FAYETTE COUNTY EROSION AND SEDIMENT
CONTROL
T he Ins and Ou t s
of L oc a l Co m p l i anc e
Bryan Keller, Environmental Programs Engineer.STORMWATER MANAGEMENT DEPARTMENT
140 Stonewall Ave. W.Suite 203Fayetteville, GA 30214
P 770-305-5410 F 770-305-5256www.fayettecountyga.gov
8/8/2019 Local Compliance
2/34
8/8/2019 Local Compliance
3/34
T he Ins and Ou t so f L oc a l Co m p l i an c e
Fayette County ES&CP Program for Compliance:
Design Review and Program Implementation Education
On Site Inspections Enforcement
8/8/2019 Local Compliance
4/34
T he Ins and Ou t s o f Loc a l Com pl i anc e
VANESSA [email protected]
Stormwater Management Department140 Stonewall Ave. W.
Suite 203
Fayetteville, GA 30214P 770-305-5410 F 770-305-5256
www.fayettecountyga.gov
BRYAN [email protected]
8/8/2019 Local Compliance
5/34
T he Ins and Ou t s o f Loc a l Com pl i anc e
Stormwater Management Department140 Stonewall Ave. W.
Suite 203
Fayetteville, GA 30214P 770-305-5410 F 770-305-5256
www.fayettecountyga.gov
DEBORAH [email protected]
NANCY [email protected]
TONY [email protected]
8/8/2019 Local Compliance
6/34
The Ins and Out s o f Loc a l Compl i anc e
Fiscal Year2011* 2010 2009 2008 2007
Building Permits Issued 33 178 163 366 498Disturbed Acres Approved 0 55.9 51.3 189.2 598.4Land Disturbance Permits 7 50 38 153 237Residential E&SC Inspections 277 1073 1210 1533 979Commercial E&SC Inspections 112 444 505 1014 1111Notice of Violations 2 34 106 276 184Stop Work Orders 0 12 66 48 29Citations 0 2 4 0 0* - 1st Quarter Only
6
Our Program Covers UnincorporatedFayette County (UCFC):
~150 Sq. Miles
~50,000 Residents
~20,000 Parcels
2 Inspectors Level 1b Cert.
8/8/2019 Local Compliance
7/34
The Ins and Out s o f Loc a l Compl i anc e
7
What Achieves Compliance in FayetteCounty?
8/8/2019 Local Compliance
8/34
The Ins and Out s o f Loc a l Com pl i ance
8
First step in gaining compliance is a good set ofplans and should include:
Easy to find contact information
All required NPDES information
Clearly Marked BMPs and associated details
Clearly marked field changes
BMP maintenance information
8/8/2019 Local Compliance
9/34
The Ins and Out s o f Loc a l Com pl i ance
9
Fayette County Educational Tools: Brochures/Packets/Forms
General Public Seminars On Site Education
Staff Training Communication
www.fayettecountyga.gov/stormwater_management
8/8/2019 Local Compliance
10/34
10
RESIDENTIAL BUILDERS PACKET
8/8/2019 Local Compliance
11/34
8/8/2019 Local Compliance
12/34
The Ins and Out s o f Loc a l Com pl i ance
How UCFC educates builders/developers forinspections:Residential:
Home builders info pack Pre Construction meeting on site
In the field meetings Written/Verbal Communication
Commercial/Infrastructure: Pre-construction meeting (formal) In the field meetings Written/Verbal Communication
12
8/8/2019 Local Compliance
13/34
The Ins and Out s o f Loc a l Compl i anc e
SITE INSPECTIONS
13
RESIDENTIAL
Goal: Three inspectionsper site
Actual: Once a month +
42 Active6 SOW (P&I)18 Expired
Commercial
Goal: One inspection perweek
Actual: One inspectionper week +
2 Active5 Non-Active/Expired
Infrastructure
Goal: Once per week
Actual: One inspectionper week +
5 Active
Fayette Countys MS4 NPDES Permit inspection requirements twoinspections during construction
8/8/2019 Local Compliance
14/34
14
Residential Inspection Log
8/8/2019 Local Compliance
15/34
The Ins and Out s o f Loc a l Com pl i ance
15
Commercial Inspection Log
8/8/2019 Local Compliance
16/34
16
Infrastructure Inspection Log
8/8/2019 Local Compliance
17/34
The Ins and Out s o f Loc a l Com pl i ance
What we look at for compliance:
The EPA Clean Water Act of 1972
The Georgia Erosion and Sedimentation Act of 1975
NPDES Permit
Fayette Countys Local Ordinance
8/8/2019 Local Compliance
18/34
The Ins and Out s o f Loc a l Com pl i ance
So what happens if a site is outof compliance?????
