA Ia ://.a.Ra Ma R S (RS)
Ra ://.ad.b.
Ida R S (IRS) IdaCaa R S(CRS)**
Caa ://.c./
* PRS a IACS b c J 2011
**CRS a IACS b c Ma 2011
10.2.2 Hc R S(HRS)
Gc ://..
Ca Ca R S (CR)
Ca ://.cca..
T Ld (TL) T ://.d.B Kaa Ida (BKI) Ida ://.aada.cR Iaca Naa(RINAVE)*
Pa ://.a.
Iaa Naa SBa (INSB)
Gc ://.b.
Aa Caca Sc (ACS) Ia ://.aaca.Baa R S(RBNA)
Ba ://.ba..b
Iaa R S (IROS)
USA, Fda ://..
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
85/102
F & SSPA c a 85 (102) R: Ic R
S Caca Maaa(SCM)
Maaa ://.c.c.
D Ba S(DBS)
C ://.db.c
Iaa Caca Sc(ICS)
Ia ://.c..
Gada Ba S(GBS)
USA, Daa ://.b.
C C
E.d Da
F B
Gac Na
Ga a c Nad
Ga Nad
Ga Fad
Ga Pad
GRT a Fac
Icc Ud Kd
Naa d Ud Kd
Oa Ga
O d E Ga
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
86/102
F & SSPA c a 86 (102) R: Ic R
Sa Ka Sd
Sda Sd
Ta Ga
TIGF Fac
Wa Ga
C C
BEB Eda d Ed GbH Ga
Cca Sa Ud Kd
DONG Sa Da
EDF Fac
E.d Da
E.ON Ga Sa Ga
E Nad
E Mb Ud Sa Aca
F B
Ga Nad
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
87/102
F & SSPA c a 87 (102) R: Ic R
Ga Gaa Ga
Naa d Ud Kd
PGNG Pad
RWE Ga
NAM Nad
S Fac
TAQA Ud Aab Ea
TIGF Fac
Vbd Ga AG Ga
Wa Ga
C C
E Nad
F B
Ga Nad
Ga Pad
Naa d Ud d
S H LNG Taca
Ud Kd
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
88/102
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
89/102
F & SSPA c a 89 (102) R: Ic R
11 2 /
B
P B
F M Mb ad Pbc WK Ab II aa 20 b 5 1000 B
T: +32 2 553 62 51Ea: [email protected]
D
M Scd Bc
Da Ma AVdad 38CCa
T: +45 39174501M: +45 21784652Ea: [email protected]
F
S Sdb
F Ta Sa AcPaaa 5
PO B 320, 00101 HT: +358 20 618 6463M: +358 40 515 5413Ea: .db@a.
H H
CaT Na M Tad ad IdPb 8014 D,0030 O
T: +47 22240411Ea: @d.d.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
90/102
F & SSPA c a 90 (102) R: Ic R
Sd Ma AdaRda Gd
T: +46 11 191038M: +46 733 019930SE 601 78 N
Ea: Rda.Gd@a.
G A
Ad MaaB 49134100 29 ScS
Ea: ad.aa@a.
A APa Kc Ad Ba Ba 7, 70603 Scc
Ea: [email protected].
H
J K J P Yd9850 HaDa
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
91/102
F & SSPA c a 91 (102) R: Ic R
Pac Va CabIabaaa 1,8380 ZbB
T: +32 50543211M: +32 478696245Ea: [email protected]
F G
D NGadaa 41040 BB
T. (Zb): +32(0)2.282.7481T. (B) : +32(0)2282.6480M: +32(0)475.72.18.02
G
A S
Saa 115058 BNa
T: +47 55214316M: +47 95868604Ea: A.S@a.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
92/102
F & SSPA c a 92 (102) R: Ic R
G
B AM 102151 EFad
T: +358 20 4471M: + 358 400 4033 19Ea: B.Aa@Ga.
G
P Ka
Ccaa 17G
T Nad
T: +31505213322M: +31629096238Ea: .c.a.a@a.
G AGLa LadBa 1820457 Hab
GaT: +49 (0)40 361497120Ea: [email protected]
E.
