Date post: | 15-May-2018 |
Category: |
Documents |
Upload: | nguyenquynh |
View: | 230 times |
Download: | 3 times |
LOCAL HOUSING LOAN HOUCHEKLIST.
1.Lattest pay slips(3) months
..2. form 16 latest‐2 yeas.
3.bank statement (6) months.
4.appointment letter.
5.office id card.6. pan card.
7.address proof.8.passphotos size copies (4).
TAKE OVER HOUSING LOAN CHEKLIST.
1. sanction letter 2. loan statement 3. list of document 4. four closer letter 5. outstanding letter 6.
PROPERTY REQUIRED DOCUMENTS CHECKLIST.
1.sale deed documents, 2.all link documents, 3.ghmc approval building plan &proceeding letter, 4. builder development agreement document, 5.supplymentory agreements document. 6.builder firm registration copy, 7.builder patner deedship copy, VENDOR REQUIRED DOCUMENTS: 1.pan card (id proof) 2.Address proof(voter id (or)aadhar card(or) ration card, 3.passphoto size (1) copy.
BUSINESS CHECLIST.
1.ITS Returns latest -3 years company(self attested CA).
2.ITS Returns latest -3 years Personnel(self attested CA).
3.company (3CD&3CB) -3 years copies. 4.company M.O.U. copy. 5.company firm Registration copy. 6.company business address proof telephone bill latest. 7.company PAN CARD. 8.personnal PAN CARD. 9.personal address proof. 10. company current Account Bank statement latest-3 years.11.any Bank saving Accounts
personnel's -6 months statements.12.SBI Saving Account.13.company Trading license copy.14.pass photos graphs -4 copies.
LIQUID ASSETS: 1.FD copies, NSC bonds, mutual founds, LIC copies, shares, properties,
LIABILITIES:1.company OD loans statement -1 year ,car loans statement-1 year ,Housing loans statement-1 year, personnel loan-1 year
NRI HOUSING LOAN CHECKLIST. 1. completed loan application.
2. three passport size photographs including those affixed in the loan application.
3. copy of passport including page containing visa tamping (TO BE NOTORIZED).
4. copy of valid permit( TO BE NOTORISED).
5. copy of employment contract/offer letter(and english translation duly attested by employer/consulate/embassy/our foreign office if it I in any other language).( TO BE NOTORIZED).
6. latest salary certificate/ salary slips for 3 month in original or notarized or proof of income in case of self employed/ professionals.(TO BE NOTORIZED).
7. latest credit report of individuals .(TO BE NOTORISED).
8. copy of identity card issued by the employee(TO BE NOTORISED).
9. proof of Residence (driving license /utility bill etc.)(TO BE NOTORIZED).
10. of overseas bank account for the last six months which reflect credit of salary , savings etc. and 6 months statement of NRE/NRO A /c. in India (TO BE NOTORIZED).
11. Brief write up on employment profile for the last 10 years.
12. Brief write up on the company/institution where employed i.e it con
HOME LOAN ELIGIBILITY CRITERIA
your income:2,17,000 /‐housing loan amount:64,00,000/‐tenure: (240)months,
EMI: 60,494/‐per month, (180)months EMI:67,604/‐tenure: (120)m EMI: 83,516/‐
Tenure: (300)m EMI: /‐,tenure: ( 360)m EMI: /‐ Rate interest floating : women :9.70%‐ 1crore above lacs, and men :9.75%
1.For home loan eligibility criteria:1,15,00,000/‐tenure: (240)months, EMI RS:1,08,701/‐
2. for home loan eligibility criteria:1,03,00,000/‐tenure: (180) per month EMI RS:97,691/‐pm
3.for home loan eligibility criteria:84,00,000/‐tenure: (120)month EMI RS:1,09,615/‐pm
4.for home loan eligibility criteria:,00,000/‐tenure: (300) EMI RS: /‐
5
(L
ABSTRACTFLOOR KNLINE,MDHVENKA CH
S.NO.DES
1.Supply&
Including
2.supply&
Cost of al
. for home lo
PROJE
1. RBI LTVR):90%=1
2.Projr
3.Prorc 1.your 2. flat a 3.per sf 4.wood total pr bank fo bank fo total b
thanks
T ESTIMATE FNOWN AS LEMHAPUR, SERILHALAM S%
CRIPTION
&fixing ceram
cost of all m
&fixing pre‐ la
l materials &l
an eligibility c
CT COST ELI
NAMES (Loa8,00,000/-
rct cost:20,00,0
ct cost: 75,00,0
project cost:/-
area: sft
ft price:/-
d work estimate
roject cost:/-
ounding of rati
ounding of rati
bank founding
and Regards,
FOR DDITIONAMON TREE,SYLINM PALLY, R
ic Tiles for da
aterials& lab
minated cup‐
lab our charg
criteria:,00,00
GIBILITY CRIC
an to value Rat
000/- above to
000/-above (LT
e cost:/-
o (80%) projec
o(80%) wood
project cost an
well come to S
AL WORKS INY. NO.‐‐‐‐‐‐‐‐‐‐RANGA REDDY
ado in toilets
our charges
‐boards & wa
es etc. comp
00/‐ Tenure:
CTREIA:
tio) LTVR Pro
o 75,00,000/-(L
TVR):75%
ct cost:/-
work estimate
nd wood work
SBI, any clarif
N FLAT.NO.‐‐‐‐‐‐‐,SITUATED Y ,TELANGAN
etc. complete
ardrobes, inc
plete
(360) EMI RS
oject cost:20,00
LTVR):80%
cost:/-
k cost:/-
fy please call b
‐‐‐‐,BLOCK.NOAT IMEGE H
NA,BEING PUR
QTY
e.‐‐‐‐‐‐‐ ‐‐
cluding‐‐‐‐‐‐‐
S: /
0,000/- BANK
back sir.
