CONTINUOUS PUSH TO UTILIZE NATURAL GAS AND LNG BY FASTRACKING LNG SUPPLY IMPORTS AND INFRASTRUCTURE DEVELOPMENT
2nd
LNGFORUM SERIES
4 - 6 February 2015 | Pan Paci�c Manila , Philippines
LNG SUPPLY, TRANSPORT & STORAGE PHILIPPINES
WHY LNG PHILIPPINES? For the Philippines – which is currently one of Asia's fastest-growing economy –, importing LNG is only a question of when and how, and no longer if. To prepare for the energy future of the Philippines – especially with the inevitable decline of Malampaya–, this forum will continue to lay the groundwork for the establishment of a natural gas master-plan incorporating the entire value chain which is anticipated to be announced end 2015. Taking the theme, “Continuous Push to Utilize Natural Gas and LNG by Fast Tracking LNG Supply Imports and Infrastructure Development”, the timely 2nd LNG SUPPLY, TRANSPORT & STORAGE PHILIPPINES 2015 will continue to addresses issues with LNG imports and infrastructure developments that will definitely be taking place in the Philippines and the region. This is the perfect opportunity for all serious stakeholders to highlight potential opportunities for development and establish their position in the upcoming LNG boom.
IN PARTNERSHIPWITH
Organized by:
Media Partners:
TEL: +65 6506 0951 FAX: +65 6749 7293 EMAIL: [email protected] WEB: www.lng-world.com
Philippine ResourcesMining, Petroleum & Energy Journal
Conference Sponsors:
Sponsor:
Silver Sponsors:
TEL: +65 6506 0951 FAX: +65 6749 7293 EMAIL: [email protected] WEB: www.lng-world.com
ABOUT THE 2nd LNG SUPPLY, TRANSPORT & STORAGE PHILIPPINES 2015 FORUM
Asia is LNG reliant - with spiralling demand double that of Latin America or Europe. The Philippines, currently one of Asia's fastest-growing economies is seriously seeking LNG to fill its demand gap. In addition to seeking sustainable LNG supply, private stakeholders in the Philippines are putting terminal projects – both offshore and onshore – on a fast-track route.
With the Department of Energy (DOE) currently forging a master plan for liquefied natural gas (LNG) as part of its efforts to increase the LNG share in the energy mix, Philippines will soon be importing LNG once all the necessary plans and infrastructure are in place.
WHAT HAPPENED IN 2013?
The first ever LNG Supply, Transport and Storage Philippines 2013 Forum attracted 176 delegates. The 2013 forum offers a one-shot platform for all serious stakeholders to highlight their positions in and distinctive solutions for the nascent Philippine LNG industry while establishing relationships with key policy-makers and private sector players integral to gas import licensing as well as LNG supply, off-take and distribution.
The event report can be downloaded on http://lng-world.com/event-report.html
LNGFORUM SERIES
2nd LNG SUPPLY, TRANSPORT& STORAGE PHILIPPINES
4 - 6 February 2015 | Pan Paci�c Manila, Philippines
CONTINUOUS PUSH TO UTILIZE NATURAL GAS AND LNG BY FASTRACKING LNG SUPPLY IMPORTS AND INFRASTRUCTURE DEVELOPMENT
IN PARTNERSHIPWITH
PROPOSED RUNDOWN
Pre Conference Workshops• Wednesday, 4 February 2015 •
Workshop A: LNG 101: INTRODUCTION TO LNG BUSINESS This workshop is designed for those looking to gain a better understanding of the fundamentals of the LNG industry - from the technical to the commercial aspects.