18
8/8/2019 Local Compliance
19/34
19
NOTICE OF
V I O L AT I O N
THIS PROJECT IS IN VIOLATION OF THE FAYETTECOUNTY S OIL EROSION AND S EDIMENTATIONCONTROL ORDINANCE . THE FOLLOWINGVIOLATION (S ) MUST BE CORRECTED BY
________________
REMOVE MUD FROM STREET INSTALL /MAINTAIN CONSTRUCTION ENTRANCE INSTALL /MAINTAIN S ILT FENCE P ROVIDE TEMPORARY S TABILIZATION (SEED & STRA REPAIR /REPLACE ALL DEFICIENT EROSION & SEDIMECONTROL MEASURES PER APPROVED PLAN AND /ORMANUAL FOR EROSION & SEDIMENT CONTROL ING EORGIA
________ NANCY HOWARD DATE ISSUED BY
CONTINUED NONCOMPLIANCE IS SUBJECT TO A STOP WORKORDER AND /OR CITATION
THIS NOTICE TO BE REMOVED BY COUNTY STAFF ONLY
Fayette County Stormwater Management Department140 Stonewall Avenue West, Suite 203, Fayetteville, GA 30214
770-305-5410
Notice of Violations:
Issued both written and verbally Can be issued for any violation
of the local ordinance
Are posted on site in visiblelocation
Violations to be corrected in 5days*
A follow up inspection isALWAYS required
8/8/2019 Local Compliance
20/34
20
STOP WORK
ORDER
THIS PROJECT IS IN VIOLATION OF THE FAYETTECOUNTY S OIL EROSION AND S EDIMENTATION
CONTROL ORDINANCE . THE FOLLOWINGVIOLATION (S ) MUST BE CORRECTED BY
________________
REMOVE MUD FROM STREET INSTALL /MAINTAIN CONSTRUCTION ENTRANCE INSTALL /MAINTAIN S ILT FENCE P ROVIDE TEMPORARY S TABILIZATION (SEED & STRAW )
REPAIR /REPLACE ALL DEFICIENT EROSION & SEDIMENTCONTROL MEASURES PER APPROVED PLAN AND /ORMANUAL FOR EROSION & S EDIMENT CONTROL INGEORGIA
________ TONY HICKS DATE ISSUED BY
CONTINUED NONCOMPLIANCE IS SUBJECT TO A CITATION
THIS NOTICE TO BE REMOVED BY COUNTY STAFF ONLY
Fayette County Stormwater Management Department140 Stonewall Avenue West, Suite 203, Fayetteville, GA 30214
770-305-5410
Stop Work Orders:
Issued both written andverbally
Are posted on site in visiblelocation
Are issued for:
Missed NOV deadline
3 NOVs for sameviolation
Sediment in statewaters
A follow up inspection is
ALWAYS required
Most Stop Work orders arefixed within 24 to 48 hoursbecause time is money!
8/8/2019 Local Compliance
21/34
The Ins and Out s o f Loc a l Com pl i ance
21
Fayette County Ordinance
Sec. 8-260. Stop-Work Orders.stop work orders shall apply to all
activity on the site with the exception ofthe installation and maintenance of
temporary or permanent erosion andsediment controls
8/8/2019 Local Compliance
22/34
The Ins and Out s o f Loc a l Com pl i ance
22
CITATIONS : Are always an option
Are a good deterrent
Can take upwards of 45 day + to get into court
Are used in Fayette County as a last resort.
8/8/2019 Local Compliance
23/34
The Ins and Out s o f Loc a l Com pl i ance
23
COMPLIANCE IS OUR GOAL!
CITATIONS IN SOME CASES DO NOTSPEED UP COMPLIANCE ISSUES.
8/8/2019 Local Compliance
24/34
8/8/2019 Local Compliance
25/34
25
8/8/2019 Local Compliance
26/34
The Ins and Out s o f Loc a l Com pl i ance
26
8/8/2019 Local Compliance
27/34
The Ins and Out s o f Loc a l Com pl i ance
27
Common non compliance issues in FayetteCounty:
Temporary stabilization
Silt (mud) in the road Maintenance of BMPs
8/8/2019 Local Compliance
28/34
The Ins and Out s o f Loc a l Com pl i ance
28
So what sites are incompliance?
8/8/2019 Local Compliance
29/34
The Ins and Out s o f Loc a l Com pl i ance
SO WHAT CAUSES NOTICE OFVIOLATIONS / STOP WORK
ORDERS / CITATIONS
8/8/2019 Local Compliance
30/34
8/8/2019 Local Compliance
31/34
The Ins and Out s o f Loc a l Com pl i ance
31
Here is an example of a violation Fayette Countyhas file with the GAEPD
Why was it filed with the GAEPD:
Violator was a repeat offender
Citations delayed in Court
Violator asked for extensions
Violator wanted a jury trial
His excuse was If they can do it I can do it!!!
8/8/2019 Local Compliance
32/34
The Ins and Out s o f Loc a l Com pl i ance
32
8/8/2019 Local Compliance
33/34
The Ins and Out s o f Loc a l Com pl i ance
33
8/8/2019 Local Compliance
34/34
The Ins and Out s o f Loc a l Com pl i ance
34
Thanks!If you have any other questions contact me, Bryan