O.‐‐‐‐‐‐,(PHOEHOSPITAL COMRCHSED BY M
Rate
‐‐‐‐‐‐‐ ‐‐‐‐
‐‐‐‐‐‐ ‐‐‐‐‐‐
K Founding
ENIX),ON. ‐‐‐‐MMON MR. RAKESH
Per Am
‐‐‐‐‐ ‐‐‐‐‐
‐‐‐ ‐‐‐‐‐‐‐‐‐
ount.
‐‐‐‐‐
‐‐‐‐
3. module kitchen platform cabinets &labour charges ‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐
4.TV stood set in Bedrooms &labour charges ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐
Dressing in hall bedrooms& labour charges ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐
5.Hall cabinets &TV cabinets & labour charges ‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
6.Wooden partition cabinet& show case &labour charges ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
7.Pooja wood work&labour charges ‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
8.False ceiling‐designed&labour charges ‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
9.Led lighting‐fix tress&labour charges ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
10. Read racks& shoe racks&labour charges ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
11.Lappam finish &colouring to false ceiling&labour charges ‐‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐
12.Electric wiring &labour charges ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐
13.Corner cabinet &labour charges ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐
14.Croclay cabinet&labour charges ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
15.daing table all sets &labourcharges ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐
16. A.C setting&labour charges ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐
17.Cards &Beds&labour charges ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐
18.Home theater &labour charges ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total estimate cost:24,50,000/‐
NOTE: Per lac EMI Rate of interest9.85% for women’s
1. Tenure: (360)months ,per lac EMI RS: 884/‐ 2. Tenure: (300)months ,per lac EMI RS: 915/‐ 3. Tenure: (240)months ,per lac EMI RS: 971/‐ 4. Tenure: (180)months ,per lac EMI RS: 1,080/‐ 5. Tenure: (120)months ,per lac EMI RS:1,327/‐
per lac EMI Rate of interest9.90% for men’s
1. Tenure: (360)months ,per lac EMI RS: 888/‐ 2. Tenure: (300)months ,per lac EMI RS: 919/‐ 3. Tenure: (240)months ,per lac EMI RS: 974/‐ 4. Tenure: (180)months ,per lac EMI RS:1,083/‐ 5. Tenure: (120)months ,per lac EMI RS:1,327/‐
welcome to SBI.
THANKS medum AND sir,
Send by SBI home loans uppun eeti buchaiah.(m).8008423710.
Welcome to SBI Home loans.
SBI Home loan come to you on the solid foundation of trust and transparency built in the tradition of state Bank o India.
SBI HOMES LOAN now offers interest rates concession on REE HOMES.
Best practices followed in SBI mentioned bellow will tell you why it makes sense to do business with state bank of India.
1. SBI HOME LOANS unique Advantage .
2. package of Exclusive benefits.
3. Low interest rates further, they changes interest on a daily reducing balance.
4. Low processing changes .
5. No hidden costs(or) administrative charges .
6. No prepayment penalties. Reduce your interest burden and optimally utilize your surplus funds by prepaying the loan.
7. over 1,3700 branches nationalized ,
12. LOAN TO VALUE (LTV) RATIO RBI
In order to prevent excessive leveraging, the LTV ratio in respect of housing loans should not exceed 80 per cent. However, for small value housing loans i.e. housing loans up to Rs. 20 lakh (which get categorized as priority sector advances), the LTV ratio should not exceed 90 per cent.
It has been brought to our notice that banks adopt different practices for deciding the value of the house
property while sanctioning housing loans. Some banks include stamp duty, registration and other
documentation charges in the cost of the house property. This overstates the realizable value of the
property as stamp duty, registration and other documentation charges are not realizable and
consequently the margin stipulated gets diluted. Accordingly, banks should not include these charges in
the cost of the housing property they finance so that the effectiveness of LTV norms is not diluted. SBI Max Gain – Why should you choose this home saver loan? Most home loan borrowers face the dilemma of whether to use their monthly savings to prepay their loan or set
it aside for emergencies. In most cases, the extra money just sits in their savings accounts earning below par
(and taxable) interest. A home saver loan lets you have the cake and eat it too. You will be able to park this
amount in the home loan account for any number of days and pull it out anytime for your urgent needs or
regular expenses when they become due (e.g., paying kids school fees every quarter). The money thus kept in
the home loan account reduces the total interest outgo on your home loan and helps you close your loan faster.