Facilitated by:
Tony Regan Principal ConsultantTRI-ZEN INTERNATIONAL PTE LTD
TEL: +65 6506 0951 FAX: +65 6749 7293 EMAIL: [email protected] WEB: www.lng-world.com
Main Conference Day One• Thursday • 5 February 2015 •
0900 Welcome Remark by All Events Group 0905 KEYNOTE WELCOME
H.E Carlos Jericho Petilla Secretary DEPARTMENT OF ENERGY (Invited)
0915 OPENING REMARK: FUTURE OF LNG FOR THE PHILLIPINES
Senior Representative DEPARTMENT OF ENERGY
0930 MEETING INCREASING DOMESTIC DEMAND WITH NATURAL GAS AND LNG: PNOC ROLE AND GOALS
Antonio M. Cailao President & CEO PHILIPPINE NATIONAL OIL COMPANY
1000 LNG SUPPLY/DEMAND AND BENEFITS OF GAS
James MacTaggart General Manager for Middle East, North Africa and Asia SHELL
1030 Networking Coffee Break
1100 NEW LNG SUPPLY FROM CANADA – OPPORTUNITIES FOR THE PHILIPPINES
Francois Nguyen Director International Energy Policy Branch ALBERTA DEPARTMENT OF ENERGY
1130 UTILIZING LNG FOR POWER GENERATION – INDONESIA CASE STUDY
Chairani Rachmatullah Senior Manager for Energy Planning and Evaluation PT PLN
1200 Networking Lunch
1315 INTEGRATING NATURAL GAS INFRASTRUCTURE TO MEET INCREASING DOMESTIC DEMAND
Jose Basanio T. Aldon Senior Adviser – Natural Gas Business, Business Development FIRST GEN CORPORATION
1345 DEVELOPING AN LNG CHAIN FOR THE PHILIPPINES: MEMBRANE SYSTEMS OPEN UP NEW OPPORTUNITIES
Stéphane Maillard Business Development Manager GAZTRANSPORT & TECHNIGAZ
1415 FSRU EVOLUTION AND ADVANTAGES
Jakob Stampe Director- Regas HÖEGH LNG ASIA
1445 Networking Coffee Break
1515 SMALL SCALE LNG BASED POWER GENERATION IN THE PHILIPPINES
Bing Thomas Country Manager - Business Development (Power Plants) WÄRTSILÄ CORPORATION
1545 PANEL DISCUSSION
EFFECTIVE INTEGRATION ALONG THE NATURAL GAS VALUE CHAIN: WHAT NEEDS TO BE DONE TO ENSURE LNG TAKES OFF SUCCESSFULLY IN THE PHILIPPINES?
Panellists include: • Alan Townsend, Senior Energy Specialist, WORLD BANK • Francois Nguyen, Director International Energy Policy Branch, ALBERTA DEPARTMENT OF ENERGY • Jose Basanio T. Aldon, Senior Adviser – Natural Gas Business, Business Development, FIRST GEN CORPORATION • Nicolas Lefevre, General Manager, TRACTEBEL ENGINEERING (GDF SUEZ)
Facilitated by: Tony Regan Principal Consultant TRI-ZEN INTERNATIONAL PTE LTD
1630 End of Conference Day One
LNGFORUM SERIES
2nd LNG SUPPLY, TRANSPORT& STORAGE PHILIPPINES
4 - 6 February 2015 | Pan Paci�c Manila, Philippines
CONTINUOUS PUSH TO UTILIZE NATURAL GAS AND LNG BY FASTRACKING LNG SUPPLY IMPORTS AND INFRASTRUCTURE DEVELOPMENT
IN PARTNERSHIPWITH
TEL: +65 6506 0951 FAX: +65 6749 7293 EMAIL: [email protected] WEB: www.lng-world.com
Main Conference Day Two• Friday • 6 February 2015 •0900 Day One Recap
0915 HASTENING NATURAL GAS AND LNG INFRASTRUCTURE DEVELOPMENT FOR POWER – PRACTICAL, FAST TRACK SOLUTIONS
Karim G. Garcia Energy Expert
0945 CHALLENGES AND OPPORTUNITIES FOR LNG IMPORT TERMINALS: THE EXPERIENCE AND VIEWS FROM A EUROPEAN LNG TERMINAL OWNER AND OPERATOR
Franck Le Baron VP International Projects ELENGY (GDF SUEZ)
1015 CRITICAL ROLE OF LNG IN JAPAN’S ENERGY MIX
Akira Miyamoto General Manager and Executive Researcher OSAKA GAS
1045 Networking Coffee Break
1115 CONFIGURATION AND PLANNING OF NEAR SHORE FLOATING TERMINALS – OPPORTUNITIES FOR THE PHILIPPINES
Ron Heffron Vice President MOFFATT & NICHOL
1145 FINANCING NATURAL GAS AND LNG PROJECTS: KEY CONSIDERATIONS
1215 Networking Lunch
1330 TEMPORARY POWER SOLUTIONS WITH NATURAL GAS
Donny Syafrudin Head of International Sales PT SUMBERDAYA SEWATAMA
1430 THE POTENTIAL OF SMALL-MID SCALE LIQUIFACTION IN THE PHILIPPINES
Tony Regan Principal Consultant TRI-ZEN INTERNATIONAL PTE LTD
1500 LNG FOR TRANSPORTATION
Lee Giok Seng Executive Director ASIA PACIFIC NATURAL GAS VEHICLES ASSOCIATION
1530 Summary and End of Conference
LNGFORUM SERIES
2nd LNG SUPPLY, TRANSPORT& STORAGE PHILIPPINES
4 - 6 February 2015 | Pan Paci�c Manila, Philippines
CONTINUOUS PUSH TO UTILIZE NATURAL GAS AND LNG BY FASTRACKING LNG SUPPLY IMPORTS AND INFRASTRUCTURE DEVELOPMENT
IN PARTNERSHIPWITH
LNGFORUM SERIES
2nd LNG SUPPLY, TRANSPORT& STORAGE PHILIPPINES
4 - 6 February 2015 | Pan Paci�c Manila, Philippines
CONTINUOUS PUSH TO UTILIZE NATURAL GAS AND LNG BY FASTRACKING LNG SUPPLY IMPORTS AND INFRASTRUCTURE DEVELOPMENT
IN PARTNERSHIPWITH
B1SHELL
B2WARTSILA
B4TRACTEBEL
ENGINEERING
12 SQM
9 SQM
9 SQM
TEL: +65 6506 0951 FAX: +65 6749 7293 EMAIL: [email protected] WEB: www.lng-world.com
Samuel TanBusiness Development ManagerEmail : [email protected] : +65 6506 0963Mobile: +65 8777 0237Fax : +65 6749 7293
CONTACT PERSON:
STANDARD BOOTH
Consists of:
Wall Panels; 1 x Reception Table; 2 x Chairs; 1 x Powerpoint; 1 x Spotlight; 1 x Waste Basket; Carpet Underlay; Fascia Sticker with Booth No.