Tb Bab
La 7DK2750 BaDa
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
93/102
F & SSPA c a 93 (102) R: Ic R
A D
C UddTad 412450 Ca SVDa
T: +45 33852955Ea:C.Udd@a.
AE A A/
S B
Sa Aa Pad 281291 Ca K
Da
B
B Sabbaad 552100 Ca Da
T: +45 7731 1039M: +45 2088 8901Ea: [email protected]
G G G
Fd SEa: [email protected]
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
94/102
F & SSPA c a 94 (102) R: Ic R
E EA
Jaa K
Ca d Wa 910
1040 BB
T: +32 2 297 41 64F: +32 2 297 37 27Ea:[email protected].
EA
Pa Bd
Ea Ma Sa Ac (EMSA)Ca d Sd1249206 Lb, Pa
T: +351 21 1214 606EMa: [email protected].
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
95/102
F & SSPA c a 95 (102) R: Ic
12 3
Reference Group Members
Company Contact Address Telephone/Mobile
Svenskt Marintekniskt Forum Johan Algell RiversideMuseigatan 2SE-451 50 UddevallaSweden
Energy Ports Ola Joslin P.O. Box 27314SE-102 54 StockholmSweden
Tel +46 8 670 28 05Mobile +46 70 770 28 05
Port of Esbjerg Kjeld Dahl Srensen Hulvejen 1DK-6700 EsbjergDenmark
Tel +45 5150 8454
Delphis N.V. Edouard De Witte Tel +32 32 47 60 21Mobile +32 477 88 40 48
Bart Rombouts Tel +32 32 47 70 21
Royal Belgian Shipowners Association Ludovic Laffineur Ernest Van Dijckkaai 82000 AntwerpenBelgium
Tel +32 03 232 72 32
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
96/102
F & SSPA c a 96 (102) R: Ic R
Company Contact Address Telephone/Mobile
Grand Port Maritime de
Dunkerque
Frdric Caron Terre-Plein Guillain
BP 46 53459 386 DunkerqueCedex 1France
Tel +33 (0)3 28 28 74 49
Jean-Nol Carlier Tel +33 (0)3 28 28 74 41
Belgian Federal Public Service
Mobility and TransportWalter Mille
ECSA European CommunityShipowners Association
Alfons Guinier Rue Ducale 67P.O. Box 2B-1000 BrusselsBelgium
Benoit Loicq
Kzlekedsmrnk szakrt Henrik Domanovszky ElnkMagyar GzzemKzlekeds KlaszterEgyeslet
+36 70 396 75 02
Rolls-Royce AB Peter Rydahl P.O. Box 10SE-681 29 KristinehamnSweden
Tel +46 550 84 141Mobile +467 70 603 71 27
Keppel Offshore & Marine
Europ Technology Centre
Ruud Haneveer Tel +31 613 00 36 17
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
97/102
F & SSPA c a 97 (102) R: Ic R
Company Contact Address Telephone/Mobile
Rolls-Royce Marine A/S Bent O Pedersen Tel +45 99 30 36 07Mobile +45 404 30 560
Rolls-Royce AB Peter Rydahl
General Sales Manager - Sweden
P.O. Box 1010, S-681
29 Kristinehamn,Sweden
Direct tel: +46 550 84141
Direct fax: +46 550 84173Mobile: +46 70 603 7127
Rolls-Royce Marine Postboks 924, 5008
Bergen
Phone: +47 90 27 95 55
Baltic Sea Clean Shipping Sten Bjrk Port of Trelleborg Mobile +46 708 817 145
Viking Line Kari Pihlajaneimi
Ministry of Infrastructure and the
Environment
Jaap Kolpa P.O. Box 2094
2500 EX The HagueThe Netherlands
Tel +31 70 351 16 24
Baltic Energy Forum e.V. Jrg D Strussler Grevesmhlener Str 8223936 Mallentin
Tel +49 38824 81013
Port of Antwerp Tessa Major Siberiastraat 202030 AntwerpBelgium
Tel +32 03 205 2477Mobile +32 0486 03 64 41
Port of Aarhus Kim Meilstrup Mindet 2Postboks 130DK-8100 Aarhus CDenmark
Tel +45 89 36 82 12Mobile +45 20 60 52 82
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
98/102
F & SSPA c a 98 (102) R: Ic R
Company Contact Address Telephone/Mobile
Ministry of Transport Sren Clausen Frederiksholms Kanal27 FDK-1220 Copenhagen K
Denmark
Tel +45 33 92 43 87
Danish Shipowners Association Peter Wallbohm Olsen Amaliegade 33DK-1256 Copenhagen KDenmark
Tel +45 33 48 92 07Mobile +45 29 36 88 70
Danish Ports Nete Herskind Weidekampsgade 10,Postboks 33702300 Kbenhavn S.