MaxGain is a popular home saver loan product from SBI.).
We will focus exclusively on SBI MaxGain in this article. Other home saver loans listed above are quite
similar and may differ in minor details. Before we delve deeper into SBI MaxGain, let’s understand what is an
overdraft (OD) account.
What is overdraft (OD)?
An overdraft facility is a credit line provided to individuals against their assets. You can think of it as being
similar to a credit card with a limit but without the interest-free (grace) period. i.e., the interest clock starts
ticking as soon as the amount is withdrawn instead of waiting until the payment due date. The interest rate on
overdraft account is typically lower than credit card. You can withdraw money upto the sanctioned limit and
will have to repay the outstanding balance along with interest only for the duration that you utilize the money
from the account.
How is SBI Max Gain different from regular home loans?
SBI MaxGain is a home loan that is sanctioned as an OD with a limit that is equal to the approved loan
amount. Your home acts as the underlying security for the OD account. This product has the same interest rate
as the other home loans from SBI upto Rs. 1 crore (as of this writing). A premium of 0.25% is applied for
home loans above Rs. 1 crore. There is no extra charge for use of OD facility. The current account (OD) comes
with cheque book and net banking facility.
Home saver loans are suited for those individuals:
• whose earnings aren’t constant – self-employed or businessmen. At a recent real estate expo, SBI told me that MaxGain isn’t available for the self-employed and businessmen.
• who have a periodic (quarterly, semi-annual or annual) bonus or variable pay component that can be parked in the OD account.
• who have savings after paying EMI and other monthly expenses.
• NRIs and professionals with higher income.
How does monthly payment work?
A typical MaxGain account statement looks like this:
Description SBI H L MAXGAIN AUG11
Name Mr. FIRSTNAME LASTNAME
Book Balance -14,62,750.00
Available Balance 1,00,366.00
Limit 15,63,116.00
Uncleared balance 0.00
Drawing Power 15,63,116.00
Currency INR
Rate of Interest (% p.a.) 10.3%
Lien Amount 0.00
Here are a
1. Uponamou
2. Draw3. Avai
below4. Book5. Your
6. PrincPoweschedprinc
7. Intermont
8. All samoufor thexce
Here’s a c
A
We will as
from the s
account du
a few points to
n final disbursunts will reduc
wing Power =ilable Balancew (Point 5 thruk Balance = Dr monthly EM
cipal portion oer and the Limdule. Surplus cipal portion o
rest portion is th.
urplus moneyunt is kept onlhat month. Sinss amount (i.e
omparison of
Amortization
ssume that bot
chedule, the b
uring the first
o help understa
sal, your Limitce with each E
= Outstanding e = Any surpluu 8).
Drawing PoweMI will not vary
of the EMI is amit. The princiamount depos
of the EMI.
calculated aga
y parked in thely for a few dance the interese., EMI – Princ
amortization
n schedule (fi
th home loans
borrower does
24 months:
and the how m
t and DrawingEMI payment.
principal loanus amount par
er – Available y despite surpl
applied on theipal portion ofsited in the OD
ainst the Book
e home loan acays during the st is calculatedcipal – Interes
schedule (first
irst 24 month
(Clic
s have the sam
the following
monthly payme
g Power will e
n amount. rked in this ac
Balance. Thislus amount in
date of EMI pf the EMI is caD account and
k Balance on a
ccount goes tomonth, it help
d on the Book st) is added to
t 24 months on
hs only) of re
ck to enlarge)
me principal am
g deposits into
ent works:
equal the sanct
count + accru
s is shown as athe OD accou
payment and galculated as peaccrued intere
a daily basis an
owards Availabps reduce the iBalance insteathe Available
nly) of regular
egular home
)
mount, interest
(and withdraw
tioned loan am
ued interest sav
a negative (miunt.
goes to reduceer the original est savings do
nd is debited a
ble Balance. Einterest compoad of outstand Balance.
r home loan a
loan vs SBI M
t rate and tenu
wals from) his
mount. These
vings. More on
inus) amount.
e the Drawing amortization
o not alter the
at the end of th
Even if the suronent of the Eding principal,
and SBI MaxG
MaxGain
ure. As you can
s SBI MaxGai
n this
he
rplus EMI , any
Gain:
n see
in
1. Deposits a surplus amount of 2,00,000 at the beginning of month-6
2. Withdraws 1,00,000 in month-12 for his kid’s school fees
3. Withdraws 1,00,000 in month-17 for family vacation
4. Gets a salary hike and starts depositing 20,000 each month from month-18
5. Withdraws 1,20,000 in month-24 to pay his kid’s school fees
Although the borrower has withdrawn all the surplus money that he deposited at the end of month-24, he still
has interest savings (Available Balance) of 19,529.72. You cannot achieve such results using the regular home
loan.
SBI MaxGain Excel – Daily Interest Calculation
Regular Home Loan SBI MaxGain Home Loan
1 EMI includes two components: Principal and Interest.
The principal component increases and the interest
component decreases with each successive payment.
EMI remains constant throughout the loan tenure.
Same as regular home loan.
2 Principal and Interest components are calculated as per
the original amortization table.
