LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
1 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 1: Zone 2 – MB 1-107/4A Jacking Pit (24/5/18) Activity: Pipe jacking from MB 1-107/4A to MB 1-107/5 (450 mm DN)
FOTOGRAPH 2: Zone 2 – MB 1-101/1 (10/5/18) Activity: Manhole Construction
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
2 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 3: Zone 2 – MB 1-107/12 (21/5/18) Activity: Manhole Construction
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
3 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 4: ZONE 2 – Jacking Pit of River Crossing (21/5/18) Activity: Cofferdam Pit Construction
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
4 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 5: ZONE 3A – NPS 4 (20/5/18) Activity: Pump house construction.
FOTOGRAPH 6: ZONE 3A – MB 6-11 (7/5/18) Activity: Pit Construction
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
5 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 7: ZONE 3A – MB 6-30 Jacking Pit (2/5/18) Activity: Pipe jacking from MB 6-30 to MB 6-31 (1050 mm DN)
FOTOGRAPH 8: ZONE 3A – MB 6-13/2 Jacking Pit (15/5/18) Activity: Pipe jacking from MB 6-13/2 to MB 6-13/1 (225 mm DN)
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
6 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 9: ZONE 3A – MB 6-21 (15/5/18) Activity: Manhole Construction
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
7 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 10: ZONE 3A– NPS 4 (17/5/18) Activity: Installation of Mechanical Course Screen
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
8 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 11: ZONE 3B– MB 1-32 Jacking Pit (26/4/18) Activity: Pipe jacking from MB 1-32 to MB 1-31A (750 mm DN)
FOTOGRAPH 12: ZONE 3C – MB 4-01/1A Jacking Pit (15/5/18) Activity: Pipe jacking from MB 4-01/1A to MB 4-01/1 (225 mm DN)
LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)
NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11
Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)
9 | F O T O G R A P H
LOCATION : SECTION C
FOTOGRAPH 13: ZONE 3C – MB 5-19/5/1 Jacking Pit (10/5/18) Activity: Pipe jacking from MB 5-19/5/1 to MB 5-19/5 (250 mm DN)