Gabriele PuglierinGabriele Puglierin 11
LNLLNL--LNS LNS InternationalInternational ScientificScientificCommitteeCommittee MeetingMeetingLNLLNL FebruaryFebruary 1010thth, 2005, 2005
Gabriele PUGLIERIN Gabriele PUGLIERIN -- LNL DirectorLNL Director
INFN INFN –– LNL LNL
INFN - LNL Identity Card
MULTI TASKMULTI DISCIPLINARY
Nuclear Physics BasedUser Oriented Laboratories
CORE RESEARCH ACTIVITIES1. Nuclear Structure and Dynamics2. Applications and Interdisciplinary use of ion
beams and nuclear techniques and methods
Gabriele PuglierinGabriele Puglierin 33
ALPI Complex
TandemXTU
High EnergyPhysics Building
CN accelerator
ISTITUTO NAZIONALE DI FISICA NUCLEARELABORATORI NAZIONALI DI LEGNARO
Gabriele PuglierinGabriele Puglierin 44
ISTITUTO NAZIONALE DI FISICA NUCLEARELABORATORI NAZIONALI DI LEGNARO in 1961
Ion and neutron beamsIon implantation
Trace elements analysisRBS, ERD, NRA, PIXE,
Channeling.Microbeam associated with IBIC, IBIL, PIXE
NUCLEAR PHYSICSACTIVITIES
FOLLOW - UPAT LNL
RADIATION BIOPHYSICSmicro/nanoDOSIMETRYRADIOPROTECTIONENVIRONMENTALSTUDIES
SURFACE ANALYSIS AND MODIFICATIONWITH ION BEAM
MATERIAL BULK PROPERTIESGEOLOGICAL SAMPLE ANALYSIS
PROBING OF RADIATION HARDNESS industrial, space and research
applicationsMODIFICATION OF SUPERCONDUCTING
MATERIAL THROUGH IRRADIATIONNANO MATERIALS
Accelerator Physics and TechnologyIon ImplanterMaterial Science Laboratory for radiation and particledetectorsComputingRF Superconductivity (Materials, Chemistry, FabricationMethods)Target LaboratoryCryogenics (Materials, mechanics, plants)Advanced Detection SystemsRadiobiology LaboratoryHalls equipped for construction of large size apparatus
Methods andTechniques
FUNDAMENTALINTERACTION
PHYSICSvacuum polarization(QED), gravitational
wavesearching,
Atomic trapping ofRIBs (MOT trap)
µ-chambers (CMS)
Silicon streaps(ALICE)
R&D, Support ofTechnological and Research
Infrastructures
AURIGA 2AURIGA 2ndnd run @ 4K: upgrades & resultsrun @ 4K: upgrades & results
800 820 840 860 880 900 920 940 960 980 10001E-22
1E-21
1E-20
1E-19
1E-18Auriga T=4.5K Run#590
Shh
[H
z-1/2]
Frequency [Hz]
- AURIGA- AURIGA expected sensitivity- LIGO LLO- LIGO LHO
new mechanical suspensions:attenuation > 360 dB at 1 kHz FEM modelled
new capacitive transducer:two-modes (1 mechanical+1 electrical) optimal mass
new amplifier:double stage SQUID 200 h energy resolution
new data analysis:C++ object oriented code frame data format
Spurious lines * (related to environmentalnoise), do not affect significativelythe burst sensitivity e.g., for a 1 ms pulse:
hmin≈ 3 x10-19
Bandwidth: noise floor below 5x10-21 Hz-1/2
within a 100 Hz band
Spurious event rate: few events/hour with an observational duty-cycle of 60 %
* **
*
DUAL R&D: wideband high frequency DUAL R&D: wideband high frequency gravitational wave detectorgravitational wave detector
2 nested resonant masses
Mo Dual 16.4 ton height 2.3 m Ø 0.94m SiC Dual 62.2 ton height 3 m Ø 2.9m
Science with DUAL• Neutron Star mergers, vibrations and instabilities • Equation of State of superdense matter • Experimental Physics of Black Holes:
inspiral, merger and ring-down
Differential readout of the relative distance of the 2 masses over large areas:• Gravitational wave signal sums up• Backaction noise cancels out
Sensitive in a kHz-wide frequency band
Seamless cavities: An eventual new fabrication technology for the ILC
40 MV/m: The best result measured at KEK on a LNL monocell spun cavity,
Nb sputtering into Cu cavitiesSpinning of a Seamless Nb resonatorElectropolishing of a QWR
Transferring the Know-how developed for Superconducting Cavities for Particle Accelerators to the low tech Industry on Surface treatments
Gold Electropolishing without CyanidesTitanium screw for dental Implant
Cu cleaning from Th ultra traces for the Double Beta Decay Experiments
Chemical Polishing
ElectroPolishing
Plasma cleaning
Plasma Cleaning
INFN - LNL PERSONNEL
ACCELERATORDIVISION
RESEARCHDIVISION
Engineeringand GeneralService
ADMINISTRATIVESERVICE
DIRECTIONSERVICE
RADIOPROT. &HEALTH SERVICES
3 14 28 1
21 4 9 1
- 2 23 1
- - - 5
- - - 5
- 1 1 1
24 21 61 14
RESEARCH TECHNOL. TECHNIC. ADMINIS.
OPEN STAFF POSITIONS(winners of public competitions) 2
INFN TEMPORARYPOSITIONS + POSITIONSFINANCED BY UE
21
PADUA UNIVERSITY NONACCADEMIC STAFF POSITIONS 5
ASSOCIATED PADUAUNIVERSITY ACCADEMIC STAFF 3
OTHER ASSOCIATED SCIENTIFICPERSONNEL 89
STAFF POSITIONS
46
35
26
5
5
3
120
TOTAL
LNL Employees
113 117
11.1 10 14 16.1 21
120120.1121114.1
17
020406080
100120140160
1999 2000 2001 2002 2003 2004
Years
Temporary StaffPermanent Staff
Technicians - Administration staff
69
7
70
7
72
9
75
8
75
8
75
0
20
40
60
80
100
1999
2000
2001
2002
2003
2004
Years
Permanent staff Temporary staffPermanent staff
11
Technologists - Researchers
44 45 46 45 45
3 5 8 8.1 10
0
10
20
30
40
50
60
2000
2001
2002
2003
2004
YEARS
Permanent Staff Temporary Staff
LaboratoryCouncil
ScientificCommittee
Operation of Acceleratorsfor interdis. activitiesand applications
Technological plantsfor accelerators
Ion sources
AcceleratorDivision
ResearchDivision
Exper. groups II, III,V
User SupportingService
Computing
Material Science Lab
Radiobiology Lab
Library and Documentation
Engineering andGeneral Services
Division
Building and GeneralSupp. Services
Control Systems forAccel. and Exp. Apparatus
Drawing and TechnnicalDocumentation
TechnologicalInfrastructures and Plants
Technologiesand materials for Mechanic
Application
DirectionService
Administr.Service
RadioprotectionHealth
Service
DIRECTOR
R&D
Accelerator OperationMaintenance
AcceleratorPhysics and Technology
Lab General Store
INFN - LNL ORGANIZATION CHART
Individual users asking for access(duration of stay > 7 days)
260
100
183
135
166
168
273
277
162
305
228
356
260
357
0
100
200
300
400
500
600
700
1998 1999 2000 2001 2002 2003 2004
years
Italian GuestsForeign guests
LNL Nuclear Physics PROPOSALSApproval Factor %
0
10
20
30
40
50
60
70
80
19941995
19961997
19981999
20002001
20022003
2004
N.° of submitted proposals N.° of approved proposals
51%
57%.70%
60%65%
57%50%54%
75%71%
72%
LNL – BUDGET 2005-2004
LNL Budget 2005LNL Budget 2005 LNL Budget 2004LNL Budget 2004
