www.bridgend.gov.ukwww.bridgend.gov.uk
Local Area Energy Strategy &
Smart Energy Plan
Dr Michael Jenkins
www.bridgend.gov.uk
BCBC’s Vision
02
To make Bridgend a decarbonised,
digitally connected smart County
Borough.
BCBC aim to act as an enabler for innovators to introduce and deliver
decarbonisation projects, products and concepts to local consumers.
www.bridgend.gov.uk
Local Challenges
03
• Policy Environment
• Local Topography
• Housing: Type, Tenure.
• Social Factors: Health, Deprivation.
• Technical Factors: Electricity
Network Constraints, Digital
Connectivity.
• Data
• Consumer Acceptance
(OS data © Crown copyright and database right 2018)
www.bridgend.gov.uk
Local Area Energy Strategy
05
Dominant 2050 Domestic Heating Systems
Identified:
(OS data © Crown copyright and database right 2018)
www.bridgend.gov.uk
20
16
To
day
20
25
20
50
Bridgend Data
Local Area Energy
Planning
Local Area Energy
Strategy
Smart Energy Plan
(2018 – 2025)
Smart Energy Plan
delivery:
Build strategic
partnerships
Deliver innovation
projects
Stimulate the local
economy through:
•Investment
•Industry growth
Use learning from
Testing period to:
Devise future Smart
Energy Plans
Make confident
decisions
Encourage further
economic growth
Achieve 95%
reduction in CO2from buildings
Local Area Energy Strategy
04
Planning TestingFurther Testing
& Roll-Out
www.bridgend.gov.ukwww.bridgend.gov.uk07
Smart Energy Plan
Deployment/Innovative heating
projects, complementary transport,
power & digitalisation projects2025
Success:
✓ Create new decarbonisation market offerings to the consumer.
✓ Establish Bridgend as an area of Low Carbon Innovation.
✓ Attract organisations to introduce ideas & concepts to the area.
✓ Stimulate the local economy.
✓ Create the infrastructure needed for the low carbon transition.
✓ Make the wider Welsh and UK energy industry aware of learning from
projects.
www.bridgend.gov.ukwww.bridgend.gov.uk08
Smart Energy Plan: Deployment Projects
(OS data © Crown copyright and database right 2018)
www.bridgend.gov.uk
Smart Energy Plan: Innovation Projects
1. Deployment of Better Targeted Retrofit
2. Developing & testing compelling propositions for hybrid heat pumps
3. Overcoming barriers to transitioning from gas to district heating
4. Reducing costs of urban heat networks and overcoming barriers to connecting
existing homes
5. Developing & testing compelling customer propositions for electric heating
targeting potential early adopters through council services.
6. Intelligent Bridgend Energy Systems Design
06
www.bridgend.gov.ukwww.bridgend.gov.uk11
Smart Energy Plan: Innovation Project 3
Caerau Mine Water Gas-to-District Heating Transition
• Transition gas consumers in the Upper Llynfi Valley to a low carbon district
heat network.• Identify barriers and opportunities to
extending the network
• Provide key learning to inform other
similar residential retrofit schemes.
• Understand:
• Successful consumer engagement
methods.
• Commercial considerations
• Consumers’ experiences
• Can mine water provide a
commercial heat resource?
(BCBC, 2018)
www.bridgend.gov.ukwww.bridgend.gov.uk12
Smart Energy Plan: Innovation Project 4
Affordable Urban Heat Networks
• Develop innovative construction methods, products and delivery mechanisms
to reduce costs and increase efficiencies associated with district heat networks
• Utilise resources such as ETI
Heat Infrastructure
Development project
• Consider aspects relevant to
extending from urban centres
to existing residential areas.
• Focus on overcoming barriers
to connecting existing homes
to heat networks
(OS data © Crown copyright and database right 2018)
www.bridgend.gov.uk
Smart Energy Plan: Innovation Project 6
Intelligent Bridgend Energy Systems Design
www.bridgend.gov.ukwww.bridgend.gov.uk15
Smart Energy Plan: Road Map
2019 2020 2021 2022 2023 2024 2025
Deployment Project 1
Deployment Project 2
Deployment Project 3
Innovation Project 1
Innovation Project 2
Innovation Project 3
Innovation Project 4
Innovation Project 5
Innovation
Project 6
Activity A Non-Domestic Building Data
Activity B Low & Zero Carbon DH Energy Sources
Activity C Planning Policy Alignment with
Decarbonisation Strategy
Activity D Establishing Bridgend as a Centre for Innovation
Activity E Identify Power, Transport and Digitalisation Projects
Activity F Scoping Future Delivery Plans
www.bridgend.gov.ukwww.bridgend.gov.uk16
Summary
Innovation
Projects 2025Transition to
Business as
Usual2050
(ETI, 2018a)
www.bridgend.gov.uk
Thank You