Principal component is calculated as per the
original amortization table. The Drawing Power is
reduced by the principal amount of the EMI each
month.
Interest component, however, varies depending on
Book Balance.
3 Interest is calculated on the outstanding principal loan
amount (as in the original amortization table).
Interest is calculated on the Book Balance on a
daily basis and is debited at the end of the month.
Excess amount from the monthly payment (i.e.,
EMI – Principal – Interest), if any, is applied
towards the Available Balance.
4 Principal and Interest components are applied on the
EMI payment date itself.
Principal is applied on the EMI payment date itself
whereas Interest is debited at the end of the month.
Until then, the entire interest portion is shown as
part of the Available Balance.
5 Cannot be used like SB or current account for
outgoing transactions and bill payments.
You can use the home loan account to do funds
transfer (NEFT, RTGS etc.) and bill payments
using cheque book and net banking facility.
Available Balance is the limit for such
transactions.
6 Home loan is closed when the outstanding principal
amount is zero.
You can approach the bank to close your home
loan when the Book Balance reaches zero.
Pre-payment vs Parking Surplus Funds
Pre-Payment (in regular home loan or
MaxGain)
Parking Surplus Funds in SBI MaxGain
1 Reduces outstanding Principal Balance. Increases your Available Balance and reduces your Book
Balance.
2 Your amortisation schedule changes. You
can opt to reduce either your loan tenure or
loan EMI.
1) If you opted for lesser loan tenure, then
more of your future EMI goes towards
Principal.
2) If you opted for lesser EMI, your future
EMI (and consequently your principal and
interest portions) will reduce.
Your amortisation schedule remains unchanged. However,
more of your interest portion goes towards Available
Balance.
3 The money is gone forever. You cannot You can withdraw the surplus amount at any time. Your
amortization schedule remains unchanged. Now, less of your
undo this action. interest portion goes towards Available Balance.
4 Tax deductible under Section 80C. Interest savings are not tax deductible.
Advantanges of SBI MaxGain
Liquidity
If you make partial prepayment on your home loan, that money goes to reduce the outstanding principal and is
not available to you anymore. However, any surplus funds parked in Max Gain home loan account can be
withdrawn anytime.
However, surplus fund deposited before full disbursal or for under construction property cannot be withdrawn
until complete disbursal. Your interest outgo will reduce because of this deposit and interest saved will get
added to available balance, but you cannot withdraw till you get possession.
Interest Savings
If surplus funds are parked in the OD account, it saves interest outgo on the home loan. Helps you close the
loan faster.
Better yield than other deposit / investment products
Interest saved is interest earned . Experts recommend this product over other investment products including tax
free bonds and FD.
Instead of opening a Fixed Deposit (FD) for 1-5 years, if you park the same funds in the OD account, you will
get 1 to 3% higher savings. Note that you will be realizing this rate even if you park your funds temporarily
unlike FD where you will pay a penalty for premature withdrawal. On top of that the savings with Max Gain
are tax free.
Tax deduction
Any amount that you deposit to Max gain will not be treated as “pre-payment” under Section 80C. Hence, that
amount does not qualify for Section 80C rebate. Experts advice that you should only park amount over and
above the tax deductible interest portion. Interest saved (as shown under Available Balance) is not tax
deductible under Section 24.
STATE BANK OF INDIA :: INDIA's LARGEST BANK
https://www.sbi.co.in/user.htm 1/6
SBI HOME LOANS - LIST OF APPROVED PROJECTS
Sr.No
City /
Place