Tel +45 33 70 31 37
Fax:+45 3370 33 71
Baltic Ports Organization Bogdan Oldakowski c/o Actia Forum LtdPulaskiego Str 881-368 Gdynia
Poland
Tel +48 58 627 2467Mobile +48 502 559 631
Vopak LNG Holding B.V. Joop Jonkers P.O. Box 8633000 AW RotterdamThe Netherlands
Tel +31 (0) 10 400 2417Mobile +31 (0) 6 2279
9430Danish Society of NavalArchitecture and MarineEngineering
Steen Sabinsky Amaliegade 33 BDK-1256 Copenhagen KDenmark
Tel +45 33 33 74 88Mobile +45 29 66 24 08
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
99/102
F & SSPA c a 99 (102) R: Ic R
13 4
Fab d a LNG a ac ad cda.
Da S,
Sc Ocb 2010, Da Ma A a aad a a ca a
ab , a, Bac Sa b d b aa a . T
c a a bad ca 20 a, cd ca,
ad a ad a acd TRANSEUROPEAN TRANSPORT
NETWORKS EXECUTIVE AGENCY TENT EA a a Ma Sa a.
Pa cd a.I Ma 2011, Sd cac , F & SSPA, ad a
ab d cda d a ac LNG
a. T cac a d Ma 9 Ca ad a a d
ac 2012.
Hb F & SSPA c a d ab a cac a
d cb TENT c.
T F & SSPA a ad b ca ca F Id
AB ad SSPA Sd AB, c.
T c c a ad a ad dad a
c. T c a b d J.
W , c a cac Y ad
da dc Y ad Y ca ca cb c. W d
a a cb ad a d cb a
ac a aab c c.
A c a b. I a F & SSPA
c, ab d, d TENT c. T F&SSPA a cdc a b aca a ad . T a
cdcd b F ad SSPA ad c ca d
cb.
Bad Ba d (WP2), aa c d ; Ecc
ac (WP3), Oaa ad cca ac (WP4) ad Sa ac (WP5)
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
100/102
F & SSPA c a 100 (102) R: Ic R
c. T ad WP6 cda a LNG a
ac a . Rcda b adad a c
WP7. T F & SSPA c a cdc d ab
a d ca ad ada dc. T b cdcd
d ac dd aa d aca dc ad
aa cd. Fc , ad a d, a a d cb. Fa, WP8 Fa cda b
d ad d a a ac a.
A dad cd d d: S
a ac B J 17. T WP7 a ac a
Dcb 2011 ad d Jaa 2012. T c b ad Mac
2012. A dad a ad cd b d Ic .
W ad cdc a c ad aca ca Y
d c 10 !
Kd ad
F F & SSPA c a
Mca Gb J Sad
Cac, d c ad Pc a ad
D Had Da Vc Pd
F Id AB SSPA Sd AB
[email protected] .ad@a.
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
101/102
8/14/2019 LNG-Infrastructure-Inception-report _110707.pdf
102/102
Monica GullbergTekn. Lic./Lic. Eng. (Civ. Eng.)
Energy and System AnalysisF, Industry Division
Jim SandkvistVice PresidentTekn. Lic./Lic. Eng. (Civ. Eng.)
SSPA SWEDEN AB - YOUR MARITIME SOLUTIONPARTNER