3m x 3m
PREMIUM BOOTH
Consists of:
Wall Panels; 1 x Reception Table; 2 x Chairs; 1 x Powerpoint; 1 x Spotlight; 1 x Waste Basket; Carpet Underlay; Fascia Sticker with Booth No.
4m x 3m
PAN PACIFIC HOTEL, MANILA FLOORPLAN
Delegate 1 Mr ( ) Mrs ( ) Ms ( ) Dr ( ) Other ( )
First Name: Last Name:
Job Title: Department:
Telephone ( ) Fax ( )
Email:
Delegate 2 Mr ( ) Mrs ( ) Ms ( ) Dr ( ) Other ( )
First Name: Last Name:
Job Title: Department:
Telephone ( ) Fax ( )
Email:
Approving Manager Mr ( ) Mrs ( ) Ms ( ) Dr ( ) Other ( )
First Name: Last Name:
Job Title: Department:
Telephone ( ) Fax ( )
Email:
Company:
Address:
Email: [email protected]
Phone: +65 6506 0951
Fax: +65 6749 7293
Post: All Events Group Pte Ltd 52 Foch Road, #02-02 Singapore 209274
By Cheque: Made payable to All Events Group Pte Ltd and mailed with your registration form to All Events Group Pte Ltd (postal address above)
By Telegraphic Transfer: to All Events Group Pte Ltd, United Overseas BankAccount Number: 421-300-086-6Branch Code: 7375-494
By Credit Card: Please debit my credit card for:
USD
Card No:
Expiry Date: (mm/yy)
Name on Card:
CVV/Security Code:
Signature:
Visa Mastercard
Payment Policy: Payment is due in full at the time of registration. Full payment is mandatory for event attendance. Cancellations & Substitutions: Substitutions will be accepted at any time prior to the event. AEG will not provide refunds for cancellations. For cancellations received in writing more than seven (7) days prior to the conference, you will receive a full credit to be used at another AEG event for up to one year from the date of issuance. For cancellations received seven (7) days or less prior to an event (including day 7), no credits will be issued. In the event that AEG cancels an event, a full credit will be credited to the delegate for use at another AEG event. This credit is valid for one (1) year from the date of issuance. We reserve the right to change the venue and date of the event if required. AEG is not responsible for any loss or damage as a result of a substitution, alteration or cancellation / postponement of an event. AEG will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this event impracticable or impossible. For purpose of this clause, a fortuitous event shall include, but not be limited to: war, fire, labor strike, extreme weather or other emergencies. Program Change Policy: Please note that speakers and topics were confirmed at the time of publishing; however circumstances beyond the control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, AEG reserves the right to alter or modify the advertised speakers and/or topics if necessary. Any substitutions or alterations will be updated on our web page as soon as possible.
REGISTRATION: 4 WAYS TO REGISTER
EASY PAYMENT METHODS
Conference + Workshop A USD 2950
Conference Only USD 2200
Workshop A USD 750
TEL: +65 6506 0951 FAX: +65 6749 7293 EMAIL: [email protected] WEB: www.lng-world.com
LNGFORUM SERIES
2nd LNG SUPPLY, TRANSPORT& STORAGE PHILIPPINES
4 - 6 February 2015 | Pan Paci�c Manila, Philippines
CONTINUOUS PUSH TO UTILIZE NATURAL GAS AND LNG BY FASTRACKING LNG SUPPLY IMPORTS AND INFRASTRUCTURE DEVELOPMENT
IN PARTNERSHIPWITH