Project Name Builder Name Project Id
1 Hyderabad 1 Lakshmi Infratech India Ltd Hyd1111190
2 Hyderabad 1 Lakshmi Infratech India Ltd Ben0213283
3 Hyderabad ADITYA SILICON HEIGHTS Aditya Construction Company India(P) Ltd Hyd1387699132
4 Hyderabad APARNA SAROVAR GRANDE Aparna Infrahousing(P) Ltd Hyd1376119470
5 Hyderabad ASHVITA Mahindra Life Space Develpers Limited Hyd1389251601
6 Hyderabad Ace Atlantis Ace Constructions Hyd1413312
7 Hyderabad Aditya Eden Park-Block A & B Aditya Construction Company India(P) Ltd Hyd0512185
8 Hyderabad Aditya Empress Heights
Aditya Housing & Infrastructure Development Corporation
Pvt Ltd
Hyd111024
9 Hyderabad Aditya Imperial Heights Aditya Construction Company India(P) Ltd Hyd2911231
10 Hyderabad Aditya Sunshine Aditya Homes Pvt Ltd Hyd0113268
11 Hyderabad Alekhya - Blue Lotus Alekya Homes Hyd061192
12 Hyderabad Alekhya Towers Alekhya Constructions Ltd Hyd0111110
13 Hyderabad Aliens Space Station-1 Aliens Group Infra(P) Ltd Hyd1109100
14 Hyderabad Amity Ville Shanta Sriram Constructions(P) Ltd Hyd0711144
15 Hyderabad Aparna Aura Aparna Constructions And Estates Private Limited Hyd1513302
16 Hyderabad Aparna Cyber Commune Aparna Constructions And Estates Private Limited Hyd0411114
17 Hyderabad Aparna Cyberzon Aparna Constructions And Estate Pvt Ltd Hyd0713324
18 Hyderabad Aparna Hill Park Avenues Aparna Constructions And Estates Private Limited Hyd0811133
19 Hyderabad Aparna Hill Park Boulevard Aparna Constructions And Estates Private Limited Hyd3110280
20 Hyderabad Aparna Hill Park Gardenia Aparna Constructions And Estates Private Limited Hyd1813305
21 Hyderabad Aparna Hill Park Lake Breeze Aparna Constructions And Estates Private Limited Hyd1813304
22 Hyderabad Aparna Kanopy Aparna Sheltar
23 Hyderabad Aparna Sarovar Aparna Infrahousing(P) Ltd Hyd041195
24 Hyderabad Aparna Towers Aparna Constructions And Estates Private Limited Hyd0806107
25 Hyderabad Ark Homes Ark Builders Hyd0910105
26 Hyderabad Astonia Royale Arihant Universal Realty Pvt Ltd Mum1010633
27 Hyderabad Banyan Tree Retreat Mak Projects P Ltd., Hyd12075
28 Hyderabad Bhuvana Apartments Vasavi Nirman Hyd2112262
29 Hyderabad Bloomdale Kadakia & Modi Housing Hyd01094
30 Hyderabad Bloomfield Elation Towers Vasudeva Realtors Pvt.Ltd Hyd0811117
31 Hyderabad Bollineni Homes Bollineni Developers Limited Company Hyd1609284
32 Hyderabad Cannon Dale Rajapushpa Properties(P) Ltd Hyd0412180
33 Hyderabad Casa Paradiso Sanath Nagar Enterprises Ltd(Lodha Group) Hyd1011146
34 Hyderabad Casa Rouge Shl Ventures Hyd1211175
35 Hyderabad Cascade Greens Krupa Builde
36 Hyderabad Central Park India Bulls Wholesale Services Ltd Hyd121027
37 Hyderabad Crr Lakeside Ville Aakriti Infraprojects (P) Ltd Hyd031147
38 Hyderabad Cyber Employees Welfare Society Cyber Employees Welfare Society Hyd01109
STATE BANK OF INDIA :: INDIA's LARGEST BANK
https://www.sbi.co.in/user.htm 2/6
39 Hyderabad Cyprus Palms Srinivasa Constructions Hyd0911128
40 Hyderabad Divya Sree Shakti N.V. Rattaiah & Co Hyd031193
41 Hyderabad Domus Sneha Constructions Hyd030813
42 Hyderabad Empire Meadows Empire Meadows (P) Ltd Hyd101028
43 Hyderabad First Avenue Bhima Builders & Developers Mum011026
44 Hyderabad Fortune Casa Palace Lawns And Lords Constructions Hyd0412181
45 Hyderabad Fortune Weekend Homes Fortune Infra Development (P) Ltd Hyd1111195
46 Hyderabad Gateway Grandeur Rajyasree Constructions Hyd0412178
47 Hyderabad Gauthami Iconia Gauthami Developers Hyd3013321
48 Hyderabad Gayatri Residency Sai Surya Constructions Hyd2512223
49 Hyderabad Gharonda Jyoti Gharonda Builders And Developers Hyd101086
50 Hyderabad Girija Residency Girija Builders Pvt Ltd Hyd3013322
51 52 Hyderabad Golden Ridge Block A Andhra Infra Projects & Industries (P) Ltd Hyd2613340
53 Hyderabad Golden Ridge Block C Andhra Infra Projects & Industries (P) Ltd Hyd2613341
54 Hyderabad Golden Ridge,Block-B Andhra Infra Projects & Industries (P) Ltd Hyd0613339