InitialInitial Budget 9.9 Budget 9.9 M€M€RunningRunning CostsCosts 7.8 7.8 M€M€ResearchResearch ProgramsPrograms 2.1 2.1 M€M€
InitialInitial Budget 10.25 Budget 10.25 M€M€RunningRunning CostsCosts 7.8 7.8 M€M€ResearchResearch ProgramsPrograms 2.4 2.4 M€M€
Final Budget Final Budget ?? Final Budget 18 Final Budget 18 M€M€(4.7 (4.7 forfor the new the new infrastructuresinfrastructures))
Infrastructures for the new projects
NEW ELECTRICAL POWER STATION 132/20 KV 80 KVA
NEW COURSE OF THE WEST SIDE BOARDER DITCH
PRIMARY URBANIZATION, ROADS, CABLE DUCTS …
Funded (7M€), work in progress to be concluded into 2006
Funded (2.3M€), project completed, work to be assigned,completion expected into 2006
Founded (2.4M€), project on the way, work to be assigned,completion expected into 2006
LNL - What’s NEW?A new DirectorA new Director
A new (PAC) Program A new (PAC) Program AdvisoryAdvisory CommitteeCommittee
A new INFN A new INFN PresidentPresident, , Prof.Prof. Roberto Roberto PetronzioPetronzio
A new INFN Executive Board (A new INFN Executive Board (exceptexcept forfor Prof.Prof. G. Ricco, in G. Ricco, in
chargecharge of of NuclearNuclear PhysicsPhysics))
A new A new PresidentPresident on the INFN on the INFN NuclearNuclear PhysicsPhysics AdvisoryAdvisory
CommitteeCommittee, , Prof.Prof. Angela BraccoAngela Bracco
A new A new financialfinancial lawlaw impliesimplies a a reductionreduction of the of the PersonnelPersonnel
costscosts (5%), (5%), butbut therethere isis the the possibilitypossibility toto useuse externalexternal fundsfunds
forfor temporarytemporary contractscontracts..
EURONSEURONSEUROpeanEUROpean NuclearNuclear StructureStructure researchresearch
ContractContract n.° 506065n.° 506065
UCL-CRC (B)GANIL (F)GSI (D)INFN-LNL (I)JYU-JYFL (FIN)RUG-KVI (NL)ECT* (EUR)CERN-ISOLDE (EUR)
Future cooperationsPooling of resourcesStimulating complementarityEnsuring broad dissemination of results
Development of:• Detectors• Integrated Electronics
(ASIC)• Ion sources• Ion Traps
Radiation-safety issues
352
3144
76
Researchers Man-days Projects
8 World-class facilities11 Joint Research Activities 7 Networks
MANET+
TRASNATIONAL ACCESS ACTIVITIES
NEXT GENERATION RIB FACILITIES
78 78 EuropeanEuropean ScientificScientific InstitutionsInstitutions, (, (fromfrom 27 27 countriescountries) ) involved.involved.Total Financial Budget for INFN: 1.290.600 €
EXTERNAL FINANCIAL RESOURCESEUROPEAN CONTRACTS (2004 Data)EUROPEAN CONTRACTS (2004 Data)
PROJECT ACRONYMPROJECT ACRONYM DURATIONDURATION SCIENTIFIC SCIENTIFIC COORDINATORCOORDINATOR
TOTAL TOTAL AMOUNTAMOUNT
NN--TOFTOF--ADS (5TH FP)ADS (5TH FP)Ads Nuclear Data within the framework of the research Ads Nuclear Data within the framework of the research and training programme (EURATOM) in the field of nuclear and training programme (EURATOM) in the field of nuclear energyenergy
01/11/0001/11/0031/12/0431/12/04
Dr. N. ColonnaDr. N. Colonna 253,3 253,3 kEkE
CARE CARE –– Coordinated Accelerator Research in EuropeCoordinated Accelerator Research in Europe 01/01/0401/01/0431/12/0831/12/08
Dr. V. Dr. V. PalmieriPalmieri 415,8 415,8 kEkE