55 Hyderabad Golf Edge Green Living Phoenix Living Spaces (P) Ltd Hyd021146
56 Hyderabad Golf View Theme Ambience Constructions Pvt Ltd Hyd021144
57 Hyderabad Good Earth Elements Good Earth India Infra (P) Ltd Ker0112511
58 Hyderabad Gowra Tulips Gowra Ventures (P) Ltd Hyd021143
59 Hyderabad Green Grace S&S Green Projects (P) Ltd Hyd0611113
60 Hyderabad Gurus Choice Residency Choice Infrastructure Projects (P) Ltd Hyd051184
61 Hyderabad HSR VASUDHA H S R Developers (P) Ltd Hyd1387883768
62 Hyderabad Hareram Residency A.V Constructions Hyd0212148
63 Hyderabad Harmony Heights Shanta Sriram Constructions (P) Ltd Hyd051187
64 Hyderabad Hi-Vision Residency Hi - Vision Infratech And Developers (India) Pvt. Ltd Hyd041180
65 Hyderabad Hibiscus Alekhya Design House (P) Ltd Hyd041176
66 Hyderabad Hill Park Aparna Constructions And Estates Private Limited Hyd1210109
67 Hyderabad Hill Side Residency Vengamamba Constructions Hyd0512177
68 Hyderabad Hima Sai Heights Sai Sree Developers Pvt Ltd Hyd0911132
69 Hyderabad Hmda Plots Auction-E Bidding Hyderabad Metropolitan Development Authority Hyd031129
70 Hyderabad Honey Dew Honey Dew Hyd1812230
71 Hyderabad Hsr Amrut Akash H S R Developers (P) Ltd Hyd121025
72 Hyderabad ISOLA Giridhari Homes (P) Ltd Hyd1378194750
73 Hyderabad Imperial Heights Aditya Construction Company India(P) Ltd Hyd0711119
74 Hyderabad Incor Bonsai Apartments Incor Infrastructure Pvt Ltd Hyd0610122
75 Hyderabad Indraprastha Enclave A.V Constructions Hyd1912215
76 Hyderabad Indu Aranya Indu Projects Hyd08082
77 Hyderabad Indu Fortune Fields Gardenia Indu Projects Hyd050796
78 Hyderabad Indu Fortune Fields-The Annexe
Cyberabad Hitech Integrated Township Development
Corporation(P) Ltd(Chidco)
Hyd0411131
79 Hyderabad Indus Cresttownship - Phase -I
Software Engineers Employees Housing & Welfare
Association
Hyd041172
80 Hyderabad J R Residency J.R Residency Hyd091098
81 Hyderabad JIVIKA AT RAJESHWARA Aditya Constructions (Aditya Builders) Hyd1388041561
82 Hyderabad Jains Salzburg Jain Housing & Constructions Ltd Hyd2112229
83 Hyderabad Janapriya Arcadia Janapriya Engineers Syndicate Ltd., Hyd06083
84 Hyderabad Janapriya Nile Valley Janapriya Townships Pvt Ltd Hyd12092498/8/2014 SHyderabad Gks Pri STATE BANK OF INDIA :: INDIA's LARGEST BANK
https://www.sbi.co.in/user.htm 3/6
85 Hyderabad Jhjhkhk Hiranandani Realtors Pvt Ltd., Che080958
86 Hyderabad Jyothi Anri Vamsiram Builders Hyd1912207
87 Hyderabad Jyothi Dwelling Vamsiram Builders Hyd1612208
88 Hyderabad Jyothi Lotus Vamsiram Builders Hyd1912209
89 Hyderabad Jyothi Park View Vamsiram Builders Hyd1912210
90 Hyderabad LAKSHMI SAPPHIRE LAKSMI INFRATECH Hyd1387702554
91 Hyderabad LAKSHMIS SAPPHIRE Lakshmi Infratech India Limited Hyd1387700928
92 Hyderabad LODHA MERIDIAN Lodha Healthy Constructions & Developers (P) Ltd Hyd1380452994
93 Hyderabad LORE ASVASIDH TOWERS LORE INFRA Hyd1388647461
94 Hyderabad LUXOR APARTMENTS TRISHALA INFRASTRUCTURE PVT LTD Hyd1388475836
95 Hyderabad Lakshmi Classic Lakshmi Infratech India Limited Hyd0712251
96 Hyderabad Lakshmi Royal Arch Lakshmi Infratech India Limited Hyd121020
97 Hyderabad Lakshmi Splendour Sri Gummadi Lakshmi Narayana & Gummadi Naga Sirisha Hyd2613317
98 Hyderabad Lakshmis Elegant Lakshmi Infra Properties (India) Ltd Hyd0412232
99 Hyderabad Lakshmis Majestic Plaza Lakshmi Infra Tech India Ltd Hyd021157
100 Hyderabad Lakshmis Royal Castle Lakshmi Infratech India Ltd Hyd0612189
101 Hyderabad Lakshmis Splendour Sri Gummadi Lakshmi Narayana & Gummadi Naga Sirisha Hyd1313311
102 Hyderabad Lakshmni Park View Lakshmi Constructions Hyd111021
103 Hyderabad Laxmi Nivas Andhra Infra Projects & Industries (P) Ltd Hyd0512188
104 Hyderabad Legacy Village M3v Jubilee Infrastructure (P) Ltd Hyd0611126
105 Hyderabad Legend G R K Harmony Legend Estates (P) Ltd Hyd1212270
106 Hyderabad Legend Residency A.V Constructions Hyd051185
107 Hyderabad Lemon Tree Park Vaishnavi Estates Private Limited Hyd051183
108 Hyderabad Lodha Bellezza Lodha Healthy Constructions & Developers (P) Ltd Hyd021151
109 Hyderabad Lodha Bellezza Phase 2 & 3 Lodha Healthy Constructions & Developers (P) Ltd Hyd0712253
110 Hyderabad Luxor Heights Phase-Ii Kolla Developers & Builders(P)Ltd Hyd0911134
111 Hyderabad MAYFAIR VILLAS PRANIT PROJECTS PVT LTD Hyd1389178340
112 Hyderabad MAYURI HILLS HOME CONSTRUCTIONS Hyd1385554219
113 Hyderabad Madhava Residency A.V Conde Phase-I Gk Arpl Ventures Hyd1912250
114 Hyderabad Madhu Park Ridge Madhu Infrastructure (P) Ltd Hyd0911130
115 Hyderabad Magnificent Habitat Sairaghavendra Constructions & Developers Hyd090810
116 Hyderabad Magnum Opus Magnum Infratech (India) Pvt Ltd Hyd2412260
117 Hyderabad Mahalaxmi Jewel Mahalaxmi Homes Hyd3013299
118 Hyderabad Manjeera Diamond Towers Manjeera Projects Hyd0811121
119 Hyderabad Manjeera Majestic Homes Manjeera Retail Holdings (P) Ltd Hyd051181
120 Hyderabad Manjeera Trinity Homes Manjeera Constructions Ltd Hyd041182
121 Hyderabad Mantri Celestia Mantri Developers Pvt Ltd Hyd0210213
122 Hyderabad Maram Panchavati Residency Maram Infra Projects Pvt Ltd Hyd2712261
123 Hyderabad Maruthi Green Fields Maruthi Corporation Ltd Hyd0911139
124 Hyderabad Matrixx Majestic MATRIXX BUILDERS AND DEVELOPERS Hyd1378364444
125 Hyderabad Mayuri Meadows S L N Constructions Hyd0312152
126 Hyderabad Meghana Residency A.V Constructions Hyd0613351
127 Hyderabad Metro Residency Nestcon Shelters (P) Ltd Hyd031148
128 Hyderabad Monsoon Breeze ( CanaryResidency)Umang Realtech Pvt. Ltd. Del0212174
i129 Hyderabad Movie TowersTelugu Film Producers Mutually Aided Co-OperativeHousing Scociety limitedHyd0711138
130 Hyderabad Muppas Aishwarya Muppa Homes Pvt Ltd Hyd13132908/8/2014 STATE BANK OF INDIA :: INDIA's LARGEST BANK
https://www.sbi.co.in/user.htm 4/6
131 Hyderabad My Home Abhra My Home Constructions P Ltd Hyd0513303
132 Hyderabad My Home Jewel My Home Constructions P Ltd Hyd09086
133 Hyderabad My Home Jewel Owners Share My Home Constructions P Ltd Hyd0512186
134 Hyderabad Mystic Hills Accor Buildcon India(P) Ltd Hyd0811118
135 Hyderabad Nagarjuna Residency Ncc Urban Infrastructure Limited Hyd0911145
136 Hyderabad Necklace Pride Rajlaxmi Griha Nirman Pvt.Ltd Hyd2413314
137 Hyderabad Neervi Heights Neervi Properties Pvt Ltd Hyd2013297
138 Hyderabad Nsl Sushanta Serene Estates Pvt.Ltd Hyd0811135
139 Hyderabad Ocean Heights Vaibhav Constructions Hyd121033
140 Hyderabad Open Skies Rajapushpa Properties(P) Ltd Hyd0811136
141 Hyderabad Ozone Heights Consortium Of Software Engineers Welfare Association Hy
141 Hyderabad Ozone Heights Consortium Of Software Engineers Welfare Association Hyd041177
142 Hyderabad PATELS GREEN PARK OM SREE BUILDERS & DEVELOPERS Hyd1382446367
143 Hyderabad PUSHPAK ABHAYA INFRASTRUCTURE PVT LTD Hyd1389182875
144 Hyderabad Padhamvathi Complex Valuetech Engineeringnservices (P) Ltd Hyd021142
145 Hyderabad Padmanabha Residency Shanta Sriram Constructions(P) Ltd Hyd0911129
146 Hyderabad Paramount Avenue Paramount Estates Hyd1378203842
147 Hyderabad Pbel City Pbel Property Development (India) Pvt Ltd Hyd0311103
148 Hyderabad Prajapati Elite Prajapati Developers Hyd041170
149 Hyderabad Prajapati Elite I I I Prajapati Developers Hyd1513295
150 Hyderabad Prajapati Elite Ii Prajapati Developers Hyd1513294
151 Hyderabad Prestige Royal Woods Prestage Estates & Projects (P) Limited Hyd111023
152 Hyderabad Prime Heights Prime Ventures Hyd0512193
153 Hyderabad Pristine Place Sbc Infra Projects India Pvt Ltd Hyd0908102
154 Hyderabad Pristine Place Sbc Infrastructure India Ltd Hyd090811
154 Hyderabad Pristine Place Sbc Infrastructure India Ltd Hyd090811
155 Hyderabad R L CITY SRI R L CONSTRUCTIONS Hyd1380454630
156 Hyderabad RAHUL GRANDEUR RAHUL BUILDERS & DEVELOPERS Hyd1385030569
157 Hyderabad RAIL VIHAR PHASE III Indian Railway Welfare Organisation Hyd1387885164