EURISOL DSEURISOL DS (Negotiation phase)(Negotiation phase)European Isotope Separation OnEuropean Isotope Separation On--Line Radioactive Ion Beam Line Radioactive Ion Beam FacilityFacility
1/2/051/2/0531/1/0931/1/09
Dr. G. FortunaDr. G. Fortuna 1.428,5 1.428,5 kEkE
GRIDCC GRIDCC Grid Enabled Instrumentation with Distributed Control and Grid Enabled Instrumentation with Distributed Control and ComputationComputation
1/9/041/9/0431/8/0731/8/07
Dr. G. Dr. G. MaronMaron 808,0 808,0 kEkE
ILIAS ILIAS Integrated Large Infrastructure for Astroparticle ScienceIntegrated Large Infrastructure for Astroparticle Science
1/4/041/4/0431/3/0931/3/09
Dr. J.P. Dr. J.P. ZendriZendri 157,3 157,3 kEkE
CELLION CELLION Studies of cellular response to targeted single ions using Studies of cellular response to targeted single ions using nanotechnologynanotechnology
1/2/041/2/0431/1/0831/1/08
Dr. R. Dr. R. CherubiniCherubini 222,9 222,9 kEkE
MARIE CURIE/TONEVMARIE CURIE/TONEVNuclear structure investigation of mirror nuclei via lifetime Nuclear structure investigation of mirror nuclei via lifetime measurementsmeasurements
3/03/033/03/032/3/052/3/05
Dr. G. De AngelisDr. G. De Angelis 123,8 123,8 kEkE
FRAUExternal Funded Research Activities Unit - EUROPEAN UNION and other public and private bodies
EXTERNAL FINANCIAL RESOURCESOTHER RESEARCH INSTITUTIONS FUNDS (2004 Data)OTHER RESEARCH INSTITUTIONS FUNDS (2004 Data)
INSTITUTION/INSTITUTION/ PROJECT ACRONYMPROJECT ACRONYM DURATIONDURATION SCIENTIFIC SCIENTIFIC COORDINATORCOORDINATOR
TOTAL TOTAL AMOUNTAMOUNT
MIUR:MIUR:Nanotechnologies and Microsystems (FISR)Nanotechnologies and Microsystems (FISR)Electromechanical Microsystems based on Silicon Electromechanical Microsystems based on Silicon Carbide on Silicon working in hostile environmentsCarbide on Silicon working in hostile environments
18/12/0318/12/0317/12/0417/12/04
Dr. V. Dr. V. RigatoRigato 70,0 70,0 kEkE
MINI GEARS MINI GEARS SpASpA::Collaboration on new materials industrial applicationCollaboration on new materials industrial application
20042004 Dr. V. Dr. V. RigatoRigato 35,1 35,1 kEkE
OTHERSOTHERS
Contribution of others Institutions to new Contribution of others Institutions to new installationsinstallations
1999 20041999 2004 600,0 600,0 kEkE
MAE:MAE:Contribution for construction of a “Neutron source Contribution for construction of a “Neutron source for exotic beams production with medical for exotic beams production with medical application”application”
01/01/0401/01/0431/12/0431/12/04
Dr. L. Dr. L. TecchioTecchio 41,0 41,0 kEkE
PRIVATE FUNDS (2004 Data)PRIVATE FUNDS (2004 Data)
FRAUExternal Funded Research Activities Unit - EUROPEAN UNION and other public and private bodies
EXTERNAL FINANCIAL RESOURCES
2005 SHARE OF RESOURCES2005 SHARE OF RESOURCES
AMOUNTAMOUNT
EUROPEAN CONTRACTSEUROPEAN CONTRACTS878,00 878,00 kEkE
OTHER RESEARCH INSTITUTIONS FUNDSOTHER RESEARCH INSTITUTIONS FUNDS 76,00 76,00 kEkE
PRIVATE FUNDSPRIVATE FUNDS 35,10 35,10 kEkE
TOTAL 989,1 TOTAL 989,1 kEkE
FRAUExternal Funded Research Activities Unit - EUROPEAN UNION and other public and private bodies
EXTERNAL FINANCIAL RESOURCESPROJECTS SUPPORTED BY ISTCPROJECTS SUPPORTED BY ISTC(INTERNATIONAL SCIENCE & TECHNOLOGY CENTER)(INTERNATIONAL SCIENCE & TECHNOLOGY CENTER)
PROJECT NAMEPROJECT NAME DEVELOPMENT OF SOLID NEUTRON CONVERTERDEVELOPMENT OF SOLID NEUTRON CONVERTER
CONTRACT/DURATION/AMOUNTCONTRACT/DURATION/AMOUNT ISTC 2257 ISTC 2257 -- (2003(2003--2006) 2006) -- 450,0 k$450,0 k$FOREIGN COLLABORATORSFOREIGN COLLABORATORS INFNINFN--LNL, CERN, UNIVERSITY OF MAINZLNL, CERN, UNIVERSITY OF MAINZ
SCIENTIFIC COORDINATOR:SCIENTIFIC COORDINATOR: Dr. L. Dr. L. TecchioTecchio
RUSSIAN PARTICIPANTSRUSSIAN PARTICIPANTS PNPI (PNPI (GatchinaGatchina), KHLOPIN RADIUM INSTITUTE), KHLOPIN RADIUM INSTITUTE
SCIENTIFIC COORDINATOR:SCIENTIFIC COORDINATOR: Dr. L. Dr. L. TecchioTecchio
PROJECT NAMEPROJECT NAME DEVELOPMENT OF HIGH TEMPERATURE UCx TARGETDEVELOPMENT OF HIGH TEMPERATURE UCx TARGETCONTRACT/DURATION/AMOUNTCONTRACT/DURATION/AMOUNT ISTC 2965 ISTC 2965 –– (2005(2005--2006) 2006) -- 160,0 k$160,0 k$FOREIGN COLLABORATORSFOREIGN COLLABORATORS INFNINFN--LNL, GANIL, TRIUMPHLNL, GANIL, TRIUMPH
RUSSIAN PARTICIPANTSRUSSIAN PARTICIPANTS BINP (Novosibirsk), VNIITF (BINP (Novosibirsk), VNIITF (SnezhinskSnezhinsk))
FRAUExternal Funded Research Activities Unit - EUROPEAN UNION and other public and private bodies
In January we had a visit of the INFN President.
There was some discussion on the future of the
Lab.
We have been encouraged to continue the effort to
get in reasonable time RIB’s of Physics interest.
This also according to NUPECC indication for the
medium term facilities.
This also according to the recent collaboration
agreement GANIL – LNL.
This also as part of the effort to the largest project
EURISOL.
1.1. GSI GSI approvedapproved (AGREEMENTS SIGNED)(AGREEMENTS SIGNED)2.2. SPIRAL II, SPIRAL II, defineddefined, , ~ approved~ approved3.3. Collaboration GANIL Collaboration GANIL -- LNL progressingLNL progressing
VERY ACTIVE IN : VERY ACTIVE IN : physics physics target developmenttarget development
In the future: In the future: SOURCESOURCETARGET HANDLINGTARGET HANDLINGBEAM SELECTIONBEAM SELECTIONRADIATION CONTROLRADIATION CONTROLSAFETYSAFETYLICENSESLICENSES
International scenario
4.4. EURISOL DS start upEURISOL DS start up
Focus on the future programs1.1. ToTo havehave the system ALPIthe system ALPI--PIAVE PIAVE working working properlyproperly
(FIRST PRIORITY).(FIRST PRIORITY).2.2. SpeedSpeed up the up the FacilityFacility forfor RIB Production.RIB Production.3.3. SupportSupport the the interdisciplinaryinterdisciplinary researchresearch..
Social Impact1.1. ParticipationParticipation in in HadrontherapyHadrontherapy, CNAO, Trento, , CNAO, Trento,
BNCT, BNCT, micromicro--nanonano dosimetrydosimetry, , radiobiologyradiobiology..2.2. DevelopmentDevelopment of GRID.of GRID.3.3. Master on “Master on “SurfaceSurface TreatmentsTreatments forfor IndustrialIndustrial
ApplicationsApplications”, Training ”, Training & Stages& Stages forfor StudentsStudents..4.4. TechnologicalTechnological Transfer, Transfer, visitvisit SuperconductingSuperconducting Lab.Lab.