158 Hyderabad Rail Vihar Indian Railway Welfare Organisation Hyd121018
159 Hyderabad Rail Vihar Indian Railway Welfare Organisation Hyd121019
160 Hyderabad Rain Drops Alekya Homes Hyd051191
161 Hyderabad Rainbow Vistas @ Rock Garden Cybercity Builders & Developers (P) Ltd Hyd021149
162 Hyderabad Rambagh K.N.Infra Projects(P) Ltd Hyd0312153 163 Hyderabad Ramky Towers Ramky Infrasructure Ltd Hyd09087
164 Hyderabad Ramsri Residency Ramsri Infratech Private Limited Hyd0309106
165 Hyderabad Rc Diamond Homes Ramana Constructions Hyd2812228
166 Hyderabad Rc Green Fields Ramana Constructions Hyd031173
167 Hyderabad Rc Green Leaves Ramana Constructions Hyd031174
168 Hyderabad Reliance Kamal Reliance Builders Hyd2313301
169 Hyderabad Reliance Paradise Reliance Builders Hyd1110101
170 Hyderabad Richmond Villas Keerti Estates Pvt Ltd Hyd011175
171 Hyderabad Royal Estilo Greenfields Infra Hyd09081
172 Hyderabad Royal Home Signature Royal Home Constructions Hyd09088
173 Hyderabad Rvs Silpa Hilltop Rv Silpa Homes & Silpa Homes (P) Ltd Hyd0612192
174 Hyderabad S. No 111 Of Bahadurpally Village K.N.R. Homes Hyd051190
175 Hyderabad S.V. Enclave Sanbow Constructions Hyd1011127
176 Hyderabad SANKALP ARV VIVA SANKALP INFRA PROJECTS PVT LTD Hyd1389439562
177 Hyderabad SIORA MEADOWS SIORA INFRASTRUCTURE PVT LTD Hyd1380809649
8/8/2014 STATE BANK OF INDIA :: INDIA's LARGEST BANK
https://www.sbi.co.in/user.htm 5/6
178 Hyderabad Sai Ashray Giridhari Homes (P) Ltd Hyd051188
179 Hyderabad Sai Mitra Towers Sai Mitra Constructions Hyd041169
180 Hyderabad Sai Raghavendra Residency Rajasree Constructions Hyd051178
181 Hyderabad Sai Shanti Nivas S.S.Constructions Hyd0512182
182 Hyderabad Sai Teja Residency Sri Sai Ramanuja Constructions Hyd2812285
183 Hyderabad Sai Tirumala Towers Sai Tirumala Constructions Hyd11089
184 Hyderabad Sais 4 Square Elegant - Block -A Rishis Sai Ram Projects Pvt.Ltd Hyd0711111
185 Hyderabad Sais 4 Square Elegant - Block -B Rishis Sai Ram Projects Pvt.Ltd Hyd0711112
186 Hyderabad Saket Pranam Saket Engineers Pvt.Ltd Hyd0811123
187 Hyderabad Saket Pranam Block C Saket Engineers Pvt.Ltd Hyd2013344
188 Hyderabad Saket Sriyam Saket Engineers Pvt.Ltd Hyd0611115
189 Hyderabad Sankalp Homes Sankalp Welfare Association Hyd1110125
190 Hyderabad Sanman Belmor Sanman Homes (P) Ltd Hyd1111143
191 Hyderabad Sfgtdbd Bhima Builders & Developers Mum1011780
192 Hyderabad Shivakasi Nilayam Mvv Builders Hyd2212248
193 Hyderabad Shree Hemadurga Sivhills Brc Infra Pvt Ltd Hyd0513308
194 Hyderabad Shweta Aryan Shweta Developers Hyd0412187
195 Hyderabad Silicon City Jaithra Homes(P) Ltd Hyd0112150
196 Hyderabad Siri Balaji Towers Siri Balaji Constuctions Hyd070912
197 Hyderabad Skypx Oaks Skypx Builders Pvt Ltd Hyd0613329 198 Hyderabad Smr Hi Lands Smr Sai Teja Estates Hyd041171
199 Hyderabad Smr Vinay,Fountain Head Prithivi Estates Hyd1210104
200 Hyderabad Spring Views Exotica Sree Keerthi Constructions Hyd2212211
201 Hyderabad Sree Tarashankar Enclave Sree Keerthi Constructions Hyd0412184
202 Hyderabad Sri Homes Sri Builders&Developers Hyd0711116
203 Hyderabad Sri Siri`S Ivk Towers Inter Continental Constructions Hyd0512179
204 Hyderabad Sri Tirumala Harmony Sri Tirumala Construction Company Hyd2513291
205 Hyderabad Sri Vigneswara Residency Vigneswara Builders Hyd0112142
203 Hyderabad Sri Siri`S Ivk Towers Inter Continental Constructions Hyd0512179
204 Hyderabad Sri Tirumala Harmony Sri Tirumala Construction Company Hyd2513291
205 Hyderabad Sri Vigneswara Residency Vigneswara Builders Hyd0112142
206 Hyderabad Srihitha Heights A.V Constructions
207 Hyderabad Sumadhura,S Nakshatra Sumadhura C onstructions P Ltd Hyd100815
208 Hyderabad Sunway Opus Grand Neville-Phase- Iii(A) Sunway Opus International Pvt.Ltd Hyd0711137 209 Hyderabad Svrs Sreenilayam Svr Estates Hyd1211140 210 Hyderabad Svs Pride-C hintalapally Narasinga Rao Residency S V C onstructions Hyd2112277
211 Hyderabad Swan Lake